WisDOT contract 20251111024 bid tabulation

Wisconsin Rapids - Vesper; Town Hall Road to CTH Hh (CTH F, Wood County Wisconsin Rapids - Vesper). Let by Wisconsin DOT on November 11, 2025, Wood. 8 bids received; low bid $1,303,522 by Mashuda Contractors, Inc..

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
106
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Mashuda Contractors, Inc.$1,303,522Low
2Earth, Inc.$1,362,269+5.0%
3Chippewa Concrete Services, Inc.$1,395,433+7.0%
4Gerke Excavating Inc$1,403,065+8.0%
5Haas Sons, Inc.$1,407,666+8.0%
6McCabe Construction, Inc.$1,419,400+9.0%
7A-1 Excavating LLC$1,515,630+16%
8Zignego Company, Inc.$1,526,130+17%
WisDOT contract 20251111024: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Mashuda Contractors, Inc.2. Earth, Inc.3. Chippewa Concrete Services, Inc.4. Gerke Excavating Inc5. Haas Sons, Inc.6. McCabe Construction, Inc.
1Grubbing (201.0205)STA36$1.00$500.00$429.25$319.45$1.00$425.00
2Removing delineators and markers (204.0180)EACH1$50.00$100.00$50.50$50.00$50.00$52.50
3Excavation common (205.0100)CY4,499$11.16$14.00$16.01$16.60$9.59$15.85
4Borrow (208.0100)CY1,928$19.84$17.00$23.74$33.59$27.30$23.50
5Finishing roadway (project) 01. 6942-01-72 (213.0100)EACH1$750.00$5,000.00$7,171.00$3,740.01$1.00$2,100.00
6Base aggregate dense 3/4-inch (305.0110)TON350$26.28$24.50$31.56$24.14$29.57$31.25
7Base aggregate dense 1 1/4-inch (305.0120)TON6,540$19.56$19.45$19.04$19.20$19.32$18.85
8Base aggregate open-graded (310.0110)TON23$47.00$28.00$61.61$54.01$29.56$61.00
9Coloring concrete wisdot red (405.0100)CY299$81.00$81.00$79.92$81.00$85.20$85.05
10Concrete pavement 7-inch (415.0070)SY4,524$73.45$73.60$77.77$73.45$76.21$77.12
11Concrete truck apron 12-inch (415.2010)SY474$89.00$89.00$83.62$89.00$102.32$93.45
12Concrete pavement joint filling (415.4100)SY5,850$2.50$2.50$3.56$2.50$2.80$2.63
13Rout and seal (415.6000.S)LF1,133$7.51$7.80$7.59$7.51$4.00$7.89
14Culvert pipe reinforced concrete class IV 15-inch (522.0415)LF83$71.25$90.00$62.87$58.09$71.42$62.25
15Culvert pipe reinforced concrete class IV 18-inch (522.0418)LF30$76.75$92.00$68.48$58.09$74.50$67.80
16Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF50$137.50$175.00$167.66$118.71$134.20$166.00
17Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH7$752.00$800.00$979.70$1,314.51$1,110.75$970.00
18Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015)EACH6$788.00$875.00$1,191.80$1,353.66$1,150.75$1,180.00
19Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH2$842.00$1,000.00$1,323.10$1,414.61$1,200.75$1,310.00
20Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH2$1,125.00$1,580.00$2,413.90$1,696.66$1,581.00$2,390.00
21Concrete curb & gutter 18-inch type A (601.0405)LF318$22.00$22.00$29.85$22.00$33.18$23.10
22Concrete curb & gutter 30-inch type A (601.0409)LF2,441$22.40$22.50$24.70$22.40$25.40$23.52
23Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF734$23.40$23.40$29.64$23.40$27.37$24.57
24Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF296$23.40$23.40$29.64$23.40$27.37$24.57
25Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF409$24.75$24.75$35.58$24.75$36.85$26.00
26Concrete sidewalk 4-inch (602.0405)SF7,644$6.40$6.40$8.32$6.40$6.82$6.72
27Concrete driveway 8-inch (602.0820)SY209$77.00$77.00$94.28$77.00$91.62$80.85
28Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF240$75.00$84.00$70.70$68.51$70.10$70.00
29Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF316$80.00$88.00$75.75$54.75$66.42$75.00
30Inlet covers type DW (611.0613)EACH2$900.00$1,120.00$1,024.14$1,116.11$950.00$1,014.00
31Inlet covers type H (611.0624)EACH3$890.00$1,100.00$939.30$1,025.62$875.00$930.00
32Inlet covers type HM (611.0627)EACH6$890.00$1,100.00$959.50$982.10$900.00$950.00
33Inlet covers type H-S (611.0639)EACH1$890.00$1,100.00$939.30$1,022.54$875.00$930.00
34Inlet covers type T (611.0652)EACH3$1,170.00$1,500.00$1,212.00$1,301.66$1,150.00$1,200.00
35Inlets 4-FT diameter (611.3004)EACH15$2,244.00$2,800.00$2,040.20$2,524.03$3,099.00$2,020.00
36Pipe underdrain 6-inch (612.0106)LF403$13.00$14.00$14.39$10.39$11.96$14.25
37Maintenance and repair of haul roads (project) 01. 6942-01-72 (618.0100)EACH1$1.00$100.00$1.01$0.01$1.00$1.00
38Mobilization (619.1000)EACH1$110,046$70,000$48,632$117,274$98,575$91,999
39Concrete median sloped nose (620.0300)SF327$14.00$14.00$16.67$14.00$13.76$14.70
40Water (624.0100)MGAL143$35.00$35.00$40.40$42.87$1.00$40.00
41Topsoil (625.0100)SY2,810$0.01$5.00$8.23$6.28$8.98$8.15
42Salvaged topsoil (625.0500)SY4,450$0.01$3.00$3.69$0.94$3.05$3.65
43Mulching (627.0200)SY7,260$0.35$0.50$0.35$0.35$0.35$0.37
44Silt fence (628.1504)LF3,660$1.75$2.25$1.77$1.75$1.75$1.84
45Silt fence maintenance (628.1520)LF7,320$0.03$0.01$0.03$0.03$0.03$0.03
46Mobilizations erosion control (628.1905)EACH6$303.00$150.00$306.03$303.00$303.00$318.15
47Mobilizations emergency erosion control (628.1910)EACH4$333.00$100.00$336.33$333.00$333.00$350.00
48Erosion mat urban class I type B (628.2008)SY1,200$1.95$2.35$1.97$1.95$1.95$2.05
49Inlet protection type A (628.7005)EACH15$115.00$150.00$116.15$115.00$115.00$120.75
50Inlet protection type B (628.7010)EACH15$50.00$100.00$50.50$50.00$50.00$52.50
51Temporary ditch checks (628.7504)LF70$8.00$10.00$8.08$8.00$8.00$8.40
52Culvert pipe checks (628.7555)EACH40$25.00$20.00$25.25$25.00$25.00$26.25
53Fertilizer type B (629.0210)CWT6$100.00$120.00$101.00$100.00$100.00$105.00
54Seeding mixture no. 20 (630.0120)LB230$7.33$10.00$7.40$7.33$7.33$7.70
55Seeding mixture no. 40 (630.0140)LB12$25.00$20.00$25.25$25.00$25.00$26.25
56Seeding temporary (630.0200)LB248$5.33$4.00$5.38$5.33$5.33$5.60
57Seed water (630.0500)MGAL164$1.03$10.00$1.04$1.03$1.03$1.08
58Markers culvert end (633.5200)EACH9$75.00$75.00$75.75$75.00$75.00$78.75
59Posts wood 4X6-inch X 16-FT (634.0616)EACH53$98.00$100.00$98.98$98.00$98.00$103.00
60Sign flags permanent type II (637.0620)EACH24$225.00$200.00$227.25$225.00$225.00$236.00
61Signs type II reflective H (637.2210)SF327.25$20.00$21.00$20.20$20.00$20.00$21.00
62Signs type II reflective F (637.2230)SF43$25.00$25.00$25.25$25.00$25.00$26.25
63Moving signs type II (638.2102)EACH2$150.00$175.00$151.50$150.00$150.00$157.50
64Removing signs type II (638.2602)EACH32$25.00$50.00$25.25$25.00$25.00$26.25
65Removing small sign supports (638.3000)EACH28$25.00$50.00$25.25$25.00$25.00$26.25
66Field office type C (642.5201)EACH1$7,500.00$8,000.00$7,575.00$10,263$15,000$7,500.00
67Traffic control drums (643.0300)DAY140$0.50$0.60$0.51$0.50$0.50$0.53
68Traffic control barricades type III (643.0420)DAY2,392$0.55$0.60$0.56$0.55$0.55$0.58
69Traffic control warning lights type A (643.0705)DAY3,312$0.20$0.25$0.20$0.20$0.20$0.21
70Traffic control signs (643.0900)DAY2,484$0.70$0.75$0.71$0.70$0.70$0.74
71Traffic control signs PCMS (643.1050)DAY28$50.00$60.00$50.50$50.00$50.00$52.50
72Traffic control (643.5000)EACH1$1,900.00$8,000.00$1,919.00$1,900.00$1,900.00$1,995.00
73Geotextile type DF schedule A (645.0111)SY179$5.00$6.00$3.03$10.74$2.79$3.00
74Marking line epoxy 6-inch (646.2020)LF6,716$1.65$1.60$1.01$1.55$1.65$1.05
75Marking line epoxy 10-inch (646.4020)LF287$3.00$2.00$2.02$1.80$3.00$2.10
76Marking dotted extension epoxy 18-inch (646.6320)LF76$14.00$20.00$23.23$18.90$14.00$24.15
77Marking diagonal epoxy 12-inch (646.7120)LF186$16.00$10.50$22.22$10.25$16.00$23.10
78Marking curb epoxy (646.8120)LF78$13.00$13.00$11.11$12.50$13.00$11.55
79Marking island nose epoxy (646.8220)EACH4$330.00$500.00$454.50$450.00$330.00$472.50
80Construction staking storm sewer (650.4000)EACH22$125.00$130.00$126.25$125.00$125.00$131.25
81Construction staking subgrade (650.4500)LF892$0.01$1.00$0.01$2.00$2.00$0.01
82Construction staking base (650.5000)LF892$2.00$1.00$0.01$2.00$2.00$1.05
83Construction staking curb gutter and curb & gutter (650.5500)LF152$0.75$1.00$0.76$0.75$0.75$2.10
84Construction staking pipe culverts (650.6000)EACH1$125.00$150.00$126.25$125.00$125.00$420.00
85Construction staking electrical installations (project) 01. 6942-01- 72 (650.8501)EACH1$4,000.00$4,500.00$4,040.00$4,000.00$4,000.00$1,260.00
86Construction staking sidewalk (project) 01. 6942-01-72 (650.9500)EACH1$200.00$250.00$202.00$200.00$200.00$315.00
87Construction staking supplemental control (project) 01. 6942-01-72 (650.9911)EACH1$2,500.00$3,000.00$2,525.00$2,500.00$2,500.00$6,375.00
88Construction staking slope stakes (650.9920)LF892$0.80$1.00$0.81$0.80$0.80$1.05
89Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF2,158$4.70$4.75$4.75$4.70$10.50$4.94
90Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF32$9.00$99.00$9.09$9.00$12.50$9.45
91Pull boxes non-conductive 24X36- inch (653.0154)EACH4$2,400.00$2,400.00$2,424.00$2,400.00$2,350.00$2,520.00
92Concrete bases type 6 (654.0106)EACH16$1,400.00$1,400.00$1,414.00$1,400.00$1,350.00$1,470.00
93Concrete control cabinet bases type L24 (654.0224)EACH1$2,000.00$2,000.00$2,020.00$2,000.00$1,500.00$2,100.00
94Electrical wire lighting 12 AWG (655.0610)LF2,496$0.95$1.00$0.96$0.95$1.40$1.00
95Electrical wire lighting 8 AWG (655.0620)LF7,734$1.55$1.60$1.57$1.55$1.90$1.63
96Electrical service meter breaker pedestal (location) 01. sta 101+20NB (656.0201)EACH1$1,600.00$1,600.00$1,616.00$1,600.00$2,215.00$1,680.00
97Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH16$800.00$800.00$808.00$800.00$750.00$840.00
98Poles type 6-aluminum (657.0327)EACH16$2,400.00$2,400.00$2,424.00$2,400.00$2,500.00$2,520.00
99Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH16$410.00$410.00$414.10$410.00$375.00$430.50
100Luminaires utility LED B (659.1120)EACH16$600.00$600.00$606.00$600.00$400.00$630.00
101Lighting control cabinets 120/240 24-inch (659.2124)EACH1$10,000$10,000$10,100$10,000$7,400.00$10,500
102Sawing asphalt (690.0150)LF238$2.00$5.00$2.37$2.35$2.35$2.10
103Incentive compressive strength concrete pavement (715.0720)DOL1,500$1.00$1.00$1.00$1.00$1.00$1.00
104On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00$5.00$5.00$5.00$5.00
105On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00$5.00$5.00
106Special 01. construction staking roundabout CTH F/HH (SPV.0060)EACH1$10,000$11,000$10,100$10,000$10,000$20,916
WisDOT contract 20251111024: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy