WisDOT contract 20251111037 bid tabulation
Hudson - Baldwin; Cnw Rr Bridge B-55-0076 (USH 012, St Croix County Hudson - Baldwin). Let by Wisconsin DOT on November 11, 2025, St Croix. 5 bids received; low bid $1,240,822 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 82
- Data through
- 10 NOV 2026
4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $1,240,822 | Low |
| 2 | Sheet Piling Services LLC | $1,272,209 | +3.0% |
| 3 | Larson Construction Co., Inc. | $1,280,913 | +3.0% |
| 4 | Zenith Tech., Inc. - Waukesha | $1,348,204 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Sheet Piling Services LLC | 3. Larson Construction Co., Inc. | 4. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|
| 1 | Abatement of asbestos containing material (structure) 01. B-55-76 (203.0211.S) | EACH | 1 | $8,000.00 | $6,415.00 | $6,479.15 | $6,415.00 |
| 2 | Removing structure (structure) 01. B-55-76 (203.0220) | EACH | 1 | $300,000 | $350,000 | $185,349 | $289,000 |
| 3 | Debris containment (structure) 01. B-55-76 (203.0330) | EACH | 1 | $500.00 | $20,000 | $70,150 | $43,750 |
| 4 | Removing concrete pavement (204.0100) | SY | 377 | $22.50 | $22.50 | $22.50 | $22.50 |
| 5 | Removing guardrail (204.0165) | LF | 160 | $6.00 | $6.00 | $6.00 | $6.00 |
| 6 | Excavation common (205.0100) | CY | 450 | $13.50 | $13.50 | $13.50 | $13.50 |
| 7 | Excavation for structures bridges (structure) 01. B-55-76 (206.1001) | EACH | 1 | $10,000 | $100,000 | $3,325.00 | $41,000 |
| 8 | Backfill granular grade 1 (209.1500) | TON | 210 | $22.38 | $22.38 | $22.38 | $22.38 |
| 9 | Backfill structure type A (210.1500) | TON | 20 | $33.70 | $33.70 | $33.70 | $33.70 |
| 10 | Finishing roadway (project) 01. 8949-00-73 (213.0100) | EACH | 1 | $500.00 | $0.01 | $2,000.00 | $3,000.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 3 | $150.00 | $150.00 | $150.00 | $150.00 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 326 | $35.20 | $35.20 | $35.20 | $35.20 |
| 13 | Concrete pavement 8-inch (415.0080) | SY | 82 | $127.48 | $127.48 | $128.75 | $127.48 |
| 14 | Concrete pavement approach slab (415.0410) | SY | 114 | $329.64 | $329.64 | $332.94 | $329.64 |
| 15 | Drilled tie bars (416.0610) | EACH | 4 | $16.03 | $16.03 | $16.19 | $16.03 |
| 16 | Tack coat (455.0605) | GAL | 24 | $16.38 | $16.38 | $16.38 | $16.38 |
| 17 | Asphaltic surface (465.0105) | TON | 75 | $196.91 | $196.91 | $196.91 | $196.91 |
| 18 | Concrete masonry bridges (502.0100) | CY | 260 | $1,000.00 | $1,000.00 | $1,149.00 | $1,600.00 |
| 19 | Expansion device (502.3101) | LF | 49 | $250.00 | $300.00 | $722.00 | $275.00 |
| 20 | Protective surface treatment (502.3200) | SY | 711 | $3.00 | $3.50 | $3.97 | $4.00 |
| 21 | Pigmented surface sealer (502.3210) | SY | 213 | $5.00 | $4.00 | $8.00 | $13.00 |
| 22 | Adhesive anchors no. 5 bar (502.4205) | EACH | 111 | $20.00 | $25.00 | $38.00 | $29.00 |
| 23 | Adhesive anchors no. 6 bar (502.4206) | EACH | 42 | $25.00 | $30.00 | $38.00 | $36.00 |
| 24 | Bar steel reinforcement HS coated structures (505.0600) | LB | 66,310 | $1.39 | $1.30 | $1.97 | $1.55 |
| 25 | Bearing pads elastomeric laminated (506.2610) | EACH | 5 | $2,500.00 | $3,500.00 | $1,345.00 | $2,250.00 |
| 26 | Steel diaphragms (structure) 01. B- 55-76 (506.4000) | EACH | 12 | $2,000.00 | $3,000.00 | $2,500.00 | $2,400.00 |
| 27 | Removing bearings (structure) 01. B-55-76 (506.7050.S) | EACH | 5 | $200.00 | $1,000.00 | $742.00 | $2,200.00 |
| 28 | Concrete surface repair (509.1500) | SF | 42 | $150.00 | $125.00 | $154.00 | $285.00 |
| 29 | Rubberized membrane waterproofing (516.0500) | SY | 16 | $20.00 | $25.00 | $66.00 | $60.00 |
| 30 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 127 | $70.45 | $70.45 | $71.15 | $70.45 |
| 31 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 69 | $70.45 | $70.45 | $71.15 | $70.45 |
| 32 | Concrete surface drains (602.3010) | CY | 3 | $1,572.13 | $1,572.13 | $1,587.85 | $1,572.13 |
| 33 | Riprap medium (606.0200) | CY | 6 | $125.00 | $125.00 | $125.00 | $125.00 |
| 34 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $250.00 | $1,000.00 | $259.00 | $300.00 |
| 35 | Adjusting steel plate beam guard (614.0400) | LF | 100 | $10.00 | $10.00 | $10.00 | $10.00 |
| 36 | Replacing guardrail posts and blocks (614.0950) | EACH | 12 | $200.00 | $200.00 | $200.00 | $200.00 |
| 37 | MGS thrie beam transition (614.2500) | LF | 157.60 | $98.00 | $98.00 | $98.00 | $98.00 |
| 38 | Maintenance and repair of haul roads (project) 01. 8949-00-73 (618.0100) | EACH | 1 | $0.01 | $0.01 | $1,500.00 | $3,600.00 |
| 39 | Mobilization (619.1000) | EACH | 1 | $285,729 | $141,206 | $265,400 | $125,000 |
| 40 | Water (624.0100) | MGAL | 12 | $1.00 | $1.00 | $1.00 | $1.00 |
| 41 | Salvaged topsoil (625.0500) | SY | 244 | $4.00 | $4.00 | $4.00 | $4.00 |
| 42 | Mulching (627.0200) | SY | 190 | $2.00 | $2.00 | $2.00 | $2.00 |
| 43 | Silt fence (628.1504) | LF | 426 | $3.00 | $3.00 | $3.00 | $3.00 |
| 44 | Silt fence maintenance (628.1520) | LF | 426 | $0.01 | $0.01 | $0.01 | $0.01 |
| 45 | Mobilizations erosion control (628.1905) | EACH | 3 | $375.00 | $375.00 | $375.00 | $375.00 |
| 46 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $1.00 | $1.00 | $1.00 | $1.00 |
| 47 | Erosion mat class I type B (628.2004) | SY | 244 | $2.00 | $2.00 | $2.00 | $2.00 |
| 48 | Fertilizer type B (629.0210) | CWT | 0.50 | $500.00 | $500.00 | $500.00 | $500.00 |
| 49 | Seeding mixture no. 20 (630.0120) | LB | 23 | $25.00 | $25.00 | $25.00 | $25.00 |
| 50 | Seeding temporary (630.0200) | LB | 15 | $5.00 | $5.00 | $5.00 | $5.00 |
| 51 | Seed water (630.0500) | MGAL | 11 | $1.00 | $1.00 | $1.00 | $1.00 |
| 52 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $110.00 | $110.00 | $110.00 | $110.00 |
| 53 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 2 | $120.00 | $120.00 | $120.00 | $120.00 |
| 54 | Signs type II reflective F (637.2230) | SF | 12 | $25.00 | $25.00 | $25.00 | $25.00 |
| 55 | Moving signs type II (638.2102) | EACH | 2 | $50.00 | $50.00 | $50.00 | $50.00 |
| 56 | Removing small sign supports (638.3000) | EACH | 6 | $20.00 | $20.00 | $20.00 | $20.00 |
| 57 | Field office type B (642.5001) | EACH | 1 | $3,500.00 | $1,500.00 | $4,000.00 | $12,000 |
| 58 | Traffic control barricades type III (643.0420) | DAY | 2,178 | $1.10 | $1.10 | $1.10 | $1.10 |
| 59 | Traffic control warning lights type A (643.0705) | DAY | 3,564 | $0.20 | $0.20 | $0.20 | $0.20 |
| 60 | Traffic control signs (643.0900) | DAY | 27,918 | $0.35 | $0.35 | $0.35 | $0.35 |
| 61 | Traffic control covering signs type I (643.0910) | EACH | 2 | $175.00 | $175.00 | $175.00 | $175.00 |
| 62 | Traffic control covering signs type II (643.0920) | EACH | 7 | $20.00 | $20.00 | $20.00 | $20.00 |
| 63 | Traffic control signs PCMS (643.1050) | DAY | 14 | $50.00 | $50.00 | $50.00 | $50.00 |
| 64 | Traffic control (643.5000) | EACH | 1 | $2,700.00 | $2,700.00 | $2,700.00 | $2,700.00 |
| 65 | Geotextile type HR (645.0120) | SY | 24 | $5.00 | $5.00 | $5.00 | $5.00 |
| 66 | Marking line epoxy 6-inch (646.2020) | LF | 1,320 | $3.75 | $3.75 | $3.75 | $3.75 |
| 67 | Construction staking subgrade (650.4500) | LF | 142 | $0.01 | $0.01 | $0.01 | $0.01 |
| 68 | Construction staking base (650.5000) | LF | 88 | $0.01 | $0.01 | $0.01 | $0.01 |
| 69 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 127 | $5.00 | $5.00 | $5.00 | $5.00 |
| 70 | Construction staking structure layout (structure) 01. B-55-0076 (650.6501) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 71 | Construction staking concrete pavement (650.7000) | LF | 68 | $5.00 | $5.00 | $5.00 | $5.00 |
| 72 | Construction staking supplemental control (project) 01. 8949-00-73 (650.9911) | EACH | 1 | $850.00 | $850.00 | $850.00 | $850.00 |
| 73 | Construction staking slope stakes (650.9920) | LF | 142 | $2.00 | $2.00 | $2.00 | $2.00 |
| 74 | Sawing asphalt (690.0150) | LF | 100 | $2.00 | $2.95 | $2.95 | $2.95 |
| 75 | Sawing concrete (690.0250) | LF | 6 | $6.25 | $2.95 | $2.95 | $2.95 |
| 76 | Incentive strength concrete structures (715.0502) | DOL | 1,560 | $1.00 | $1.00 | $1.00 | $1.00 |
| 77 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 78 | Railroad flagging reimbursement (801.0117) | DOL | 25,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 79 | Installing and maintaining bird deterrent system (station) 01. 466+17 (999.2000.S) | EACH | 1 | $0.01 | $0.01 | $1,300.00 | $0.01 |
| 80 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 81 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 82 | Special 01. fiber wrap reinforcing non-structural (SPV.0165) | SF | 67 | $295.00 | $295.00 | $295.00 | $295.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.