WisDOT contract 20251209020 bid tabulation
T Forest, Walnut Road; Sheboygan River Bridge (LOC STR, Fond du Lac County T Forest, Walnut Road). Let by Wisconsin DOT on December 9, 2025, Fond Du Lac. 4 bids received; low bid $626,576 by Pheifer Brothers Construction Co., Inc..
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 73
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pheifer Brothers Construction Co., Inc. | $626,576 | Low |
| 2 | Radtke Contractors Inc. | $629,908 | +1.0% |
| 3 | Lunda Construction Company | $712,446 | +14% |
| 4 | Sheet Piling Services LLC | $718,320 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pheifer Brothers Construction Co., Inc. | 2. Radtke Contractors Inc. | 3. Lunda Construction Company | 4. Sheet Piling Services LLC |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 6 | $1,000.00 | $1,000.00 | $1,812.75 | $1,195.00 |
| 2 | Grubbing (201.0205) | STA | 6 | $600.00 | $600.00 | $1,000.00 | $485.00 |
| 3 | Removing structure over waterway remove debris (structure) 01. P-20- 084 (203.0250) | EACH | 1 | $101,000 | $47,213 | $30,800 | $80,000 |
| 4 | Removing guardrail (204.0165) | LF | 81 | $10.00 | $4.00 | $10.00 | $3.50 |
| 5 | Excavation common (205.0100) | CY | 807 | $21.41 | $22.00 | $22.00 | $21.41 |
| 6 | Excavation for structures bridges (structure) 01. B-20-264 (206.1001) | EACH | 1 | $114,500 | $32,349 | $15,000 | $11,100 |
| 7 | Borrow (208.0100) | CY | 393 | $0.01 | $24.00 | $24.00 | $0.01 |
| 8 | Backfill structure type A (210.1500) | TON | 438 | $31.30 | $28.50 | $28.50 | $31.30 |
| 9 | Finishing roadway (project) 01. 4816-00-73 (213.0100) | EACH | 1 | $1,500.00 | $500.00 | $1,000.00 | $1,500.00 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 110 | $85.00 | $25.50 | $25.50 | $85.00 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 650 | $20.25 | $23.50 | $23.50 | $20.25 |
| 12 | Breaker run (311.0110) | TON | 1,081 | $22.06 | $21.35 | $21.35 | $22.06 |
| 13 | HMA cold weather paving (450.4000) | TON | 297 | $0.01 | $0.01 | $0.01 | $0.01 |
| 14 | Tack coat (455.0605) | GAL | 66 | $15.25 | $15.25 | $12.25 | $15.25 |
| 15 | Incentive density HMA pavement (460.2000) | DOL | 190 | $1.00 | $1.00 | $1.00 | $1.00 |
| 16 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 168 | $96.00 | $96.00 | $138.20 | $96.00 |
| 17 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 129 | $117.00 | $117.00 | $148.40 | $117.00 |
| 18 | Concrete masonry bridges (502.0100) | CY | 188 | $260.00 | $707.35 | $1,000.00 | $1,100.00 |
| 19 | Protective surface treatment (502.3200) | SY | 189 | $4.70 | $3.69 | $5.00 | $3.50 |
| 20 | Pigmented surface sealer (502.3210) | SY | 46 | $16.00 | $24.01 | $12.00 | $4.00 |
| 21 | Bar steel reinforcement HS structures (505.0400) | LB | 4,940 | $0.93 | $1.31 | $1.25 | $1.50 |
| 22 | Bar steel reinforcement HS coated structures (505.0600) | LB | 32,220 | $1.04 | $1.35 | $1.40 | $1.38 |
| 23 | Rubberized membrane waterproofing (516.0500) | SY | 12 | $60.00 | $64.32 | $35.00 | $25.00 |
| 24 | Pre-boring rock or consolidated materials (550.0020) | LF | 80 | $239.00 | $228.39 | $200.00 | $75.00 |
| 25 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 520 | $14.00 | $31.40 | $45.00 | $55.00 |
| 26 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 107 | $85.00 | $80.00 | $80.00 | $85.00 |
| 27 | Concrete surface drains (602.3010) | CY | 2 | $1,500.00 | $975.00 | $975.00 | $1,500.00 |
| 28 | Riprap medium (606.0200) | CY | 6 | $150.00 | $145.00 | $145.00 | $150.00 |
| 29 | Riprap heavy (606.0300) | CY | 195 | $98.00 | $86.00 | $86.00 | $98.00 |
| 30 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 160 | $5.92 | $4.25 | $4.25 | $5.92 |
| 31 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $330.00 | $340.69 | $200.00 | $300.00 |
| 32 | MGS guardrail 3 (614.2300) | LF | 100 | $35.00 | $35.00 | $26.00 | $26.00 |
| 33 | MGS thrie beam transition (614.2500) | LF | 160 | $95.00 | $95.00 | $92.00 | $92.00 |
| 34 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,800.00 | $4,200.00 | $3,835.00 | $3,835.00 |
| 35 | Mobilization (619.1000) | EACH | 1 | $50,194 | $89,870 | $127,350 | $91,170 |
| 36 | Water (624.0100) | MGAL | 11.40 | $40.00 | $100.00 | $100.00 | $40.00 |
| 37 | Topsoil (625.0100) | SY | 1,580 | $7.60 | $5.83 | $5.83 | $7.60 |
| 38 | Silt fence (628.1504) | LF | 885 | $3.00 | $2.05 | $2.40 | $2.40 |
| 39 | Silt fence maintenance (628.1520) | LF | 884 | $0.01 | $0.01 | $0.01 | $0.01 |
| 40 | Mobilizations erosion control (628.1905) | EACH | 5 | $200.00 | $200.00 | $420.00 | $420.00 |
| 41 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $200.00 | $350.00 | $350.00 |
| 42 | Erosion mat urban class I type B (628.2008) | SY | 1,580 | $1.75 | $1.85 | $2.29 | $2.29 |
| 43 | Turbidity barriers (628.6005) | SY | 180 | $48.00 | $40.00 | $45.00 | $45.00 |
| 44 | Temporary ditch checks (628.7504) | LF | 25 | $9.25 | $8.95 | $8.95 | $8.95 |
| 45 | Rock bags (628.7570) | EACH | 70 | $20.00 | $12.00 | $16.00 | $16.00 |
| 46 | Fertilizer type B (629.0210) | CWT | 1 | $95.00 | $95.00 | $110.00 | $110.00 |
| 47 | Seeding mixture no. 30 (630.0130) | LB | 71 | $12.00 | $12.95 | $8.80 | $8.80 |
| 48 | Seeding temporary (630.0200) | LB | 44 | $5.00 | $5.00 | $3.55 | $3.55 |
| 49 | Seed water (630.0500) | MGAL | 35 | $80.00 | $15.00 | $25.00 | $25.00 |
| 50 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 5 | $75.00 | $225.00 | $100.00 | $100.00 |
| 51 | Signs type II reflective H (637.2210) | SF | 3 | $35.00 | $40.00 | $28.50 | $28.50 |
| 52 | Signs type II reflective F (637.2230) | SF | 12 | $35.00 | $40.00 | $28.00 | $28.00 |
| 53 | Removing signs type II (638.2602) | EACH | 4 | $50.00 | $35.00 | $41.00 | $41.00 |
| 54 | Removing small sign supports (638.3000) | EACH | 3 | $50.00 | $35.00 | $34.30 | $34.30 |
| 55 | Field office type B (642.5001) | EACH | 1 | $3,200.00 | $1,919.36 | $1,500.00 | $2,000.00 |
| 56 | Traffic control barricades type III (643.0420) | DAY | 1,026 | $0.67 | $0.67 | $0.67 | $0.67 |
| 57 | Traffic control warning lights type A (643.0705) | DAY | 1,368 | $0.20 | $0.20 | $0.20 | $0.20 |
| 58 | Traffic control signs (643.0900) | DAY | 798 | $0.63 | $0.63 | $0.63 | $0.63 |
| 59 | Traffic control (643.5000) | EACH | 1 | $2,550.00 | $2,550.00 | $2,550.00 | $2,550.00 |
| 60 | Geotextile type DF schedule A (645.0111) | SY | 98 | $5.11 | $8.00 | $8.00 | $5.11 |
| 61 | Geotextile type HR (645.0120) | SY | 415 | $5.00 | $8.00 | $8.00 | $5.00 |
| 62 | Construction staking subgrade (650.4500) | LF | 457 | $0.01 | $0.01 | $0.01 | $0.01 |
| 63 | Construction staking base (650.5000) | LF | 457 | $1.32 | $2.35 | $2.35 | $1.32 |
| 64 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 107 | $0.71 | $2.50 | $2.50 | $0.71 |
| 65 | Construction staking structure layout (structure) 01. B-20-264 (650.6501) | EACH | 1 | $2,375.97 | $3,500.00 | $3,500.00 | $2,375.97 |
| 66 | Construction staking supplemental control (project) 01. 4816-00-73 (650.9911) | EACH | 1 | $660.39 | $10.00 | $10.00 | $660.39 |
| 67 | Construction staking slope stakes (650.9920) | LF | 457 | $0.93 | $2.50 | $2.50 | $0.93 |
| 68 | Sawing asphalt (690.0150) | LF | 40 | $2.95 | $2.95 | $2.95 | $2.95 |
| 69 | Incentive strength concrete structures (715.0502) | DOL | 1,128 | $1.00 | $1.00 | $1.00 | $1.00 |
| 70 | Installing and maintaining bird deterrent system (station) 01. sta 11+98 (999.2000.S) | EACH | 1 | $0.01 | $0.01 | $1.00 | $0.01 |
| 71 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 72 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 |
| 73 | Special 01. select crushed material for travel corridor (SPV.0195) | TON | 21 | $40.00 | $24.50 | $24.50 | $40.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.