WisDOT contract 20260113007 bid tabulation

T Christiana - T Portland (CTH Pc); Vernon Co Line to STH 33 (CTH PC, Monroe County T. Christiana - T. Portland (CTH PC)). Let by Wisconsin DOT on January 13, 2026, Monroe. 8 bids received; low bid $6,458,359 by H. James & Sons, Inc.

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
156
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1H. James & Sons, Inc$6,458,359Low
2Mashuda Contractors, Inc.$7,277,572+13%
3Gerke Excavating Inc$7,312,291+13%
4James Peterson Sons, Inc.$7,557,351+17%
5Integrity Grading and Excavating, Inc.$7,693,247+19%
6Michels Road & Stone, Inc.$7,777,825+20%
7Hoffman Construction Company$7,973,256+23%
8Earth, Inc.$8,173,151+27%
WisDOT contract 20260113007: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. H. James & Sons, Inc2. Mashuda Contractors, Inc.3. Gerke Excavating Inc4. James Peterson Sons, Inc.5. Integrity Grading and Excavating, Inc.6. Michels Road & Stone, Inc.
1Grubbing (201.0205)STA51$295.00$400.00$305.43$263.75$263.75$263.75
2Removing small pipe culverts (203.0100)EACH27$425.00$350.00$335.74$522.00$213.20$200.00
3Removing structure (structure) 01. V-41-069 (203.0220)EACH1$2,475.00$1,000.00$3,627.78$3,018.00$7,530.57$11,000
4Removing structure (structure) 02. sta. 1111'J'+00 (203.0220)EACH1$1,695.00$1,000.00$2,718.67$3,018.00$2,109.38$13,000
5Removing structure over waterway minimal debris (structure) 01. steel girder bridge (203.0260)EACH1$30,500$38,300$14,885$17,000$17,000$18,000
6Removing concrete pavement (204.0100)SY110$22.00$9.00$34.12$25.00$23.24$20.00
7Removing concrete sidewalk (204.0155)SY5$60.00$15.00$181.83$100.00$112.52$20.00
8Removing fence (204.0170)LF13,000$1.00$1.00$1.00$1.00$1.00$2.00
9Excavation common (205.0100)CY292,500$3.31$5.14$5.15$5.44$7.50$5.05
10Excavation for structures bridges (structure) 01. B-41-333 (206.1001)EACH1$4,975.00$4,250.00$11,665$3,912.00$10,234$8,000.00
11Backfill structure type A (210.1500)TON420$32.50$44.10$23.05$37.57$41.78$28.00
12Finishing roadway (project) 01. 5016-00-71 (213.0100)EACH1$1,000.00$1,500.00$9,500.00$5,000.00$500.00$5,000.00
13Base aggregate dense 3/4-inch (305.0110)TON5,610$17.80$20.35$22.03$21.80$21.08$20.90
14Base aggregate dense 1 1/4-inch (305.0120)TON63,300$15.34$16.55$16.05$16.52$19.00$15.20
15Breaker run (311.0110)TON4,500$15.34$15.51$14.75$14.98$19.58$14.90
16Tack coat (455.0605)GAL3,090$3.00$3.00$3.15$3.00$3.00$3.00
17HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$10,000$10,000$10,500$10,000$10,000$10,000
18HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$10,000$10,000$10,500$10,000$10,000$10,000
19Incentive density PWL HMA pavement (460.2005)DOL11,043$1.00$1.00$1.00$1.00$1.00$1.00
20Incentive density HMA pavement longitudinal joints (460.2007)DOL2,460$1.00$1.00$1.00$1.00$1.00$1.00
21Incentive air voids HMA pavement (460.2010)DOL12,950$1.00$1.00$1.00$1.00$1.00$1.00
22HMA pavement 4 LT 58-28 S (460.5224)TON12,950$89.34$89.34$93.81$89.34$89.34$89.34
23Asphaltic surface driveways and field entrances (465.0120)TON230$162.00$162.00$170.10$162.00$162.00$162.00
24Asphaltic curb (465.0310)LF318$16.24$16.24$17.05$16.24$16.24$16.24
25Asphaltic flumes (465.0315)SY238$71.13$71.13$74.69$81.13$71.13$71.13
26Asphaltic rumble strips, centerline (465.0560)LF9,860$0.45$0.45$0.45$0.45$0.51$0.45
27Concrete masonry bridges (502.0100)CY239$1,000.00$1,000.00$1,000.00$1,000.00$1,000.00$910.00
28Protective surface treatment (502.3200)SY355$2.50$2.50$2.50$2.50$2.50$4.80
29Pigmented surface sealer (502.3210)SY135$2.50$2.50$2.50$2.50$2.50$12.00
30Prestressed girder type I 45W-inch (503.0146)LF392$375.00$375.00$375.00$375.00$375.00$310.00
31Bar steel reinforcement HS structures (505.0400)LB5,440$1.75$1.75$1.75$1.75$1.75$1.20
32Bar steel reinforcement HS coated structures (505.0600)LB33,650$1.85$1.85$1.85$1.85$1.85$1.31
33Bearing pads elastomeric non- laminated (506.2605)EACH8$125.00$125.00$125.00$125.00$125.00$120.00
34Steel diaphragms (structure) 01. B- 41-333 (506.4000)EACH6$1,000.00$1,000.00$1,000.00$1,000.00$1,000.00$1,100.00
35Rubberized membrane waterproofing (516.0500)SY14$18.00$18.00$18.00$18.00$18.00$61.00
36Apron endwalls for culvert pipe 18- inch (520.1018)EACH38$280.00$488.00$416.54$258.00$699.73$600.00
37Apron endwalls for culvert pipe 24- inch (520.1024)EACH12$335.00$496.00$473.18$360.00$708.14$650.00
38Apron endwalls for culvert pipe 30- inch (520.1030)EACH20$645.00$763.00$842.42$640.00$974.71$900.00
39Apron endwalls for culvert pipe 36- inch (520.1036)EACH2$850.00$1,117.00$1,064.10$845.00$1,283.97$1,500.00
40Apron endwalls for culvert pipe 60- inch (520.1060)EACH4$2,550.00$2,811.00$3,172.10$3,390.00$3,193.83$3,500.00
41Apron endwalls for culvert pipe 72- inch (520.1072)EACH2$3,200.00$3,450.00$3,650.38$4,136.00$3,635.24$4,000.00
42Culvert pipe class III-A 18-inch (520.3318)LF700$69.00$61.50$36.82$83.50$41.47$68.00
43Culvert pipe class III-A 30-inch (520.3330)LF346$93.40$92.50$54.15$110.50$58.54$85.00
44Culvert pipe class III-A 36-inch (520.3336)LF30$129.30$109.00$71.51$137.50$67.89$100.00
45Culvert pipe class IV 24-inch (520.4124)LF526$74.10$75.00$59.24$139.50$51.88$90.00
46Culvert pipe class IV 30-inch (520.4130)LF346$90.25$98.00$73.66$175.00$66.66$95.00
47Culvert pipe class IV 60-inch (520.4160)LF332$219.25$266.00$214.11$263.50$173.48$250.00
48Culvert pipe class IV 72-inch (520.4172)LF262$277.25$330.00$245.81$336.50$200.35$300.00
49Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH1$315.00$488.00$462.02$290.00$699.73$600.00
50Apron endwalls for pipe arch steel 35X24-inch (521.1235)EACH2$525.00$635.00$626.66$564.00$1,373.90$650.00
51Pipe arch corrugated steel 35X24- inch (521.3735)LF80$98.00$91.00$81.91$121.50$78.70$180.00
52Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH3$1,215.00$820.00$1,051.44$1,208.00$1,223.81$1,460.00
53Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH3$1,355.00$924.00$1,204.60$1,393.00$1,292.41$1,800.00
54Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH2$1,525.00$1,240.00$1,377.05$1,605.00$1,461.25$1,600.00
55Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH2$2,500.00$1,860.00$2,316.11$2,518.00$2,774.77$2,500.00
56Culvert pipe corrugated polyethylene 18-inch (530.0118)LF94$117.00$62.50$60.40$146.00$38.39$133.00
57Pile points (550.0500)EACH9$125.00$125.00$125.00$125.00$125.00$110.00
58Piling steel HP 10-inch X 42 LB (550.1100)LF720$42.00$42.00$42.00$42.00$42.00$19.00
59Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF6,240$21.00$21.00$21.00$21.00$21.00$21.00
60Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF136$25.00$25.00$25.00$25.00$25.00$25.00
61Concrete sidewalk 4-inch (602.0405)SF40$10.00$10.00$10.00$10.00$10.00$10.00
62Concrete driveway 6-inch (602.0810)SY56$64.00$64.00$64.00$64.00$64.00$64.00
63Concrete surface drains (602.3010)CY4$500.00$500.00$500.00$500.00$500.00$500.00
64Riprap heavy (606.0300)CY1,107$61.50$73.50$87.71$73.53$73.92$93.32
65Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF1,027$77.00$64.07$64.67$149.87$76.00$100.00
66Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF408$86.50$83.58$69.86$185.23$86.92$110.00
67Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF187$81.00$66.53$65.97$166.89$76.25$105.00
68Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF60$116.00$107.30$110.96$236.94$131.99$150.00
69Storm sewer pipe reinforced concrete class IV 36-inch (608.0436)LF160$207.00$170.77$202.26$339.81$157.13$205.00
70Manhole covers type J (611.0530)EACH2$850.00$715.00$733.12$659.00$690.64$800.00
71Inlet covers type C (611.0612)EACH3$890.00$740.00$772.47$698.00$727.57$750.00
72Inlet covers type F (611.0615)EACH2$2,050.00$2,160.00$2,084.47$2,638.00$1,924.67$2,100.00
73Inlet covers type HM (611.0627)EACH14$1,150.00$890.00$1,041.04$1,016.00$972.00$1,100.00
74Manholes 4-FT diameter (611.2004)EACH1$3,800.00$2,000.00$3,794.97$4,904.00$3,567.91$4,200.00
75Manholes 6-FT diameter (611.2006)EACH1$7,050.00$4,000.00$7,139.79$8,263.00$5,397.43$7,200.00
76Inlets 3-FT diameter (611.3003)EACH3$2,475.00$1,000.00$2,739.43$3,065.00$2,757.39$2,300.00
77Inlets 4-FT diameter (611.3004)EACH9$3,200.00$1,410.00$3,485.11$3,883.00$3,174.21$3,370.00
78Inlets 2X3-FT (611.3230)EACH5$2,350.00$1,100.00$2,583.80$2,606.00$2,698.21$2,150.00
79Inlets 2.5X3-FT (611.3253)EACH2$2,450.00$1,100.00$2,719.90$2,500.00$2,685.55$2,300.00
80Pipe grates (size) 01. 12-inch (611.9850.S)EACH1$780.00$250.00$1,507.75$1,152.00$791.16$1,250.00
81Pipe grates (size) 02. 18-inch (611.9850.S)EACH1$1,025.00$300.00$1,775.71$1,397.00$907.24$1,550.00
82Pipe grates (size) 03. 24-inch (611.9850.S)EACH1$1,950.00$350.00$2,778.25$2,313.00$1,033.87$2,450.00
83Pipe underdrain wrapped 6-inch (612.0406)LF350$11.60$12.00$9.07$18.50$11.88$6.00
84Anchor assemblies for steel plate beam guard (614.0150)EACH4$250.00$250.00$250.00$250.00$250.00$320.00
85MGS thrie beam transition (614.2500)LF160$90.00$90.00$90.00$90.00$90.00$98.00
86MGS guardrail terminal eat (614.2610)EACH4$3,433.00$3,433.00$3,433.00$3,433.00$3,433.00$5,200.00
87Fence chain link 5-FT (616.0205)LF235$42.00$42.00$42.00$42.00$42.00$63.00
88Fence safety (616.0700.S)LF80$10.00$10.00$10.00$10.00$10.00$10.00
89Maintenance and repair of haul roads (project) 01. 5016-00-71 (618.0100)EACH1$100.00$1.00$0.01$150.00$500.00$0.01
90Mobilization (619.1000)EACH1$504,338$608,382$558,686$416,500$288,000$1,045,577
91Dust control surface treatment (623.0200)SY64,000$0.01$0.05$0.40$0.50$0.01$0.01
92Water (624.0100)MGAL1,020$38.00$32.50$27.02$45.00$40.00$50.00
93Salvaged topsoil (625.0500)SY186,700$0.70$1.15$1.29$1.30$1.00$0.50
94Mulching (627.0200)SY7,770$0.35$0.35$0.35$0.35$0.35$0.40
95Silt fence (628.1504)LF6,470$1.63$1.63$1.63$1.63$1.63$2.50
96Silt fence maintenance (628.1520)LF12,940$0.03$0.03$0.03$0.03$0.03$0.01
97Mobilizations erosion control (628.1905)EACH10$101.00$101.00$101.00$101.00$101.00$350.00
98Mobilizations emergency erosion control (628.1910)EACH6$201.00$201.00$201.00$201.00$201.00$500.00
99Erosion mat class I type A (628.2002)SY29,400$0.92$0.92$0.92$0.92$0.92$1.25
100Erosion mat class I type B (628.2004)SY45,590$0.92$0.92$0.92$0.92$0.92$1.25
101Erosion mat urban class I type A (628.2006)SY2,940$1.60$1.60$1.60$1.60$1.60$2.00
102Erosion mat urban class I type B (628.2008)SY23,700$1.60$1.60$1.60$1.60$1.60$2.00
103Erosion mat class II type B (628.2023)SY76,000$1.57$1.57$1.57$1.57$1.57$1.90
104Erosion mat class III type C (628.2037)SY34,000$4.53$4.53$4.53$4.53$4.53$3.75
105Turbidity barriers (628.6005)SY320$43.00$43.00$43.00$43.00$43.00$65.00
106Inlet protection type A (628.7005)EACH19$100.00$100.00$100.00$100.00$100.00$125.00
107Inlet protection type C (628.7015)EACH16$75.00$75.00$75.00$75.00$75.00$125.00
108Temporary ditch checks (628.7504)LF11,350$4.53$4.53$9.12$4.53$4.53$10.00
109Culvert pipe checks (628.7555)EACH182$20.00$20.00$20.00$20.00$20.00$15.00
110Tracking pads (628.7560)EACH3$0.01$3,100.00$1,465.82$2,500.00$1,000.00$2,200.00
111Fertilizer type B (629.0210)CWT116$105.00$105.00$105.00$105.00$105.00$125.00
112Seeding mixture no. 20 (630.0120)LB8,550$5.13$5.13$5.13$5.13$5.13$8.00
113Seeding mixture no. 70A (630.0171)LB60$155.00$155.00$155.00$155.00$155.00$300.00
114Seeding temporary (630.0200)LB5,580$3.03$3.03$3.03$3.06$3.03$3.00
115Seed water (630.0500)MGAL4,650$1.00$1.00$1.00$1.00$1.00$0.01
116Markers culvert end (633.5200)EACH26$75.00$75.00$75.00$75.00$75.00$85.00
117Posts wood 4X6-inch X 16-FT (634.0616)EACH60$94.00$94.00$94.00$94.00$94.00$145.00
118Signs type II reflective H (637.2210)SF122.94$20.00$20.00$20.00$20.00$20.00$30.00
119Signs type II reflective F (637.2230)SF216.23$23.00$23.00$23.00$23.00$23.00$32.00
120Moving signs type II (638.2102)EACH18$75.00$75.00$75.00$75.00$75.00$200.00
121Removing signs type II (638.2602)EACH27$20.00$20.00$20.00$20.00$20.00$50.00
122Removing small sign supports (638.3000)EACH25$20.00$20.00$20.00$20.00$20.00$50.00
123Moving small sign supports (638.4000)EACH9$75.00$75.00$75.00$75.00$75.00$50.00
124Field office type B (642.5001)EACH1$12,000$14,000$11,884$15,000$20,000$17,000
125Traffic control drums (643.0300)DAY2,400$0.15$0.15$0.15$0.15$0.15$0.15
126Traffic control barricades type III (643.0420)DAY6,400$0.50$0.50$0.50$0.50$0.50$0.50
127Traffic control warning lights type A (643.0705)DAY11,200$0.10$0.10$0.10$0.10$0.10$0.10
128Traffic control signs (643.0900)DAY11,200$0.20$0.20$0.20$0.20$0.20$0.20
129Traffic control covering signs type II (643.0920)EACH4$125.00$125.00$125.00$125.00$125.00$125.00
130Traffic control signs PCMS (643.1050)DAY14$45.00$45.00$45.00$45.00$45.00$45.00
131Traffic control (643.5000)EACH1$14,000$14,000$14,000$14,000$14,000$14,000
132Geotextile type DF schedule A (645.0111)SY62$17.00$8.00$12.24$15.00$2.73$7.00
133Geotextile type HR (645.0120)SY2,180$2.25$3.50$3.18$3.72$1.68$4.00
134Geotextile type SR (645.0135)SY3,750$2.50$3.80$1.48$2.93$1.00$3.00
135Marking line epoxy 6-inch (646.2020)LF39,330$0.53$0.53$0.53$0.53$0.53$0.53
136Marking stop line epoxy 18-inch (646.6120)LF32$17.50$17.50$17.50$17.50$17.50$17.50
137Locating no-passing zones (648.0100)MI2.35$575.34$575.34$575.32$575.34$575.34$575.34
138Construction staking storm sewer (650.4000)EACH32$200.00$200.00$130.00$200.00$200.00$200.00
139Construction staking subgrade (650.4500)LF17,581$0.01$0.01$0.40$0.01$0.01$0.01
140Construction staking base (650.5000)LF17,581$0.45$0.45$0.45$0.45$0.45$0.45
141Construction staking curb gutter and curb & gutter (650.5500)LF6,376$1.00$1.00$1.00$1.00$1.00$1.00
142Construction staking pipe culverts (650.6000)EACH13$300.00$300.00$140.00$300.00$300.00$300.00
143Construction staking structure layout (structure) 01. B-41-333 (650.6501)EACH1$3,000.00$3,000.00$750.00$3,000.00$3,000.00$3,000.00
144Construction staking structure layout (structure) 01. R-41-10 (650.6501)EACH1$1,000.00$1,000.00$1,000.00$1,000.00$1,000.00$1,000.00
145Construction staking sidewalk (project) 01. 5016-00-71 (650.9500)EACH1$100.00$100.00$400.00$100.00$100.00$100.00
146Construction staking supplemental control (project) 01. 5016-00-71 (650.9911)EACH1$1,000.00$1,000.00$1,800.00$1,000.00$1,000.00$1,000.00
147Construction staking slope stakes (650.9920)LF17,581$0.65$0.65$0.75$0.65$0.65$0.65
148Sawing asphalt (690.0150)LF460$1.95$1.97$1.89$1.97$1.97$1.89
149Sawing concrete (690.0250)LF6$2.95$4.00$2.89$4.00$4.00$2.89
150Incentive strength concrete structures (715.0502)DOL1,434$1.00$1.00$1.00$1.00$1.00$1.00
151Incentive iri ride (740.0440)DOL9,317$1.00$1.00$1.00$1.00$1.00$1.00
152Maintaining bird deterrent system (station) 01. sta. 26+50 (999.2005.S)EACH1$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00$0.01
153On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,500$5.00$5.00$5.00$5.00$5.00$5.00
154On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS3,520$5.00$5.00$5.00$5.00$5.00$5.00
155Special 01. temporary stone checks (SPV.0035)CY12$100.00$47.00$78.69$150.00$97.53$150.00
156Special 01. wall modular block mechanically stabilized earth (R-41- 10) (SPV.0165)SF1,890$86.00$85.00$85.00$85.00$66.25$105.00
WisDOT contract 20260113007: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy