WisDOT contract 20260210023 bid tabulation

Ledgeview - Bellevue; CTH Mm - Continental Dr (USH 141, Brown County Ledgeview - Bellevue). Let by Wisconsin DOT on February 10, 2026, Brown. 2 bids received; low bid $1,927,563 by Northeast Asphalt, Inc.

Owner
Wisconsin DOT
Letting
10 FEB 2026
Pay items
99
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Northeast Asphalt, Inc$1,927,563Low
2MCC, Inc.$2,394,960+24%
WisDOT contract 20260210023: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Northeast Asphalt, Inc2. MCC, Inc.
1Grubbing (201.0205)STA1$1,500.00$2,000.00
2Removing asphaltic surface (204.0110)SY269$15.00$12.30
3Removing asphaltic surface butt joints (204.0115)SY1,755$5.60$5.50
4Removing asphaltic surface milling (204.0120)SY62,890$1.30$3.05
5Removing curb & gutter (204.0150)LF835$18.50$12.00
6Removing concrete sidewalk (204.0155)SY350$6.50$25.00
7Removing guardrail (204.0165)LF1,965$2.25$2.50
8Prepare foundation for asphaltic paving (project) 01. 1450-18-71 (211.0101)EACH1$25,680$19,825
9Prepare foundation for asphaltic shoulders (211.0400)STA24$180.00$320.00
10Finishing roadway (project) 01. 1450-18-71 (213.0100)EACH1$3,000.00$8,350.00
11Base aggregate dense 3/4-inch (305.0110)TON1,330$26.00$34.40
12Base aggregate dense 1 1/4-inch (305.0120)TON498$26.00$32.00
13HMA cold weather paving (450.4000)TON1,250$0.01$3.00
14Tack coat (455.0605)GAL7,480$3.00$3.75
15Incentive density HMA pavement (460.2000)DOL8,300$1.00$1.00
16HMA pavement 3 LT 58-28 S (460.5223)TON6,295$65.80$71.00
17HMA pavement 4 LT 58-28 S (460.5224)TON6,350$76.90$75.00
18HMA pavement 4 MT 58-28 H (460.6424)TON310$116.50$150.00
19Asphaltic surface patching (465.0110)TON189$210.00$150.00
20Asphaltic surface driveways and field entrances (465.0120)TON250$210.00$150.00
21Asphaltic flumes (465.0315)SY40$56.00$60.00
22Asphaltic rumble strips, centerline (465.0560)LF5,160$0.50$1.00
23Culvert pipe salvaged 24-inch (524.0124)LF92$100.00$135.00
24Apron endwalls for culvert pipe salvaged 24-inch (524.0624)EACH4$1,000.00$550.00
25Concrete curb & gutter 30-inch type D (601.0411)LF540$75.00$85.00
26Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF305$73.00$85.00
27Concrete curb pedestrian (601.0600)LF75$50.00$65.00
28Concrete sidewalk 4-inch (602.0405)SF215$8.00$16.00
29Concrete sidewalk 6-inch (602.0415)SF3,290$8.50$16.00
30Curb ramp detectable warning field yellow (602.0505)SF256$60.00$40.00
31Riprap medium (606.0200)CY80$125.00$65.00
32Barrier system grading shaping finishing (614.0010)EACH6$5,250.00$7,300.00
33Guardrail mow strip emulsified asphalt (614.0397)SY145$23.40$36.72
34MGS guardrail 3 (614.2300)LF262.50$26.53$28.50
35MGS guardrail 3 K (614.2330)LF1,162.50$38.73$38.50
36MGS thrie beam transition (614.2500)LF78.80$98.00$95.00
37MGS guardrail terminal eat (614.2610)EACH10$3,595.00$3,800.00
38Maintenance and repair of haul roads (project) 01. 1450-18-71 (618.0100)EACH1$10.00$0.01
39Mobilization (619.1000)EACH1$150,450$425,000
40Concrete median sloped nose (620.0300)SF30$20.00$30.00
41Water (624.0100)MGAL10$100.00$100.00
42Topsoil (625.0100)SY920$7.50$9.50
43Silt fence (628.1504)LF3,745$2.00$2.00
44Silt fence maintenance (628.1520)LF3,745$0.01$0.01
45Mobilizations erosion control (628.1905)EACH4$0.01$50.00
46Mobilizations emergency erosion control (628.1910)EACH2$0.01$25.00
