| 1 | Clearing (201.0105) | STA | 1 | $4,000.00 |
| 2 | Grubbing (201.0205) | STA | 3 | $250.00 |
| 3 | Removing structure over waterway remove debris (structure) 01. B-40- 532 (203.0250) | EACH | 1 | $97,500 |
| 4 | Removing concrete pavement (204.0100) | SY | 690 | $5.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 282 | $2.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 75 | $10.00 |
| 7 | Removing concrete bases (204.0195) | EACH | 1 | $900.00 |
| 8 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 96 | $17.97 |
| 9 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 24 | $19.13 |
| 10 | Excavation common (205.0100) | CY | 1,550 | $25.90 |
| 11 | Excavation for structures culverts (structure) 01. B-40-1104 (206.2001) | EACH | 1 | $89,500 |
| 12 | Backfill structure type B (210.2500) | TON | 1,860 | $26.30 |
| 13 | Finishing roadway (project) 01. 2395-07-71 (213.0100) | EACH | 1 | $2,500.00 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 310 | $23.00 |
| 15 | Breaker run (311.0110) | TON | 825 | $26.55 |
| 16 | Concrete pavement 8-inch (415.0080) | SY | 690 | $89.60 |
| 17 | Drilled dowel bars (416.0620) | EACH | 64 | $16.50 |
| 18 | Concrete masonry culverts (504.0100) | CY | 340 | $1,250.00 |
| 19 | Bar steel reinforcement HS structures (505.0400) | LB | 15,490 | $1.15 |
| 20 | Bar steel reinforcement HS coated structures (505.0600) | LB | 34,020 | $1.25 |
| 21 | Railing steel type NY4 (513.7084) | LF | 142.20 | $375.00 |
| 22 | Rubberized membrane waterproofing (516.0500) | SY | 28 | $35.00 |
| 23 | Concrete collars for pipe (520.8000) | EACH | 3 | $835.00 |
| 24 | Concrete curb & gutter 31-inch (601.0331) | LF | 282 | $28.00 |
| 25 | Concrete sidewalk 5-inch (602.0410) | SF | 650 | $12.50 |
| 26 | Riprap heavy (606.0300) | CY | 435 | $135.00 |
| 27 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 96 | $165.52 |
| 28 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 24 | $217.43 |
| 29 | Adjusting inlet covers (611.8115) | EACH | 2 | $524.00 |
| 30 | Maintenance and repair of haul roads (project) 01. 2395-07-71 (618.0100) | EACH | 1 | $1.00 |
| 31 | Mobilization (619.1000) | EACH | 1 | $174,721 |
| 32 | Water (624.0100) | MGAL | 15 | $20.00 |
| 33 | Topsoil (625.0100) | SY | 480 | $15.70 |
| 34 | Silt fence (628.1504) | LF | 150 | $7.00 |
| 35 | Silt fence maintenance (628.1520) | LF | 150 | $0.75 |
| 36 | Mobilizations erosion control (628.1905) | EACH | 3 | $300.00 |
| 37 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $190.00 |
| 38 | Erosion mat urban class I type A (628.2006) | SY | 470 | $4.00 |
| 39 | Inlet protection type B (628.7010) | EACH | 1 | $100.00 |
| 40 | Inlet protection type C (628.7015) | EACH | 1 | $100.00 |
| 41 | Inlet protection type D (628.7020) | EACH | 2 | $200.00 |
| 42 | Temporary ditch checks (628.7504) | LF | 18 | $21.75 |
| 43 | Fertilizer type B (629.0210) | CWT | 1 | $175.00 |
| 44 | Seeding mixture no. 40 (630.0140) | LB | 23 | $19.50 |
| 45 | Seeding temporary (630.0200) | LB | 13 | $20.00 |
| 46 | Seed water (630.0500) | MGAL | 13 | $50.00 |
| 47 | Field office type B (642.5001) | EACH | 1 | $6,000.00 |
| 48 | Traffic control drums (643.0300) | DAY | 5,010 | $0.25 |
| 49 | Traffic control barricades type III (643.0420) | DAY | 4,008 | $0.25 |
| 50 | Traffic control warning lights type A (643.0705) | DAY | 7,348 | $0.20 |
| 51 | Traffic control warning lights type C (643.0715) | DAY | 3,340 | $0.20 |
| 52 | Traffic control signs (643.0900) | DAY | 21,042 | $0.20 |
| 53 | Traffic control signs PCMS (643.1050) | DAY | 28 | $50.00 |
| 54 | Traffic control (643.5000) | EACH | 1 | $3,200.00 |
| 55 | Temporary audible message devices (644.1900.S) | DAY | 835 | $2.50 |
| 56 | Geotextile type C (645.0105) | SY | 520 | $3.00 |
| 57 | Geotextile type HR (645.0120) | SY | 545 | $4.50 |
| 58 | Cold weather marking epoxy 6-inch (646.6466) | LF | 480 | $10.23 |
| 59 | Construction staking storm sewer (650.4000) | EACH | 3 | $250.00 |
| 60 | Construction staking subgrade (650.4500) | LF | 140 | $0.01 |
| 61 | Construction staking base (650.5000) | LF | 140 | $1.00 |
| 62 | Construction staking structure layout (structure) 01. B-40-1104 (650.6501) | EACH | 1 | $3,000.00 |
| 63 | Construction staking concrete pavement (650.7000) | LF | 140 | $5.00 |
| 64 | Construction staking electrical installations (project) 01. 2395-07- 71 (650.8501) | EACH | 1 | $550.00 |
| 65 | Construction staking sidewalk (project) 01. 2395-07-71 (650.9500) | EACH | 1 | $550.00 |
| 66 | Construction staking supplemental control (project) 01. 2395-07-71 (650.9911) | EACH | 1 | $2,500.00 |
| 67 | Construction staking slope stakes (650.9920) | LF | 140 | $4.00 |
| 68 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 150 | $12.22 |
| 69 | Concrete bases type 5 (654.0105) | EACH | 1 | $2,963.00 |
| 70 | Electrical wire lighting 8 AWG (655.0620) | LF | 1,600 | $2.13 |
| 71 | Sawing concrete (690.0250) | LF | 122 | $2.95 |
| 72 | Incentive compressive strength concrete pavement (715.0720) | DOL | 207 | $1.00 |
| 73 | On-the-job training pre-apprentice at $5.00/HR (ASP.1.1PA) | HRS | 800 | $5.00 |
| 74 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,800 | $5.00 |
| 75 | Special 01. salvage and reinstall light unit (SPV.0060) | EACH | 1 | $2,279.00 |
| 76 | Special 02. temporary bypass (SPV.0060) | EACH | 1 | $130,000 |
| 77 | Special 01. coarse aggregate mix for stream bed (SPV.0195) | TON | 85 | $52.00 |