WisDOT contract 20251209043 bid tabulation
T Almena, 15 1/2 Avenue; Lightning Creek Bridge B-03-0221 (LOC STR, Barron County T Almena, 15 1/2 Avenue). Let by Wisconsin DOT on December 9, 2025, Barron. 5 bids received.
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 57
- Data through
- 10 NOV 2026
4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 2 | Larson Construction Co., Inc. | $676,521 | +3.0% |
| 3 | Lunda Construction Company | $727,337 | +11% |
| 4 | Sheet Piling Services LLC | $745,613 | +13% |
| 5 | Zenith Tech., Inc. - Waukesha | $883,086 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Larson Construction Co., Inc. | 2. Lunda Construction Company | 3. Sheet Piling Services LLC | 4. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|
| 1 | Removing structure over waterway debris capture (structure) 01. P-3- 954 (203.0270) | EACH | 1 | $32,000 | $125,000 | $175,000 | $130,000 |
| 2 | Excavation common (205.0100) | CY | 168 | $15.50 | $15.50 | $15.50 | $15.50 |
| 3 | Excavation for structures bridges (structure) 01. B-3-221 (206.1001) | EACH | 1 | $29,450 | $50,000 | $75,000 | $35,000 |
| 4 | Backfill structure type A (210.1500) | TON | 220 | $20.40 | $20.40 | $20.40 | $20.40 |
| 5 | Finishing roadway (project) 01. 8311-00-70 (213.0100) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 |
| 6 | Base aggregate dense 3/4-inch (305.0110) | TON | 30 | $62.50 | $62.50 | $62.50 | $62.50 |
| 7 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 315 | $26.75 | $26.75 | $26.75 | $26.75 |
| 8 | Tack coat (455.0605) | GAL | 37 | $13.96 | $13.96 | $13.96 | $13.96 |
| 9 | Asphaltic surface (465.0105) | TON | 86 | $174.91 | $174.91 | $174.91 | $174.91 |
| 10 | Asphaltic flumes (465.0315) | SY | 12 | $58.17 | $58.17 | $58.17 | $58.17 |
| 11 | Concrete masonry bridges (502.0100) | CY | 111 | $849.60 | $1,000.00 | $800.00 | $1,350.00 |
| 12 | Protective surface treatment (502.3200) | SY | 149 | $3.50 | $5.00 | $3.00 | $4.00 |
| 13 | Pigmented surface sealer (502.3210) | SY | 71 | $6.75 | $10.00 | $4.00 | $13.00 |
| 14 | Bar steel reinforcement HS structures (505.0400) | LB | 3,500 | $1.85 | $1.55 | $1.55 | $1.89 |
| 15 | Bar steel reinforcement HS coated structures (505.0600) | LB | 10,110 | $1.85 | $1.60 | $1.65 | $2.05 |
| 16 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 14 | $200.00 | $200.00 | $500.00 | $220.00 |
| 17 | Rubberized membrane waterproofing (516.0500) | SY | 18 | $55.00 | $25.00 | $30.00 | $50.00 |
| 18 | Pile points (550.0500) | EACH | 10 | $175.00 | $200.00 | $150.00 | $115.00 |
| 19 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 700 | $59.00 | $50.00 | $48.00 | $60.00 |
| 20 | Riprap heavy (606.0300) | CY | 175 | $89.00 | $80.00 | $65.00 | $120.00 |
| 21 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 170 | $7.00 | $7.00 | $7.00 | $7.00 |
| 22 | Maintenance and repair of haul roads (project) 01. 8311-00-70 (618.0100) | EACH | 1 | $1,500.00 | $0.01 | $0.01 | $500.00 |
| 23 | Mobilization (619.1000) | EACH | 1 | $73,560 | $99,699 | $52,250 | $164,000 |
| 24 | Water (624.0100) | MGAL | 7 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | Salvaged topsoil (625.0500) | SY | 546 | $3.00 | $3.00 | $3.00 | $3.00 |
| 26 | Silt fence heavy duty (628.1530.S) | LF | 590 | $12.50 | $12.50 | $12.50 | $12.50 |
| 27 | Silt fence heavy duty maintenance (628.1535.S) | LF | 590 | $0.01 | $0.01 | $0.01 | $0.01 |
| 28 | Mobilizations erosion control (628.1905) | EACH | 5 | $500.00 | $500.00 | $500.00 | $500.00 |
| 29 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $1.00 | $1.00 | $1.00 | $1.00 |
| 30 | Erosion mat urban class I type B (628.2008) | SY | 683 | $2.00 | $2.00 | $2.00 | $2.00 |
| 31 | Turbidity barriers (628.6005) | SY | 340 | $47.85 | $47.85 | $47.85 | $47.85 |
| 32 | Fertilizer type A (629.0205) | CWT | 0.70 | $150.00 | $150.00 | $150.00 | $150.00 |
| 33 | Seeding mixture no. 20 (630.0120) | LB | 45 | $27.00 | $27.00 | $27.00 | $27.00 |
| 34 | Seeding temporary (630.0200) | LB | 35 | $5.00 | $5.00 | $5.00 | $5.00 |
| 35 | Seed water (630.0500) | MGAL | 23 | $1.00 | $1.00 | $1.00 | $1.00 |
| 36 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 4 | $93.00 | $93.00 | $93.00 | $93.00 |
| 37 | Signs type II reflective F (637.2230) | SF | 12 | $25.00 | $25.00 | $25.00 | $25.00 |
| 38 | Removing signs type II (638.2602) | EACH | 4 | $15.00 | $15.00 | $15.00 | $15.00 |
| 39 | Removing small sign supports (638.3000) | EACH | 4 | $15.00 | $15.00 | $15.00 | $15.00 |
| 40 | Field office type B (642.5001) | EACH | 1 | $3,300.00 | $3,000.00 | $1,500.00 | $5,000.00 |
| 41 | Traffic control barricades type III (643.0420) | DAY | 1,280 | $0.50 | $0.50 | $0.50 | $0.50 |
| 42 | Traffic control warning lights type A (643.0705) | DAY | 1,990 | $0.20 | $0.20 | $0.20 | $0.20 |
| 43 | Traffic control signs (643.0900) | DAY | 1,000 | $0.50 | $0.50 | $0.50 | $0.50 |
| 44 | Traffic control (643.5000) | EACH | 1 | $2,713.00 | $2,713.00 | $2,713.00 | $2,713.00 |
| 45 | Geotextile type DF schedule A (645.0111) | SY | 56 | $5.00 | $5.00 | $5.00 | $5.00 |
| 46 | Geotextile type HR (645.0120) | SY | 295 | $4.00 | $5.00 | $4.00 | $9.00 |
| 47 | Marking line epoxy 4-inch (646.1020) | LF | 1,000 | $5.25 | $5.25 | $5.25 | $5.25 |
| 48 | Construction staking base (650.5000) | LF | 198 | $0.01 | $1.00 | $0.01 | $0.01 |
| 49 | Construction staking structure layout (structure) 01. B-3-221 (650.6501) | EACH | 1 | $1,303.00 | $3,000.00 | $1,303.00 | $1,303.00 |
| 50 | Construction staking supplemental control (project) 01. 8311-00-70 (650.9911) | EACH | 1 | $369.00 | $1,200.00 | $369.00 | $369.00 |
| 51 | Construction staking slope stakes (650.9920) | LF | 198 | $0.99 | $1.00 | $0.99 | $0.99 |
| 52 | Incentive strength concrete structures (715.0502) | DOL | 666 | $1.00 | $1.00 | $1.00 | $1.00 |
| 53 | Installing and maintaining bird deterrent system (station) 01. sta 10+00 (999.2000.S) | EACH | 1 | $2,600.00 | $0.01 | $0.01 | $1.00 |
| 54 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 55 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 56 | Special 01. prestressed girder box type 21-inch (SPV.0090) | LF | 348 | $765.00 | $500.00 | $550.00 | $620.00 |
| 57 | Special 01. select crushed material for travel corridor (SPV.0195) | TON | 20 | $84.00 | $50.00 | $75.00 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.