WisDOT contract 20260113045 bid tabulation

Foster - Augusta; Bears Grass Creek Bridge B-18-0256 (CTH VV, Eau Claire County Foster - Augusta). Let by Wisconsin DOT on January 13, 2026, Eau Claire. 4 bids received; low bid $501,281 by Larson Construction Co., Inc..

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
71
Data through
10 NOV 2026

3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Larson Construction Co., Inc.$501,281Low
2Radtke Contractors Inc.$525,587+5.0%
4Lunda Construction Company$598,416+19%
WisDOT contract 20260113045: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Larson Construction Co., Inc.2. Radtke Contractors Inc.3. Lunda Construction Company
1Removing small pipe culverts (203.0100)EACH1$360.00$360.00$360.00
2Removing structure over waterway minimal debris (structure) 01. P-18- 0082 (203.0260)EACH1$26,941$42,127$75,000
3Removing guardrail (204.0165)LF260$3.50$3.50$3.50
4Excavation common (205.0100)CY360$9.95$9.95$9.95
5Excavation, hauling, and disposal of potential creosote contaminated soil (205.0508.S)TON110$149.96$99.10$75.00
6Excavation for structures bridges (structure) 01. B-18-0256 (206.1001)EACH1$15,135$22,034$35,000
7Borrow (208.0100)CY310$16.25$16.25$16.25
8Backfill structure type A (210.1500)TON422$17.15$28.47$17.15
9Finishing roadway (project) 01. 7830-00-72 (213.0100)EACH1$725.00$725.00$725.00
10Base aggregate dense 3/4-inch (305.0110)TON180$26.75$26.75$26.75
11Base aggregate dense 1 1/4-inch (305.0120)TON665$29.35$29.35$29.35
12Tack coat (455.0605)GAL65$10.76$10.76$10.76
13Asphaltic surface (465.0105)TON200$151.04$151.04$151.04
14Concrete masonry bridges (502.0100)CY198$656.00$603.83$850.00
15Protective surface treatment (502.3200)SY191$4.54$3.69$5.00
16Pigmented surface sealer (502.3210)SY50$8.00$22.19$6.00
17Bar steel reinforcement HS structures (505.0400)LB4,560$1.60$1.34$1.10
18Bar steel reinforcement HS coated structures (505.0600)LB33,000$1.50$1.38$1.25
19Rubberized membrane waterproofing (516.0500)SY12$59.00$64.32$25.00
20Culvert pipe corrugated steel 36- inch (521.3136)LF40$115.00$115.00$115.00
21Piling steel HP 10-inch X 42 LB (550.1100)LF560$59.00$39.01$45.00
22Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF90$75.45$75.45$75.45
23Concrete surface drains (602.3010)CY1.60$1,504.59$1,504.59$1,504.59
24Riprap medium (606.0200)CY35$78.15$78.15$78.15
25Riprap heavy (606.0300)CY60$73.00$81.46$60.00
26Pipe underdrain wrapped 6-inch (612.0406)LF146$7.65$4.26$7.65
27Anchor assemblies for steel plate beam guard (614.0150)EACH4$225.00$315.69$150.00
28MGS guardrail 3 (614.2300)LF97$29.40$29.40$29.40
29MGS guardrail short radius (614.2350)LF24$31.35$31.35$31.35
30MGS thrie beam transition (614.2500)LF118$98.75$98.75$98.75
31MGS guardrail terminal eat (614.2610)EACH3$3,700.00$3,700.00$3,700.00
32MGS guardrail short radius terminal (614.2630)EACH1$2,675.00$2,675.00$2,675.00
33Maintenance and repair of haul roads (project) 01. 7830-00-72 (618.0100)EACH1$1,500.00$250.00$0.01
34Mobilization (619.1000)EACH1$55,950$89,295$78,052
35Water (624.0100)MGAL10$45.00$45.00$45.00
36Salvaged topsoil (625.0500)SY1,370$1.45$1.45$1.45
37Silt fence (628.1504)LF900$2.35$2.35$2.35
38Silt fence maintenance (628.1520)LF900$0.10$0.10$0.10
39Mobilizations erosion control (628.1905)EACH4$180.00$180.00$180.00
40Mobilizations emergency erosion control (628.1910)EACH2$90.00$90.00$90.00
41Erosion mat urban class I type B (628.2008)SY1,370$1.85$1.85$1.85
42Turbidity barriers (628.6005)SY120$54.00$54.00$54.00
43Culvert pipe checks (628.7555)EACH5$18.00$18.00$18.00
44Fertilizer type B (629.0210)CWT0.90$155.00$155.00$155.00
45Seeding mixture no. 20 (630.0120)LB65$8.90$8.90$8.90
46Seed water (630.0500)MGAL30$0.01$0.01$0.01
47Posts wood 4X6-inch X 12-FT (634.0612)EACH4$84.00$84.00$84.00
48Signs type II reflective F (637.2230)SF12$29.75$29.75$29.75
49Moving signs type II (638.2102)EACH3$120.00$120.00$120.00
50Removing signs type II (638.2602)EACH4$23.00$23.00$23.00
51Removing small sign supports (638.3000)EACH4$23.00$23.00$23.00
52Moving small sign supports (638.4000)EACH2$65.00$65.00$65.00
53Field office type B (642.5001)EACH1$3,350.00$2,833.88$3,500.00
54Traffic control drums (643.0300)DAY665$0.40$0.40$0.40
55Traffic control barricades type III (643.0420)DAY1,330$0.50$0.50$0.50
56Traffic control warning lights type A (643.0705)DAY2,280$0.10$0.10$0.10
57Traffic control signs (643.0900)DAY1,235$0.45$0.45$0.45
58Traffic control (643.5000)EACH1$1,525.00$1,525.00$1,525.00
59Geotextile type DF schedule A (645.0111)SY92$3.05$4.71$3.05
60Geotextile type HR (645.0120)SY155$3.75$4.00$4.00
61Marking line epoxy 4-inch (646.1020)LF1,100$4.90$4.90$4.90
62Construction staking subgrade (650.4500)LF375$0.01$0.01$0.01
63Construction staking base (650.5000)LF375$0.01$0.01$1.00
64Construction staking curb gutter and curb & gutter (650.5500)LF90$1.00$1.00$2.00
65Construction staking structure layout (structure) 01. B-18-0256 (650.6501)EACH1$1,726.00$1,726.00$2,000.00
66Construction staking supplemental control (project) 01. 7830-00-72 (650.9911)EACH1$369.00$369.00$750.00
67Construction staking slope stakes (650.9920)LF375$0.98$0.98$1.00
68Sawing asphalt (690.0150)LF46$4.00$2.95$4.00
69Incentive strength concrete structures (715.0502)DOL1,980$1.00$1.00$1.00
70Installing and maintaining bird deterrent system (station) 01. sta 16+50 (999.2000.S)EACH1$3,000.00$0.01$0.01
71Special 01. MGS thrie beam transition TL-2 (SPV.0090)LF22$55.00$55.00$55.00
WisDOT contract 20260113045: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy