WisDOT contract 20260210012 bid tabulation
Pleasant Prairie - Caledonia; Il State Line to STH 50 (STH 031, Kenosha County Pleasant Prairie - Caledonia). Let by Wisconsin DOT on February 10, 2026, Kenosha. 5 bids received; low bid $5,745,371 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 165
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $5,745,371 | Low |
| 2 | Michels Road & Stone, Inc. | $6,074,509 | +6.0% |
| 3 | Zenith Tech., Inc. - Waukesha | $6,088,527 | +6.0% |
| 4 | Lalonde Contractors Incorporated | $6,413,334 | +12% |
| 5 | A.W. Oakes & Son, Inc. | $7,306,777 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. Michels Road & Stone, Inc. | 3. Zenith Tech., Inc. - Waukesha | 4. Lalonde Contractors Incorporated | 5. A.W. Oakes & Son, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing structure (structure) 01. sta 145+50 (203.0220) | EACH | 1 | $1,750.00 | $1,750.00 | $8,000.00 | $1,750.00 | $1,750.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 382 | $20.00 | $22.00 | $18.00 | $13.66 | $25.00 |
| 3 | Removing asphaltic surface milling (204.0120) | SY | 11,269 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 4 | Removing curb & gutter (204.0150) | LF | 2,302 | $6.00 | $9.00 | $8.00 | $11.53 | $11.00 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 395 | $6.00 | $9.00 | $10.00 | $14.93 | $8.50 |
| 6 | Removing concrete bases (204.0195) | EACH | 2 | $729.00 | $729.00 | $729.00 | $729.00 | $750.00 |
| 7 | Removing storm sewer (size) 01. 38X60-inch (204.0245) | LF | 27 | $32.00 | $32.00 | $35.00 | $32.00 | $32.00 |
| 8 | Removing storm sewer (size) 02. 24-inch (204.0245) | LF | 6 | $37.00 | $37.00 | $30.00 | $37.00 | $37.00 |
| 9 | Removing (item description) 01. traffic signals (STH 31 (green bay RD) & 95TH ST/dabbs farm RD) (204.9060.S) | EACH | 1 | $1,687.00 | $1,687.00 | $1,687.00 | $1,687.00 | $1,700.00 |
| 10 | Removing (item description) 02. traffic signals (STH 31 (green bay RD) & 85TH street) (204.9060.S) | EACH | 1 | $1,687.00 | $1,687.00 | $1,687.00 | $1,687.00 | $1,700.00 |
| 11 | Removing (item description) 03. traffic signals (STH 31 (green bay RD) & 78TH street) (204.9060.S) | EACH | 1 | $1,406.00 | $1,406.00 | $1,406.00 | $1,406.00 | $1,500.00 |
| 12 | Removing (item description) 04. traffic signals (STH 31 & STH 165) (204.9060.S) | EACH | 1 | $1,406.00 | $1,406.00 | $1,406.00 | $1,406.00 | $1,500.00 |
| 13 | Removing (item description) 05. loop detector wire & lead in cable (STH 31 & 95TH street) (204.9060.S) | EACH | 1 | $1,687.00 | $1,687.00 | $1,687.00 | $1,687.00 | $1,700.00 |
| 14 | Removing (item description) 06. loop detector wire & lead in cable (STH 31 & 85TH street) (204.9060.S) | EACH | 1 | $1,687.00 | $1,687.00 | $1,687.00 | $1,687.00 | $1,700.00 |
| 15 | Excavation common (205.0100) | CY | 140 | $100.00 | $90.00 | $28.00 | $75.00 | $50.00 |
| 16 | Excavation for structures culverts (structure) 01. sta 145+50 (206.2001) | EACH | 1 | $1,825.00 | $1,825.00 | $3,500.00 | $1,825.00 | $1,825.00 |
| 17 | Backfill granular grade 1 (209.1500) | TON | 70 | $30.00 | $30.00 | $21.00 | $30.00 | $30.00 |
| 18 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 97 | $200.00 | $170.00 | $62.00 | $239.59 | $140.00 |
| 19 | Finishing roadway (project) 01. 2390-08-70 (213.0100) | EACH | 1 | $1,000.00 | $5,000.00 | $1,613.73 | $2,934.00 | $3,165.00 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 752 | $50.00 | $52.00 | $46.00 | $41.94 | $38.00 |
| 21 | Base aggregate open-graded (310.0110) | TON | 36 | $1.00 | $52.00 | $87.25 | $54.33 | $50.00 |
| 22 | Breaker run (311.0110) | TON | 142 | $1.00 | $35.00 | $81.40 | $50.36 | $50.00 |
| 23 | Drilled tie bars (416.0610) | EACH | 9,901 | $12.00 | $13.00 | $7.69 | $20.39 | $15.00 |
| 24 | Drilled dowel bars (416.0620) | EACH | 16,539 | $16.00 | $19.00 | $17.17 | $18.22 | $30.00 |
| 25 | Concrete pavement repair (416.1710) | SY | 3,895 | $93.93 | $110.00 | $93.40 | $114.56 | $115.00 |
| 26 | Concrete pavement repair shes (416.1715) | SY | 2,423 | $125.18 | $127.00 | $145.64 | $163.45 | $168.00 |
| 27 | Concrete pavement replacement (416.1720) | SY | 5,968 | $93.93 | $110.00 | $103.24 | $100.21 | $115.00 |
| 28 | Concrete pavement replacement shes (416.1725) | SY | 3,837 | $125.18 | $127.00 | $143.03 | $149.08 | $168.00 |
| 29 | Continuous diamond grinding concrete pavement (420.1000) | SY | 206,190 | $4.35 | $4.20 | $4.80 | $4.20 | $4.20 |
| 30 | Tack coat (455.0605) | GAL | 7,325 | $0.20 | $0.20 | $0.20 | $0.20 | $0.20 |
| 31 | Incentive density HMA pavement (460.2000) | DOL | 2,080 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 32 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 2,048 | $86.00 | $86.00 | $86.00 | $86.00 | $86.00 |
| 33 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,340 | $76.00 | $76.00 | $76.00 | $76.00 | $76.00 |
| 34 | Asphaltic surface (465.0105) | TON | 32 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 |
| 35 | Asphaltic rumble strips, shoulder (465.0520) | LF | 17,306 | $0.40 | $0.28 | $0.40 | $0.40 | $0.40 |
| 36 | Concrete collars for pipe (520.8000) | EACH | 3 | $1,300.00 | $1,300.00 | $800.00 | $1,300.00 | $1,300.00 |
| 37 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 6 | $110.00 | $110.00 | $120.00 | $110.00 | $110.00 |
| 38 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 38X60-inch (522.2338) | LF | 27 | $325.00 | $325.00 | $620.00 | $325.00 | $325.00 |
| 39 | Concrete curb integral type D (601.0150) | LF | 10 | $60.00 | $25.00 | $56.58 | $44.25 | $100.00 |
| 40 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 1,834 | $41.00 | $25.00 | $58.27 | $57.64 | $53.00 |
| 41 | Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413) | LF | 458 | $41.00 | $26.00 | $62.16 | $60.13 | $53.00 |
| 42 | Concrete curb pedestrian (601.0600) | LF | 70 | $100.00 | $45.00 | $40.12 | $53.49 | $75.00 |
| 43 | Concrete sidewalk 5-inch (602.0410) | SF | 3,608 | $13.14 | $10.00 | $9.17 | $11.73 | $10.00 |
| 44 | Curb ramp detectable warning field yellow (602.0505) | SF | 70 | $60.00 | $45.00 | $38.12 | $45.79 | $50.00 |
| 45 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 48 | $120.00 | $55.00 | $65.52 | $70.91 | $80.00 |
| 46 | Riprap medium (606.0200) | CY | 10 | $85.00 | $85.00 | $175.00 | $85.00 | $85.00 |
| 47 | Inlet covers type HM (611.0627) | EACH | 3 | $1,350.00 | $1,300.00 | $1,100.00 | $769.20 | $1,100.00 |
| 48 | Inlet covers type WM (611.0660) | EACH | 11 | $2,000.00 | $2,000.00 | $1,700.00 | $1,666.80 | $2,000.00 |
| 49 | Adjusting manhole covers (611.8110) | EACH | 5 | $900.00 | $650.00 | $950.00 | $916.67 | $1,000.00 |
| 50 | Adjusting inlet covers (611.8115) | EACH | 65 | $900.00 | $650.00 | $700.00 | $896.67 | $1,000.00 |
| 51 | Pipe underdrain 4-inch (612.0104) | LF | 100 | $50.00 | $45.00 | $25.00 | $73.70 | $30.00 |
| 52 | Maintenance and repair of haul roads (project) 01. 2390-08-70 (618.0100) | EACH | 1 | $1.00 | $0.01 | $595.65 | $1.00 | $0.01 |
| 53 | Mobilization (619.1000) | EACH | 1 | $290,000 | $672,930 | $190,520 | $329,596 | $775,000 |
| 54 | Concrete corrugated median (620.0100) | SF | 45 | $50.00 | $21.00 | $86.78 | $25.78 | $25.00 |
| 55 | Concrete median sloped nose (620.0300) | SF | 54 | $20.00 | $16.00 | $24.64 | $24.95 | $25.00 |
| 56 | Water (624.0100) | MGAL | 13 | $100.00 | $150.00 | $100.00 | $87.33 | $100.00 |
| 57 | Salvaged topsoil (625.0500) | SY | 1,423 | $6.00 | $11.00 | $14.25 | $8.99 | $10.00 |
| 58 | Mobilizations erosion control (628.1905) | EACH | 10 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 59 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $200.00 | $300.00 | $300.00 | $200.00 | $300.00 |
| 60 | Erosion mat class I type A (628.2002) | SY | 1,423 | $1.85 | $1.71 | $1.71 | $1.85 | $2.00 |
| 61 | Inlet protection type B (628.7010) | EACH | 2 | $55.00 | $71.50 | $71.50 | $55.00 | $72.00 |
| 62 | Inlet protection type C (628.7015) | EACH | 326 | $55.00 | $55.00 | $55.00 | $55.00 | $55.00 |
| 63 | Culvert pipe checks (628.7555) | EACH | 18 | $19.00 | $30.16 | $30.16 | $19.00 | $31.00 |
| 64 | Fertilizer type A (629.0205) | CWT | 0.98 | $150.00 | $154.75 | $154.76 | $150.00 | $155.00 |
| 65 | Seeding mixture no. 30 (630.0130) | LB | 29.50 | $12.95 | $10.32 | $10.32 | $12.95 | $11.00 |
| 66 | Seed water (630.0500) | MGAL | 40.50 | $20.00 | $44.19 | $44.19 | $20.00 | $45.00 |
| 67 | Markers culvert end (633.5200) | EACH | 2 | $65.00 | $81.58 | $81.58 | $65.00 | $82.00 |
| 68 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 9 | $130.00 | $152.16 | $152.16 | $130.00 | $153.00 |
| 69 | Signs type II reflective H (637.2210) | SF | 58.50 | $28.00 | $20.62 | $20.62 | $28.00 | $21.00 |
| 70 | Signs type II reflective H folding (637.2215) | SF | 22.40 | $29.00 | $31.30 | $31.30 | $29.00 | $32.00 |
| 71 | Signs type II reflective F (637.2230) | SF | 24 | $28.00 | $24.46 | $24.46 | $28.00 | $25.00 |
| 72 | Moving signs type II (638.2102) | EACH | 5 | $110.00 | $158.18 | $158.18 | $110.00 | $159.00 |
| 73 | Removing signs type II (638.2602) | EACH | 12 | $30.00 | $50.60 | $50.60 | $30.00 | $51.00 |
| 74 | Removing small sign supports (638.3000) | EACH | 6 | $30.00 | $38.87 | $38.87 | $30.00 | $39.00 |
| 75 | Field office type B (642.5001) | EACH | 1 | $20,000 | $19,500 | $13,249 | $16,464 | $25,000 |
| 76 | Traffic control drums (643.0300) | DAY | 172,201 | $0.20 | $0.20 | $0.20 | $0.20 | $0.25 |
| 77 | Traffic control barricades type III (643.0420) | DAY | 13,443 | $1.00 | $1.00 | $0.45 | $1.00 | $1.00 |
| 78 | Traffic control warning lights type A (643.0705) | DAY | 27,050 | $0.10 | $0.10 | $0.05 | $0.10 | $0.10 |
| 79 | Traffic control warning lights type C (643.0715) | DAY | 3,631 | $0.20 | $0.20 | $0.05 | $0.20 | $0.20 |
| 80 | Traffic control connected arrow boards (643.0810) | DAY | 269 | $25.00 | $25.00 | $27.00 | $25.00 | $25.00 |
| 81 | Traffic control signs (643.0900) | DAY | 36,070 | $0.25 | $0.25 | $0.50 | $0.25 | $0.25 |
| 82 | Traffic control signs PCMS (643.1050) | DAY | 784 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 83 | Traffic control cones 42-inch (643.1070) | DAY | 149,291 | $0.10 | $0.10 | $0.20 | $0.10 | $0.10 |
| 84 | Temporary marking line paint 6- inch (643.3165) | LF | 59,845 | $0.45 | $0.45 | $0.38 | $0.45 | $0.50 |
| 85 | Temporary marking line removable tape 6-inch (643.3180) | LF | 157,671 | $1.10 | $1.10 | $1.90 | $1.10 | $1.10 |
| 86 | Temporary marking line paint 10- inch (643.3265) | LF | 10,730 | $0.68 | $0.68 | $0.70 | $0.68 | $0.70 |
| 87 | Temporary marking line removable tape 10-inch (643.3280) | LF | 12,490 | $3.00 | $3.00 | $3.60 | $3.00 | $3.00 |
| 88 | Temporary marking stop line paint 18-inch (643.3805) | LF | 56 | $1.75 | $1.75 | $5.00 | $1.75 | $1.75 |
| 89 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 1,665 | $2.00 | $2.00 | $3.00 | $2.00 | $2.00 |
| 90 | Temporary marking removable mask out tape 10-inch (643.3970) | LF | 1,280 | $5.00 | $5.00 | $6.00 | $5.00 | $5.00 |
| 91 | Traffic control interim lane closure (643.4100) | EACH | 20 | $500.00 | $500.00 | $950.00 | $500.00 | $750.00 |
| 92 | Traffic control (643.5000) | EACH | 1 | $50,000 | $50,000 | $25,000 | $50,000 | $82,000 |
| 93 | Marking line epoxy 4-inch (646.1020) | LF | 3,251 | $0.70 | $0.34 | $0.34 | $0.70 | $0.40 |
| 94 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 20,368 | $1.10 | $0.76 | $0.76 | $1.10 | $0.80 |
| 95 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 120,930 | $1.33 | $1.30 | $1.30 | $1.33 | $1.30 |
| 96 | Marking line epoxy 8-inch (646.3020) | LF | 1,407 | $1.50 | $0.93 | $0.93 | $1.50 | $1.00 |
| 97 | Marking line grooved black epoxy 10-inch (646.4025) | LF | 899 | $3.00 | $1.89 | $1.89 | $3.00 | $2.00 |
| 98 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 11,556 | $2.30 | $2.78 | $2.78 | $2.30 | $2.80 |
| 99 | Marking arrow epoxy (646.5020) | EACH | 90 | $240.00 | $252.24 | $252.24 | $240.00 | $253.00 |
| 100 | Marking word epoxy (646.5120) | EACH | 32 | $320.00 | $304.80 | $304.80 | $320.00 | $305.00 |
| 101 | Marking railroad crossing epoxy (646.5320) | EACH | 12 | $1,300.00 | $1,851.28 | $1,851.28 | $1,300.00 | $1,855.00 |
| 102 | Marking stop line epoxy 18-inch (646.6120) | LF | 1,038 | $14.00 | $11.51 | $11.51 | $14.00 | $11.60 |
| 103 | Marking yield line epoxy 18-inch (646.6220) | EACH | 52 | $30.00 | $37.28 | $37.28 | $30.00 | $37.30 |
| 104 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,387 | $9.00 | $12.81 | $12.81 | $9.00 | $13.00 |
| 105 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 282 | $12.00 | $14.80 | $14.80 | $12.00 | $15.00 |
| 106 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 114 | $18.00 | $25.62 | $25.62 | $18.00 | $26.00 |
| 107 | Marking curb epoxy (646.8120) | LF | 2,535 | $9.00 | $3.87 | $3.87 | $9.00 | $4.00 |
| 108 | Marking island nose epoxy (646.8220) | EACH | 59 | $300.00 | $281.25 | $281.25 | $300.00 | $282.00 |
| 109 | Marking removal line 4-inch (646.9000) | LF | 52,775 | $1.00 | $1.00 | $0.50 | $1.00 | $1.00 |
| 110 | Marking removal line grooved permanent tape 4-inch (646.9050) | LF | 897 | $1.00 | $1.00 | $3.00 | $1.00 | $1.00 |
| 111 | Marking removal line 8-inch (646.9100) | LF | 7,643 | $0.44 | $0.44 | $0.45 | $0.44 | $0.50 |
| 112 | Marking removal line grooved permanent tape 8-inch (646.9150) | LF | 3,880 | $0.69 | $0.69 | $2.00 | $0.69 | $0.70 |
| 113 | Marking removal line wide (646.9200) | LF | 67 | $5.00 | $5.00 | $2.00 | $5.00 | $5.00 |
| 114 | Marking removal special marking (646.9300) | EACH | 43 | $55.00 | $55.00 | $125.00 | $55.00 | $60.00 |
| 115 | Construction staking pipe culverts (650.6000) | EACH | 3 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 116 | Construction staking structure layout (structure) 01. sta 145+50 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 117 | Construction staking electrical installations (project) 01. 2390-08- 70 (650.8501) | EACH | 1 | $2,700.00 | $2,700.00 | $2,700.00 | $2,700.00 | $2,700.00 |
| 118 | Construction staking curb ramps (650.9000) | EACH | 8 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 119 | Construction staking supplemental control (project) 01. 2390-08-70 (650.9911) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 120 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,231 | $8.63 | $8.63 | $8.63 | $8.63 | $9.00 |
| 121 | Conduit special 2-inch (652.0605) | LF | 642 | $14.92 | $14.92 | $14.92 | $14.92 | $15.00 |
| 122 | Conduit special 3-inch (652.0615) | LF | 87 | $21.15 | $21.15 | $21.15 | $21.15 | $22.00 |
| 123 | Conduit loop detector (652.0800) | LF | 5,647 | $7.14 | $7.14 | $7.14 | $7.14 | $7.50 |
| 124 | Pull boxes steel 24X36-inch (653.0135) | EACH | 17 | $1,193.00 | $1,193.00 | $1,193.00 | $1,193.00 | $1,300.00 |
| 125 | Pull boxes steel 24X42-inch (653.0140) | EACH | 1 | $1,203.00 | $1,203.00 | $1,203.00 | $1,203.00 | $1,400.00 |
| 126 | Adjusting pull boxes (653.0900) | EACH | 2 | $338.00 | $338.00 | $338.00 | $338.00 | $350.00 |
| 127 | Removing pull boxes (653.0905) | EACH | 7 | $297.00 | $297.00 | $297.00 | $297.00 | $300.00 |
| 128 | Concrete bases type 1 (654.0101) | EACH | 2 | $818.00 | $818.00 | $818.00 | $818.00 | $820.00 |
| 129 | Concrete bases type 2 (654.0102) | EACH | 1 | $1,272.00 | $1,272.00 | $1,272.00 | $1,272.00 | $1,280.00 |
| 130 | Cable traffic signal 5-14 AWG (655.0230) | LF | 411 | $1.43 | $1.43 | $1.43 | $1.43 | $1.50 |
| 131 | Cable traffic signal 7-14 AWG (655.0240) | LF | 1,094 | $1.66 | $1.66 | $1.66 | $1.66 | $1.75 |
| 132 | Cable traffic signal 12-14 AWG (655.0260) | LF | 3,176 | $2.47 | $2.47 | $2.47 | $2.47 | $2.50 |
| 133 | Cable traffic signal 15-14 AWG (655.0270) | LF | 537 | $3.15 | $3.15 | $3.15 | $3.15 | $3.20 |
| 134 | Loop detector lead in cable (655.0700) | LF | 22,189 | $1.49 | $1.49 | $1.49 | $1.49 | $1.50 |
| 135 | Loop detector wire (655.0800) | LF | 23,287 | $1.14 | $1.14 | $1.14 | $1.14 | $1.20 |
| 136 | Traffic signal evp detector cable (655.0900) | LF | 3,702 | $1.16 | $1.16 | $1.16 | $1.16 | $1.20 |
| 137 | Pedestal bases (657.0100) | EACH | 2 | $252.00 | $252.00 | $252.00 | $252.00 | $255.00 |
| 138 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 1 | $598.00 | $598.00 | $598.00 | $598.00 | $600.00 |
| 139 | Poles type 2 (657.0305) | EACH | 1 | $2,408.00 | $2,408.00 | $2,408.00 | $2,408.00 | $2,500.00 |
| 140 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 3 | $1,021.00 | $1,021.00 | $1,021.00 | $1,021.00 | $1,100.00 |
| 141 | Traffic signal face 3S 12-inch (658.0173) | EACH | 8 | $838.00 | $838.00 | $838.00 | $838.00 | $840.00 |
| 142 | Traffic signal face 4S 12-inch (658.0174) | EACH | 9 | $1,054.00 | $1,054.00 | $1,054.00 | $1,054.00 | $1,100.00 |
| 143 | Pedestrian signal face 16-inch (658.0416) | EACH | 4 | $547.00 | $547.00 | $547.00 | $547.00 | $550.00 |
| 144 | Pedestrian push buttons (658.0500) | EACH | 3 | $399.00 | $399.00 | $399.00 | $399.00 | $400.00 |
| 145 | Signal mounting hardware (location) 01. (STH 31 (green bay RD) & 95TH street/dabbs farm RD) (658.5070) | EACH | 1 | $2,562.00 | $2,562.00 | $2,562.00 | $2,562.00 | $2,600.00 |
| 146 | Signal mounting hardware (location) 02. (STH 31 (green bay RD) & 85TH street) (658.5070) | EACH | 1 | $1,900.00 | $1,900.00 | $1,900.00 | $1,900.00 | $2,000.00 |
| 147 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 14 | $81.00 | $81.00 | $81.00 | $81.00 | $85.00 |
| 148 | Field system integrator (670.0101) | EACH | 1 | $12,039 | $12,039 | $12,039 | $12,039 | $12,100 |
| 149 | ITS documentation (670.0201) | EACH | 1 | $4,119.00 | $4,119.00 | $4,119.00 | $4,119.00 | $4,200.00 |
| 150 | Communication system testing (678.0501) | EACH | 1 | $4,119.00 | $4,119.00 | $4,119.00 | $4,119.00 | $4,200.00 |
| 151 | Install ethernet switches (678.0600) | EACH | 6 | $1,072.00 | $1,072.00 | $1,072.00 | $1,072.00 | $1,100.00 |
| 152 | Install wireless antennas (678.0700) | EACH | 10 | $2,115.00 | $2,115.00 | $2,115.00 | $2,115.00 | $2,200.00 |
| 153 | Sawing asphalt (690.0150) | LF | 805 | $1.95 | $1.39 | $1.95 | $1.95 | $5.00 |
| 154 | Sawing concrete (690.0250) | LF | 62,414 | $1.95 | $1.95 | $1.95 | $1.95 | $5.00 |
| 155 | Incentive iri ride (740.0440) | DOL | 50,840 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 156 | Special 01. concrete masonry apron endwall (SPV.0035) | CY | 17.60 | $1,075.00 | $1,075.00 | $3,715.00 | $1,075.00 | $1,075.00 |
| 157 | Special 03. TRNSPT & install state furn traffic signal cabinet (STH 31 & 95TH street) (SPV.0060) | EACH | 1 | $2,864.00 | $2,864.00 | $2,864.00 | $2,864.00 | $2,900.00 |
| 158 | Special 04. removing video detection system (STH 31 & 78TH street) (SPV.0060) | EACH | 1 | $1,406.00 | $1,406.00 | $1,406.00 | $1,406.00 | $1,500.00 |
| 159 | Special 05. TRNSPT & install state furn evp heads & confirm lights (STH 31 & STH 165) (SPV.0060) | EACH | 1 | $2,822.00 | $2,822.00 | $2,822.00 | $2,822.00 | $2,900.00 |
| 160 | Special 06. TRNSPT & install state furn evp heads & confirm lights(STH 31 & 95TH street) (SPV.0060) | EACH | 1 | $2,822.00 | $2,822.00 | $2,822.00 | $2,822.00 | $2,900.00 |
| 161 | Special 07. TRNSPT & install state furn evp heads & confirm lights(STH 31 & 85TH street) (SPV.0060) | EACH | 1 | $2,822.00 | $2,822.00 | $2,822.00 | $2,822.00 | $2,900.00 |
| 162 | Special 08. section corner monuments (SPV.0060) | EACH | 1 | $1,000.00 | $500.00 | $1,427.81 | $1,822.73 | $500.00 |
| 163 | Special 01. marking stop line epoxy 24-inch (SPV.0090) | LF | 55 | $20.00 | $13.81 | $13.81 | $20.00 | $14.00 |
| 164 | Special 02. concrete pavement repair longitudinal joint (SPV.0090) | LF | 2,271 | $53.72 | $26.00 | $62.01 | $55.96 | $69.00 |
| 165 | Special 03. concrete pavement repair shes longitudinal joint (SPV.0090) | LF | 4,539 | $57.71 | $30.00 | $60.74 | $99.21 | $71.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.