WisDOT contract 20251209045 bid tabulation

CTH E - Dorchester; Br N Fork Popple Rvr Br B-10-0261 (CTH A, Clark County CTH E - Dorchester). Let by Wisconsin DOT on December 9, 2025, Clark. 6 bids received; low bid $549,064 by Larson Construction Co., Inc..

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
60
Data through
10 NOV 2026

5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Larson Construction Co., Inc.$549,064Low
2Radtke Contractors Inc.$595,479+8.0%
4Janke General Contractors, Inc.$621,192+13%
5Sheet Piling Services LLC$647,067+18%
6Lunda Construction Company$658,679+20%
WisDOT contract 20251209045: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Larson Construction Co., Inc.2. Radtke Contractors Inc.3. Janke General Contractors, Inc.4. Sheet Piling Services LLC5. Lunda Construction Company
1Removing structure over waterway minimal debris (structure) 01. P-10- 29 (203.0260)EACH1$32,590$47,569$45,000$35,000$115,000
2Removing asphaltic surface milling (204.0120)SY480$31.25$31.25$31.25$31.25$28.89
3Excavation common (205.0100)CY238$18.95$15.61$23.00$18.95$18.95
4Excavation, hauling, and disposal of potential creosote contaminated soil (205.0508.S)TON183$94.00$107.66$125.00$150.00$75.00
5Excavation for structures bridges (structure) 01. B-10-0261 (206.1001)EACH1$31,900$30,030$30,700$20,000$30,000
6Borrow (208.0100)CY164$27.60$26.67$18.00$27.60$27.60
7Backfill structure type A (210.1500)TON340$17.60$27.91$40.00$17.60$17.60
8Finishing roadway (project) 01. 8880-05-76 (213.0100)EACH1$510.00$1,000.00$100.00$510.00$510.00
9Base aggregate dense 3/4-inch (305.0110)TON124$26.10$30.68$40.00$26.10$26.10
10Base aggregate dense 1 1/4-inch (305.0120)TON600$22.90$23.89$30.00$22.90$22.90
11Tack coat (455.0605)GAL50$13.00$13.00$13.00$13.00$13.00
12Asphaltic surface (465.0105)TON193$158.32$158.32$158.32$158.32$158.32
13Concrete masonry bridges (502.0100)CY206$610.00$549.12$695.00$1,050.00$800.00
14Protective surface treatment (502.3200)SY259$3.00$3.69$5.00$2.50$5.00
15Bar steel reinforcement HS structures (505.0400)LB4,730$1.50$1.34$2.00$1.50$1.13
16Bar steel reinforcement HS coated structures (505.0600)LB30,760$1.50$1.35$2.00$1.60$1.30
17Railing tubular type M (513.4061)LF110$315.00$271.27$350.00$350.00$275.00
18Rubberized membrane waterproofing (516.0500)SY14$65.00$64.32$47.00$18.00$25.00
19Pile points (550.0500)EACH16$175.00$105.50$235.00$125.00$150.00
20Piling steel HP 10-inch X 42 LB (550.1100)LF800$56.00$35.31$80.00$55.00$45.00
21Riprap heavy (606.0300)CY70$79.00$75.57$106.00$75.00$80.00
22Pipe underdrain wrapped 6-inch (612.0406)LF130$6.70$4.26$13.00$6.70$6.70
23MGS thrie beam transition (614.2500)LF157.60$91.60$95.50$92.00$91.60$91.60
24MGS guardrail terminal eat (614.2610)EACH4$3,405.00$3,850.00$3,700.00$3,405.00$3,405.00
25Maintenance and repair of haul roads (project) 01. 8880-05-76 (618.0100)EACH1$500.00$250.00$100.00$0.01$0.01
26Mobilization (619.1000)EACH1$53,165$118,397$35,000$60,250$69,240
27Water (624.0100)MGAL7.40$0.50$30.00$28.00$0.50$0.50
28Salvaged topsoil (625.0500)SY525$4.05$4.50$6.00$4.05$4.05
29Silt fence (628.1504)LF860$2.50$3.19$2.20$2.50$2.50
30Silt fence maintenance (628.1520)LF1,372$0.01$0.10$0.01$0.01$0.01
31Mobilizations erosion control (628.1905)EACH4$400.00$250.00$350.00$400.00$400.00
32Mobilizations emergency erosion control (628.1910)EACH3$50.00$250.00$100.00$50.00$50.00
33Erosion mat urban class I type B (628.2008)SY525$2.25$2.00$2.29$2.25$2.25
34Turbidity barriers (628.6005)SY160$40.40$51.50$25.00$40.40$40.40
35Fertilizer type B (629.0210)CWT0.75$280.00$100.00$110.00$280.00$280.00
36Seeding mixture no. 30 (630.0130)LB55$17.25$8.10$8.80$17.25$17.25
37Seeding temporary (630.0200)LB35$5.50$3.50$3.55$5.50$5.50
38Seed water (630.0500)MGAL26$0.01$25.00$25.00$0.01$0.01
39Posts wood 4X6-inch X 12-FT (634.0612)EACH4$84.50$130.00$100.00$84.50$84.50
40Signs type II reflective F (637.2230)SF12$29.60$30.00$28.00$29.60$29.60
41Removing signs type II (638.2602)EACH4$21.25$15.00$41.00$21.25$21.25
42Removing small sign supports (638.3000)EACH4$21.25$15.00$34.30$21.25$21.25
43Field office type B (642.5001)EACH1$3,000.00$2,429.04$2,500.00$1,500.00$3,000.00
44Traffic control barricades type III (643.0420)DAY1,475$0.45$0.45$0.45$0.45$0.45
45Traffic control warning lights type A (643.0705)DAY2,655$0.20$0.20$0.20$0.20$0.20
46Traffic control signs (643.0900)DAY885$0.45$0.45$0.45$0.45$0.45
47Traffic control (643.5000)EACH1$1,566.00$1,566.00$1,566.00$1,566.00$1,566.00
48Geotextile type DF schedule A (645.0111)SY72$4.40$4.71$4.00$4.40$4.40
49Geotextile type HR (645.0120)SY155$3.50$5.10$5.00$4.00$5.00
50Marking line paint 4-inch (646.1005)LF1,352$3.91$3.91$3.91$3.75$4.25
51Construction staking subgrade (650.4500)LF334$0.01$0.01$0.01$0.01$0.01
52Construction staking base (650.5000)LF334$0.01$0.01$0.01$0.01$1.00
53Construction staking structure layout (structure) 01. B-10-0261 (650.6501)EACH1$1,587.00$1,587.00$1,587.00$1,587.00$3,000.00
54Construction staking supplemental control (project) 01. 8880-05-76 (650.9911)EACH1$469.00$469.00$469.00$469.00$1,100.00
55Construction staking slope stakes (650.9920)LF334$0.98$0.98$0.98$0.98$1.00
56Sawing asphalt (690.0150)LF92$2.95$2.95$3.00$2.95$2.95
57Incentive strength concrete structures (715.0502)DOL1,236$1.00$1.00$1.00$1.00$1.00
58Maintaining bird deterrent system (station) 01. 13+50 (999.2005.S)EACH1$2,600.00$0.01$2,000.00$0.01$0.01
59On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00$5.00
60On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00$5.00$5.00$5.00$5.00
WisDOT contract 20251209045: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way