WisDOT contract 20251209039 bid tabulation

T Lynn, Catlin Avenue; S Br Oneill Creek Bridge B-10-0256 (LOC STR, Clark County T Lynn, Catlin Avenue). Let by Wisconsin DOT on December 9, 2025, Clark. 6 bids received; low bid $499,310 by Larson Construction Co., Inc..

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
61
Data through
10 NOV 2026

5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Larson Construction Co., Inc.$499,310Low
2Sheet Piling Services LLC$516,777+3.0%
3Radtke Contractors Inc.$519,572+4.0%
5Janke General Contractors, Inc.$561,479+12%
6Lunda Construction Company$659,935+32%
WisDOT contract 20251209039: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Larson Construction Co., Inc.2. Sheet Piling Services LLC3. Radtke Contractors Inc.4. Janke General Contractors, Inc.5. Lunda Construction Company
1Clearing (201.0105)STA1$670.00$670.00$500.00$250.00$670.00
2Grubbing (201.0205)STA1$346.00$346.00$500.00$750.00$346.00
3Removing structure over waterway minimal debris (structure) 01. P-10- 244 (203.0260)EACH1$34,540$45,000$44,013$50,000$150,000
4Removing fence (204.0170)LF80$4.40$4.40$7.50$10.00$4.40
5Excavation common (205.0100)CY136$16.05$16.05$18.90$25.00$16.05
6Excavation for structures bridges (structure) 01. B-10-256 (206.1001)EACH1$28,419$25,000$26,041$38,500$50,000
7Cofferdams (structure) 01. B-10-256 (206.5001)EACH1$35,176$12,000$56,317$25,000$75,000
8Borrow (208.0100)CY38$33.25$33.25$10.00$28.00$33.25
9Backfill structure type A (210.1500)TON300$26.05$26.05$27.65$35.00$26.05
10Finishing roadway (project) 01. 7856-00-71 (213.0100)EACH1$450.00$450.00$1,000.00$100.00$450.00
11Base aggregate dense 3/4-inch (305.0110)TON113$27.70$27.70$31.36$45.00$27.70
12Base aggregate dense 1 1/4-inch (305.0120)TON126$25.25$25.25$28.50$28.00$25.25
13Select crushed material (312.0110)TON115$25.50$25.50$28.50$27.00$25.54
14Concrete masonry bridges (502.0100)CY178$784.00$950.00$770.33$1,110.00$800.00
15Protective surface treatment (502.3200)SY270$3.00$4.50$3.69$5.00$5.00
16Underwater substructure inspection (structure) 01. B-10-256 (502.9000.S)EACH1$2,400.00$5,200.00$500.00$3,500.00$5,200.00
17Bar steel reinforcement HS structures (505.0400)LB5,470$1.67$2.70$1.37$1.95$1.25
18Bar steel reinforcement HS coated structures (505.0600)LB22,380$1.67$2.90$1.45$1.95$1.25
19Structural steel carbon (506.0105)LB530$6.00$7.00$9.14$9.00$6.00
20Railing tubular type M (513.4061)LF134$333.00$250.00$257.01$325.00$275.00
21Rubberized membrane waterproofing (516.0500)SY12$60.00$18.00$64.32$45.00$25.00
22Pile points (550.0500)EACH6$150.00$150.00$105.50$200.00$150.00
23Piling steel HP 10-inch X 42 LB (550.1100)LF540$63.00$60.00$39.19$70.00$45.00
24Riprap heavy (606.0300)CY105$76.00$45.00$71.59$80.00$80.00
25Pipe underdrain wrapped 6-inch (612.0406)LF120$6.80$6.80$4.26$15.00$6.80
26Maintenance and repair of haul roads (project) 01. 7586-00-71 (618.0100)EACH1$500.00$0.01$250.00$100.00$0.01
27Mobilization (619.1000)EACH1$62,306$52,550$86,890$30,000$72,045
28Water (624.0100)MGAL3.60$0.50$0.50$25.00$43.00$0.50
29Topsoil (625.0100)SY441$6.50$6.50$8.98$10.00$6.50
30Silt fence (628.1504)LF214$3.00$3.00$3.75$3.40$3.00
31Silt fence maintenance (628.1520)LF214$0.01$0.01$0.10$0.01$0.01
32Mobilizations erosion control (628.1905)EACH3$400.00$400.00$200.00$1.00$400.00
33Mobilizations emergency erosion control (628.1910)EACH3$10.00$10.00$200.00$100.00$10.00
34Erosion mat urban class I type B (628.2008)SY441$2.40$2.40$2.50$2.00$2.40
35Turbidity barriers (628.6005)SY155$44.80$44.80$52.10$30.00$44.80
36Temporary ditch checks (628.7504)LF50$7.25$7.25$12.50$10.50$7.25
37Fertilizer type B (629.0210)CWT0.50$300.00$300.00$110.00$200.00$300.00
38Seeding mixture no. 20 (630.0120)LB10$25.50$25.50$8.10$15.00$25.50
39Seeding mixture no. 60 (630.0160)LB3$25.05$25.05$100.00$23.00$25.05
40Seed water (630.0500)MGAL8.80$0.50$0.50$30.00$25.00$0.50
41Posts wood 4X6-inch X 12-FT (634.0612)EACH4$85.25$85.25$130.00$155.00$85.25
42Signs type II reflective F (637.2230)SF12$29.75$29.75$30.00$26.00$29.75
43Removing signs type II (638.2602)EACH4$21.50$21.50$15.00$70.00$21.50
44Removing small sign supports (638.3000)EACH4$21.50$21.50$15.00$70.00$21.50
45Field office type B (642.5001)EACH1$3,200.00$2,000.00$2,429.04$2,500.00$3,500.00
46Traffic control barricades type III (643.0420)DAY1,188$0.45$0.45$0.45$0.45$0.45
47Traffic control warning lights type A (643.0705)DAY1,848$0.10$0.10$0.10$0.10$0.10
48Traffic control signs (643.0900)DAY924$0.40$0.40$0.40$0.40$0.40
49Traffic control (643.5000)EACH1$2,214.00$2,214.00$2,214.00$2,214.00$2,214.00
50Geotextile type DF schedule A (645.0111)SY60$4.50$4.50$4.71$4.00$4.50
51Geotextile type HR (645.0120)SY180$4.00$5.00$5.10$5.00$5.00
52Construction staking subgrade (650.4500)LF98$0.01$0.01$0.01$0.01$0.01
53Construction staking base (650.5000)LF98$0.01$0.01$0.01$0.01$0.01
54Construction staking structure layout (structure) 01. B-10-256 (650.6501)EACH1$2,000.00$2,503.00$2,000.00$2,000.00$3,200.00
55Construction staking supplemental control (project) 01. 7586-00-71 (650.9911)EACH1$1,400.00$469.00$1,400.00$1,400.00$1,200.00
56Construction staking slope stakes (650.9920)LF98$0.01$0.98$0.01$0.01$1.00
57Incentive strength concrete structures (715.0502)DOL1,068$1.00$1.00$1.00$1.00$1.00
58Installing and maintaining bird deterrent system (station) 01. 2+13 (999.2000.S)EACH1$3,780.00$0.01$0.01$5,000.00$0.01
59On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00$5.00
60On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00$5.00$5.00$5.00$5.00
61Special 501. select crushed material for travel corridor (SPV.0195)TON14$95.00$27.00$98.85$100.00$75.00
WisDOT contract 20251209039: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy