WisDOT contract 20251209029 bid tabulation
Waupaca - Appleton; Old STH 49 to Winnebago Co Line Wb (USH 010, Waupaca County Waupaca - Appleton). Let by Wisconsin DOT on December 9, 2025, Waupaca. 4 bids received; low bid $3,591,015 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 128
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $3,591,015 | Low |
| 2 | Sommers Construction Co., Inc. | $3,614,148 | +1.0% |
| 3 | Zignego Company, Inc. | $3,719,565 | +4.0% |
| 4 | Michels Road & Stone, Inc. | $3,834,492 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Sommers Construction Co., Inc. | 3. Zignego Company, Inc. | 4. Michels Road & Stone, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 63 | $58.00 | $20.00 | $20.00 | $44.00 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 89 | $4.25 | $4.25 | $4.25 | $4.25 |
| 3 | Removing asphaltic surface milling (204.0120) | SY | 3,515 | $2.80 | $2.80 | $2.80 | $2.80 |
| 4 | Removing curb (204.0130) | LF | 80 | $10.00 | $15.00 | $15.00 | $11.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 206 | $10.00 | $10.00 | $10.00 | $11.00 |
| 6 | Removing guardrail (204.0165) | LF | 4,412 | $3.50 | $3.00 | $3.00 | $3.50 |
| 7 | Removing delineators and markers (204.0180) | EACH | 26 | $20.00 | $50.00 | $50.00 | $20.00 |
| 8 | Removing surface drains (204.0190) | EACH | 2 | $500.00 | $500.00 | $500.00 | $600.00 |
| 9 | Removing concrete bases (204.0195) | EACH | 2 | $200.00 | $200.00 | $500.00 | $200.00 |
| 10 | Removing inlets (204.0220) | EACH | 2 | $490.00 | $750.00 | $750.00 | $600.00 |
| 11 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 20 | $36.10 | $35.00 | $35.00 | $45.00 |
| 12 | Removing (item description) 01. removing loop detector wire and lead-in cable, STH 110 & STH 96 (204.9060.S) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 13 | Excavation common (205.0100) | CY | 5,823 | $38.80 | $38.80 | $38.80 | $38.80 |
| 14 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 830 | $2.00 | $2.00 | $2.00 | $2.00 |
| 15 | Finishing roadway (project) 01. 1510-02-62 (213.0100) | EACH | 1 | $5,000.00 | $2,500.00 | $1,000.00 | $5,000.00 |
| 16 | Base aggregate dense 3/4-inch (305.0110) | TON | 4,083 | $27.65 | $27.45 | $31.00 | $28.00 |
| 17 | Concrete pavement 10-inch (415.0100) | SY | 235 | $95.00 | $94.00 | $100.00 | $200.00 |
| 18 | Drilled tie bars (416.0610) | EACH | 1,900 | $8.75 | $8.45 | $15.00 | $15.00 |
| 19 | Drilled dowel bars (416.0620) | EACH | 6,360 | $14.75 | $14.70 | $20.00 | $19.00 |
| 20 | Concrete pavement repair (416.1710) | SY | 2,150 | $101.00 | $101.97 | $97.75 | $122.00 |
| 21 | Concrete pavement replacement (416.1720) | SY | 5,925 | $104.50 | $101.97 | $97.75 | $123.00 |
| 22 | Continuous diamond grinding concrete pavement (420.1000) | SY | 13,350 | $7.80 | $6.30 | $9.04 | $8.00 |
| 23 | Tack coat (455.0605) | GAL | 145 | $7.45 | $7.45 | $7.45 | $7.45 |
| 24 | Incentive density HMA pavement (460.2000) | DOL | 8,200 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 12,810 | $72.10 | $72.10 | $72.10 | $72.10 |
| 26 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 39,975 | $0.15 | $0.16 | $0.15 | $0.19 |
| 27 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 4 | $880.00 | $350.00 | $350.00 | $2,000.00 |
| 28 | Culvert pipe corrugated polyethylene 12-inch (530.0112) | LF | 354 | $100.60 | $72.25 | $72.25 | $110.00 |
| 29 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 6 | $75.00 | $73.00 | $100.00 | $46.00 |
| 30 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 206 | $65.00 | $73.00 | $100.00 | $45.00 |
| 31 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 42 | $65.00 | $73.00 | $100.00 | $48.00 |
| 32 | Concrete curb & gutter 4-inch sloped 30-inch type TBTT (601.0586) | LF | 288 | $65.00 | $73.00 | $100.00 | $47.00 |
| 33 | Concrete surface drains (602.3010) | CY | 6.50 | $1,000.00 | $1,500.00 | $1,000.00 | $1,700.00 |
| 34 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 36,775 | $0.58 | $0.92 | $0.58 | $0.64 |
| 35 | Riprap medium (606.0200) | CY | 18 | $225.00 | $125.00 | $125.00 | $185.00 |
| 36 | Inlet covers type V (611.0654) | EACH | 4 | $720.00 | $875.00 | $875.00 | $1,000.00 |
| 37 | Inlets 2X2-FT (611.3220) | EACH | 4 | $4,118.00 | $2,588.00 | $2,588.00 | $5,500.00 |
| 38 | Adjusting inlet covers (611.8115) | EACH | 9 | $530.00 | $1,050.00 | $1,050.00 | $600.00 |
| 39 | Barrier system grading shaping finishing (614.0010) | EACH | 10 | $3,600.00 | $3,346.60 | $3,346.60 | $3,000.00 |
| 40 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 1,808 | $13.00 | $12.50 | $16.00 | $12.50 |
| 41 | MGS guardrail 3 (614.2300) | LF | 3,712.50 | $24.00 | $28.50 | $28.50 | $24.00 |
| 42 | MGS thrie beam transition (614.2500) | LF | 394 | $92.00 | $92.00 | $92.00 | $92.00 |
| 43 | MGS guardrail terminal eat (614.2610) | EACH | 10 | $3,750.00 | $4,950.00 | $4,950.00 | $3,750.00 |
| 44 | Mobilization (619.1000) | EACH | 1 | $257,000 | $245,690 | $267,000 | $235,393 |
| 45 | Water (624.0100) | MGAL | 63 | $50.00 | $25.00 | $200.00 | $55.00 |
| 46 | Topsoil (625.0100) | SY | 72 | $20.00 | $15.00 | $15.00 | $15.00 |
| 47 | Silt fence (628.1504) | LF | 2,159 | $2.12 | $2.00 | $2.00 | $2.12 |
| 48 | Silt fence maintenance (628.1520) | LF | 2,159 | $0.01 | $0.01 | $0.01 | $0.01 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 2 | $350.00 | $500.00 | $500.00 | $350.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $250.00 | $0.01 | $0.01 | $250.00 |
| 51 | Erosion mat urban class I type B (628.2008) | SY | 72 | $3.00 | $5.15 | $5.15 | $3.00 |
| 52 | Inlet protection type B (628.7010) | EACH | 10 | $65.00 | $55.00 | $55.00 | $65.00 |
| 53 | Rock bags (628.7570) | EACH | 286 | $13.00 | $14.00 | $14.00 | $13.00 |
| 54 | Fertilizer type B (629.0210) | CWT | 0.20 | $90.00 | $500.00 | $500.00 | $90.00 |
| 55 | Seeding mixture no. 20 (630.0120) | LB | 4 | $7.00 | $50.00 | $50.00 | $7.00 |
| 56 | Seed water (630.0500) | MGAL | 1.60 | $45.00 | $150.00 | $150.00 | $45.00 |
| 57 | Delineator posts steel (633.0100) | EACH | 55 | $34.00 | $85.00 | $85.00 | $34.00 |
| 58 | Delineator reflectors (633.0500) | EACH | 55 | $9.80 | $20.00 | $20.00 | $9.80 |
| 59 | Field office type B (642.5001) | EACH | 1 | $10,000 | $8,500.00 | $20,000 | $13,900 |
| 60 | Traffic control drums (643.0300) | DAY | 41,086 | $0.55 | $0.20 | $0.55 | $0.55 |
| 61 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 118 | $16.00 | $94.00 | $16.00 | $16.00 |
| 62 | Traffic control barricades type III (643.0420) | DAY | 2,195 | $0.50 | $0.50 | $0.50 | $0.50 |
| 63 | Traffic control warning lights type A (643.0705) | DAY | 4,162 | $0.10 | $0.12 | $0.10 | $0.10 |
| 64 | Traffic control warning lights type C (643.0715) | DAY | 5,678 | $0.10 | $0.13 | $0.10 | $0.10 |
| 65 | Traffic control connected arrow boards (643.0810) | DAY | 118 | $18.00 | $10.35 | $18.00 | $18.00 |
| 66 | Traffic control signs (643.0900) | DAY | 10,615 | $0.55 | $0.20 | $0.55 | $0.55 |
| 67 | Traffic control covering signs type II (643.0920) | EACH | 8 | $35.00 | $115.00 | $35.00 | $35.00 |
| 68 | Traffic control signs fixed message (643.1000) | SF | 184 | $9.80 | $18.75 | $9.80 | $9.80 |
| 69 | Traffic control cones 42-inch (643.1070) | DAY | 4,942 | $0.50 | $0.20 | $0.50 | $0.50 |
| 70 | Basic traffic queue warning system (643.1205.S) | DAY | 118 | $90.00 | $115.00 | $90.00 | $90.00 |
| 71 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 236 | $6.00 | $5.75 | $6.00 | $6.00 |
| 72 | Temporary marking line removable tape 6-inch (643.3180) | LF | 15,268 | $1.70 | $1.85 | $1.70 | $1.70 |
| 73 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 68 | $3.00 | $2.65 | $3.00 | $3.00 |
| 74 | Temporary marking removable mask out tape 10-inch (643.3970) | LF | 321 | $5.00 | $3.55 | $5.00 | $5.00 |
| 75 | Traffic control (643.5000) | EACH | 1 | $26,000 | $85,400 | $26,000 | $26,000 |
| 76 | Geotextile type HR (645.0120) | SY | 36 | $57.00 | $6.00 | $6.00 | $7.00 |
| 77 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 11,646 | $0.87 | $0.87 | $0.87 | $0.87 |
| 78 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 107,522 | $1.42 | $1.42 | $1.42 | $1.42 |
| 79 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 5,872 | $2.84 | $2.84 | $2.84 | $2.84 |
| 80 | Marking arrow epoxy (646.5020) | EACH | 3 | $385.30 | $385.30 | $385.30 | $385.30 |
| 81 | Marking word epoxy (646.5120) | EACH | 2 | $389.85 | $389.85 | $389.85 | $389.85 |
| 82 | Marking aerial enforcement bar epoxy (646.5420) | EACH | 10 | $382.70 | $382.70 | $382.70 | $382.70 |
| 83 | Marking outfall epoxy (646.5520) | EACH | 256 | $50.14 | $50.14 | $50.14 | $50.14 |
| 84 | Marking stop line epoxy 18-inch (646.6120) | LF | 29 | $16.14 | $16.14 | $16.14 | $16.14 |
| 85 | Cold weather marking epoxy 6-inch (646.6466) | LF | 13,500 | $0.48 | $0.48 | $0.48 | $0.48 |
| 86 | Cold weather marking epoxy 10- inch (646.6470) | LF | 500 | $1.06 | $1.06 | $1.06 | $1.06 |
| 87 | Marking chevron epoxy 24-inch (646.7220) | LF | 640 | $26.49 | $26.49 | $26.49 | $26.49 |
| 88 | Marking removal line 4-inch (646.9000) | LF | 5,940 | $1.20 | $0.45 | $0.45 | $0.45 |
| 89 | Marking removal line grooved permanent tape 6-inch (646.9052) | LF | 10,286 | $3.00 | $3.00 | $3.00 | $3.00 |
| 90 | Marking removal line 10-inch (646.9102) | LF | 40 | $5.00 | $5.00 | $5.00 | $5.00 |
| 91 | Marking removal special marking (646.9300) | EACH | 5 | $90.00 | $90.00 | $90.00 | $90.00 |
| 92 | Marking removal plowable raised pavement markers (646.9400) | EACH | 355 | $74.50 | $74.50 | $74.50 | $74.50 |
| 93 | Construction staking storm sewer (650.4000) | EACH | 5 | $25.00 | $25.00 | $200.00 | $25.00 |
| 94 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 548 | $0.01 | $0.01 | $1.00 | $0.01 |
| 95 | Construction staking concrete pavement (650.7000) | LF | 2,965 | $0.10 | $0.10 | $0.50 | $0.10 |
| 96 | Construction staking resurfacing reference (650.8000) | LF | 36,480 | $0.25 | $0.25 | $0.30 | $0.25 |
| 97 | Construction staking electrical installations (project) 01. 1510-02- 62 (650.8501) | EACH | 1 | $440.00 | $440.00 | $800.00 | $440.00 |
| 98 | Construction staking supplemental control (project) 01. 1510-02-62 (650.9911) | EACH | 1 | $10.00 | $10.00 | $3,115.50 | $10.00 |
| 99 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 55 | $10.00 | $10.00 | $10.00 | $10.00 |
| 100 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 105 | $14.00 | $14.00 | $14.00 | $14.00 |
| 101 | Conduit special 3-inch (652.0615) | LF | 120 | $30.00 | $30.00 | $30.00 | $30.00 |
| 102 | Conduit loop detector (652.0800) | LF | 514 | $6.00 | $6.00 | $6.00 | $6.00 |
| 103 | Pull boxes steel 24X36-inch (653.0135) | EACH | 2 | $1,275.00 | $1,275.00 | $1,275.00 | $1,275.00 |
| 104 | Pull boxes steel 24X42-inch (653.0140) | EACH | 2 | $1,375.00 | $1,375.00 | $1,375.00 | $1,375.00 |
| 105 | Removing pull boxes (653.0905) | EACH | 3 | $75.00 | $75.00 | $75.00 | $75.00 |
| 106 | Concrete bases type 1 (654.0101) | EACH | 1 | $1,775.00 | $1,775.00 | $1,775.00 | $1,775.00 |
| 107 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,200.00 | $2,200.00 | $2,200.00 | $2,200.00 |
| 108 | Cable traffic signal 5-14 AWG (655.0230) | LF | 1,289 | $2.25 | $2.25 | $2.25 | $2.25 |
| 109 | Cable traffic signal 7-14 AWG (655.0240) | LF | 179 | $2.75 | $2.75 | $2.75 | $2.75 |
| 110 | Cable traffic signal 12-14 AWG (655.0260) | LF | 535 | $4.75 | $4.75 | $4.75 | $4.75 |
| 111 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 985 | $2.00 | $2.00 | $2.00 | $2.00 |
| 112 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,540 | $1.00 | $1.00 | $1.00 | $1.00 |
| 113 | Electrical wire lighting 12 AWG (655.0610) | LF | 725 | $1.00 | $1.00 | $1.00 | $1.00 |
| 114 | Loop detector lead in cable (655.0700) | LF | 2,235 | $2.00 | $2.00 | $2.00 | $2.00 |
| 115 | Loop detector wire (655.0800) | LF | 2,159 | $1.00 | $1.00 | $1.00 | $1.00 |
| 116 | Traffic signal face 3S 12-inch (658.0173) | EACH | 6 | $685.00 | $685.00 | $685.00 | $685.00 |
| 117 | Signal mounting hardware (location) 01. STH 110 & STH 96 (658.5070) | EACH | 1 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 118 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 6 | $75.00 | $75.00 | $75.00 | $75.00 |
| 119 | Sawing asphalt (690.0150) | LF | 580 | $2.00 | $1.69 | $3.69 | $1.69 |
| 120 | Sawing concrete (690.0250) | LF | 16,806 | $2.20 | $2.10 | $4.10 | $4.75 |
| 121 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 1,665 | $2.65 | $8.00 | $8.00 | $2.65 |
| 122 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 |
| 123 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,260 | $5.00 | $5.00 | $5.00 | $5.00 |
| 124 | Special 01. locate and clean existing underdrain outfall (SPV.0060) | EACH | 256 | $80.00 | $50.00 | $50.00 | $70.00 |
| 125 | Special 10. restore structure (SPV.0060) | EACH | 4 | $2,975.00 | $2,150.00 | $2,150.00 | $3,000.00 |
| 126 | Special 11. modify traffic signals, STH 110 & STH 96 (SPV.0060) | EACH | 1 | $8,500.00 | $8,500.00 | $8,500.00 | $8,500.00 |
| 127 | Special 12. modify traffic signal cabinet installation, STH 110 & STH 96 (SPV.0060) | EACH | 1 | $2,100.00 | $2,100.00 | $2,100.00 | $2,100.00 |
| 128 | Special 01. reinforced concrete pavement approach slab repair (SPV.0165) | SF | 80 | $150.00 | $127.45 | $200.00 | $140.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.