WisDOT contract 20260113030 bid tabulation

T Eau Pleine, Abe Lincoln Road; Carlson Creek Bridge, B-37-0487 (LOC STR, Marathon County T Eau Pleine, Abe Lincoln Road). Let by Wisconsin DOT on January 13, 2026, Marathon. 6 bids received; low bid $757,980 by Larson Construction Co., Inc..

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
61
Data through
10 NOV 2026

5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Larson Construction Co., Inc.$757,980Low
2Sheet Piling Services LLC$772,419+2.0%
3Lunda Construction Company$791,482+4.0%
5Zenith Tech., Inc. - Waukesha$899,362+19%
6Janke General Contractors, Inc.$908,950+20%
WisDOT contract 20260113030: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Larson Construction Co., Inc.2. Sheet Piling Services LLC3. Lunda Construction Company4. Zenith Tech., Inc. - Waukesha5. Janke General Contractors, Inc.
1Removing structure over waterway remove debris (structure) 01. P-37- 302 (203.0250)EACH1$36,146$200,000$125,000$50,000$85,000
2Excavation common (205.0100)CY127$17.35$19.50$25.51$25.51$16.50
3Excavation for structures bridges (structure) 01. B-37-487 (206.1001)EACH1$28,932$6,000.00$50,000$30,000$53,000
4Borrow (208.0100)CY134$33.90$19.50$32.50$32.50$23.00
5Backfill structure type A (210.1500)TON290$27.75$23.15$26.53$26.53$30.00
6Finishing roadway (project) 01. 6678-02-70 (213.0100)EACH1$530.00$0.01$500.00$500.00$250.00
7Base aggregate dense 3/4-inch (305.0110)TON30$55.25$32.50$35.40$35.40$48.00
8Base aggregate dense 1 1/4-inch (305.0120)TON210$30.50$22.50$23.96$23.96$32.00
9Concrete pavement 6-inch (415.0060)SY18$137.58$136.22$136.22$136.22$200.00
10Concrete pavement approach slab (415.0410)SY100$315.27$312.15$312.15$312.15$275.00
11Drilled tie bars (416.0610)EACH20$16.19$16.03$16.03$16.03$20.00
12Tack coat (455.0605)GAL23$15.00$15.00$15.00$15.00$15.00
13Asphaltic surface (465.0105)TON65$176.70$176.70$176.70$176.70$176.70
14Concrete masonry bridges (502.0100)CY138$765.00$900.00$800.00$1,425.00$1,000.00
15Protective surface treatment (502.3200)SY180$3.00$3.50$5.00$4.50$5.50
16Pigmented surface sealer (502.3210)SY82$7.00$4.00$10.00$14.00$10.00
17Bar steel reinforcement HS structures (505.0400)LB4,140$2.00$1.40$1.46$2.00$2.65
18Bar steel reinforcement HS coated structures (505.0600)LB11,710$2.00$1.50$1.61$2.00$2.05
19Bearing pads elastomeric non- laminated (506.2605)EACH14$215.00$300.00$175.00$275.00$300.00
20Rubberized membrane waterproofing (516.0500)SY20$65.00$25.00$25.00$70.00$43.00
21Pre-boring unconsolidated materials (550.0010)LF138$357.26$125.00$225.00$525.00$350.00
22Piling steel HP 10-inch X 42 LB (550.1100)LF162$68.00$65.00$55.00$95.00$101.00
23Concrete surface drains (602.3010)CY5$1,682.64$1,665.98$1,665.98$1,665.98$1,315.00
24Riprap heavy (606.0300)CY185$72.00$68.75$75.14$75.14$90.00
25Pipe underdrain wrapped 6-inch (612.0406)LF190$6.95$6.15$7.15$7.15$15.00
26Maintenance and repair of haul roads (project) 01. 6678-02-70 (618.0100)EACH1$1,000.00$0.01$0.01$500.00$250.00
27Mobilization (619.1000)EACH1$98,830$52,942$94,841$100,000$100,000
28Water (624.0100)MGAL6$0.50$50.00$25.00$25.00$34.00
29Salvaged topsoil (625.0500)SY449$4.35$3.75$4.15$4.15$6.00
30Silt fence (628.1504)LF488$3.00$3.00$3.65$3.65$4.00
31Silt fence maintenance (628.1520)LF488$0.01$0.03$0.10$0.10$0.01
32Mobilizations erosion control (628.1905)EACH5$400.00$193.00$200.00$200.00$50.00
33Mobilizations emergency erosion control (628.1910)EACH3$100.00$303.00$200.00$200.00$1.00
34Erosion mat urban class I type B (628.2008)SY562$2.30$3.00$2.10$2.10$4.00
35Turbidity barriers (628.6005)SY270$37.75$40.00$49.15$49.15$50.00
36Fertilizer type A (629.0205)CWT0.50$252.00$300.00$150.00$150.00$400.00
37Seeding mixture no. 20 (630.0120)LB40$17.80$12.00$8.10$8.10$20.00
38Seeding temporary (630.0200)LB25$7.50$9.00$3.50$3.50$10.00
39Seed water (630.0500)MGAL18$0.10$40.00$25.00$25.00$25.00
40Posts wood 4X6-inch X 14-FT (634.0614)EACH4$91.85$150.00$125.00$125.00$150.00
41Signs type II reflective F (637.2230)SF12$30.75$50.00$30.00$30.00$35.00
42Removing signs type II (638.2602)EACH6$22.00$50.00$10.00$10.00$40.00
43Removing small sign supports (638.3000)EACH4$22.00$50.00$10.00$10.00$40.00
44Field office type B (642.5001)EACH1$3,500.00$1,250.00$3,500.00$5,000.00$2,000.00
45Traffic control barricades type III (643.0420)DAY1,188$0.40$0.40$0.40$0.40$0.40
46Traffic control warning lights type A (643.0705)DAY1,848$0.10$0.10$0.10$0.10$0.10
47Traffic control signs (643.0900)DAY924$0.40$0.40$0.40$0.40$0.40
48Traffic control (643.5000)EACH1$1,600.00$1,600.00$1,600.00$1,600.00$1,600.00
49Geotextile type DF schedule A (645.0111)SY62$4.50$5.25$7.50$7.50$5.00
50Geotextile type HR (645.0120)SY310$3.10$5.95$7.15$7.15$6.00
51Construction staking subgrade (650.4500)LF169$0.01$0.01$0.01$0.01$0.01
52Construction staking base (650.5000)LF169$1.00$1.00$1.00$1.00$1.00
53Construction staking structure layout (structure) 01. B-37-487 (650.6501)EACH1$2,800.00$2,800.00$2,800.00$2,800.00$2,800.00
54Construction staking supplemental control (project) 01. 6678-02-70 (650.9911)EACH1$801.81$801.81$801.81$801.81$801.81
55Construction staking slope stakes (650.9920)LF169$2.50$2.50$2.50$2.50$2.50
56Incentive strength concrete structures (715.0502)DOL828$1.00$1.00$1.00$1.00$1.00
57Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00$1.00$1.00$1.00
58On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00$5.00
59On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00$5.00
60Special 01. prestressed girder box type 27-inch (SPV.0090)LF418$622.00$500.00$500.00$625.00$700.00
61Special 01. select crushed material for travel corridor (SPV.0195)TON20$44.00$38.50$40.00$40.00$55.00
WisDOT contract 20260113030: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy