WisDOT contract 20260113046 bid tabulation

T Beaver, Riplinger Rd; Nelson Creek Bridge B-10-0266 (LOC STR, Clark County T Beaver, Riplinger Road). Let by Wisconsin DOT on January 13, 2026, Clark. 6 bids received; low bid $411,374 by Radtke Contractors Inc..

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
61
Data through
10 NOV 2026

5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Radtke Contractors Inc.$411,374Low
3Larson Construction Co., Inc.$485,685+18%
4Sheet Piling Services LLC$542,664+32%
5Lunda Construction Company$644,393+57%
6Janke General Contractors, Inc.$937,644+128%
WisDOT contract 20260113046: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Radtke Contractors Inc.2. Larson Construction Co., Inc.3. Sheet Piling Services LLC4. Lunda Construction Company5. Janke General Contractors, Inc.
1Removing structure over waterway minimal debris (structure) 01. P-10- 937 (203.0260)EACH1$27,499$32,451$95,000$105,000$125,000
2Excavation common (205.0100)CY372$19.00$30.90$19.00$23.40$31.00
3Excavation, hauling, and disposal of creosote contaminated soil (205.0506.S)TON96$98.00$162.00$98.00$85.00$75.00
4Excavation for structures bridges (structure) 01. B-10-266 (206.1001)EACH1$15,543$24,311$6,000.00$45,000$99,000
5Borrow (208.0100)CY260$18.95$31.56$18.95$37.85$58.00
6Backfill structure type A (210.1500)TON276$23.50$26.89$23.50$26.50$41.00
7Finishing roadway (project) 01.7841-00-74 (213.0100)EACH1$500.00$500.00$500.00$525.00$250.00
8Base aggregate dense 3/4-inch (305.0110)TON100$32.50$28.75$32.50$34.60$63.00
9Base aggregate dense 1 1/4-inch (305.0120)TON480$22.10$23.25$22.10$26.60$31.00
10Concrete masonry bridges (502.0100)CY114$727.84$761.00$1,000.00$800.00$1,100.00
11Protective surface treatment (502.3200)SY163$3.69$3.50$5.00$10.00$6.50
12Bar steel reinforcement HS structures (505.0400)LB3,960$1.38$1.70$1.40$1.15$2.25
13Bar steel reinforcement HS coated structures (505.0600)LB16,410$1.46$1.70$1.50$1.30$2.25
14Structural steel carbon (506.0105)LB540$10.86$8.00$10.00$10.00$8.00
15Railing tubular type M (513.4061)LF82$274.95$377.00$265.00$275.00$320.00
16Rubberized membrane waterproofing (516.0500)SY10$64.32$65.00$30.00$10.00$50.00
17Culvert pipe temporary 18-inch (520.2018)LF56$50.00$52.50$50.00$89.65$70.00
18Culvert pipe salvaged 36-inch (524.0136)LF40$23.75$53.10$23.75$41.50$120.00
19Temporary structure (station) 01. station 51+90 (526.0101)EACH1$32,976$65,750$75,000$125,000$261,000
20Pile points (550.0500)EACH14$105.50$115.00$120.00$100.00$150.00
21Piling steel HP 10-inch X 42 LB (550.1100)LF770$38.89$59.00$41.00$35.00$75.00
22Riprap heavy (606.0300)CY95$67.50$79.60$67.50$80.00$100.00
23Pipe underdrain wrapped 6-inch (612.0406)LF138$6.15$6.50$6.15$6.90$15.00
24Maintenance and repair of haul roads (project) 01. 7841-00-74 (618.0100)EACH1$250.00$500.00$0.01$500.00$250.00
25Mobilization (619.1000)EACH1$62,628$41,550$62,369$86,758$61,000
26Water (624.0100)MGAL12$50.00$25.00$50.00$0.01$20.00
27Salvaged topsoil (625.0500)SY1,850$3.50$3.50$3.50$2.10$4.50
28Mulching (627.0200)SY1,590$1.30$0.50$1.30$0.70$1.00
29Silt fence (628.1504)LF420$1.95$3.25$1.95$3.25$3.80
30Silt fence maintenance (628.1520)LF420$0.90$0.10$0.90$0.01$0.01
31Mobilizations erosion control (628.1905)EACH5$200.00$200.00$200.00$400.00$50.00
32Mobilizations emergency erosion control (628.1910)EACH2$300.00$200.00$300.00$75.00$1.00
33Erosion mat urban class I type B (628.2008)SY370$1.95$1.95$1.95$2.25$2.00
34Turbidity barriers (628.6005)SY295$42.50$47.96$42.50$37.95$20.00
35Temporary ditch checks (628.7504)LF80$19.00$15.00$19.00$7.25$7.00
36Culvert pipe checks (628.7555)EACH3$25.00$10.00$25.00$19.50$108.00
37Fertilizer type B (629.0210)CWT1.20$250.00$100.00$250.00$248.25$300.00
38Seeding mixture no. 20 (630.0120)LB78$6.50$7.10$6.50$17.05$18.00
39Seeding temporary (630.0200)LB57$6.00$3.50$6.00$6.50$13.00
40Seed water (630.0500)MGAL46$29.50$25.00$29.50$0.01$20.00
41Delineators temporary (633.1100)EACH30$18.00$18.00$18.00$18.00$35.00
42Posts wood 4X6-inch X 14-FT (634.0614)EACH4$50.00$125.00$130.00$91.00$200.00
43Signs type II reflective F (637.2230)SF12$130.00$30.00$37.50$29.75$29.00
44Removing signs type II (638.2602)EACH4$37.50$10.00$25.00$21.75$50.00
45Removing small sign supports (638.3000)EACH4$25.00$10.00$50.00$21.75$50.00
46Field office type B (642.5001)EACH1$1,924.20$3,200.00$1,000.00$4,500.00$2,500.00
47Traffic control drums (643.0300)DAY2,760$0.50$0.50$0.50$0.50$0.50
48Traffic control barricades type III (643.0420)DAY368$0.50$0.50$0.50$0.50$0.50
49Traffic control warning lights type A (643.0705)DAY736$0.10$0.10$0.10$0.10$0.10
50Traffic control warning lights type C (643.0715)DAY1,840$0.10$0.10$0.10$0.10$0.10
51Traffic control signs (643.0900)DAY2,300$0.50$0.50$0.50$0.50$0.50
52Traffic control (643.5000)EACH1$1,678.00$1,678.00$1,678.00$1,678.00$1,678.00
53Geotextile type DF schedule A (645.0111)SY84$5.15$7.50$5.15$4.45$4.00
54Geotextile type HR (645.0120)SY206$5.95$7.48$5.95$5.00$6.00
55Construction staking subgrade (650.4500)LF142$0.01$0.01$0.01$0.01$0.01
56Construction staking base (650.5000)LF142$0.01$0.01$2.00$1.00$0.01
57Construction staking structure layout (structure) 01. B-10-266 (650.6501)EACH1$2,000.00$2,000.00$2,400.00$2,000.00$2,000.00
58Construction staking supplemental control (project) 01. 7841-00-74 (650.9911)EACH1$1,000.00$1,000.00$200.00$1,000.00$1,000.00
59Construction staking slope stakes (650.9920)LF142$0.01$0.01$10.00$1.00$0.01
60Incentive strength concrete structures (715.0502)DOL684$1.00$1.00$1.00$1.00$1.00
61Special 01. select crushed material for travel corridor (SPV.0195)TON52$38.00$35.10$38.00$36.00$65.00
WisDOT contract 20260113046: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy