WisDOT contract 20251209023 bid tabulation

T Wolf River, Apache Avenue; Alder Creek Bridge (LOC STR, Winnebago County T Wolf River, Apache Avenue). Let by Wisconsin DOT on December 9, 2025, Winnebago. 4 bids received; low bid $410,625 by Radtke Contractors Inc..

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
57
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Radtke Contractors Inc.$410,625Low
2Pheifer Brothers Construction Co., Inc.$433,984+6.0%
3Sheet Piling Services LLC$441,165+7.0%
4Lunda Construction Company$490,015+19%
WisDOT contract 20251209023: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Radtke Contractors Inc.2. Pheifer Brothers Construction Co., Inc.3. Sheet Piling Services LLC4. Lunda Construction Company
1Clearing (201.0110)SY114$5.00$5.00$5.00$5.00
2Grubbing (201.0210)SY114$40.00$40.00$40.00$40.00
3Removing structure over waterway remove debris (structure) 01. P-70- 0049 (203.0250)EACH1$54,075$94,300$35,000$125,000
4Excavation common (205.0100)CY199$23.00$23.00$23.00$23.00
5Excavation for structures bridges (structure) 01. B-70-0332 (206.1001)EACH1$17,499$75,700$25,000$25,000
6Backfill structure type A (210.1500)TON280$36.60$26.13$26.13$26.13
7Finishing roadway (project) 01. 6446-01-70 (213.0100)EACH1$700.00$700.00$700.00$700.00
8Base aggregate dense 3/4-inch (305.0110)TON10$80.00$80.00$80.00$80.00
9Base aggregate dense 1 1/4-inch (305.0120)TON138$25.25$25.25$25.25$25.25
10Breaker run (311.0110)TON207$24.75$24.75$24.75$24.75
11Asphaltic surface (465.0105)TON53$274.90$274.90$217.50$217.50
12Concrete masonry bridges (502.0100)CY151$641.33$430.00$1,000.00$700.00
13Protective surface treatment (502.3200)SY165$3.68$4.70$4.00$5.00
14Bar steel reinforcement HS structures (505.0400)LB2,960$1.33$1.01$1.60$1.25
15Bar steel reinforcement HS coated structures (505.0600)LB19,890$1.34$1.11$1.25$1.50
16Railing tubular type M (513.4061)LF138$294.05$310.00$275.00$300.00
17Rubberized membrane waterproofing (516.0500)SY16$64.07$60.00$25.00$35.00
18Piling steel HP 10-inch X 42 LB (550.1100)LF560$35.87$19.00$55.00$40.00
19Riprap heavy (606.0300)CY80$97.73$97.00$85.00$90.00
20Pipe underdrain wrapped 6-inch (612.0406)LF180$4.25$6.50$6.50$6.50
21Mobilization (619.1000)EACH1$58,431$23,602$46,245$51,497
22Water (624.0100)MGAL6$1.00$1.00$1.00$1.00
23Topsoil (625.0100)SY99$15.00$15.00$15.00$15.00
24Silt fence (628.1504)LF323$2.25$5.00$5.00$5.00
25Silt fence maintenance (628.1520)LF323$0.01$0.01$0.01$0.01
26Mobilizations erosion control (628.1905)EACH1$250.00$300.00$300.00$300.00
27Mobilizations emergency erosion control (628.1910)EACH1$250.00$100.00$100.00$100.00
28Erosion mat urban class I type B (628.2008)SY31$6.00$5.00$5.00$5.00
29Turbidity barriers (628.6005)SY133$40.00$56.00$56.00$56.00
30Rock bags (628.7570)EACH4$25.00$25.00$25.00$25.00
31Fertilizer type B (629.0210)CWT0.06$500.00$500.00$500.00$500.00
32Seeding mixture no. 20 (630.0120)LB2$100.00$75.00$75.00$75.00
33Seed water (630.0500)MGAL2$75.00$75.00$75.00$75.00
34Posts wood 4X6-inch X 12-FT (634.0612)EACH4$225.00$125.00$125.00$125.00
35Signs type II reflective F (637.2230)SF12$45.00$35.00$35.00$35.00
36Removing signs type II (638.2602)EACH4$45.00$40.00$40.00$40.00
37Removing small sign supports (638.3000)EACH4$45.00$40.00$40.00$40.00
38Field office type B (642.5001)EACH1$1,414.52$3,200.00$2,000.00$1,500.00
39Traffic control barricades type III (643.0420)DAY480$2.50$0.56$1.00$0.56
40Traffic control warning lights type A (643.0705)DAY960$0.25$0.19$0.50$0.19
41Traffic control signs (643.0900)DAY720$0.75$0.50$1.00$0.50
42Traffic control signs fixed message (643.1000)SF36$25.00$19.00$25.00$19.00
43Traffic control (643.5000)EACH1$1,250.00$3,765.00$1,250.00$3,765.00
44Geotextile type DF schedule A (645.0111)SY50$4.70$5.00$5.00$5.00
45Geotextile type HR (645.0120)SY260$5.09$6.60$3.50$5.00
46Construction staking subgrade (650.4500)LF100$0.01$0.01$0.01$0.01
47Construction staking base (650.5000)LF100$0.55$0.55$0.55$0.55
48Construction staking structure layout (structure) 01. B-70-0332 (650.6501)EACH1$3,500.00$3,500.00$3,500.00$3,500.00
49Construction staking supplemental control (project) 01. 6446-01-70 (650.9911)EACH1$10.00$10.00$10.00$10.00
50Construction staking slope stakes (650.9920)LF200$2.00$2.00$2.00$2.00
51Sawing asphalt (690.0150)LF32$2.95$4.00$4.00$4.00
52Incentive strength concrete structures (715.0502)DOL1,232$1.00$1.00$1.00$1.00
53Installing and maintaining bird deterrent system (station) 01. 10+00 (999.2000.S)EACH1$0.01$0.01$0.01$1.00
54On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00
55On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00
56Special 01. flashing stainless steel (SPV.0090)LF92$79.13$82.00$50.00$45.00
57Special 01. select crushed material for travel corridor (SPV.0195)TON67$44.68$60.00$55.00$30.00
WisDOT contract 20251209023: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way