47Erosion mat urban class I type B (628.2008)SY920$0.01$2.40
48Inlet protection type C (628.7015)EACH12$75.00$66.00
49Temporary ditch checks (628.7504)LF70$4.50$7.25
50Culvert pipe checks (628.7555)EACH5$18.00$14.00
51Rock bags (628.7570)EACH360$18.00$14.00
52Fertilizer type B (629.0210)CWT0.75$100.00$125.00
53Seeding mixture no. 30 (630.0130)LB17.50$141.00$12.00
54Seed water (630.0500)MGAL21$0.01$5.00
55Markers culvert end (633.5200)EACH4$65.00$68.00
56Moving signs type II (638.2102)EACH10$100.00$75.00
57Removing signs type II (638.2602)EACH1$15.00$35.00
58Removing small sign supports (638.3000)EACH3$10.00$35.00
59Field office type B (642.5001)EACH1$11,200$12,000
60Traffic control drums (643.0300)DAY1,160$0.71$0.71
61Traffic control barricades type III (643.0420)DAY44$5.48$5.48
62Traffic control warning lights type A (643.0705)DAY56$2.00$2.00
63Traffic control signs (643.0900)DAY6,263$0.91$0.91
64Traffic control covering signs type II (643.0920)EACH16$69.44$69.44
65Traffic control signs PCMS (643.1050)DAY42$48.00$48.00
66Temporary marking line paint 6- inch (643.3165)LF117,160$0.35$0.35
67Temporary marking crosswalk removable tape 6-inch (643.3350)LF72$5.96$5.96
68Traffic control (643.5000)EACH1$15,033$19,033
69Temporary pedestrian surface matting (644.1440)SF450$7.53$7.53
70Temporary pedestrian curb ramp (644.1601)DAY5$45.16$45.16
71Temporary pedestrian detectable warning field (644.1605)SF20$22.69$22.69
72Temporary pedestrian barricade (644.1810)LF665$7.23$7.23
73Temporary audible message devices (644.1900.S)DAY80$9.75$9.75
74Geotextile type HR (645.0120)SY205$5.00$2.34
75Marking line epoxy 6-inch (646.2020)LF700$0.70$0.70
76Marking line grooved wet ref epoxy 6-inch (646.2040)LF48,940$1.30$1.30
77Marking line epoxy 10-inch (646.4020)LF220$1.20$1.20
78Marking line grooved wet ref epoxy 10-inch (646.4040)LF2,265$2.40$2.40
79Marking arrow epoxy (646.5020)EACH13$240.00$240.00
80Marking word epoxy (646.5120)EACH3$350.00$350.00
81Marking stop line epoxy 18-inch (646.6120)LF85$13.00$13.00
82Marking dotted extension epoxy 18-inch (646.6320)LF60$17.00$17.00
83Cold weather marking epoxy 6-inch (646.6466)LF5,000$0.01$0.32
84Cold weather marking epoxy 10- inch (646.6470)LF250$0.01$0.49
85Marking diagonal epoxy 12-inch (646.7120)LF485$13.00$13.00
86Marking crosswalk epoxy transverse line 6-inch (646.7420)LF240$16.00$16.00
87Marking curb epoxy (646.8120)LF80$13.00$13.00
88Marking island nose epoxy (646.8220)EACH8$330.00$330.00
89Construction staking curb gutter and curb & gutter (650.5500)LF835$0.69$0.50
90Construction staking resurfacing reference (650.8000)LF13,935$0.11$0.30
91Construction staking curb ramps (650.9000)EACH16$120.00$50.00
92Construction staking sidewalk (project) 01. 1450-18-71 (650.9500)EACH1$483.69$100.00
93Construction staking supplemental control (project) 01. 1450-18-71 (650.9911)EACH1$446.98$2.00
94Sawing asphalt (690.0150)LF1,239$1.50$1.95
95Sawing concrete (690.0250)LF260$2.50$2.55
96Incentive iri ride (740.0440)DOL20,620$1.00$1.00
97Special 01. grading shaping and finishing pedestrian route (SPV.0060)EACH1$1,500.00$3,000.00
98Special 02. adjusting sanitary manhole covers (SPV.0060)EACH4$2,000.00$500.00
99Special 01. ditch cleaning (SPV.0090)LF40$50.00$50.00
WisDOT contract 20260210023: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy