WisDOT contract 20251209034 bid tabulation
Merrill - Rhinelander; Barnes Creek Bridge B-35-0163 (STH 017, Lincoln County Merrill - Rhinelander). Let by Wisconsin DOT on December 9, 2025, Lincoln. 6 bids received; low bid $870,060 by Sheet Piling Services LLC.
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 62
- Data through
- 10 NOV 2026
5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sheet Piling Services LLC | $870,060 | Low |
| 2 | Larson Construction Co., Inc. | $908,250 | +4.0% |
| 4 | Lunda Construction Company | $997,709 | +15% |
| 5 | Radtke Contractors Inc. | $1,002,441 | +15% |
| 6 | Janke General Contractors, Inc. | $1,226,142 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sheet Piling Services LLC | 2. Larson Construction Co., Inc. | 3. Lunda Construction Company | 4. Radtke Contractors Inc. | 5. Janke General Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 3 | $350.00 | $600.00 | $350.00 | $350.00 | $480.00 |
| 2 | Removing structure (structure) 01. B-35-0074 (203.0220) | EACH | 1 | $25,180 | $17,400 | $25,180 | $49,729 | $25,000 |
| 3 | Removing asphaltic surface (204.0110) | SY | 160 | $20.00 | $13.00 | $8.25 | $20.85 | $15.50 |
| 4 | Removing curb & gutter (204.0150) | LF | 212 | $9.43 | $4.00 | $9.43 | $9.43 | $4.50 |
| 5 | Removing guardrail (204.0165) | LF | 658 | $3.50 | $4.00 | $3.50 | $3.50 | $4.00 |
| 6 | Excavation common (205.0100) | CY | 414 | $13.05 | $18.55 | $13.05 | $13.05 | $27.00 |
| 7 | Excavation for structures bridges (structure) 01. B-35-0163 (206.1001) | EACH | 1 | $12,000 | $30,000 | $12,000 | $78,364 | $148,000 |
| 8 | Cofferdams (structure) 01. B-35- 0163 (206.5001) | EACH | 1 | $52,000 | $41,000 | $50,000 | $75,570 | $45,000 |
| 9 | Borrow (208.0100) | CY | 165 | $5.10 | $12.65 | $5.10 | $5.10 | $15.00 |
| 10 | Backfill structure type A (210.1500) | TON | 1,300 | $18.35 | $17.15 | $18.35 | $18.35 | $40.00 |
| 11 | Backfill structure type B (210.2500) | TON | 256 | $20.15 | $10.75 | $20.15 | $20.15 | $36.00 |
| 12 | Prepare foundation for asphaltic paving (project) 01. 9030-07-82 (211.0101) | EACH | 1 | $1,500.00 | $750.00 | $1,500.00 | $1,500.00 | $2,500.00 |
| 13 | Finishing roadway (project) 01. 9030-07-82 (213.0100) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $100.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 99 | $36.60 | $36.15 | $36.60 | $36.60 | $57.00 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 515 | $26.85 | $21.45 | $26.85 | $26.85 | $29.00 |
| 16 | Tack coat (455.0605) | GAL | 71 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 17 | Asphaltic surface (465.0105) | TON | 157 | $121.34 | $121.34 | $121.34 | $121.34 | $121.34 |
| 18 | Asphaltic flumes (465.0315) | SY | 10 | $84.00 | $84.00 | $84.00 | $84.00 | $84.00 |
| 19 | Concrete masonry bridges (502.0100) | CY | 474 | $715.00 | $548.00 | $800.00 | $566.84 | $777.00 |
| 20 | Protective surface treatment (502.3200) | SY | 84 | $5.00 | $7.40 | $3.00 | $3.69 | $6.40 |
| 21 | Bar steel reinforcement HS structures (505.0400) | LB | 12,440 | $1.10 | $1.50 | $1.09 | $1.40 | $2.10 |
| 22 | Bar steel reinforcement HS coated structures (505.0600) | LB | 83,700 | $1.15 | $1.50 | $1.09 | $1.20 | $2.10 |
| 23 | Rubberized membrane waterproofing (516.0500) | SY | 42 | $30.00 | $50.00 | $20.00 | $64.32 | $43.00 |
| 24 | Sheet membrane waterproofing for buried structures 01. B-35-0163 (516.0610.S) | SY | 457 | $20.00 | $59.00 | $40.00 | $84.75 | $39.00 |
| 25 | Pile points (550.0500) | EACH | 17 | $115.00 | $225.00 | $150.00 | $105.50 | $150.00 |
| 26 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 2,125 | $44.00 | $57.00 | $45.00 | $34.16 | $74.00 |
| 27 | Riprap heavy (606.0300) | CY | 267 | $78.90 | $110.00 | $78.90 | $78.90 | $119.00 |
| 28 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 260 | $8.10 | $8.00 | $8.10 | $8.10 | $13.50 |
| 29 | Maintenance and repair of haul roads (project) 01. 9030-07-82 (618.0100) | EACH | 1 | $0.01 | $2,500.00 | $0.01 | $250.00 | $100.00 |
| 30 | Mobilization (619.1000) | EACH | 1 | $61,276 | $93,455 | $143,140 | $129,480 | $39,000 |
| 31 | Water (624.0100) | MGAL | 7 | $30.00 | $50.00 | $30.00 | $30.00 | $30.00 |
| 32 | Topsoil (625.0100) | SY | 1,530 | $7.50 | $4.25 | $7.50 | $7.50 | $10.00 |
| 33 | Mobilizations erosion control (628.1905) | EACH | 5 | $150.00 | $253.00 | $150.00 | $150.00 | $1.00 |
| 34 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $150.00 | $353.00 | $150.00 | $150.00 | $100.00 |
| 35 | Erosion mat urban class I type B (628.2008) | SY | 1,530 | $1.85 | $3.13 | $1.85 | $1.85 | $2.00 |
| 36 | Temporary ditch checks (628.7504) | LF | 72 | $12.50 | $12.00 | $12.50 | $12.50 | $11.00 |
| 37 | Fertilizer type B (629.0210) | CWT | 2.10 | $100.00 | $150.00 | $100.00 | $100.00 | $200.00 |
| 38 | Seeding mixture no. 30 (630.0130) | LB | 73 | $6.99 | $13.00 | $6.99 | $6.99 | $8.00 |
| 39 | Seeding temporary (630.0200) | LB | 45 | $4.10 | $9.00 | $4.10 | $4.10 | $7.00 |
| 40 | Seed water (630.0500) | MGAL | 70 | $10.00 | $5.00 | $10.00 | $10.00 | $30.00 |
| 41 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 1 | $120.00 | $200.00 | $120.00 | $120.00 | $150.00 |
| 42 | Moving signs type II (638.2102) | EACH | 1 | $30.00 | $300.00 | $30.00 | $30.00 | $180.00 |
| 43 | Field office type B (642.5001) | EACH | 1 | $1,000.00 | $4,000.00 | $3,500.00 | $2,529.04 | $2,500.00 |
| 44 | Traffic control barricades type III (643.0420) | DAY | 700 | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 45 | Traffic control warning lights type A (643.0705) | DAY | 1,000 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 46 | Traffic control signs (643.0900) | DAY | 3,150 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 47 | Traffic control signs fixed message (643.1000) | SF | 36 | $9.60 | $9.60 | $9.60 | $9.60 | $9.60 |
| 48 | Traffic control (643.5000) | EACH | 1 | $1,531.00 | $1,531.00 | $1,531.00 | $1,531.00 | $1,531.00 |
| 49 | Geotextile type DF schedule A (645.0111) | SY | 180 | $7.50 | $4.00 | $7.50 | $7.50 | $3.00 |
| 50 | Geotextile type HR (645.0120) | SY | 445 | $7.50 | $3.75 | $7.50 | $7.50 | $4.00 |
| 51 | Marking line epoxy 6-inch (646.2020) | LF | 500 | $10.50 | $10.98 | $12.00 | $10.98 | $10.98 |
| 52 | Construction staking subgrade (650.4500) | LF | 125 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 53 | Construction staking base (650.5000) | LF | 125 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 54 | Construction staking structure layout (structure) 01. B-35-0163 (650.6501) | EACH | 1 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 |
| 55 | Construction staking supplemental control (project) 01. 9030-07-82 (650.9911) | EACH | 1 | $712.75 | $712.75 | $712.75 | $712.75 | $712.75 |
| 56 | Construction staking slope stakes (650.9920) | LF | 389 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 57 | Sawing asphalt (690.0150) | LF | 371 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 58 | Sawing concrete (690.0250) | LF | 3 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 59 | Incentive strength concrete structures (715.0502) | DOL | 2,844 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 60 | Maintaining climbing turtle exclusion fence (999.2105.S) | LF | 830 | $6.10 | $3.00 | $6.10 | $6.10 | $1.50 |
| 61 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 62 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.