WisDOT contract 20260210045 bid tabulation
Glenwood City - Colfax; Red Cedar River Bridge B-17-0002 (STH 170, Dunn County Glenwood City - Colfax). Let by Wisconsin DOT on February 10, 2026, Dunn. 3 bids received; low bid $1,878,602 by Zenith Tech., Inc. - Waukesha.
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 85
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zenith Tech., Inc. - Waukesha | $1,878,602 | Low |
| 2 | Lunda Construction Company | $1,970,439 | +5.0% |
| 3 | Sheet Piling Services LLC | $2,507,500 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zenith Tech., Inc. - Waukesha | 2. Lunda Construction Company | 3. Sheet Piling Services LLC |
|---|---|---|---|---|---|---|
| 1 | Removing structure over waterway debris capture (structure) 01. B-17- 0002 (203.0270) | EACH | 1 | $345,000 | $150,000 | $874,000 |
| 2 | Removing asphaltic surface (204.0110) | SY | 190 | $17.50 | $17.50 | $17.50 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 12 | $26.23 | $26.23 | $26.23 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 289 | $26.23 | $26.23 | $26.23 |
| 5 | Removing curb & gutter (204.0150) | LF | 63 | $20.00 | $20.00 | $20.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 33 | $20.00 | $20.00 | $20.00 |
| 7 | Excavation common (205.0100) | CY | 5 | $100.00 | $100.00 | $100.00 |
| 8 | Finishing roadway (project) 01. 8630-00-70 (213.0100) | EACH | 1 | $3,000.00 | $500.00 | $100.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 65 | $54.00 | $54.00 | $54.00 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 40 | $54.00 | $54.00 | $54.00 |
| 11 | Concrete pavement approach slab (415.0410) | SY | 117 | $336.83 | $336.83 | $336.83 |
| 12 | Tack coat (455.0605) | GAL | 21 | $12.41 | $12.41 | $12.41 |
| 13 | Asphaltic surface (465.0105) | TON | 75 | $337.48 | $337.48 | $337.48 |
| 14 | Asphaltic curb (465.0310) | LF | 61 | $10.75 | $10.78 | $10.78 |
| 15 | Concrete masonry bridges (502.0100) | CY | 275 | $1,750.00 | $800.00 | $1,600.00 |
| 16 | Expansion device (502.3101) | LF | 78.30 | $430.00 | $400.00 | $500.00 |
| 17 | Protective surface treatment (502.3200) | SY | 750 | $6.00 | $5.00 | $5.00 |
| 18 | Pigmented surface sealer (502.3210) | SY | 80 | $25.00 | $10.00 | $5.00 |
| 19 | Adhesive anchors no. 4 bar (502.4204) | EACH | 364 | $27.00 | $25.00 | $15.00 |
| 20 | Adhesive anchors no. 5 bar (502.4205) | EACH | 68 | $31.00 | $30.00 | $15.00 |
| 21 | Bar steel reinforcement HS coated structures (505.0600) | LB | 55,950 | $2.05 | $1.90 | $1.85 |
| 22 | Bar couplers no. 4 (505.0904) | EACH | 794 | $38.00 | $25.00 | $25.00 |
| 23 | Structural steel HS (506.0605) | LB | 30,325 | $6.00 | $5.50 | $8.58 |
| 24 | Bearing pads elastomeric laminated (506.2610) | EACH | 7 | $1,325.00 | $2,500.00 | $1,500.00 |
| 25 | Welded stud shear connectors 7/8X7-inch (506.3020) | EACH | 486 | $22.00 | $10.00 | $18.00 |
| 26 | Bearing assemblies fixed (structure) 01. B-17-0002 (506.5000) | EACH | 1 | $3,650.00 | $4,250.00 | $15,000 |
| 27 | Bearing assemblies expansion (structure) 01. B-17-0002 (506.6000) | EACH | 1 | $5,100.00 | $3,250.00 | $15,000 |
| 28 | Removing bearings (structure) 01. B-17-0002 (506.7050.S) | EACH | 7 | $1,100.00 | $2,000.00 | $3,000.00 |
| 29 | Concrete surface repair (509.1500) | SF | 150 | $275.00 | $125.00 | $180.00 |
| 30 | Railing tubular type M (513.4061) | LF | 218.20 | $305.00 | $275.00 | $350.00 |
| 31 | Railing steel type 3T (513.7093) | LF | 216.60 | $185.00 | $150.00 | $250.00 |
| 32 | Painting epoxy system (structure) 01. B-17-0002 (517.0601) | EACH | 1 | $40,000 | $25,000 | $20,000 |
| 33 | Preparation and coating of top flanges (structure) 01. B-17-0002 (517.0901.S) | EACH | 1 | $9,240.00 | $9,240.00 | $9,000.00 |
| 34 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 43 | $72.34 | $72.34 | $72.34 |
| 35 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 47 | $72.34 | $72.34 | $72.34 |
| 36 | Concrete sidewalk 4-inch (602.0405) | SF | 351 | $10.24 | $10.24 | $10.24 |
| 37 | Concrete barrier temporary precast delivered (603.8000) | LF | 627 | $12.36 | $12.36 | $18.00 |
| 38 | Concrete barrier temporary precast installed (603.8125) | LF | 1,782 | $6.33 | $6.33 | $6.50 |
| 39 | Anchoring concrete barrier temporary precast on bridge decks (603.8505) | LF | 220 | $15.25 | $15.25 | $65.00 |
| 40 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 2 | $300.00 | $200.00 | $250.00 |
| 41 | Steel thrie beam structure approach (614.0200) | LF | 42 | $96.00 | $96.00 | $96.00 |
| 42 | Steel plate beam guard class A (614.0305) | LF | 37.50 | $24.00 | $24.00 | $24.00 |
| 43 | Steel plate beam guard short radius (614.0345) | LF | 62.50 | $42.00 | $42.00 | $42.00 |
| 44 | Steel plate beam guard short radius terminal (614.0390) | EACH | 2 | $2,240.00 | $2,240.00 | $2,240.00 |
| 45 | Crash cushions temporary (614.0905) | EACH | 6 | $4,125.00 | $4,750.00 | $4,125.00 |
| 46 | Salvaged rail (614.0920) | LF | 170 | $4.00 | $4.00 | $4.00 |
| 47 | MGS thrie beam transition (614.2500) | LF | 80 | $95.35 | $95.35 | $95.35 |
| 48 | Maintenance and repair of haul roads (project) 01. 8630-00-70 (618.0100) | EACH | 1 | $2,200.00 | $0.01 | $1.00 |
| 49 | Mobilization (619.1000) | EACH | 1 | $185,000 | $820,238 | $260,421 |
| 50 | Water (624.0100) | MGAL | 1 | $1.00 | $1.00 | $1.00 |
| 51 | Silt fence (628.1504) | LF | 565 | $3.50 | $3.50 | $3.50 |
| 52 | Silt fence maintenance (628.1520) | LF | 1,130 | $0.01 | $0.01 | $0.01 |
| 53 | Mobilizations erosion control (628.1905) | EACH | 4 | $365.00 | $365.00 | $365.00 |
| 54 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $10.00 | $10.00 | $10.00 |
| 55 | Inlet protection type C (628.7015) | EACH | 1 | $100.00 | $100.00 | $100.00 |
| 56 | Moving signs type II (638.2102) | EACH | 8 | $95.00 | $95.00 | $95.00 |
| 57 | Moving small sign supports (638.4000) | EACH | 8 | $60.00 | $60.00 | $60.00 |
| 58 | Field office type B (642.5001) | EACH | 1 | $9,000.00 | $6,000.00 | $2,500.00 |
| 59 | Traffic control drums (643.0300) | DAY | 3,237 | $0.15 | $0.50 | $0.15 |
| 60 | Traffic control barricades type III (643.0420) | DAY | 1,906 | $0.50 | $0.85 | $0.50 |
| 61 | Traffic control warning lights type C (643.0715) | DAY | 2,417 | $0.20 | $0.10 | $0.20 |
| 62 | Traffic control signs (643.0900) | DAY | 7,177 | $0.20 | $1.00 | $0.20 |
| 63 | Traffic control signs fixed message (643.1000) | SF | 96 | $15.00 | $10.60 | $15.00 |
| 64 | Traffic control cones 42-inch (643.1070) | DAY | 1,500 | $0.15 | $0.50 | $0.15 |
| 65 | Temporary marking line paint 6- inch (643.3165) | LF | 5,836 | $0.48 | $1.30 | $0.48 |
| 66 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 78 | $7.00 | $5.25 | $7.00 |
| 67 | Traffic control (643.5000) | EACH | 1 | $13,100 | $2,925.00 | $13,100 |
| 68 | Temporary pedestrian barricade (644.1810) | LF | 508 | $12.50 | $5.00 | $12.50 |
| 69 | Marking line epoxy 6-inch (646.2020) | LF | 3,720 | $1.50 | $1.99 | $1.50 |
| 70 | Marking removal line 4-inch (646.9000) | LF | 2,790 | $1.10 | $0.90 | $1.10 |
| 71 | Construction staking subgrade (650.4500) | LF | 56 | $0.01 | $0.01 | $0.01 |
| 72 | Construction staking base (650.5000) | LF | 56 | $0.01 | $0.01 | $0.01 |
| 73 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 90 | $1.00 | $1.00 | $1.00 |
| 74 | Construction staking structure layout (structure) 01. B-17-0002 (650.6501) | EACH | 1 | $2,030.00 | $2,650.00 | $2,030.00 |
| 75 | Construction staking sidewalk (project) 01. 8630-00-70 (650.9500) | EACH | 1 | $200.88 | $700.00 | $200.88 |
| 76 | Construction staking supplemental control (project) 01. 8630-00-70 (650.9911) | EACH | 1 | $308.00 | $10.00 | $308.00 |
| 77 | Temporary traffic signals for bridges (structure) 01. B-17-0002 (661.0101) | EACH | 1 | $8,000.00 | $24,750 | $8,000.00 |
| 78 | Sawing asphalt (690.0150) | LF | 35 | $2.95 | $2.95 | $2.95 |
| 79 | Sawing concrete (690.0250) | LF | 12 | $2.95 | $2.95 | $2.95 |
| 80 | Incentive strength concrete structures (715.0502) | DOL | 1,650 | $1.00 | $1.00 | $1.00 |
| 81 | Installing and maintaining bird deterrent system (station) 01. 6+86.49 (999.2000.S) | EACH | 1 | $15,000 | $0.01 | $0.01 |
| 82 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 83 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 84 | Special 01. temporary vehicle detection B-17-0002 (SPV.0060) | EACH | 1 | $1,850.00 | $100.00 | $1,850.00 |
| 85 | Special 02. cleaning and painting bearings (SPV.0060) | EACH | 2 | $2,000.00 | $2,000.00 | $2,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.