WisDOT contract 20251209001 bid tabulation
Lake Mills - Oconomowoc; STH 26 Interchange Area (IH 094, Jefferson County Lake Mills - Oconomowoc). Let by Wisconsin DOT on December 9, 2025, Jefferson. 4 bids received; low bid $3,943,583 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 150
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $3,943,583 | Low |
| 2 | Michels Road & Stone, Inc. | $4,110,225 | +4.0% |
| 3 | Zenith Tech., Inc. - Waukesha | $4,225,226 | +7.0% |
| 4 | Zignego Company, Inc. | $4,383,157 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. Michels Road & Stone, Inc. | 3. Zenith Tech., Inc. - Waukesha | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing asphaltic surface (204.0110) | SY | 374 | $24.37 | $25.00 | $36.66 | $20.00 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 208 | $2.78 | $2.78 | $1.90 | $2.78 |
| 3 | Removing asphaltic surface milling (204.0120) | SY | 34,100 | $3.12 | $3.12 | $3.26 | $3.12 |
| 4 | Removing curb & gutter (204.0150) | LF | 653 | $12.27 | $11.00 | $18.73 | $20.00 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 150 | $24.38 | $11.00 | $42.72 | $20.00 |
| 6 | Removing guardrail (204.0165) | LF | 7,100 | $2.25 | $2.65 | $2.25 | $2.25 |
| 7 | Removing surface drains (204.0190) | EACH | 9 | $194.06 | $500.00 | $668.11 | $1,000.00 |
| 8 | Removing (item description) 01. pedestrian push button (204.9060.S) | EACH | 3 | $200.00 | $150.00 | $150.00 | $150.00 |
| 9 | Excavation common (205.0100) | CY | 97 | $75.90 | $100.00 | $171.74 | $100.00 |
| 10 | Prepare foundation for asphaltic paving (project) 01. 1067-04-61 (211.0101) | EACH | 1 | $0.01 | $0.01 | $5,175.00 | $0.01 |
| 11 | Finishing roadway (project) 01. 1067-04-61 (213.0100) | EACH | 1 | $3,880.00 | $5,000.00 | $2,500.00 | $1,000.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,404 | $30.01 | $38.00 | $61.40 | $60.00 |
| 13 | Shaping shoulders (305.0500) | STA | 398 | $69.87 | $27.00 | $120.00 | $100.00 |
| 14 | Breaker run (311.0110) | TON | 134 | $33.51 | $21.00 | $107.70 | $100.00 |
| 15 | Select crushed material (312.0110) | TON | 30 | $54.48 | $21.00 | $107.70 | $100.00 |
| 16 | Rout and seal (415.6000.S) | LF | 39,700 | $1.14 | $1.13 | $1.14 | $1.14 |
| 17 | Drilled tie bars (416.0610) | EACH | 1,275 | $17.70 | $14.00 | $16.80 | $30.00 |
| 18 | Drilled dowel bars (416.0620) | EACH | 2,710 | $21.37 | $27.00 | $26.14 | $30.00 |
| 19 | Pavement dowel bars retrofit warranted (416.0623.S) | EACH | 856 | $184.33 | $208.00 | $92.74 | $270.00 |
| 20 | Concrete pavement repair shes (416.1715) | SY | 1,300 | $167.02 | $154.00 | $185.00 | $194.00 |
| 21 | Concrete pavement replacement shes (416.1725) | SY | 3,530 | $167.85 | $157.00 | $185.00 | $194.00 |
| 22 | Continuous diamond grinding concrete pavement (420.1000) | SY | 47,900 | $4.41 | $4.91 | $10.67 | $4.41 |
| 23 | Tack coat (455.0605) | GAL | 2,900 | $3.56 | $3.56 | $2.30 | $3.56 |
| 24 | Incentive density HMA pavement (460.2000) | DOL | 3,290 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 3,620 | $98.58 | $98.58 | $121.50 | $98.58 |
| 26 | Asphaltic surface (465.0105) | TON | 1,893 | $102.96 | $102.96 | $113.50 | $102.96 |
| 27 | Asphaltic surface patching (465.0110) | TON | 5 | $206.03 | $206.03 | $920.00 | $206.03 |
| 28 | Asphaltic surface safety islands (465.0305) | TON | 3 | $206.03 | $206.03 | $920.00 | $206.03 |
| 29 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 12,500 | $0.60 | $0.60 | $1.25 | $0.60 |
| 30 | Preparation decks type 1 (509.0301) | SY | 112 | $277.00 | $277.00 | $300.00 | $277.00 |
| 31 | Preparation decks type 2 (509.0302) | SY | 45 | $316.00 | $316.00 | $375.00 | $316.00 |
| 32 | Sawing pavement deck preparation areas (509.0310.S) | LF | 1,120 | $8.50 | $8.50 | $7.00 | $8.50 |
| 33 | Concrete surface repair (509.1500) | SF | 76 | $274.00 | $274.00 | $300.00 | $274.00 |
| 34 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 47 | $71.56 | $40.00 | $61.69 | $120.00 |
| 35 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 161 | $72.04 | $41.00 | $64.81 | $120.00 |
| 36 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 57 | $70.74 | $42.00 | $69.29 | $120.00 |
| 37 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 207 | $76.66 | $44.00 | $69.17 | $120.00 |
| 38 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 323 | $94.55 | $44.00 | $68.72 | $120.00 |
| 39 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 185 | $95.75 | $44.00 | $69.40 | $120.00 |
| 40 | Concrete curb pedestrian (601.0600) | LF | 37 | $93.00 | $45.00 | $35.42 | $120.00 |
| 41 | Concrete sidewalk 4-inch (602.0405) | SF | 1,200 | $17.49 | $14.00 | $19.64 | $16.00 |
| 42 | Curb ramp detectable warning field natural patina (602.0515) | SF | 100 | $45.09 | $38.00 | $34.22 | $75.00 |
| 43 | Concrete surface drains hes (602.3015) | CY | 13.50 | $2,243.41 | $1,700.00 | $1,303.41 | $1,000.00 |
| 44 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 7,700 | $0.90 | $0.90 | $1.95 | $0.90 |
| 45 | Slope paving repair crushed aggregate (604.9010.S) | CY | 65 | $80.00 | $200.00 | $200.00 | $80.00 |
| 46 | Reseal crushed aggregate slope paving (604.9015.S) | SY | 1,833 | $24.00 | $10.80 | $10.80 | $10.80 |
| 47 | Riprap medium (606.0200) | CY | 239 | $134.16 | $170.00 | $248.10 | $260.00 |
| 48 | Adjusting manhole covers (611.8110) | EACH | 1 | $1,199.00 | $550.00 | $1,843.69 | $2,000.00 |
| 49 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 85 | $64.34 | $28.00 | $61.20 | $30.00 |
| 50 | MGS guardrail 3 (614.2300) | LF | 6,618.40 | $28.00 | $28.00 | $28.00 | $28.00 |
| 51 | MGS guardrail 3 HS (614.2310) | LF | 350 | $36.00 | $36.00 | $36.00 | $36.00 |
| 52 | MGS guardrail 3 QS (614.2320) | LF | 150 | $55.00 | $55.00 | $55.00 | $55.00 |
| 53 | MGS guardrail 3 K (614.2330) | LF | 37.50 | $40.00 | $40.00 | $40.00 | $40.00 |
| 54 | MGS thrie beam transition (614.2500) | LF | 646.60 | $92.00 | $92.00 | $92.00 | $92.00 |
| 55 | MGS guardrail terminal eat (614.2610) | EACH | 25 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 |
| 56 | MGS guardrail terminal type 2 (614.2620) | EACH | 11 | $3,200.00 | $3,200.00 | $3,200.00 | $3,200.00 |
| 57 | Maintenance and repair of haul roads (project) 01. 1067-04-61 (618.0100) | EACH | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 58 | Mobilization (619.1000) | EACH | 1 | $450,729 | $546,859 | $193,491 | $558,000 |
| 59 | Water (624.0100) | MGAL | 28.10 | $67.25 | $60.00 | $24.23 | $200.00 |
| 60 | Salvaged topsoil (625.0500) | SY | 992 | $15.67 | $9.00 | $11.55 | $10.00 |
| 61 | Silt fence (628.1504) | LF | 750 | $2.50 | $2.50 | $2.50 | $2.50 |
| 62 | Silt fence maintenance (628.1520) | LF | 1,500 | $0.01 | $0.01 | $0.01 | $0.01 |
| 63 | Mobilizations erosion control (628.1905) | EACH | 6 | $200.00 | $200.00 | $200.00 | $200.00 |
| 64 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $100.00 | $100.00 | $100.00 | $100.00 |
| 65 | Erosion mat urban class I type A (628.2006) | SY | 992 | $1.80 | $1.80 | $1.80 | $1.80 |
| 66 | Inlet protection type A (628.7005) | EACH | 5 | $150.00 | $150.00 | $150.00 | $150.00 |
| 67 | Culvert pipe checks (628.7555) | EACH | 3 | $20.00 | $20.00 | $20.00 | $20.00 |
| 68 | Rock bags (628.7570) | EACH | 90 | $20.00 | $20.00 | $20.00 | $20.00 |
| 69 | Fertilizer type B (629.0210) | CWT | 3.10 | $90.00 | $90.00 | $90.00 | $90.00 |
| 70 | Seeding mixture no. 30 (630.0130) | LB | 70 | $9.75 | $9.75 | $9.75 | $9.75 |
| 71 | Seeding borrow pit (630.0300) | LB | 5 | $9.75 | $9.75 | $9.75 | $9.75 |
| 72 | Seed water (630.0500) | MGAL | 22 | $80.00 | $80.00 | $80.00 | $80.00 |
| 73 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 2 | $200.00 | $200.00 | $200.00 | $200.00 |
| 74 | Moving signs type II (638.2102) | EACH | 6 | $75.00 | $75.00 | $75.00 | $75.00 |
| 75 | Removing small sign supports (638.3000) | EACH | 2 | $50.00 | $50.00 | $50.00 | $50.00 |
| 76 | Field office type C (642.5201) | EACH | 1 | $12,864 | $18,500 | $8,689.31 | $20,000 |
| 77 | Traffic control drums (643.0300) | DAY | 14,607 | $0.51 | $0.40 | $0.20 | $0.20 |
| 78 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 86 | $74.85 | $67.75 | $53.03 | $52.50 |
| 79 | Traffic control barricades type III (643.0420) | DAY | 1,299 | $1.25 | $1.25 | $0.61 | $0.60 |
| 80 | Traffic control warning lights type A (643.0705) | DAY | 2,388 | $0.24 | $0.40 | $0.10 | $0.10 |
| 81 | Traffic control warning lights type C (643.0715) | DAY | 2,099 | $0.28 | $0.40 | $0.10 | $0.10 |
| 82 | Traffic control connected arrow boards (643.0810) | DAY | 137 | $19.23 | $25.00 | $12.12 | $12.00 |
| 83 | Traffic control signs (643.0900) | DAY | 7,251 | $0.96 | $0.40 | $0.30 | $0.30 |
| 84 | Traffic control covering signs type I (643.0910) | EACH | 16 | $114.33 | $280.00 | $227.27 | $225.00 |
| 85 | Traffic control covering signs type II (643.0920) | EACH | 43 | $85.12 | $240.00 | $40.40 | $40.00 |
| 86 | Traffic control signs PCMS (643.1050) | DAY | 79 | $72.84 | $27.50 | $35.35 | $35.00 |
| 87 | Truck or trailer mounted attenuator (643.1055.S) | DAY | 48 | $383.64 | $700.00 | $555.56 | $550.00 |
| 88 | Basic traffic queue warning system (643.1205.S) | DAY | 86 | $113.33 | $147.50 | $101.01 | $100.00 |
| 89 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 137 | $7.32 | $19.25 | $6.31 | $6.25 |
| 90 | Temporary marking line paint 6- inch (643.3165) | LF | 1,435 | $6.00 | $1.70 | $1.52 | $1.50 |
| 91 | Temporary marking line paint 10- inch (643.3265) | LF | 210 | $12.00 | $3.50 | $2.53 | $2.50 |
| 92 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 90 | $11.00 | $2.50 | $5.05 | $5.00 |
| 93 | Temporary marking stop line paint 18-inch (643.3805) | LF | 26 | $12.00 | $5.50 | $15.15 | $15.00 |
| 94 | Temporary marking stop line epoxy 18-inch (643.3820) | LF | 20 | $12.00 | $15.50 | $202.02 | $200.00 |
| 95 | Traffic control (643.5000) | EACH | 1 | $44,859 | $174,125 | $42,813 | $42,385 |
| 96 | Temporary pedestrian surface matting (644.1440) | SF | 250 | $14.89 | $3.20 | $7.58 | $7.50 |
| 97 | Temporary pedestrian curb ramp (644.1601) | DAY | 14 | $26.85 | $24.50 | $50.51 | $50.00 |
| 98 | Temporary pedestrian barricade (644.1810) | LF | 220 | $12.04 | $7.00 | $5.81 | $5.75 |
| 99 | Temporary audible message devices (644.1900.S) | DAY | 28 | $8.21 | $8.50 | $15.15 | $15.00 |
| 100 | Geotextile type HR (645.0120) | SY | 566 | $3.96 | $9.00 | $10.98 | $10.00 |
| 101 | Geotextile type sas (645.0140) | SY | 40 | $12.04 | $10.00 | $12.08 | $10.00 |
| 102 | Marking line epoxy 4-inch (646.1020) | LF | 400 | $1.00 | $1.00 | $1.01 | $1.00 |
| 103 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 4,270 | $1.40 | $1.40 | $1.41 | $1.40 |
| 104 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 48,230 | $1.43 | $1.43 | $1.44 | $1.43 |
| 105 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 3,330 | $8.00 | $8.00 | $8.08 | $8.00 |
| 106 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 6,540 | $2.95 | $2.95 | $2.98 | $2.95 |
| 107 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 2,200 | $10.25 | $10.25 | $10.35 | $10.25 |
| 108 | Marking arrow epoxy (646.5020) | EACH | 45 | $225.00 | $225.00 | $227.27 | $225.00 |
| 109 | Marking word epoxy (646.5120) | EACH | 44 | $300.00 | $300.00 | $303.03 | $300.00 |
| 110 | Marking symbol epoxy (646.5220) | EACH | 9 | $300.00 | $300.00 | $303.03 | $300.00 |
| 111 | Marking stop line epoxy 18-inch (646.6120) | LF | 680 | $11.50 | $11.50 | $11.62 | $11.50 |
| 112 | Marking chevron epoxy 24-inch (646.7220) | LF | 490 | $13.00 | $13.00 | $13.13 | $13.00 |
| 113 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 320 | $11.00 | $11.00 | $11.11 | $11.00 |
| 114 | Marking parking stall epoxy (646.8320) | LF | 1,870 | $6.00 | $6.00 | $6.06 | $6.00 |
| 115 | Marking removal line 4-inch (646.9000) | LF | 1,030 | $4.00 | $0.70 | $0.51 | $0.50 |
| 116 | Marking removal line 6-inch (646.9002) | LF | 300 | $4.05 | $1.10 | $1.01 | $1.00 |
| 117 | Marking removal line wide (646.9200) | LF | 82 | $12.00 | $3.50 | $2.02 | $2.00 |
| 118 | Marking removal plowable raised pavement markers (646.9400) | EACH | 177 | $150.00 | $28.00 | $29.92 | $28.00 |
| 119 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 427 | $3.00 | $3.00 | $3.00 | $3.00 |
| 120 | Construction staking resurfacing reference (650.8000) | LF | 12,900 | $0.13 | $0.13 | $0.13 | $0.13 |
| 121 | Construction staking electrical installations (project) 01. 1067-04- 61 (650.8501) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 122 | Construction staking curb ramps (650.9000) | EACH | 9 | $300.00 | $300.00 | $300.00 | $300.00 |
| 123 | Construction staking sidewalk (project) 01. 1067-04-61 (650.9500) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 124 | Construction staking supplemental control (project) 01. 1067-04-61 (650.9911) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 125 | Construction staking slope stakes (650.9920) | LF | 11,850 | $1.00 | $1.00 | $1.00 | $1.00 |
| 126 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 716 | $10.00 | $8.00 | $8.00 | $10.00 |
| 127 | Install conduit into existing item (652.0700.S) | EACH | 6 | $200.00 | $150.00 | $150.00 | $200.00 |
| 128 | Conduit loop detector (652.0800) | LF | 54 | $7.00 | $10.00 | $10.00 | $7.00 |
| 129 | Pull boxes steel 12X36-inch (653.0115) | EACH | 1 | $925.00 | $850.00 | $850.00 | $925.00 |
| 130 | Pull boxes steel 24X42-inch (653.0140) | EACH | 6 | $950.00 | $1,200.00 | $1,200.00 | $950.00 |
| 131 | Junction boxes 8X8X8-inch (653.0208) | EACH | 1 | $1,200.00 | $2,000.00 | $2,000.00 | $1,200.00 |
| 132 | Adjusting pull boxes (653.0900) | EACH | 7 | $400.00 | $450.00 | $450.00 | $400.00 |
| 133 | Removing pull boxes (653.0905) | EACH | 3 | $190.00 | $150.00 | $150.00 | $150.00 |
| 134 | Concrete bases type 1 (654.0101) | EACH | 3 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 135 | Electrical wire lighting 10 AWG (655.0615) | LF | 715 | $1.00 | $1.10 | $1.10 | $1.00 |
| 136 | Loop detector wire (655.0800) | LF | 270 | $1.25 | $1.30 | $1.30 | $1.25 |
| 137 | Pedestal bases (657.0100) | EACH | 3 | $255.00 | $300.00 | $300.00 | $255.00 |
| 138 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 3 | $275.00 | $450.00 | $450.00 | $275.00 |
| 139 | Pedestrian push buttons (658.0500) | EACH | 3 | $335.00 | $450.00 | $450.00 | $335.00 |
| 140 | Remove cable (674.0300) | LF | 1,470 | $1.00 | $1.00 | $1.00 | $1.00 |
| 141 | Reinstall cable (674.0400) | LF | 1,500 | $1.00 | $1.50 | $1.50 | $1.00 |
| 142 | Sawing asphalt (690.0150) | LF | 1,481 | $1.75 | $1.39 | $1.39 | $1.39 |
| 143 | Sawing concrete (690.0250) | LF | 9,713 | $2.35 | $5.00 | $7.62 | $5.25 |
| 144 | Incentive iri ride (740.0440) | DOL | 9,207 | $1.00 | $1.00 | $1.00 | $1.00 |
| 145 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 146 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,160 | $5.00 | $5.00 | $5.00 | $5.00 |
| 147 | Special 01. rapid set deck repair (SPV.0035) | CY | 15 | $2,355.00 | $2,355.00 | $2,500.00 | $2,355.00 |
| 148 | Special 01. foam-jacking (SPV.0085) | LB | 50 | $68.00 | $68.00 | $75.00 | $200.00 |
| 149 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 7,230 | $3.74 | $3.74 | $3.98 | $3.74 |
| 150 | Special 02. methacrylate flood seal (SPV.0180) | SY | 5,210 | $17.60 | $17.60 | $17.00 | $17.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.