WisDOT contract 20251111024 bid tabulation
Wisconsin Rapids - Vesper; Town Hall Road to CTH Hh (CTH F, Wood County Wisconsin Rapids - Vesper). Let by Wisconsin DOT on November 11, 2025, Wood. 8 bids received; low bid $1,303,522 by Mashuda Contractors, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 106
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mashuda Contractors, Inc. | $1,303,522 | Low |
| 2 | Earth, Inc. | $1,362,269 | +5.0% |
| 3 | Chippewa Concrete Services, Inc. | $1,395,433 | +7.0% |
| 4 | Gerke Excavating Inc | $1,403,065 | +8.0% |
| 5 | Haas Sons, Inc. | $1,407,666 | +8.0% |
| 6 | McCabe Construction, Inc. | $1,419,400 | +9.0% |
| 7 | A-1 Excavating LLC | $1,515,630 | +16% |
| 8 | Zignego Company, Inc. | $1,526,130 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mashuda Contractors, Inc. | 2. Earth, Inc. | 3. Chippewa Concrete Services, Inc. | 4. Gerke Excavating Inc | 5. Haas Sons, Inc. | 6. McCabe Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 36 | $1.00 | $500.00 | $429.25 | $319.45 | $1.00 | $425.00 |
| 2 | Removing delineators and markers (204.0180) | EACH | 1 | $50.00 | $100.00 | $50.50 | $50.00 | $50.00 | $52.50 |
| 3 | Excavation common (205.0100) | CY | 4,499 | $11.16 | $14.00 | $16.01 | $16.60 | $9.59 | $15.85 |
| 4 | Borrow (208.0100) | CY | 1,928 | $19.84 | $17.00 | $23.74 | $33.59 | $27.30 | $23.50 |
| 5 | Finishing roadway (project) 01. 6942-01-72 (213.0100) | EACH | 1 | $750.00 | $5,000.00 | $7,171.00 | $3,740.01 | $1.00 | $2,100.00 |
| 6 | Base aggregate dense 3/4-inch (305.0110) | TON | 350 | $26.28 | $24.50 | $31.56 | $24.14 | $29.57 | $31.25 |
| 7 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 6,540 | $19.56 | $19.45 | $19.04 | $19.20 | $19.32 | $18.85 |
| 8 | Base aggregate open-graded (310.0110) | TON | 23 | $47.00 | $28.00 | $61.61 | $54.01 | $29.56 | $61.00 |
| 9 | Coloring concrete wisdot red (405.0100) | CY | 299 | $81.00 | $81.00 | $79.92 | $81.00 | $85.20 | $85.05 |
| 10 | Concrete pavement 7-inch (415.0070) | SY | 4,524 | $73.45 | $73.60 | $77.77 | $73.45 | $76.21 | $77.12 |
| 11 | Concrete truck apron 12-inch (415.2010) | SY | 474 | $89.00 | $89.00 | $83.62 | $89.00 | $102.32 | $93.45 |
| 12 | Concrete pavement joint filling (415.4100) | SY | 5,850 | $2.50 | $2.50 | $3.56 | $2.50 | $2.80 | $2.63 |
| 13 | Rout and seal (415.6000.S) | LF | 1,133 | $7.51 | $7.80 | $7.59 | $7.51 | $4.00 | $7.89 |
| 14 | Culvert pipe reinforced concrete class IV 15-inch (522.0415) | LF | 83 | $71.25 | $90.00 | $62.87 | $58.09 | $71.42 | $62.25 |
| 15 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 30 | $76.75 | $92.00 | $68.48 | $58.09 | $74.50 | $67.80 |
| 16 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 50 | $137.50 | $175.00 | $167.66 | $118.71 | $134.20 | $166.00 |
| 17 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 7 | $752.00 | $800.00 | $979.70 | $1,314.51 | $1,110.75 | $970.00 |
| 18 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 6 | $788.00 | $875.00 | $1,191.80 | $1,353.66 | $1,150.75 | $1,180.00 |
| 19 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 2 | $842.00 | $1,000.00 | $1,323.10 | $1,414.61 | $1,200.75 | $1,310.00 |
| 20 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $1,125.00 | $1,580.00 | $2,413.90 | $1,696.66 | $1,581.00 | $2,390.00 |
| 21 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 318 | $22.00 | $22.00 | $29.85 | $22.00 | $33.18 | $23.10 |
| 22 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 2,441 | $22.40 | $22.50 | $24.70 | $22.40 | $25.40 | $23.52 |
| 23 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 734 | $23.40 | $23.40 | $29.64 | $23.40 | $27.37 | $24.57 |
| 24 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 296 | $23.40 | $23.40 | $29.64 | $23.40 | $27.37 | $24.57 |
| 25 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 409 | $24.75 | $24.75 | $35.58 | $24.75 | $36.85 | $26.00 |
| 26 | Concrete sidewalk 4-inch (602.0405) | SF | 7,644 | $6.40 | $6.40 | $8.32 | $6.40 | $6.82 | $6.72 |
| 27 | Concrete driveway 8-inch (602.0820) | SY | 209 | $77.00 | $77.00 | $94.28 | $77.00 | $91.62 | $80.85 |
| 28 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 240 | $75.00 | $84.00 | $70.70 | $68.51 | $70.10 | $70.00 |
| 29 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 316 | $80.00 | $88.00 | $75.75 | $54.75 | $66.42 | $75.00 |
| 30 | Inlet covers type DW (611.0613) | EACH | 2 | $900.00 | $1,120.00 | $1,024.14 | $1,116.11 | $950.00 | $1,014.00 |
| 31 | Inlet covers type H (611.0624) | EACH | 3 | $890.00 | $1,100.00 | $939.30 | $1,025.62 | $875.00 | $930.00 |
| 32 | Inlet covers type HM (611.0627) | EACH | 6 | $890.00 | $1,100.00 | $959.50 | $982.10 | $900.00 | $950.00 |
| 33 | Inlet covers type H-S (611.0639) | EACH | 1 | $890.00 | $1,100.00 | $939.30 | $1,022.54 | $875.00 | $930.00 |
| 34 | Inlet covers type T (611.0652) | EACH | 3 | $1,170.00 | $1,500.00 | $1,212.00 | $1,301.66 | $1,150.00 | $1,200.00 |
| 35 | Inlets 4-FT diameter (611.3004) | EACH | 15 | $2,244.00 | $2,800.00 | $2,040.20 | $2,524.03 | $3,099.00 | $2,020.00 |
| 36 | Pipe underdrain 6-inch (612.0106) | LF | 403 | $13.00 | $14.00 | $14.39 | $10.39 | $11.96 | $14.25 |
| 37 | Maintenance and repair of haul roads (project) 01. 6942-01-72 (618.0100) | EACH | 1 | $1.00 | $100.00 | $1.01 | $0.01 | $1.00 | $1.00 |
| 38 | Mobilization (619.1000) | EACH | 1 | $110,046 | $70,000 | $48,632 | $117,274 | $98,575 | $91,999 |
| 39 | Concrete median sloped nose (620.0300) | SF | 327 | $14.00 | $14.00 | $16.67 | $14.00 | $13.76 | $14.70 |
| 40 | Water (624.0100) | MGAL | 143 | $35.00 | $35.00 | $40.40 | $42.87 | $1.00 | $40.00 |
| 41 | Topsoil (625.0100) | SY | 2,810 | $0.01 | $5.00 | $8.23 | $6.28 | $8.98 | $8.15 |
| 42 | Salvaged topsoil (625.0500) | SY | 4,450 | $0.01 | $3.00 | $3.69 | $0.94 | $3.05 | $3.65 |
| 43 | Mulching (627.0200) | SY | 7,260 | $0.35 | $0.50 | $0.35 | $0.35 | $0.35 | $0.37 |
| 44 | Silt fence (628.1504) | LF | 3,660 | $1.75 | $2.25 | $1.77 | $1.75 | $1.75 | $1.84 |
| 45 | Silt fence maintenance (628.1520) | LF | 7,320 | $0.03 | $0.01 | $0.03 | $0.03 | $0.03 | $0.03 |
| 46 | Mobilizations erosion control (628.1905) | EACH | 6 | $303.00 | $150.00 | $306.03 | $303.00 | $303.00 | $318.15 |
| 47 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $333.00 | $100.00 | $336.33 | $333.00 | $333.00 | $350.00 |
| 48 | Erosion mat urban class I type B (628.2008) | SY | 1,200 | $1.95 | $2.35 | $1.97 | $1.95 | $1.95 | $2.05 |
| 49 | Inlet protection type A (628.7005) | EACH | 15 | $115.00 | $150.00 | $116.15 | $115.00 | $115.00 | $120.75 |
| 50 | Inlet protection type B (628.7010) | EACH | 15 | $50.00 | $100.00 | $50.50 | $50.00 | $50.00 | $52.50 |
| 51 | Temporary ditch checks (628.7504) | LF | 70 | $8.00 | $10.00 | $8.08 | $8.00 | $8.00 | $8.40 |
| 52 | Culvert pipe checks (628.7555) | EACH | 40 | $25.00 | $20.00 | $25.25 | $25.00 | $25.00 | $26.25 |
| 53 | Fertilizer type B (629.0210) | CWT | 6 | $100.00 | $120.00 | $101.00 | $100.00 | $100.00 | $105.00 |
| 54 | Seeding mixture no. 20 (630.0120) | LB | 230 | $7.33 | $10.00 | $7.40 | $7.33 | $7.33 | $7.70 |
| 55 | Seeding mixture no. 40 (630.0140) | LB | 12 | $25.00 | $20.00 | $25.25 | $25.00 | $25.00 | $26.25 |
| 56 | Seeding temporary (630.0200) | LB | 248 | $5.33 | $4.00 | $5.38 | $5.33 | $5.33 | $5.60 |
| 57 | Seed water (630.0500) | MGAL | 164 | $1.03 | $10.00 | $1.04 | $1.03 | $1.03 | $1.08 |
| 58 | Markers culvert end (633.5200) | EACH | 9 | $75.00 | $75.00 | $75.75 | $75.00 | $75.00 | $78.75 |
| 59 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 53 | $98.00 | $100.00 | $98.98 | $98.00 | $98.00 | $103.00 |
| 60 | Sign flags permanent type II (637.0620) | EACH | 24 | $225.00 | $200.00 | $227.25 | $225.00 | $225.00 | $236.00 |
| 61 | Signs type II reflective H (637.2210) | SF | 327.25 | $20.00 | $21.00 | $20.20 | $20.00 | $20.00 | $21.00 |
| 62 | Signs type II reflective F (637.2230) | SF | 43 | $25.00 | $25.00 | $25.25 | $25.00 | $25.00 | $26.25 |
| 63 | Moving signs type II (638.2102) | EACH | 2 | $150.00 | $175.00 | $151.50 | $150.00 | $150.00 | $157.50 |
| 64 | Removing signs type II (638.2602) | EACH | 32 | $25.00 | $50.00 | $25.25 | $25.00 | $25.00 | $26.25 |
| 65 | Removing small sign supports (638.3000) | EACH | 28 | $25.00 | $50.00 | $25.25 | $25.00 | $25.00 | $26.25 |
| 66 | Field office type C (642.5201) | EACH | 1 | $7,500.00 | $8,000.00 | $7,575.00 | $10,263 | $15,000 | $7,500.00 |
| 67 | Traffic control drums (643.0300) | DAY | 140 | $0.50 | $0.60 | $0.51 | $0.50 | $0.50 | $0.53 |
| 68 | Traffic control barricades type III (643.0420) | DAY | 2,392 | $0.55 | $0.60 | $0.56 | $0.55 | $0.55 | $0.58 |
| 69 | Traffic control warning lights type A (643.0705) | DAY | 3,312 | $0.20 | $0.25 | $0.20 | $0.20 | $0.20 | $0.21 |
| 70 | Traffic control signs (643.0900) | DAY | 2,484 | $0.70 | $0.75 | $0.71 | $0.70 | $0.70 | $0.74 |
| 71 | Traffic control signs PCMS (643.1050) | DAY | 28 | $50.00 | $60.00 | $50.50 | $50.00 | $50.00 | $52.50 |
| 72 | Traffic control (643.5000) | EACH | 1 | $1,900.00 | $8,000.00 | $1,919.00 | $1,900.00 | $1,900.00 | $1,995.00 |
| 73 | Geotextile type DF schedule A (645.0111) | SY | 179 | $5.00 | $6.00 | $3.03 | $10.74 | $2.79 | $3.00 |
| 74 | Marking line epoxy 6-inch (646.2020) | LF | 6,716 | $1.65 | $1.60 | $1.01 | $1.55 | $1.65 | $1.05 |
| 75 | Marking line epoxy 10-inch (646.4020) | LF | 287 | $3.00 | $2.00 | $2.02 | $1.80 | $3.00 | $2.10 |
| 76 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 76 | $14.00 | $20.00 | $23.23 | $18.90 | $14.00 | $24.15 |
| 77 | Marking diagonal epoxy 12-inch (646.7120) | LF | 186 | $16.00 | $10.50 | $22.22 | $10.25 | $16.00 | $23.10 |
| 78 | Marking curb epoxy (646.8120) | LF | 78 | $13.00 | $13.00 | $11.11 | $12.50 | $13.00 | $11.55 |
| 79 | Marking island nose epoxy (646.8220) | EACH | 4 | $330.00 | $500.00 | $454.50 | $450.00 | $330.00 | $472.50 |
| 80 | Construction staking storm sewer (650.4000) | EACH | 22 | $125.00 | $130.00 | $126.25 | $125.00 | $125.00 | $131.25 |
| 81 | Construction staking subgrade (650.4500) | LF | 892 | $0.01 | $1.00 | $0.01 | $2.00 | $2.00 | $0.01 |
| 82 | Construction staking base (650.5000) | LF | 892 | $2.00 | $1.00 | $0.01 | $2.00 | $2.00 | $1.05 |
| 83 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 152 | $0.75 | $1.00 | $0.76 | $0.75 | $0.75 | $2.10 |
| 84 | Construction staking pipe culverts (650.6000) | EACH | 1 | $125.00 | $150.00 | $126.25 | $125.00 | $125.00 | $420.00 |
| 85 | Construction staking electrical installations (project) 01. 6942-01- 72 (650.8501) | EACH | 1 | $4,000.00 | $4,500.00 | $4,040.00 | $4,000.00 | $4,000.00 | $1,260.00 |
| 86 | Construction staking sidewalk (project) 01. 6942-01-72 (650.9500) | EACH | 1 | $200.00 | $250.00 | $202.00 | $200.00 | $200.00 | $315.00 |
| 87 | Construction staking supplemental control (project) 01. 6942-01-72 (650.9911) | EACH | 1 | $2,500.00 | $3,000.00 | $2,525.00 | $2,500.00 | $2,500.00 | $6,375.00 |
| 88 | Construction staking slope stakes (650.9920) | LF | 892 | $0.80 | $1.00 | $0.81 | $0.80 | $0.80 | $1.05 |
| 89 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,158 | $4.70 | $4.75 | $4.75 | $4.70 | $10.50 | $4.94 |
| 90 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 32 | $9.00 | $99.00 | $9.09 | $9.00 | $12.50 | $9.45 |
| 91 | Pull boxes non-conductive 24X36- inch (653.0154) | EACH | 4 | $2,400.00 | $2,400.00 | $2,424.00 | $2,400.00 | $2,350.00 | $2,520.00 |
| 92 | Concrete bases type 6 (654.0106) | EACH | 16 | $1,400.00 | $1,400.00 | $1,414.00 | $1,400.00 | $1,350.00 | $1,470.00 |
| 93 | Concrete control cabinet bases type L24 (654.0224) | EACH | 1 | $2,000.00 | $2,000.00 | $2,020.00 | $2,000.00 | $1,500.00 | $2,100.00 |
| 94 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,496 | $0.95 | $1.00 | $0.96 | $0.95 | $1.40 | $1.00 |
| 95 | Electrical wire lighting 8 AWG (655.0620) | LF | 7,734 | $1.55 | $1.60 | $1.57 | $1.55 | $1.90 | $1.63 |
| 96 | Electrical service meter breaker pedestal (location) 01. sta 101+20NB (656.0201) | EACH | 1 | $1,600.00 | $1,600.00 | $1,616.00 | $1,600.00 | $2,215.00 | $1,680.00 |
| 97 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 16 | $800.00 | $800.00 | $808.00 | $800.00 | $750.00 | $840.00 |
| 98 | Poles type 6-aluminum (657.0327) | EACH | 16 | $2,400.00 | $2,400.00 | $2,424.00 | $2,400.00 | $2,500.00 | $2,520.00 |
| 99 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 16 | $410.00 | $410.00 | $414.10 | $410.00 | $375.00 | $430.50 |
| 100 | Luminaires utility LED B (659.1120) | EACH | 16 | $600.00 | $600.00 | $606.00 | $600.00 | $400.00 | $630.00 |
| 101 | Lighting control cabinets 120/240 24-inch (659.2124) | EACH | 1 | $10,000 | $10,000 | $10,100 | $10,000 | $7,400.00 | $10,500 |
| 102 | Sawing asphalt (690.0150) | LF | 238 | $2.00 | $5.00 | $2.37 | $2.35 | $2.35 | $2.10 |
| 103 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 104 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 105 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 106 | Special 01. construction staking roundabout CTH F/HH (SPV.0060) | EACH | 1 | $10,000 | $11,000 | $10,100 | $10,000 | $10,000 | $20,916 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.