WisDOT contract 20251209037 bid tabulation
STH 95 - Marshland; Trempealeau River Bridge B-06-0238 (CTH P, Buffalo County STH 95 - Marshland). Let by Wisconsin DOT on December 9, 2025, Buffalo. 3 bids received; low bid $1,782,203 by Larson Construction Co., Inc..
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 82
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Larson Construction Co., Inc. | $1,782,203 | Low |
| 2 | Lunda Construction Company | $1,913,429 | +7.0% |
| 3 | Sheet Piling Services LLC | $2,258,811 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Larson Construction Co., Inc. | 2. Lunda Construction Company | 3. Sheet Piling Services LLC |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0110) | SY | 28 | $25.00 | $25.00 | $25.00 |
| 2 | Grubbing (201.0210) | SY | 28 | $25.00 | $25.00 | $25.00 |
| 3 | Removing structure over waterway minimal debris (structure) 01. B-6- 22 (203.0260) | EACH | 1 | $94,540 | $174,750 | $470,000 |
| 4 | Removing (item description) 01. usgs equipment cabinet (204.9060.S) | EACH | 1 | $200.00 | $500.00 | $0.01 |
| 5 | Excavation common (205.0100) | CY | 586 | $18.50 | $18.50 | $18.50 |
| 6 | Excavation, hauling, and disposal of potential creosote contaminated soil (205.0508.S) | TON | 224 | $135.00 | $160.00 | $90.00 |
| 7 | Excavation for structures bridges (structure) 01. B-6-238 (206.1001) | EACH | 1 | $40,300 | $70,000 | $125,000 |
| 8 | Cofferdams (structure) 01. B-6-238 (206.5001) | EACH | 1 | $104,000 | $160,000 | $200,000 |
| 9 | Borrow (208.0100) | CY | 130 | $25.00 | $25.00 | $25.00 |
| 10 | Backfill structure type A (210.1500) | TON | 310 | $25.00 | $25.00 | $25.00 |
| 11 | Finishing roadway (project) 01. 7290-00-70 (213.0100) | EACH | 1 | $500.00 | $500.00 | $500.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 83 | $45.00 | $45.00 | $45.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 713 | $29.50 | $29.50 | $29.50 |
| 14 | HMA cold weather paving (450.4000) | TON | 26 | $6.80 | $6.80 | $6.80 |
| 15 | Tack coat (455.0605) | GAL | 48 | $10.80 | $10.80 | $10.80 |
| 16 | Asphaltic surface (465.0105) | TON | 101 | $273.00 | $273.00 | $273.00 |
| 17 | Asphaltic surface temporary (465.0125) | TON | 111 | $210.00 | $210.00 | $210.00 |
| 18 | Concrete masonry bridges (502.0100) | CY | 471 | $636.00 | $900.00 | $950.00 |
| 19 | Protective surface treatment (502.3200) | SY | 611 | $3.00 | $5.00 | $3.50 |
| 20 | Underwater substructure inspection (structure) 01. B-6-238 (502.9000.S) | EACH | 2 | $3,500.00 | $7,500.00 | $5,200.00 |
| 21 | Bar steel reinforcement HS structures (505.0400) | LB | 7,920 | $1.55 | $1.15 | $1.10 |
| 22 | Bar steel reinforcement HS coated structures (505.0600) | LB | 64,020 | $1.55 | $1.25 | $1.15 |
| 23 | Temporary shoring (structure) 01. B-6-238 (511.1200) | SF | 1,030 | $33.00 | $0.01 | $30.00 |
| 24 | Railing tubular type M (513.4061) | LF | 330 | $344.00 | $350.00 | $255.00 |
| 25 | Rubberized membrane waterproofing (516.0500) | SY | 20 | $57.50 | $25.00 | $30.00 |
| 26 | Temporary structure (station) 01. 20+00'TB' (526.0101) | EACH | 1 | $336,000 | $247,250 | $225,000 |
| 27 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 3,400 | $49.90 | $38.00 | $47.00 |
| 28 | Riprap heavy (606.0300) | CY | 300 | $67.00 | $75.00 | $75.00 |
| 29 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 212 | $10.00 | $10.00 | $10.00 |
| 30 | Fence safety (616.0700.S) | LF | 104 | $12.00 | $10.00 | $10.00 |
| 31 | Maintenance and repair of haul roads (project) 01. 7290-00-70 (618.0100) | EACH | 1 | $2,000.00 | $1.00 | $0.01 |
| 32 | Mobilization (619.1000) | EACH | 1 | $180,000 | $198,878 | $150,365 |
| 33 | Water (624.0100) | MGAL | 12.20 | $22.00 | $22.00 | $22.00 |
| 34 | Salvaged topsoil (625.0500) | SY | 1,157 | $1.50 | $1.50 | $1.50 |
| 35 | Mulching (627.0200) | SY | 300 | $0.20 | $0.20 | $0.20 |
| 36 | Silt fence (628.1504) | LF | 555 | $2.00 | $2.00 | $2.00 |
| 37 | Silt fence maintenance (628.1520) | LF | 555 | $0.01 | $0.01 | $0.01 |
| 38 | Mobilizations erosion control (628.1905) | EACH | 8 | $100.00 | $100.00 | $100.00 |
| 39 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $100.00 | $100.00 |
| 40 | Erosion mat urban class I type B (628.2008) | SY | 1,157 | $1.75 | $1.75 | $1.75 |
| 41 | Turbidity barriers (628.6005) | SY | 573 | $45.00 | $45.00 | $45.00 |
| 42 | Stone ditch checks (628.7515.S) | CY | 5 | $100.00 | $100.00 | $100.00 |
| 43 | Fertilizer type B (629.0210) | CWT | 1.40 | $110.00 | $110.00 | $110.00 |
| 44 | Seeding mixture no. 20 (630.0120) | LB | 49 | $6.00 | $6.00 | $6.00 |
| 45 | Seeding temporary (630.0200) | LB | 45 | $6.00 | $6.00 | $6.00 |
| 46 | Seed water (630.0500) | MGAL | 39 | $1.00 | $1.00 | $1.00 |
| 47 | Delineators temporary (633.1100) | EACH | 10 | $18.00 | $18.00 | $18.00 |
| 48 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $100.00 | $100.00 | $100.00 |
| 49 | Signs type II reflective F (637.2230) | SF | 12 | $32.00 | $32.00 | $32.00 |
| 50 | Removing signs type II (638.2602) | EACH | 2 | $25.00 | $25.00 | $25.00 |
| 51 | Removing small sign supports (638.3000) | EACH | 2 | $25.00 | $25.00 | $25.00 |
| 52 | Field office type B (642.5001) | EACH | 1 | $4,200.00 | $7,500.00 | $3,000.00 |
| 53 | Traffic control drums (643.0300) | DAY | 7,058 | $0.50 | $0.50 | $0.50 |
| 54 | Traffic control barricades type III (643.0420) | DAY | 1,372 | $0.50 | $0.50 | $0.50 |
| 55 | Traffic control warning lights type A (643.0705) | DAY | 2,734 | $0.10 | $0.10 | $0.10 |
| 56 | Traffic control warning lights type C (643.0715) | DAY | 612 | $0.10 | $0.10 | $0.10 |
| 57 | Traffic control signs (643.0900) | DAY | 10,200 | $0.50 | $0.50 | $0.50 |
| 58 | Traffic control covering signs type II (643.0920) | EACH | 1 | $30.00 | $30.00 | $30.00 |
| 59 | Traffic control signs fixed message (643.1000) | SF | 64 | $9.90 | $9.90 | $9.90 |
| 60 | Temporary marking line paint 6- inch (643.3165) | LF | 2,005 | $1.30 | $1.30 | $0.40 |
| 61 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 154 | $1.30 | $1.30 | $0.40 |
| 62 | Temporary marking raised pavement marker type I (643.3760) | EACH | 24 | $4.50 | $4.50 | $4.50 |
| 63 | Temporary marking stop line paint 18-inch (643.3805) | LF | 47 | $6.00 | $6.00 | $3.00 |
| 64 | Traffic control (643.5000) | EACH | 1 | $2,900.00 | $2,900.00 | $2,900.00 |
| 65 | Geotextile type DF schedule A (645.0111) | SY | 64 | $4.00 | $4.00 | $4.00 |
| 66 | Geotextile type HR (645.0120) | SY | 530 | $3.33 | $3.00 | $4.00 |
| 67 | Geotextile type R (645.0130) | SY | 8 | $5.00 | $5.00 | $5.00 |
| 68 | Marking line epoxy 6-inch (646.2020) | LF | 111 | $41.25 | $60.00 | $39.00 |
| 69 | Construction staking subgrade (650.4500) | LF | 380 | $0.01 | $0.01 | $0.01 |
| 70 | Construction staking base (650.5000) | LF | 380 | $0.01 | $1.00 | $0.01 |
| 71 | Construction staking structure layout (structure) 01. B-06-0238 (650.6501) | EACH | 1 | $4,000.00 | $3,500.00 | $3,570.00 |
| 72 | Construction staking supplemental control (project) 01. 7290-00-70 (650.9911) | EACH | 1 | $2,000.00 | $1,100.00 | $570.00 |
| 73 | Construction staking slope stakes (650.9920) | LF | 380 | $0.01 | $1.00 | $0.98 |
| 74 | Sawing asphalt (690.0150) | LF | 147 | $4.00 | $4.00 | $4.00 |
| 75 | Incentive strength concrete structures (715.0502) | DOL | 2,826 | $1.00 | $1.00 | $1.00 |
| 76 | Railroad flagging reimbursement (801.0117) | DOL | 22,500 | $1.00 | $1.00 | $1.00 |
| 77 | Installing and maintaining bird deterrent system (station) 01. 10+00 (999.2000.S) | EACH | 1 | $3,400.00 | $0.01 | $0.01 |
| 78 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 | $5.00 | $5.00 |
| 79 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 |
| 80 | Special 01. temporary pedestrian portage (SPV.0060) | EACH | 1 | $9,500.00 | $1,500.00 | $250.00 |
| 81 | Special 02. salvage and reinstall signs (SPV.0060) | EACH | 12 | $300.00 | $75.00 | $75.00 |
| 82 | Special 01. flashing stainless steel (SPV.0090) | LF | 277 | $58.00 | $60.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.