WisDOT contract 20251111012 bid tabulation
C Kenosha, 22nd Ave; 50th St to Washington Rd (LOC STR, Kenosha County C Kenosha, 22nd Ave). Let by Wisconsin DOT on November 11, 2025, Kenosha. 5 bids received; low bid $3,670,737 by Stark Pavement Corporation.
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 190
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stark Pavement Corporation | $3,670,737 | Low |
| 2 | A.W. Oakes & Son, Inc. | $3,986,952 | +9.0% |
| 3 | Lalonde Contractors Incorporated | $4,056,787 | +11% |
| 4 | Michels Road & Stone, Inc. | $4,111,033 | +12% |
| 5 | Zignego Company, Inc. | $4,277,297 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stark Pavement Corporation | 2. A.W. Oakes & Son, Inc. | 3. Lalonde Contractors Incorporated | 4. Michels Road & Stone, Inc. | 5. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 176 | $10.10 | $55.00 | $35.00 | $52.75 | $10.00 |
| 2 | Grubbing (201.0220) | ID | 176 | $50.50 | $25.00 | $5.00 | $22.16 | $50.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 23,370 | $0.02 | $7.00 | $5.98 | $4.00 | $6.89 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 1,713 | $8.85 | $7.00 | $11.14 | $10.00 | $8.00 |
| 5 | Removing concrete bases (204.0195) | EACH | 3 | $450.00 | $300.00 | $365.00 | $300.00 | $500.00 |
| 6 | Removing manholes (204.0210) | EACH | 5 | $451.50 | $550.00 | $447.03 | $1,666.00 | $1,666.00 |
| 7 | Removing inlets (204.0220) | EACH | 37 | $439.16 | $370.00 | $434.81 | $733.00 | $733.00 |
| 8 | Removing storm sewer (size) 01. 8- inch to 15-inch (204.0245) | LF | 1,583 | $23.43 | $25.00 | $23.20 | $14.00 | $14.00 |
| 9 | Removing storm sewer (size) 02. 18-inch to 30-inch (204.0245) | LF | 49 | $79.70 | $25.00 | $78.91 | $14.00 | $14.00 |
| 10 | Removing (item description) 01. removing street light poles (204.9060.S) | EACH | 34 | $720.40 | $730.00 | $720.40 | $720.40 | $720.40 |
| 11 | Excavation common (205.0100) | CY | 15,804 | $24.28 | $13.50 | $19.87 | $16.00 | $25.59 |
| 12 | Finishing roadway (project) 01. 3832-01-71 (213.0100) | EACH | 1 | $6,500.00 | $3,000.00 | $2,610.00 | $5,000.00 | $1,000.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 8 | $67.28 | $100.00 | $38.45 | $30.00 | $100.00 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 9,310 | $18.58 | $18.25 | $25.95 | $18.00 | $25.00 |
| 15 | Base aggregate open-graded (310.0110) | TON | 49 | $37.51 | $40.00 | $37.14 | $28.00 | $28.00 |
| 16 | Breaker run (311.0110) | TON | 6,466 | $19.88 | $16.00 | $26.60 | $18.00 | $25.00 |
| 17 | Concrete pavement 8-inch (415.0080) | SY | 19,160 | $51.00 | $59.50 | $59.22 | $62.00 | $60.00 |
| 18 | Concrete pavement gaps (415.0210) | EACH | 8 | $1,250.00 | $1,000.00 | $1,164.33 | $150.00 | $1,000.00 |
| 19 | Concrete pavement hes 8-inch (415.1080) | SY | 310 | $81.50 | $62.00 | $83.52 | $67.00 | $80.00 |
| 20 | Concrete pavement joint filling (415.4100) | SY | 21,560 | $1.30 | $2.00 | $1.61 | $1.80 | $1.50 |
| 21 | Drilled tie bars (416.0610) | EACH | 209 | $18.00 | $15.00 | $13.71 | $7.00 | $30.00 |
| 22 | Drilled dowel bars (416.0620) | EACH | 77 | $28.00 | $30.00 | $18.28 | $15.00 | $30.00 |
| 23 | Asphaltic surface patching (465.0110) | TON | 30 | $285.00 | $400.00 | $285.00 | $370.64 | $330.00 |
| 24 | Asphaltic surface driveways and field entrances (465.0120) | TON | 23 | $285.00 | $300.00 | $285.00 | $293.00 | $330.00 |
| 25 | Asphaltic surface temporary (465.0125) | TON | 23 | $285.00 | $250.00 | $285.00 | $231.00 | $330.00 |
| 26 | Concrete collars for pipe (520.8000) | EACH | 21 | $421.35 | $570.00 | $417.18 | $844.00 | $844.00 |
| 27 | Concrete curb type D (601.0110) | LF | 15 | $100.00 | $100.00 | $57.30 | $38.00 | $40.00 |
| 28 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 60 | $50.00 | $25.00 | $53.90 | $38.00 | $30.00 |
| 29 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 7,585 | $22.00 | $21.25 | $27.52 | $23.00 | $27.00 |
| 30 | Concrete curb pedestrian (601.0600) | LF | 43 | $45.50 | $75.00 | $53.40 | $38.00 | $45.00 |
| 31 | Concrete sidewalk 4-inch (602.0405) | SF | 15,060 | $7.50 | $8.00 | $7.19 | $7.00 | $8.50 |
| 32 | Concrete sidewalk 6-inch (602.0415) | SF | 3,710 | $8.40 | $8.50 | $8.57 | $8.00 | $9.25 |
| 33 | Curb ramp detectable warning field natural patina (602.0515) | SF | 470 | $50.00 | $50.00 | $42.44 | $40.00 | $40.00 |
| 34 | Concrete driveway 6-inch (602.0810) | SY | 911 | $52.25 | $70.00 | $79.18 | $72.00 | $62.00 |
| 35 | Concrete driveway 8-inch (602.0820) | SY | 206 | $64.55 | $75.00 | $98.32 | $74.00 | $65.00 |
| 36 | Concrete driveway hes 8-inch (602.0870) | SY | 126 | $69.50 | $80.00 | $101.25 | $77.00 | $70.00 |
| 37 | Storm sewer pipe reinforced concrete class V 12-inch (608.0512) | LF | 1,568 | $89.36 | $102.00 | $88.48 | $96.00 | $96.00 |
| 38 | Storm sewer pipe reinforced concrete class V 15-inch (608.0515) | LF | 181 | $93.12 | $150.00 | $92.20 | $232.00 | $232.00 |
| 39 | Storm sewer pipe reinforced concrete class V 18-inch (608.0518) | LF | 16 | $162.67 | $165.00 | $161.06 | $554.00 | $554.00 |
| 40 | Storm sewer pipe reinforced concrete class V 21-inch (608.0521) | LF | 8 | $169.28 | $200.00 | $167.60 | $535.00 | $535.00 |
| 41 | Storm sewer pipe reinforced concrete class V 24-inch (608.0524) | LF | 24 | $146.01 | $225.00 | $144.56 | $435.00 | $435.00 |
| 42 | Reconstructing manholes (611.0420) | EACH | 4 | $1,776.16 | $2,500.00 | $1,758.57 | $1,120.00 | $1,120.00 |
| 43 | Inlet covers type DW (611.0613) | EACH | 2 | $792.92 | $1,100.00 | $785.07 | $1,050.00 | $1,050.00 |
| 44 | Inlet covers type H (611.0624) | EACH | 28 | $680.88 | $1,050.00 | $674.14 | $998.00 | $998.00 |
| 45 | Inlet covers type H-S (611.0639) | EACH | 16 | $684.40 | $1,050.00 | $677.62 | $998.00 | $998.00 |
| 46 | Manholes 4-FT diameter (611.2004) | EACH | 6 | $2,277.18 | $5,000.00 | $2,254.63 | $2,715.00 | $2,715.00 |
| 47 | Manholes 5-FT diameter (611.2005) | EACH | 2 | $2,844.38 | $6,300.00 | $2,816.22 | $3,358.00 | $3,358.00 |
| 48 | Inlets 4-FT diameter (611.3004) | EACH | 4 | $2,049.36 | $3,400.00 | $2,029.07 | $2,772.00 | $2,772.00 |
| 49 | Inlets 2X3-FT (611.3230) | EACH | 44 | $1,464.36 | $2,750.00 | $1,449.86 | $1,727.00 | $1,727.00 |
| 50 | Pipe underdrain 6-inch (612.0106) | LF | 700 | $29.66 | $30.00 | $29.37 | $26.00 | $26.00 |
| 51 | Mobilization (619.1000) | EACH | 1 | $146,374 | $147,000 | $106,207 | $371,741 | $127,000 |
| 52 | Concrete median sloped nose (620.0300) | SF | 29 | $85.50 | $15.00 | $25.52 | $12.00 | $16.00 |
| 53 | Dust control surface treatment (623.0200) | SY | 27,000 | $0.05 | $0.01 | $0.01 | $0.01 | $0.01 |
| 54 | Water (624.0100) | MGAL | 190 | $41.40 | $35.00 | $56.20 | $40.00 | $100.00 |
| 55 | Topsoil (625.0100) | SY | 5,164 | $6.80 | $6.80 | $6.80 | $7.00 | $5.25 |
| 56 | Mulching (627.0200) | SY | 5,164 | $0.01 | $0.01 | $0.01 | $0.25 | $0.55 |
| 57 | Mobilizations erosion control (628.1905) | EACH | 6 | $50.00 | $50.00 | $50.00 | $200.00 | $150.00 |
| 58 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $1.00 | $1.00 | $1.00 | $225.00 | $150.00 |
| 59 | Soil stabilizer type B (628.6510) | ACRE | 0.30 | $0.01 | $0.01 | $0.10 | $1,800.00 | $1,000.00 |
| 60 | Inlet protection type A (628.7005) | EACH | 67 | $50.00 | $60.00 | $50.00 | $80.00 | $95.00 |
| 61 | Inlet protection type B (628.7010) | EACH | 22 | $50.00 | $60.00 | $50.00 | $75.00 | $55.00 |
| 62 | Inlet protection type C (628.7015) | EACH | 74 | $70.00 | $75.00 | $70.00 | $55.00 | $58.00 |
| 63 | Inlet protection type D (628.7020) | EACH | 25 | $130.00 | $150.00 | $130.00 | $120.00 | $85.00 |
| 64 | Tracking pads (628.7560) | EACH | 5 | $1.03 | $0.01 | $1,661.00 | $100.00 | $1,000.00 |
| 65 | Fertilizer type B (629.0210) | CWT | 3 | $80.00 | $100.00 | $80.00 | $100.00 | $90.00 |
| 66 | Seeding temporary (630.0200) | LB | 139 | $0.01 | $0.01 | $0.01 | $4.50 | $3.75 |
| 67 | Sod water (631.0300) | MGAL | 116 | $15.00 | $15.00 | $15.00 | $25.00 | $45.00 |
| 68 | Sod lawn (631.1000) | SY | 5,164 | $8.00 | $8.25 | $8.00 | $9.25 | $7.75 |
| 69 | Signs type II reflective H (637.2210) | SF | 292.30 | $22.00 | $22.50 | $22.00 | $25.00 | $24.00 |
| 70 | Signs type II reflective H folding (637.2215) | SF | 15.54 | $27.00 | $28.00 | $27.00 | $30.00 | $35.00 |
| 71 | Moving signs type II (638.2102) | EACH | 10 | $60.00 | $75.00 | $60.00 | $70.00 | $115.00 |
| 72 | Removing signs type II (638.2602) | EACH | 67 | $12.00 | $15.00 | $12.00 | $30.00 | $35.00 |
| 73 | Removing small sign supports (638.3000) | EACH | 27 | $12.00 | $15.00 | $12.00 | $30.00 | $35.00 |
| 74 | Field office type B (642.5001) | EACH | 1 | $18,000 | $20,000 | $20,810 | $10,000 | $20,000 |
| 75 | Traffic control drums (643.0300) | DAY | 35,889 | $0.15 | $0.20 | $0.15 | $0.15 | $0.15 |
| 76 | Traffic control barricades type III (643.0420) | DAY | 24,314 | $0.36 | $0.40 | $0.36 | $0.36 | $0.36 |
| 77 | Traffic control warning lights type A (643.0705) | DAY | 48,628 | $0.08 | $0.10 | $0.08 | $0.08 | $0.08 |
| 78 | Traffic control warning lights type C (643.0715) | DAY | 6,325 | $0.13 | $0.15 | $0.13 | $0.13 | $0.13 |
| 79 | Traffic control connected arrow boards (643.0810) | DAY | 192 | $7.71 | $7.75 | $7.71 | $7.71 | $7.71 |
| 80 | Traffic control signs (643.0900) | DAY | 53,422 | $0.24 | $0.25 | $0.24 | $0.24 | $0.24 |
| 81 | Traffic control covering signs type II (643.0920) | EACH | 4 | $151.48 | $155.00 | $151.48 | $151.48 | $151.48 |
| 82 | Traffic control signs fixed message (643.1000) | SF | 82.50 | $18.18 | $18.50 | $18.18 | $18.18 | $18.18 |
| 83 | Traffic control signs PCMS (643.1050) | DAY | 14 | $68.37 | $70.00 | $68.37 | $68.37 | $68.37 |
| 84 | Temporary marking line paint 4- inch (643.3105) | LF | 3,484 | $0.56 | $0.75 | $0.56 | $0.56 | $0.56 |
| 85 | Temporary marking line removable tape 4-inch (643.3150) | LF | 4,121 | $2.22 | $2.25 | $2.22 | $2.22 | $2.22 |
| 86 | Temporary marking line paint 6- inch (643.3165) | LF | 60 | $0.84 | $1.00 | $0.84 | $0.84 | $0.84 |
| 87 | Temporary marking line removable tape 6-inch (643.3180) | LF | 2,846 | $2.43 | $2.50 | $2.43 | $2.43 | $2.43 |
| 88 | Temporary marking line paint 8- inch (643.3205) | LF | 193 | $1.12 | $1.25 | $1.12 | $1.12 | $1.12 |
| 89 | Temporary marking line removable tape 8-inch (643.3250) | LF | 117 | $10.86 | $11.00 | $10.86 | $10.86 | $10.86 |
| 90 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 670 | $2.16 | $2.50 | $2.16 | $2.16 | $2.16 |
| 91 | Temporary marking arrow removable tape (643.3550) | EACH | 4 | $273.91 | $280.00 | $273.91 | $273.91 | $273.91 |
| 92 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 71 | $8.56 | $8.75 | $8.56 | $8.56 | $8.56 |
| 93 | Traffic control (643.5000) | EACH | 1 | $9,119.84 | $10,000 | $9,119.84 | $9,119.84 | $9,119.84 |
| 94 | Temporary pedestrian surface matting (644.1440) | SF | 365 | $2.77 | $3.00 | $2.77 | $0.01 | $2.77 |
| 95 | Temporary pedestrian curb ramp (644.1601) | DAY | 232 | $11.54 | $12.00 | $11.54 | $0.01 | $11.54 |
| 96 | Temporary pedestrian detectable warning field (644.1605) | SF | 160 | $6.22 | $6.50 | $6.22 | $0.01 | $6.22 |
| 97 | Temporary pedestrian barricade (644.1810) | LF | 2,448 | $4.31 | $4.50 | $4.31 | $0.01 | $4.31 |
| 98 | Temporary audible message devices (644.1900.S) | DAY | 4,136 | $0.88 | $1.00 | $0.88 | $0.01 | $0.88 |
| 99 | Geotextile type DF schedule A (645.0111) | SY | 308 | $3.05 | $4.00 | $3.02 | $2.00 | $2.00 |
| 100 | Geogrid type SR (645.0220) | SY | 10,130 | $2.38 | $2.00 | $1.79 | $2.00 | $2.00 |
| 101 | Marking line epoxy 4-inch (646.1020) | LF | 21,132 | $0.55 | $0.60 | $0.55 | $0.55 | $0.55 |
| 102 | Marking line epoxy 8-inch (646.3020) | LF | 931 | $0.80 | $1.00 | $0.80 | $0.80 | $0.80 |
| 103 | Marking arrow paint (646.5005) | EACH | 1 | $285.00 | $300.00 | $285.00 | $285.00 | $285.00 |
| 104 | Marking arrow epoxy (646.5020) | EACH | 37 | $285.00 | $300.00 | $285.00 | $285.00 | $285.00 |
| 105 | Marking symbol epoxy (646.5220) | EACH | 21 | $255.00 | $375.00 | $255.00 | $255.00 | $255.00 |
| 106 | Marking stop line epoxy 18-inch (646.6120) | LF | 344 | $11.45 | $12.00 | $11.45 | $11.45 | $11.45 |
| 107 | Marking diagonal epoxy 12-inch (646.7120) | LF | 122 | $10.10 | $10.50 | $10.10 | $10.10 | $10.10 |
| 108 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,229 | $8.65 | $9.00 | $8.65 | $8.65 | $8.65 |
| 109 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 276 | $12.80 | $13.00 | $12.80 | $12.80 | $12.80 |
| 110 | Marking removal line 4-inch (646.9000) | LF | 1,498 | $0.96 | $1.00 | $0.96 | $0.96 | $0.96 |
| 111 | Marking removal line 6-inch (646.9002) | LF | 37 | $1.99 | $2.00 | $1.99 | $1.99 | $1.99 |
| 112 | Marking removal line 8-inch (646.9100) | LF | 155 | $2.64 | $2.75 | $2.64 | $2.64 | $2.64 |
| 113 | Marking removal line wide (646.9200) | LF | 68 | $3.97 | $4.00 | $3.97 | $3.97 | $3.97 |
| 114 | Marking removal special marking (646.9300) | EACH | 8 | $68.41 | $70.00 | $68.41 | $68.41 | $68.41 |
| 115 | Construction staking storm sewer (650.4000) | EACH | 56 | $70.85 | $100.00 | $70.85 | $125.00 | $70.85 |
| 116 | Construction staking subgrade (650.4500) | LF | 3,656 | $2.30 | $0.01 | $2.30 | $0.01 | $2.30 |
| 117 | Construction staking concrete pavement (650.7000) | LF | 3,656 | $1.00 | $1.00 | $1.00 | $2.25 | $1.00 |
| 118 | Construction staking electrical installations (project) 01. 3832-01- 71 (650.8501) | EACH | 1 | $4,400.00 | $5,000.00 | $4,400.00 | $5,000.00 | $4,400.00 |
| 119 | Construction staking curb ramps (650.9000) | EACH | 44 | $138.00 | $100.00 | $138.00 | $150.00 | $138.00 |
| 120 | Construction staking sidewalk (project) 01. 3832-01-71 (650.9500) | EACH | 1 | $3,840.00 | $2,000.00 | $3,840.00 | $5,000.00 | $3,840.00 |
| 121 | Construction staking supplemental control (project) 01. 3832-01-71 (650.9911) | EACH | 1 | $2,590.00 | $6,500.00 | $2,590.00 | $5,000.00 | $2,590.00 |
| 122 | Construction staking slope stakes (650.9920) | LF | 3,656 | $1.10 | $0.01 | $1.10 | $1.00 | $1.10 |
| 123 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 3,502 | $7.62 | $7.75 | $7.62 | $7.62 | $7.62 |
| 124 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,027 | $8.80 | $9.00 | $8.80 | $8.80 | $8.80 |
| 125 | Pull boxes steel 24X36-inch (653.0135) | EACH | 1 | $1,132.00 | $1,200.00 | $1,132.00 | $1,132.00 | $1,132.00 |
| 126 | Pull boxes steel 24X42-inch (653.0140) | EACH | 17 | $1,221.00 | $1,225.00 | $1,221.00 | $1,221.00 | $1,221.00 |
| 127 | Removing pull boxes (653.0905) | EACH | 1 | $88.00 | $90.00 | $88.00 | $88.00 | $88.00 |
| 128 | Concrete bases type 1 (654.0101) | EACH | 3 | $993.00 | $1,000.00 | $993.00 | $993.00 | $993.00 |
| 129 | Concrete bases type 2 (654.0102) | EACH | 5 | $1,220.00 | $1,250.00 | $1,220.00 | $1,220.00 | $1,220.00 |
| 130 | Concrete bases type 5 (654.0105) | EACH | 28 | $1,123.00 | $1,150.00 | $1,123.00 | $1,123.00 | $1,123.00 |
| 131 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,532.00 | $2,600.00 | $2,532.00 | $2,532.00 | $2,532.00 |
| 132 | Concrete control cabinet bases type L30 (654.0230) | EACH | 1 | $2,360.00 | $2,400.00 | $2,360.00 | $2,360.00 | $2,360.00 |
| 133 | Cable traffic signal 5-14 AWG (655.0230) | LF | 560 | $2.07 | $2.10 | $2.07 | $2.07 | $2.07 |
| 134 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,138 | $3.67 | $3.75 | $3.67 | $3.67 | $3.67 |
| 135 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 244 | $2.12 | $2.15 | $2.12 | $2.12 | $2.12 |
| 136 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 999 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 137 | Electrical wire lighting 12 AWG (655.0610) | LF | 4,131 | $1.10 | $1.15 | $1.10 | $1.10 | $1.10 |
| 138 | Electrical wire lighting 10 AWG (655.0615) | LF | 690 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 139 | Electrical wire lighting 8 AWG (655.0620) | LF | 19,250 | $1.70 | $1.75 | $1.70 | $1.70 | $1.70 |
| 140 | Electrical wire lighting 2 AWG (655.0635) | LF | 30 | $6.40 | $6.50 | $6.40 | $6.40 | $6.40 |
| 141 | Electrical service meter breaker pedestal (location) 01. 22ND avenue & 45TH street (656.0201) | EACH | 1 | $1,580.00 | $1,600.00 | $1,580.00 | $1,580.00 | $1,580.00 |
| 142 | Electrical service meter breaker pedestal (location) 02. 22ND avenue & 43RD street (656.0201) | EACH | 1 | $1,580.00 | $1,600.00 | $1,580.00 | $1,580.00 | $1,580.00 |
| 143 | Pedestal bases (657.0100) | EACH | 3 | $238.00 | $250.00 | $238.00 | $238.00 | $238.00 |
| 144 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 31 | $600.00 | $625.00 | $600.00 | $600.00 | $600.00 |
| 145 | Poles type 2 (657.0305) | EACH | 2 | $2,229.00 | $2,300.00 | $2,229.00 | $2,229.00 | $2,229.00 |
| 146 | Poles type 3 (657.0310) | EACH | 2 | $4,045.00 | $4,100.00 | $4,045.00 | $4,045.00 | $4,045.00 |
| 147 | Poles type 4 (657.0315) | EACH | 1 | $2,425.00 | $2,500.00 | $2,425.00 | $2,425.00 | $2,425.00 |
| 148 | Poles type 5-aluminum (657.0322) | EACH | 28 | $2,215.80 | $2,300.00 | $2,215.80 | $2,215.80 | $2,215.80 |
| 149 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 3 | $526.00 | $550.00 | $526.00 | $526.00 | $526.00 |
| 150 | Trombone arms 20-FT (657.0590) | EACH | 2 | $1,465.00 | $1,500.00 | $1,465.00 | $1,465.00 | $1,465.00 |
| 151 | Trombone arms 25-FT (657.0595) | EACH | 1 | $1,817.00 | $1,900.00 | $1,817.00 | $1,817.00 | $1,817.00 |
| 152 | Luminaire arms single member 4- inch clamp 8-FT (657.0614) | EACH | 3 | $268.00 | $275.00 | $268.00 | $268.00 | $268.00 |
| 153 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 28 | $277.00 | $285.00 | $277.00 | $277.00 | $277.00 |
| 154 | Traffic signal face 3S 12-inch (658.0173) | EACH | 11 | $914.00 | $1,000.00 | $914.00 | $914.00 | $914.00 |
| 155 | Traffic signal face 4S 12-inch (658.0174) | EACH | 2 | $1,232.00 | $1,300.00 | $1,232.00 | $1,232.00 | $1,232.00 |
| 156 | Pedestrian signal face 16-inch (658.0416) | EACH | 8 | $610.00 | $650.00 | $610.00 | $610.00 | $610.00 |
| 157 | Pedestrian push buttons (658.0500) | EACH | 6 | $428.80 | $450.00 | $428.80 | $428.80 | $428.80 |
| 158 | Signal mounting hardware (location) 01. 22ND avenue & 45TH street (658.5070) | EACH | 1 | $4,646.00 | $4,700.00 | $4,646.00 | $4,646.00 | $4,646.00 |
| 159 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 1 | $9,533.00 | $9,600.00 | $9,533.00 | $9,533.00 | $9,533.00 |
| 160 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 17 | $4.80 | $5.00 | $4.80 | $4.80 | $4.80 |
| 161 | Sawing asphalt (690.0150) | LF | 143 | $2.00 | $1.50 | $1.75 | $1.39 | $1.39 |
| 162 | Sawing concrete (690.0250) | LF | 5,721 | $2.10 | $2.00 | $2.55 | $1.85 | $1.85 |
| 163 | Incentive compressive strength concrete pavement (715.0720) | DOL | 5,840 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 164 | Incentive iri ride (740.0440) | DOL | 5,539 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 165 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 166 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,100 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 167 | Special 01. 2 3/8-inch OD, 16 GA galvanized poles, 12-FT (SPV.0060) | EACH | 32 | $150.00 | $160.00 | $150.00 | $125.00 | $250.00 |
| 168 | Special 02. 2 3/8-inch OD, 16 GA galvanized poles, 8-FT (SPV.0060) | EACH | 3 | $130.00 | $150.00 | $130.00 | $100.00 | $235.00 |
| 169 | Special 03. 30-inch round V-loc (SPV.0060) | EACH | 41 | $99.00 | $100.00 | $99.00 | $120.00 | $150.00 |
| 170 | Special 04. 2 3/8-inch Z-bracket, single sided, round, pair (SPV.0060) | EACH | 44 | $10.00 | $15.00 | $10.00 | $10.00 | $55.00 |
| 171 | Special 05. salvage and reinstall city owned bus route signs (SPV.0060) | EACH | 8 | $55.00 | $60.00 | $55.00 | $100.00 | $150.00 |
| 172 | Special 06. manhole cover storm (SPV.0060) | EACH | 17 | $733.96 | $1,500.00 | $726.69 | $1,124.00 | $1,124.00 |
| 173 | Special 07. inlet covers type CH (SPV.0060) | EACH | 7 | $647.28 | $1,000.00 | $640.87 | $969.00 | $969.00 |
| 174 | Special 08. storm sewer tap (SPV.0060) | EACH | 12 | $1,312.93 | $475.00 | $1,299.93 | $1.00 | $1.00 |
| 175 | Special 09. sealing manhole openings (SPV.0060) | EACH | 11 | $688.82 | $320.00 | $682.00 | $338.00 | $338.00 |
| 176 | Special 10. maintenance of lighting (SPV.0060) | EACH | 1 | $14,725 | $15,000 | $14,725 | $14,725 | $14,725 |
| 177 | Special 11. luminaires utility LED 80 watts (SPV.0060) | EACH | 31 | $493.60 | $500.00 | $493.60 | $493.60 | $493.60 |
| 178 | Special 12. remove existing lighting cabinet (SPV.0060) | EACH | 1 | $1,122.00 | $1,200.00 | $1,122.00 | $1,122.00 | $1,122.00 |
| 179 | Special 13. remove traffic signals 22ND avenue & 45TH street (SPV.0060) | EACH | 1 | $5,610.00 | $5,700.00 | $5,610.00 | $5,610.00 | $5,610.00 |
| 180 | Special 14. traffic signal cabinet and controller 22ND avenue & 45TH street (SPV.0060) | EACH | 1 | $29,608 | $30,000 | $29,608 | $29,608 | $29,608 |
| 181 | Special 15. radar sensor system 22ND avenue & 45TH street (SPV.0060) | EACH | 1 | $31,180 | $32,000 | $31,180 | $31,180 | $31,180 |
| 182 | Special 16. emergency vehicle preemption 22ND avenue & 45TH street (SPV.0060) | EACH | 1 | $10,735 | $11,000 | $10,735 | $10,735 | $10,735 |
| 183 | Special 17. adjusting water valve covers (SPV.0060) | EACH | 19 | $328.23 | $345.00 | $324.98 | $324.00 | $324.00 |
| 184 | Special 18. adjusting curb boxes (SPV.0060) | EACH | 83 | $164.11 | $285.00 | $162.49 | $167.00 | $167.00 |
| 185 | Special 19. adjusting sanitary sewer manhole covers (SPV.0060) | EACH | 15 | $1,767.80 | $1,875.00 | $1,750.30 | $1,265.00 | $1,265.00 |
| 186 | Special 20. relocating stone monuments (SPV.0060) | EACH | 2 | $3,000.00 | $2,000.00 | $1,652.00 | $1,000.00 | $4,480.00 |
| 187 | Special 21. laminated no parking signs and property owner notifications (SPV.0060) | EACH | 1 | $4,500.00 | $4,000.00 | $2,276.00 | $1,000.00 | $1,000.00 |
| 188 | Special 22. section corner monuments (SPV.0060) | EACH | 1 | $1,500.00 | $500.00 | $1,927.00 | $500.00 | $1,000.00 |
| 189 | Special 01. PVC pipe 6-inch (SPV.0090) | LF | 8 | $82.06 | $100.00 | $81.25 | $386.00 | $386.00 |
| 190 | Special 01. management of solid waste (SPV.0195) | TON | 611 | $52.79 | $52.20 | $82.21 | $55.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.