WisDOT contract 20251111012 bid tabulation

C Kenosha, 22nd Ave; 50th St to Washington Rd (LOC STR, Kenosha County C Kenosha, 22nd Ave). Let by Wisconsin DOT on November 11, 2025, Kenosha. 5 bids received; low bid $3,670,737 by Stark Pavement Corporation.

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
190
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Stark Pavement Corporation$3,670,737Low
2A.W. Oakes & Son, Inc.$3,986,952+9.0%
3Lalonde Contractors Incorporated$4,056,787+11%
4Michels Road & Stone, Inc.$4,111,033+12%
5Zignego Company, Inc.$4,277,297+17%
WisDOT contract 20251111012: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Stark Pavement Corporation2. A.W. Oakes & Son, Inc.3. Lalonde Contractors Incorporated4. Michels Road & Stone, Inc.5. Zignego Company, Inc.
1Clearing (201.0120)ID176$10.10$55.00$35.00$52.75$10.00
2Grubbing (201.0220)ID176$50.50$25.00$5.00$22.16$50.00
3Removing concrete pavement (204.0100)SY23,370$0.02$7.00$5.98$4.00$6.89
4Removing concrete sidewalk (204.0155)SY1,713$8.85$7.00$11.14$10.00$8.00
5Removing concrete bases (204.0195)EACH3$450.00$300.00$365.00$300.00$500.00
6Removing manholes (204.0210)EACH5$451.50$550.00$447.03$1,666.00$1,666.00
7Removing inlets (204.0220)EACH37$439.16$370.00$434.81$733.00$733.00
8Removing storm sewer (size) 01. 8- inch to 15-inch (204.0245)LF1,583$23.43$25.00$23.20$14.00$14.00
9Removing storm sewer (size) 02. 18-inch to 30-inch (204.0245)LF49$79.70$25.00$78.91$14.00$14.00
10Removing (item description) 01. removing street light poles (204.9060.S)EACH34$720.40$730.00$720.40$720.40$720.40
11Excavation common (205.0100)CY15,804$24.28$13.50$19.87$16.00$25.59
12Finishing roadway (project) 01. 3832-01-71 (213.0100)EACH1$6,500.00$3,000.00$2,610.00$5,000.00$1,000.00
13Base aggregate dense 3/4-inch (305.0110)TON8$67.28$100.00$38.45$30.00$100.00
14Base aggregate dense 1 1/4-inch (305.0120)TON9,310$18.58$18.25$25.95$18.00$25.00
15Base aggregate open-graded (310.0110)TON49$37.51$40.00$37.14$28.00$28.00
16Breaker run (311.0110)TON6,466$19.88$16.00$26.60$18.00$25.00
17Concrete pavement 8-inch (415.0080)SY19,160$51.00$59.50$59.22$62.00$60.00
18Concrete pavement gaps (415.0210)EACH8$1,250.00$1,000.00$1,164.33$150.00$1,000.00
19Concrete pavement hes 8-inch (415.1080)SY310$81.50$62.00$83.52$67.00$80.00
20Concrete pavement joint filling (415.4100)SY21,560$1.30$2.00$1.61$1.80$1.50
21Drilled tie bars (416.0610)EACH209$18.00$15.00$13.71$7.00$30.00
22Drilled dowel bars (416.0620)EACH77$28.00$30.00$18.28$15.00$30.00
23Asphaltic surface patching (465.0110)TON30$285.00$400.00$285.00$370.64$330.00
24Asphaltic surface driveways and field entrances (465.0120)TON23$285.00$300.00$285.00$293.00$330.00
25Asphaltic surface temporary (465.0125)TON23$285.00$250.00$285.00$231.00$330.00
26Concrete collars for pipe (520.8000)EACH21$421.35$570.00$417.18$844.00$844.00
27Concrete curb type D (601.0110)LF15$100.00$100.00$57.30$38.00$40.00
28Concrete curb & gutter 18-inch type A (601.0405)LF60$50.00$25.00$53.90$38.00$30.00
29Concrete curb & gutter 30-inch type A (601.0409)LF7,585$22.00$21.25$27.52$23.00$27.00
30Concrete curb pedestrian (601.0600)LF43$45.50$75.00$53.40$38.00$45.00
31Concrete sidewalk 4-inch (602.0405)SF15,060$7.50$8.00$7.19$7.00$8.50
32Concrete sidewalk 6-inch (602.0415)SF3,710$8.40$8.50$8.57$8.00$9.25
33Curb ramp detectable warning field natural patina (602.0515)SF470$50.00$50.00$42.44$40.00$40.00
34Concrete driveway 6-inch (602.0810)SY911$52.25$70.00$79.18$72.00$62.00
35Concrete driveway 8-inch (602.0820)SY206$64.55$75.00$98.32$74.00$65.00
36Concrete driveway hes 8-inch (602.0870)SY126$69.50$80.00$101.25$77.00$70.00
37Storm sewer pipe reinforced concrete class V 12-inch (608.0512)LF1,568$89.36$102.00$88.48$96.00$96.00
38Storm sewer pipe reinforced concrete class V 15-inch (608.0515)LF181$93.12$150.00$92.20$232.00$232.00
39Storm sewer pipe reinforced concrete class V 18-inch (608.0518)LF16$162.67$165.00$161.06$554.00$554.00
40Storm sewer pipe reinforced concrete class V 21-inch (608.0521)LF8$169.28$200.00$167.60$535.00$535.00
41Storm sewer pipe reinforced concrete class V 24-inch (608.0524)LF24$146.01$225.00$144.56$435.00$435.00
42Reconstructing manholes (611.0420)EACH4$1,776.16$2,500.00$1,758.57$1,120.00$1,120.00
43Inlet covers type DW (611.0613)EACH2$792.92$1,100.00$785.07$1,050.00$1,050.00
44Inlet covers type H (611.0624)EACH28$680.88$1,050.00$674.14$998.00$998.00
45Inlet covers type H-S (611.0639)EACH16$684.40$1,050.00$677.62$998.00$998.00
46Manholes 4-FT diameter (611.2004)EACH6$2,277.18$5,000.00$2,254.63$2,715.00$2,715.00
47Manholes 5-FT diameter (611.2005)EACH2$2,844.38$6,300.00$2,816.22$3,358.00$3,358.00
48Inlets 4-FT diameter (611.3004)EACH4$2,049.36$3,400.00$2,029.07$2,772.00$2,772.00
49Inlets 2X3-FT (611.3230)EACH44$1,464.36$2,750.00$1,449.86$1,727.00$1,727.00
50Pipe underdrain 6-inch (612.0106)LF700$29.66$30.00$29.37$26.00$26.00
51Mobilization (619.1000)EACH1$146,374$147,000$106,207$371,741$127,000
52Concrete median sloped nose (620.0300)SF29$85.50$15.00$25.52$12.00$16.00
53Dust control surface treatment (623.0200)SY27,000$0.05$0.01$0.01$0.01$0.01
54Water (624.0100)MGAL190$41.40$35.00$56.20$40.00$100.00
55Topsoil (625.0100)SY5,164$6.80$6.80$6.80$7.00$5.25
56Mulching (627.0200)SY5,164$0.01$0.01$0.01$0.25$0.55
57Mobilizations erosion control (628.1905)EACH6$50.00$50.00$50.00$200.00$150.00
58Mobilizations emergency erosion control (628.1910)EACH5$1.00$1.00$1.00$225.00$150.00
59Soil stabilizer type B (628.6510)ACRE0.30$0.01$0.01$0.10$1,800.00$1,000.00
60Inlet protection type A (628.7005)EACH67$50.00$60.00$50.00$80.00$95.00
61Inlet protection type B (628.7010)EACH22$50.00$60.00$50.00$75.00$55.00
62Inlet protection type C (628.7015)EACH74$70.00$75.00$70.00$55.00$58.00
63Inlet protection type D (628.7020)EACH25$130.00$150.00$130.00$120.00$85.00
64Tracking pads (628.7560)EACH5$1.03$0.01$1,661.00$100.00$1,000.00
65Fertilizer type B (629.0210)CWT3$80.00$100.00$80.00$100.00$90.00
66Seeding temporary (630.0200)LB139$0.01$0.01$0.01$4.50$3.75
67Sod water (631.0300)MGAL116$15.00$15.00$15.00$25.00$45.00
68Sod lawn (631.1000)SY5,164$8.00$8.25$8.00$9.25$7.75
69Signs type II reflective H (637.2210)SF292.30$22.00$22.50$22.00$25.00$24.00
70Signs type II reflective H folding (637.2215)SF15.54$27.00$28.00$27.00$30.00$35.00
71Moving signs type II (638.2102)EACH10$60.00$75.00$60.00$70.00$115.00
72Removing signs type II (638.2602)EACH67$12.00$15.00$12.00$30.00$35.00
73Removing small sign supports (638.3000)EACH27$12.00$15.00$12.00$30.00$35.00
74Field office type B (642.5001)EACH1$18,000$20,000$20,810$10,000$20,000
75Traffic control drums (643.0300)DAY35,889$0.15$0.20$0.15$0.15$0.15
76Traffic control barricades type III (643.0420)DAY24,314$0.36$0.40$0.36$0.36$0.36
77Traffic control warning lights type A (643.0705)DAY48,628$0.08$0.10$0.08$0.08$0.08
78Traffic control warning lights type C (643.0715)DAY6,325$0.13$0.15$0.13$0.13$0.13
79Traffic control connected arrow boards (643.0810)DAY192$7.71$7.75$7.71$7.71$7.71
80Traffic control signs (643.0900)DAY53,422$0.24$0.25$0.24$0.24$0.24
81Traffic control covering signs type II (643.0920)EACH4$151.48$155.00$151.48$151.48$151.48
82Traffic control signs fixed message (643.1000)SF82.50$18.18$18.50$18.18$18.18$18.18
83Traffic control signs PCMS (643.1050)DAY14$68.37$70.00$68.37$68.37$68.37
84Temporary marking line paint 4- inch (643.3105)LF3,484$0.56$0.75$0.56$0.56$0.56
85Temporary marking line removable tape 4-inch (643.3150)LF4,121$2.22$2.25$2.22$2.22$2.22
86Temporary marking line paint 6- inch (643.3165)LF60$0.84$1.00$0.84$0.84$0.84
87Temporary marking line removable tape 6-inch (643.3180)LF2,846$2.43$2.50$2.43$2.43$2.43
88Temporary marking line paint 8- inch (643.3205)LF193$1.12$1.25$1.12$1.12$1.12
89Temporary marking line removable tape 8-inch (643.3250)LF117$10.86$11.00$10.86$10.86$10.86
90Temporary marking crosswalk removable tape 6-inch (643.3350)LF670$2.16$2.50$2.16$2.16$2.16
91Temporary marking arrow removable tape (643.3550)EACH4$273.91$280.00$273.91$273.91$273.91
92Temporary marking stop line removable tape 18-inch (643.3850)LF71$8.56$8.75$8.56$8.56$8.56
93Traffic control (643.5000)EACH1$9,119.84$10,000$9,119.84$9,119.84$9,119.84
94Temporary pedestrian surface matting (644.1440)SF365$2.77$3.00$2.77$0.01$2.77
95Temporary pedestrian curb ramp (644.1601)DAY232$11.54$12.00$11.54$0.01$11.54
96Temporary pedestrian detectable warning field (644.1605)SF160$6.22$6.50$6.22$0.01$6.22
97Temporary pedestrian barricade (644.1810)LF2,448$4.31$4.50$4.31$0.01$4.31
98Temporary audible message devices (644.1900.S)DAY4,136$0.88$1.00$0.88$0.01$0.88
99Geotextile type DF schedule A (645.0111)SY308$3.05$4.00$3.02$2.00$2.00
100Geogrid type SR (645.0220)SY10,130$2.38$2.00$1.79$2.00$2.00
101Marking line epoxy 4-inch (646.1020)LF21,132$0.55$0.60$0.55$0.55$0.55
102Marking line epoxy 8-inch (646.3020)LF931$0.80$1.00$0.80$0.80$0.80
103Marking arrow paint (646.5005)EACH1$285.00$300.00$285.00$285.00$285.00
104Marking arrow epoxy (646.5020)EACH37$285.00$300.00$285.00$285.00$285.00
105Marking symbol epoxy (646.5220)EACH21$255.00$375.00$255.00$255.00$255.00
106Marking stop line epoxy 18-inch (646.6120)LF344$11.45$12.00$11.45$11.45$11.45
107Marking diagonal epoxy 12-inch (646.7120)LF122$10.10$10.50$10.10$10.10$10.10
108Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,229$8.65$9.00$8.65$8.65$8.65
109Marking crosswalk epoxy block style 24-inch (646.7520)LF276$12.80$13.00$12.80$12.80$12.80
110Marking removal line 4-inch (646.9000)LF1,498$0.96$1.00$0.96$0.96$0.96
111Marking removal line 6-inch (646.9002)LF37$1.99$2.00$1.99$1.99$1.99
112Marking removal line 8-inch (646.9100)LF155$2.64$2.75$2.64$2.64$2.64
113Marking removal line wide (646.9200)LF68$3.97$4.00$3.97$3.97$3.97
114Marking removal special marking (646.9300)EACH8$68.41$70.00$68.41$68.41$68.41
115Construction staking storm sewer (650.4000)EACH56$70.85$100.00$70.85$125.00$70.85
116Construction staking subgrade (650.4500)LF3,656$2.30$0.01$2.30$0.01$2.30
117Construction staking concrete pavement (650.7000)LF3,656$1.00$1.00$1.00$2.25$1.00
118Construction staking electrical installations (project) 01. 3832-01- 71 (650.8501)EACH1$4,400.00$5,000.00$4,400.00$5,000.00$4,400.00
119Construction staking curb ramps (650.9000)EACH44$138.00$100.00$138.00$150.00$138.00
120Construction staking sidewalk (project) 01. 3832-01-71 (650.9500)EACH1$3,840.00$2,000.00$3,840.00$5,000.00$3,840.00
121Construction staking supplemental control (project) 01. 3832-01-71 (650.9911)EACH1$2,590.00$6,500.00$2,590.00$5,000.00$2,590.00
122Construction staking slope stakes (650.9920)LF3,656$1.10$0.01$1.10$1.00$1.10
123Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF3,502$7.62$7.75$7.62$7.62$7.62
124Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF1,027$8.80$9.00$8.80$8.80$8.80
125Pull boxes steel 24X36-inch (653.0135)EACH1$1,132.00$1,200.00$1,132.00$1,132.00$1,132.00
126Pull boxes steel 24X42-inch (653.0140)EACH17$1,221.00$1,225.00$1,221.00$1,221.00$1,221.00
127Removing pull boxes (653.0905)EACH1$88.00$90.00$88.00$88.00$88.00
128Concrete bases type 1 (654.0101)EACH3$993.00$1,000.00$993.00$993.00$993.00
129Concrete bases type 2 (654.0102)EACH5$1,220.00$1,250.00$1,220.00$1,220.00$1,220.00
130Concrete bases type 5 (654.0105)EACH28$1,123.00$1,150.00$1,123.00$1,123.00$1,123.00
131Concrete control cabinet bases type 9 special (654.0217)EACH1$2,532.00$2,600.00$2,532.00$2,532.00$2,532.00
132Concrete control cabinet bases type L30 (654.0230)EACH1$2,360.00$2,400.00$2,360.00$2,360.00$2,360.00
133Cable traffic signal 5-14 AWG (655.0230)LF560$2.07$2.10$2.07$2.07$2.07
134Cable traffic signal 12-14 AWG (655.0260)LF1,138$3.67$3.75$3.67$3.67$3.67
135Cable type UF 2-10 AWG grounded (655.0320)LF244$2.12$2.15$2.12$2.12$2.12
136Electrical wire traffic signals 10 AWG (655.0515)LF999$1.50$1.50$1.50$1.50$1.50
137Electrical wire lighting 12 AWG (655.0610)LF4,131$1.10$1.15$1.10$1.10$1.10
138Electrical wire lighting 10 AWG (655.0615)LF690$1.50$1.50$1.50$1.50$1.50
139Electrical wire lighting 8 AWG (655.0620)LF19,250$1.70$1.75$1.70$1.70$1.70
140Electrical wire lighting 2 AWG (655.0635)LF30$6.40$6.50$6.40$6.40$6.40
141Electrical service meter breaker pedestal (location) 01. 22ND avenue & 45TH street (656.0201)EACH1$1,580.00$1,600.00$1,580.00$1,580.00$1,580.00
142Electrical service meter breaker pedestal (location) 02. 22ND avenue & 43RD street (656.0201)EACH1$1,580.00$1,600.00$1,580.00$1,580.00$1,580.00
143Pedestal bases (657.0100)EACH3$238.00$250.00$238.00$238.00$238.00
144Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH31$600.00$625.00$600.00$600.00$600.00
145Poles type 2 (657.0305)EACH2$2,229.00$2,300.00$2,229.00$2,229.00$2,229.00
146Poles type 3 (657.0310)EACH2$4,045.00$4,100.00$4,045.00$4,045.00$4,045.00
147Poles type 4 (657.0315)EACH1$2,425.00$2,500.00$2,425.00$2,425.00$2,425.00
148Poles type 5-aluminum (657.0322)EACH28$2,215.80$2,300.00$2,215.80$2,215.80$2,215.80
149Traffic signal standards aluminum 13-FT (657.0420)EACH3$526.00$550.00$526.00$526.00$526.00
150Trombone arms 20-FT (657.0590)EACH2$1,465.00$1,500.00$1,465.00$1,465.00$1,465.00
151Trombone arms 25-FT (657.0595)EACH1$1,817.00$1,900.00$1,817.00$1,817.00$1,817.00
152Luminaire arms single member 4- inch clamp 8-FT (657.0614)EACH3$268.00$275.00$268.00$268.00$268.00
153Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH28$277.00$285.00$277.00$277.00$277.00
154Traffic signal face 3S 12-inch (658.0173)EACH11$914.00$1,000.00$914.00$914.00$914.00
155Traffic signal face 4S 12-inch (658.0174)EACH2$1,232.00$1,300.00$1,232.00$1,232.00$1,232.00
156Pedestrian signal face 16-inch (658.0416)EACH8$610.00$650.00$610.00$610.00$610.00
157Pedestrian push buttons (658.0500)EACH6$428.80$450.00$428.80$428.80$428.80
158Signal mounting hardware (location) 01. 22ND avenue & 45TH street (658.5070)EACH1$4,646.00$4,700.00$4,646.00$4,646.00$4,646.00
159Lighting control cabinets 120/240 30-inch (659.2130)EACH1$9,533.00$9,600.00$9,533.00$9,533.00$9,533.00
160Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH17$4.80$5.00$4.80$4.80$4.80
161Sawing asphalt (690.0150)LF143$2.00$1.50$1.75$1.39$1.39
162Sawing concrete (690.0250)LF5,721$2.10$2.00$2.55$1.85$1.85
163Incentive compressive strength concrete pavement (715.0720)DOL5,840$1.00$1.00$1.00$1.00$1.00
164Incentive iri ride (740.0440)DOL5,539$1.00$1.00$1.00$1.00$1.00
165On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS800$5.00$5.00$5.00$5.00$5.00
166On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,100$5.00$5.00$5.00$5.00$5.00
167Special 01. 2 3/8-inch OD, 16 GA galvanized poles, 12-FT (SPV.0060)EACH32$150.00$160.00$150.00$125.00$250.00
168Special 02. 2 3/8-inch OD, 16 GA galvanized poles, 8-FT (SPV.0060)EACH3$130.00$150.00$130.00$100.00$235.00
169Special 03. 30-inch round V-loc (SPV.0060)EACH41$99.00$100.00$99.00$120.00$150.00
170Special 04. 2 3/8-inch Z-bracket, single sided, round, pair (SPV.0060)EACH44$10.00$15.00$10.00$10.00$55.00
171Special 05. salvage and reinstall city owned bus route signs (SPV.0060)EACH8$55.00$60.00$55.00$100.00$150.00
172Special 06. manhole cover storm (SPV.0060)EACH17$733.96$1,500.00$726.69$1,124.00$1,124.00
173Special 07. inlet covers type CH (SPV.0060)EACH7$647.28$1,000.00$640.87$969.00$969.00
174Special 08. storm sewer tap (SPV.0060)EACH12$1,312.93$475.00$1,299.93$1.00$1.00
175Special 09. sealing manhole openings (SPV.0060)EACH11$688.82$320.00$682.00$338.00$338.00
176Special 10. maintenance of lighting (SPV.0060)EACH1$14,725$15,000$14,725$14,725$14,725
177Special 11. luminaires utility LED 80 watts (SPV.0060)EACH31$493.60$500.00$493.60$493.60$493.60
178Special 12. remove existing lighting cabinet (SPV.0060)EACH1$1,122.00$1,200.00$1,122.00$1,122.00$1,122.00
179Special 13. remove traffic signals 22ND avenue & 45TH street (SPV.0060)EACH1$5,610.00$5,700.00$5,610.00$5,610.00$5,610.00
180Special 14. traffic signal cabinet and controller 22ND avenue & 45TH street (SPV.0060)EACH1$29,608$30,000$29,608$29,608$29,608
181Special 15. radar sensor system 22ND avenue & 45TH street (SPV.0060)EACH1$31,180$32,000$31,180$31,180$31,180
182Special 16. emergency vehicle preemption 22ND avenue & 45TH street (SPV.0060)EACH1$10,735$11,000$10,735$10,735$10,735
183Special 17. adjusting water valve covers (SPV.0060)EACH19$328.23$345.00$324.98$324.00$324.00
184Special 18. adjusting curb boxes (SPV.0060)EACH83$164.11$285.00$162.49$167.00$167.00
185Special 19. adjusting sanitary sewer manhole covers (SPV.0060)EACH15$1,767.80$1,875.00$1,750.30$1,265.00$1,265.00
186Special 20. relocating stone monuments (SPV.0060)EACH2$3,000.00$2,000.00$1,652.00$1,000.00$4,480.00
187Special 21. laminated no parking signs and property owner notifications (SPV.0060)EACH1$4,500.00$4,000.00$2,276.00$1,000.00$1,000.00
188Special 22. section corner monuments (SPV.0060)EACH1$1,500.00$500.00$1,927.00$500.00$1,000.00
189Special 01. PVC pipe 6-inch (SPV.0090)LF8$82.06$100.00$81.25$386.00$386.00
190Special 01. management of solid waste (SPV.0195)TON611$52.79$52.20$82.21$55.00$100.00
WisDOT contract 20251111012: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy