WisDOT contract 20260210017 bid tabulation
Southeast Region, Ada Curb Ramps; West Bend Area VAR LOC Per Plan (VAR HWY, Washington County Southeast Region, ADA Curb Ramps). Let by Wisconsin DOT on February 10, 2026, Washington. 4 bids received; low bid $1,728,421 by Wandel Contractors Inc.
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 99
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wandel Contractors Inc | $1,728,421 | Low |
| 2 | Lalonde Contractors Incorporated | $1,830,853 | +6.0% |
| 3 | Zenith Tech., Inc. - Waukesha | $1,881,807 | +9.0% |
| 4 | Zignego Company, Inc. | $2,010,709 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wandel Contractors Inc | 2. Lalonde Contractors Incorporated | 3. Zenith Tech., Inc. - Waukesha | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 542 | $17.20 | $17.23 | $25.00 | $20.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 102 | $20.00 | $17.01 | $10.00 | $30.00 |
| 3 | Removing curb & gutter (204.0150) | LF | 4,818 | $8.75 | $13.12 | $20.00 | $5.00 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 3,297 | $8.75 | $13.81 | $10.00 | $8.00 |
| 5 | Removing concrete bases (204.0195) | EACH | 1 | $350.00 | $350.00 | $350.00 | $1,000.00 |
| 6 | Removing (item description) 001. removing conduit (204.9090.S) | LF | 2 | $10.00 | $10.00 | $10.00 | $10.00 |
| 7 | Excavation common (205.0100) | CY | 155 | $48.75 | $65.42 | $65.00 | $50.00 |
| 8 | Finishing roadway (project) 001. 2707-08-70 (213.0100) | EACH | 1 | $15,000 | $2,976.00 | $531.05 | $1,000.00 |
| 9 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,660 | $30.00 | $30.39 | $46.00 | $0.01 |
| 10 | Concrete pavement 9-inch (415.0090) | SY | 333 | $95.00 | $146.34 | $174.53 | $110.00 |
| 11 | Concrete pavement 10-inch (415.0100) | SY | 37 | $95.00 | $163.65 | $204.59 | $180.00 |
| 12 | Drilled tie bars (416.0610) | EACH | 2,070 | $12.00 | $16.78 | $6.10 | $20.00 |
| 13 | Asphaltic surface (465.0105) | TON | 12 | $447.10 | $447.10 | $446.18 | $447.10 |
| 14 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 1,527 | $52.00 | $57.42 | $46.10 | $48.00 |
| 15 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 2,542 | $62.00 | $61.63 | $57.43 | $61.00 |
| 16 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 5 | $62.00 | $62.03 | $60.76 | $100.00 |
| 17 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 81 | $67.00 | $65.25 | $76.94 | $92.00 |
| 18 | Concrete curb pedestrian (601.0600) | LF | 770 | $28.00 | $65.90 | $29.83 | $40.00 |
| 19 | Concrete sidewalk 5-inch (602.0410) | SF | 32,133 | $10.40 | $10.06 | $13.40 | $13.56 |
| 20 | Concrete sidewalk 6-inch (602.0415) | SF | 273 | $10.40 | $11.61 | $18.65 | $20.00 |
| 21 | Curb ramp detectable warning field yellow (602.0505) | SF | 1,541 | $50.00 | $45.47 | $32.37 | $60.00 |
| 22 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 844 | $70.00 | $63.15 | $42.92 | $120.00 |
| 23 | Concrete safety islands (602.2400) | SF | 245 | $50.00 | $33.57 | $17.90 | $40.00 |
| 24 | Adjusting manhole covers (611.8110) | EACH | 1 | $991.00 | $670.00 | $1,954.41 | $1,200.00 |
| 25 | Adjusting inlet covers (611.8115) | EACH | 35 | $991.00 | $620.00 | $335.51 | $825.00 |
| 26 | Mobilization (619.1000) | EACH | 1 | $36,000 | $138,251 | $68,292 | $130,000 |
| 27 | Concrete median sloped nose (620.0300) | SF | 399 | $22.00 | $25.64 | $25.66 | $40.00 |
| 28 | Water (624.0100) | MGAL | 10 | $250.00 | $71.17 | $41.99 | $200.00 |
| 29 | Silt fence (628.1504) | LF | 1,977 | $1.95 | $1.95 | $2.00 | $1.95 |
| 30 | Silt fence maintenance (628.1520) | LF | 1,977 | $0.01 | $0.01 | $0.01 | $0.01 |
| 31 | Mobilizations erosion control (628.1905) | EACH | 6 | $50.00 | $50.00 | $50.00 | $50.00 |
| 32 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $50.00 | $50.00 | $50.00 | $50.00 |
| 33 | Inlet protection type A (628.7005) | EACH | 1 | $95.00 | $95.00 | $50.00 | $95.00 |
| 34 | Inlet protection type C (628.7015) | EACH | 222 | $45.00 | $45.00 | $65.00 | $45.00 |
| 35 | Inlet protection type D (628.7020) | EACH | 2 | $90.00 | $90.00 | $100.00 | $90.00 |
| 36 | Rock bags (628.7570) | EACH | 10 | $14.00 | $14.00 | $10.00 | $14.00 |
| 37 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 2 | $95.00 | $95.00 | $150.00 | $95.00 |
| 38 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 2 | $120.00 | $120.00 | $150.00 | $120.00 |
| 39 | Signs type II reflective H (637.2210) | SF | 484.77 | $21.00 | $21.00 | $21.00 | $21.00 |
| 40 | Signs type II reflective F (637.2230) | SF | 427.25 | $23.00 | $23.00 | $23.00 | $23.00 |
| 41 | Removing signs type II (638.2602) | EACH | 77 | $25.00 | $25.00 | $20.00 | $25.00 |
| 42 | Removing small sign supports (638.3000) | EACH | 71 | $25.00 | $25.00 | $20.00 | $25.00 |
| 43 | Field office type C (642.5201) | EACH | 1 | $15,000 | $16,464 | $1.00 | $15,000 |
| 44 | Traffic control drums (643.0300) | DAY | 23,360 | $0.35 | $0.95 | $0.35 | $0.35 |
| 45 | Traffic control barricades type III (643.0420) | DAY | 975 | $0.95 | $3.00 | $0.96 | $0.95 |
| 46 | Traffic control warning lights type A (643.0705) | DAY | 1,950 | $0.60 | $0.50 | $0.61 | $0.60 |
| 47 | Traffic control warning lights type C (643.0715) | DAY | 1,850 | $0.60 | $0.10 | $0.61 | $0.60 |
| 48 | Traffic control connected arrow boards (643.0810) | DAY | 128 | $35.00 | $25.00 | $35.35 | $35.00 |
| 49 | Traffic control signs (643.0900) | DAY | 28,552 | $0.15 | $0.40 | $0.15 | $0.15 |
| 50 | Traffic control signs fixed message (643.1000) | SF | 15 | $15.00 | $25.00 | $15.15 | $15.00 |
| 51 | Traffic control signs PCMS (643.1050) | DAY | 126 | $30.00 | $50.00 | $30.30 | $30.00 |
| 52 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 128 | $10.00 | $25.00 | $10.10 | $10.00 |
| 53 | Temporary marking line removable tape 4-inch (643.3150) | LF | 1,099 | $1.50 | $1.00 | $1.52 | $1.50 |
| 54 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 385 | $2.50 | $2.00 | $2.53 | $2.50 |
| 55 | Traffic control (643.5000) | EACH | 1 | $95,000 | $43,000 | $95,960 | $95,000 |
| 56 | Temporary pedestrian surface matting (644.1440) | SF | 7,569 | $1.95 | $6.00 | $1.97 | $1.95 |
| 57 | Temporary pedestrian curb ramp (644.1601) | DAY | 700 | $17.50 | $6.50 | $17.68 | $17.50 |
| 58 | Temporary pedestrian detectable warning field (644.1605) | SF | 528 | $5.75 | $5.00 | $5.81 | $5.75 |
| 59 | Temporary pedestrian barricade (644.1810) | LF | 6,540 | $4.00 | $4.00 | $4.04 | $4.00 |
| 60 | Temporary audible message devices (644.1900.S) | DAY | 2,772 | $1.75 | $1.10 | $1.77 | $1.75 |
| 61 | Marking line epoxy 4-inch (646.1020) | LF | 37 | $2.95 | $2.95 | $9.00 | $2.95 |
| 62 | Marking stop line epoxy 18-inch (646.6120) | LF | 1,639 | $13.35 | $13.35 | $16.00 | $13.35 |
| 63 | Marking yield line epoxy 18-inch (646.6220) | EACH | 27 | $17.75 | $17.75 | $105.00 | $17.75 |
| 64 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 7,739 | $4.45 | $4.45 | $12.00 | $4.45 |
| 65 | Marking curb epoxy (646.8120) | LF | 595 | $14.85 | $14.85 | $8.00 | $14.85 |
| 66 | Marking island nose epoxy (646.8220) | EACH | 9 | $255.00 | $255.00 | $330.00 | $255.00 |
| 67 | Marking removal line water blasting 4-inch (646.9010) | LF | 204 | $1.30 | $5.00 | $1.31 | $1.30 |
| 68 | Marking removal line water blasting 6-inch (646.9012) | LF | 4,715 | $1.50 | $0.50 | $1.52 | $1.50 |
| 69 | Marking removal line water blasting 8-inch (646.9110) | LF | 842 | $2.00 | $1.00 | $2.02 | $2.00 |
| 70 | Marking removal line water blasting wide (646.9210) | LF | 3,262 | $4.25 | $1.00 | $4.29 | $4.25 |
| 71 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 8,055 | $1.50 | $1.50 | $1.50 | $1.50 |
| 72 | Construction staking concrete pavement (650.7000) | LF | 1,280 | $2.25 | $2.25 | $2.25 | $2.25 |
| 73 | Construction staking curb ramps (650.9000) | EACH | 217 | $150.00 | $150.00 | $150.00 | $150.00 |
| 74 | Construction staking sidewalk (project) 001. 2707-08-70 (650.9500) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 75 | Construction staking supplemental control (project) 001. 2707-08-70 (650.9911) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 76 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 93 | $10.00 | $10.00 | $10.00 | $10.00 |
| 77 | Adjusting pull boxes (653.0900) | EACH | 25 | $250.00 | $250.00 | $250.00 | $250.00 |
| 78 | Concrete bases type 1 (654.0101) | EACH | 4 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 79 | Cable traffic signal 7-14 AWG (655.0240) | LF | 281 | $2.00 | $2.00 | $2.00 | $2.00 |
| 80 | Pedestal bases (657.0100) | EACH | 4 | $300.00 | $300.00 | $300.00 | $300.00 |
| 81 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 3 | $360.00 | $360.00 | $360.00 | $360.00 |
| 82 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 1 | $640.00 | $640.00 | $640.00 | $640.00 |
| 83 | Sawing asphalt (690.0150) | LF | 229 | $2.00 | $1.01 | $1.39 | $1.39 |
| 84 | Sawing concrete (690.0250) | LF | 8,286 | $2.00 | $2.38 | $2.25 | $2.25 |
| 85 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 86 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 87 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,800 | $5.00 | $5.00 | $5.00 | $5.00 |
| 88 | Special 100. curb ramp grading, shaping and finishing (SPV.0060) | EACH | 183 | $704.00 | $514.24 | $610.00 | $1,219.00 |
| 89 | Special 101. round aluminum sign post system in soft surface 7-foot (SPV.0060) | EACH | 1 | $250.00 | $250.00 | $275.00 | $250.00 |
| 90 | Special 102. round aluminum sign post system in soft surface 10-foot (SPV.0060) | EACH | 70 | $250.00 | $250.00 | $275.00 | $250.00 |
| 91 | Special 103. round aluminum sign post system in concrete surface 10-foot (SPV.0060) | EACH | 24 | $250.00 | $250.00 | $250.00 | $250.00 |
| 92 | Special 104. round aluminum sign post system in concrete surface 11-foot (SPV.0060) | EACH | 16 | $250.00 | $250.00 | $250.00 | $250.00 |
| 93 | Special 105. section corner monuments (SPV.0060) | EACH | 4 | $500.00 | $1,524.00 | $1,494.57 | $1,000.00 |
| 94 | Special 200. removing and reinstalling pedestrian standard with pedestrian push button (SPV.0060) | EACH | 2 | $550.00 | $550.00 | $550.00 | $550.00 |
| 95 | Special 201. removing and reinstalling pedestrian push button (SPV.0060) | EACH | 3 | $225.00 | $225.00 | $225.00 | $225.00 |
| 96 | Special 202. extender arm various lengths (SPV.0060) | EACH | 5 | $600.00 | $600.00 | $600.00 | $600.00 |
| 97 | Special 100. concrete curb & gutter 24-inch type A (SPV.0090) | LF | 1,168 | $64.43 | $60.09 | $51.17 | $50.00 |
| 98 | Special 101. marking epoxy ladder crosswalk markings (SPV.0090) | LF | 91 | $35.65 | $35.65 | $25.00 | $35.65 |
| 99 | Special 200. adjust existing traffic signal cable (SPV.0090) | LF | 53 | $4.00 | $4.00 | $4.00 | $4.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.