WisDOT contract 20251111037 bid tabulation

Hudson - Baldwin; Cnw Rr Bridge B-55-0076 (USH 012, St Croix County Hudson - Baldwin). Let by Wisconsin DOT on November 11, 2025, St Croix. 5 bids received; low bid $1,240,822 by Lunda Construction Company.

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
82
Data through
10 NOV 2026

4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Lunda Construction Company$1,240,822Low
2Sheet Piling Services LLC$1,272,209+3.0%
3Larson Construction Co., Inc.$1,280,913+3.0%
4Zenith Tech., Inc. - Waukesha$1,348,204+9.0%
WisDOT contract 20251111037: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lunda Construction Company2. Sheet Piling Services LLC3. Larson Construction Co., Inc.4. Zenith Tech., Inc. - Waukesha
1Abatement of asbestos containing material (structure) 01. B-55-76 (203.0211.S)EACH1$8,000.00$6,415.00$6,479.15$6,415.00
2Removing structure (structure) 01. B-55-76 (203.0220)EACH1$300,000$350,000$185,349$289,000
3Debris containment (structure) 01. B-55-76 (203.0330)EACH1$500.00$20,000$70,150$43,750
4Removing concrete pavement (204.0100)SY377$22.50$22.50$22.50$22.50
5Removing guardrail (204.0165)LF160$6.00$6.00$6.00$6.00
6Excavation common (205.0100)CY450$13.50$13.50$13.50$13.50
7Excavation for structures bridges (structure) 01. B-55-76 (206.1001)EACH1$10,000$100,000$3,325.00$41,000
8Backfill granular grade 1 (209.1500)TON210$22.38$22.38$22.38$22.38
9Backfill structure type A (210.1500)TON20$33.70$33.70$33.70$33.70
10Finishing roadway (project) 01. 8949-00-73 (213.0100)EACH1$500.00$0.01$2,000.00$3,000.00
11Base aggregate dense 3/4-inch (305.0110)TON3$150.00$150.00$150.00$150.00
12Base aggregate dense 1 1/4-inch (305.0120)TON326$35.20$35.20$35.20$35.20
13Concrete pavement 8-inch (415.0080)SY82$127.48$127.48$128.75$127.48
14Concrete pavement approach slab (415.0410)SY114$329.64$329.64$332.94$329.64
15Drilled tie bars (416.0610)EACH4$16.03$16.03$16.19$16.03
16Tack coat (455.0605)GAL24$16.38$16.38$16.38$16.38
17Asphaltic surface (465.0105)TON75$196.91$196.91$196.91$196.91
18Concrete masonry bridges (502.0100)CY260$1,000.00$1,000.00$1,149.00$1,600.00
19Expansion device (502.3101)LF49$250.00$300.00$722.00$275.00
20Protective surface treatment (502.3200)SY711$3.00$3.50$3.97$4.00
21Pigmented surface sealer (502.3210)SY213$5.00$4.00$8.00$13.00
22Adhesive anchors no. 5 bar (502.4205)EACH111$20.00$25.00$38.00$29.00
23Adhesive anchors no. 6 bar (502.4206)EACH42$25.00$30.00$38.00$36.00
24Bar steel reinforcement HS coated structures (505.0600)LB66,310$1.39$1.30$1.97$1.55
25Bearing pads elastomeric laminated (506.2610)EACH5$2,500.00$3,500.00$1,345.00$2,250.00
26Steel diaphragms (structure) 01. B- 55-76 (506.4000)EACH12$2,000.00$3,000.00$2,500.00$2,400.00
27Removing bearings (structure) 01. B-55-76 (506.7050.S)EACH5$200.00$1,000.00$742.00$2,200.00
28Concrete surface repair (509.1500)SF42$150.00$125.00$154.00$285.00
29Rubberized membrane waterproofing (516.0500)SY16$20.00$25.00$66.00$60.00
30Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF127$70.45$70.45$71.15$70.45
31Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF69$70.45$70.45$71.15$70.45
32Concrete surface drains (602.3010)CY3$1,572.13$1,572.13$1,587.85$1,572.13
33Riprap medium (606.0200)CY6$125.00$125.00$125.00$125.00
34Anchor assemblies for steel plate beam guard (614.0150)EACH4$250.00$1,000.00$259.00$300.00
35Adjusting steel plate beam guard (614.0400)LF100$10.00$10.00$10.00$10.00
36Replacing guardrail posts and blocks (614.0950)EACH12$200.00$200.00$200.00$200.00
37MGS thrie beam transition (614.2500)LF157.60$98.00$98.00$98.00$98.00
38Maintenance and repair of haul roads (project) 01. 8949-00-73 (618.0100)EACH1$0.01$0.01$1,500.00$3,600.00
39Mobilization (619.1000)EACH1$285,729$141,206$265,400$125,000
40Water (624.0100)MGAL12$1.00$1.00$1.00$1.00
41Salvaged topsoil (625.0500)SY244$4.00$4.00$4.00$4.00
42Mulching (627.0200)SY190$2.00$2.00$2.00$2.00
43Silt fence (628.1504)LF426$3.00$3.00$3.00$3.00
44Silt fence maintenance (628.1520)LF426$0.01$0.01$0.01$0.01
45Mobilizations erosion control (628.1905)EACH3$375.00$375.00$375.00$375.00
46Mobilizations emergency erosion control (628.1910)EACH3$1.00$1.00$1.00$1.00
47Erosion mat class I type B (628.2004)SY244$2.00$2.00$2.00$2.00
48Fertilizer type B (629.0210)CWT0.50$500.00$500.00$500.00$500.00
49Seeding mixture no. 20 (630.0120)LB23$25.00$25.00$25.00$25.00
50Seeding temporary (630.0200)LB15$5.00$5.00$5.00$5.00
51Seed water (630.0500)MGAL11$1.00$1.00$1.00$1.00
52Posts wood 4X6-inch X 12-FT (634.0612)EACH4$110.00$110.00$110.00$110.00
53Posts wood 4X6-inch X 14-FT (634.0614)EACH2$120.00$120.00$120.00$120.00
54Signs type II reflective F (637.2230)SF12$25.00$25.00$25.00$25.00
55Moving signs type II (638.2102)EACH2$50.00$50.00$50.00$50.00
56Removing small sign supports (638.3000)EACH6$20.00$20.00$20.00$20.00
57Field office type B (642.5001)EACH1$3,500.00$1,500.00$4,000.00$12,000
58Traffic control barricades type III (643.0420)DAY2,178$1.10$1.10$1.10$1.10
59Traffic control warning lights type A (643.0705)DAY3,564$0.20$0.20$0.20$0.20
60Traffic control signs (643.0900)DAY27,918$0.35$0.35$0.35$0.35
61Traffic control covering signs type I (643.0910)EACH2$175.00$175.00$175.00$175.00
62Traffic control covering signs type II (643.0920)EACH7$20.00$20.00$20.00$20.00
63Traffic control signs PCMS (643.1050)DAY14$50.00$50.00$50.00$50.00
64Traffic control (643.5000)EACH1$2,700.00$2,700.00$2,700.00$2,700.00
65Geotextile type HR (645.0120)SY24$5.00$5.00$5.00$5.00
66Marking line epoxy 6-inch (646.2020)LF1,320$3.75$3.75$3.75$3.75
67Construction staking subgrade (650.4500)LF142$0.01$0.01$0.01$0.01
68Construction staking base (650.5000)LF88$0.01$0.01$0.01$0.01
69Construction staking curb gutter and curb & gutter (650.5500)LF127$5.00$5.00$5.00$5.00
70Construction staking structure layout (structure) 01. B-55-0076 (650.6501)EACH1$2,000.00$2,000.00$2,000.00$2,000.00
71Construction staking concrete pavement (650.7000)LF68$5.00$5.00$5.00$5.00
72Construction staking supplemental control (project) 01. 8949-00-73 (650.9911)EACH1$850.00$850.00$850.00$850.00
73Construction staking slope stakes (650.9920)LF142$2.00$2.00$2.00$2.00
74Sawing asphalt (690.0150)LF100$2.00$2.95$2.95$2.95
75Sawing concrete (690.0250)LF6$6.25$2.95$2.95$2.95
76Incentive strength concrete structures (715.0502)DOL1,560$1.00$1.00$1.00$1.00
77Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00$1.00$1.00
78Railroad flagging reimbursement (801.0117)DOL25,000$1.00$1.00$1.00$1.00
79Installing and maintaining bird deterrent system (station) 01. 466+17 (999.2000.S)EACH1$0.01$0.01$1,300.00$0.01
80On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00
81On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00$5.00$5.00$5.00
82Special 01. fiber wrap reinforcing non-structural (SPV.0165)SF67$295.00$295.00$295.00$295.00
WisDOT contract 20251111037: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy