WisDOT contract 20260310004 bid tabulation
1660-02-73. Let by Wisconsin DOT on March 10, 2026, Crawford. 2 bids received; low bid $3,435,189 by Gerke Excavating Inc.
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 204
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gerke Excavating Inc | $3,435,189 | Low |
| 2 | Zignego Company, Inc. | $3,607,136 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerke Excavating Inc | 2. Zignego Company, Inc. |
|---|---|---|---|---|---|
| 1 | Grubbing (201.0220) | ID | 50 | $46.20 | $30.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 12,850 | $5.21 | $5.44 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 29 | $33.40 | $150.00 |
| 4 | Removing curb & gutter (204.0150) | LF | 631 | $2.53 | $2.64 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 2,016 | $2.80 | $2.87 |
| 6 | Removing concrete bases (204.0195) | EACH | 18 | $156.13 | $161.50 |
| 7 | Removing manholes (204.0210) | EACH | 7 | $377.24 | $391.79 |
| 8 | Removing inlets (204.0220) | EACH | 24 | $376.65 | $391.18 |
| 9 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 720 | $11.60 | $12.05 |
| 10 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 69 | $16.51 | $17.15 |
| 11 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 413 | $11.95 | $12.41 |
| 12 | Removing storm sewer (size) 04. 24-inch (204.0245) | LF | 382 | $11.93 | $12.39 |
| 13 | Removing storm sewer (size) 05. 42-inch (204.0245) | LF | 451 | $13.47 | $13.99 |
| 14 | Sealing pipes (204.0280) | EACH | 1 | $1,376.03 | $1,420.18 |
| 15 | Removing (item description) 01. street light (204.9060.S) | EACH | 18 | $381.44 | $363.28 |
| 16 | Excavation common (205.0100) | CY | 7,945 | $20.58 | $21.59 |
| 17 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 255 | $140.55 | $143.21 |
| 18 | Finishing roadway (project) 01. 1660-02-73 (213.0100) | EACH | 1 | $6,431.19 | $1,000.00 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 5,523 | $15.63 | $15.92 |
| 20 | Coloring concrete wisdot red (405.0100) | CY | 399 | $105.00 | $100.00 |
| 21 | Stamping colored concrete (405.1000) | CY | 13 | $315.00 | $300.00 |
| 22 | Concrete pavement 10-inch (415.0100) | SY | 8,878 | $94.50 | $94.00 |
| 23 | Concrete pavement gaps (415.0210) | EACH | 2 | $1,050.00 | $1,000.00 |
| 24 | Concrete pavement hes 10-inch (415.1100) | SY | 44 | $105.00 | $200.00 |
| 25 | Concrete truck apron 12-inch (415.2010) | SY | 1,197 | $94.50 | $151.10 |
| 26 | Concrete pavement joint filling (415.4100) | SY | 10,121 | $4.67 | $2.00 |
| 27 | Drilled tie bars (416.0610) | EACH | 28 | $15.75 | $30.00 |
| 28 | Drilled dowel bars (416.0620) | EACH | 173 | $21.00 | $30.00 |
| 29 | Tack coat (455.0605) | GAL | 2 | $37.80 | $36.00 |
| 30 | Asphaltic surface (465.0105) | TON | 51 | $148.31 | $141.25 |
| 31 | Asphaltic surface driveways and field entrances (465.0120) | TON | 26 | $148.31 | $141.25 |
| 32 | Asphaltic surface temporary (465.0125) | TON | 279 | $148.31 | $141.25 |
| 33 | Asphaltic curb (465.0310) | LF | 558 | $21.00 | $20.00 |
| 34 | Asphaltic flumes (465.0315) | SY | 15 | $73.50 | $70.00 |
| 35 | Concrete collars for pipe (520.8000) | EACH | 9 | $1,221.02 | $1,254.47 |
| 36 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,935.71 | $1,952.58 |
| 37 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,235.90 | $1,252.77 |
| 38 | Drilling shaft 42-inch (531.2042) | LF | 18 | $262.50 | $250.00 |
| 39 | Foundation single-shaft type MC-III (structure) 01. S-12-15 (531.5130) | EACH | 1 | $9,975.00 | $9,500.00 |
| 40 | Monotube cantilever type III (structure) 01. S-12-15 (532.5130) | EACH | 1 | $25,200 | $24,000 |
| 41 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 184 | $26.25 | $25.00 |
| 42 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 4,742 | $21.00 | $21.00 |
| 43 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 100 | $21.00 | $21.00 |
| 44 | Concrete curb & gutter 4-inch sloped 30-inch type G (601.0574) | LF | 991 | $25.20 | $24.00 |
| 45 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 590 | $25.20 | $24.00 |
| 46 | Concrete curb pedestrian (601.0600) | LF | 88 | $73.50 | $70.00 |
| 47 | Concrete sidewalk 5-inch (602.0410) | SF | 27,340 | $5.78 | $5.60 |
| 48 | Curb ramp detectable warning field yellow (602.0505) | SF | 120 | $47.25 | $45.00 |
| 49 | Curb ramp detectable warning field natural patina (602.0515) | SF | 320 | $47.25 | $45.00 |
| 50 | Concrete driveway 6-inch (602.0810) | SY | 485 | $56.70 | $54.00 |
| 51 | Concrete surface drains (602.3010) | CY | 1.44 | $840.00 | $800.00 |
| 52 | Riprap medium (606.0200) | CY | 16 | $90.79 | $92.57 |
| 53 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 20 | $123.31 | $126.66 |
| 54 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 20 | $125.81 | $129.16 |
| 55 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 52 | $62.23 | $63.52 |
| 56 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 90 | $76.98 | $78.27 |
| 57 | Storm sewer pipe reinforced concrete class III 42-inch (608.0342) | LF | 373 | $169.73 | $171.40 |
| 58 | Storm sewer pipe class III-B 12- inch (608.3612) | LF | 49 | $77.78 | $79.87 |
| 59 | Storm sewer pipe class III-B 15- inch (608.3615) | LF | 946 | $47.50 | $48.37 |
| 60 | Storm sewer pipe class III-B 18- inch (608.3618) | LF | 353 | $54.29 | $55.17 |
| 61 | Storm sewer pipe class III-B 24- inch (608.3624) | LF | 439 | $70.50 | $71.38 |
| 62 | Manhole covers type J (611.0530) | EACH | 4 | $815.38 | $826.53 |
| 63 | Inlet covers type DW (611.0613) | EACH | 1 | $1,171.08 | $1,182.14 |
| 64 | Inlet covers type H (611.0624) | EACH | 17 | $1,118.53 | $1,129.69 |
| 65 | Inlet covers type H-S (611.0639) | EACH | 14 | $1,081.02 | $1,092.18 |
| 66 | Inlet covers type T (611.0652) | EACH | 6 | $1,379.01 | $1,390.17 |
| 67 | Catch basins 5-FT diameter (611.1005) | EACH | 1 | $4,305.89 | $4,339.44 |
| 68 | Catch basins 6-FT diameter (611.1006) | EACH | 3 | $6,711.26 | $6,753.11 |
| 69 | Manholes 4-FT diameter (611.2004) | EACH | 2 | $3,262.24 | $3,295.71 |
| 70 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $4,190.99 | $4,232.91 |
| 71 | Manholes 7-FT diameter (611.2007) | EACH | 4 | $8,454.40 | $8,504.58 |
| 72 | Inlets 4-FT diameter (611.3004) | EACH | 29 | $2,999.30 | $3,032.75 |
| 73 | Inlets 2X3-FT (611.3230) | EACH | 5 | $2,630.53 | $2,663.99 |
| 74 | Cover plates temporary (611.8120.S) | EACH | 3 | $388.81 | $400.00 |
| 75 | MGS guardrail temporary thrie beam transition (614.1100) | LF | 79 | $86.10 | $82.00 |
| 76 | MGS guardrail temporary terminal eat (614.1200) | EACH | 2 | $3,360.00 | $3,200.00 |
| 77 | Maintenance and repair of haul roads (project) 01. 1660-02-73 (618.0100) | EACH | 1 | $0.01 | $1.00 |
| 78 | Mobilization (619.1000) | EACH | 1 | $137,254 | $280,000 |
| 79 | Concrete median sloped nose (620.0300) | SF | 452 | $12.60 | $12.00 |
| 80 | Water (624.0100) | MGAL | 83 | $27.90 | $28.96 |
| 81 | Topsoil (625.0100) | SY | 6,837 | $5.82 | $5.88 |
| 82 | Mulching (627.0200) | SY | 2,831 | $0.42 | $0.40 |
| 83 | Silt fence (628.1504) | LF | 1,145 | $2.57 | $2.45 |
| 84 | Silt fence maintenance (628.1520) | LF | 1,145 | $0.01 | $0.01 |
| 85 | Mobilizations erosion control (628.1905) | EACH | 5 | $105.00 | $100.00 |
| 86 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $105.00 | $100.00 |
| 87 | Erosion mat urban class I type A (628.2006) | SY | 4,006 | $1.89 | $1.80 |
| 88 | Inlet protection type C (628.7015) | EACH | 36 | $63.00 | $60.00 |
| 89 | Culvert pipe checks (628.7555) | EACH | 8 | $26.25 | $25.00 |
| 90 | Fertilizer type B (629.0210) | CWT | 4.37 | $105.00 | $100.00 |
| 91 | Seeding mixture no. 40 (630.0140) | LB | 304 | $14.70 | $14.00 |
| 92 | Seeding mixture no. 80 (630.0180) | LB | 3 | $210.00 | $200.00 |
| 93 | Seed water (630.0500) | MGAL | 159 | $21.00 | $20.00 |
| 94 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 33 | $89.25 | $85.00 |
| 95 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 12 | $94.50 | $90.00 |
| 96 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 6 | $99.75 | $95.00 |
| 97 | Posts tubular steel 2X2-inch X 11- FT (634.0811) | EACH | 2 | $183.75 | $175.00 |
| 98 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 4 | $194.25 | $185.00 |
| 99 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 2 | $204.75 | $195.00 |
| 100 | Signs type II reflective H (637.2210) | SF | 367.05 | $22.05 | $21.00 |
| 101 | Signs type II reflective F (637.2230) | SF | 146.25 | $23.10 | $22.00 |
| 102 | Removing signs type II (638.2602) | EACH | 50 | $36.75 | $35.00 |
| 103 | Removing small sign supports (638.3000) | EACH | 62 | $36.75 | $35.00 |
| 104 | Field office type C (642.5201) | EACH | 1 | $10,188 | $20,000 |
| 105 | Traffic control drums (643.0300) | DAY | 6,656 | $0.79 | $0.75 |
| 106 | Traffic control barricades type III (643.0420) | DAY | 4,176 | $1.05 | $1.00 |
| 107 | Traffic control flexible tubular marker posts (643.0500) | EACH | 47 | $26.25 | $25.00 |
| 108 | Traffic control flexible tubular marker bases (643.0600) | EACH | 47 | $26.25 | $25.00 |
| 109 | Traffic control warning lights type A (643.0705) | DAY | 4,019 | $0.16 | $0.15 |
| 110 | Traffic control warning lights type C (643.0715) | DAY | 1,288 | $0.21 | $0.20 |
| 111 | Traffic control signs (643.0900) | DAY | 32,796 | $0.26 | $0.25 |
| 112 | Traffic control covering signs type II (643.0920) | EACH | 2 | $26.25 | $25.00 |
| 113 | Traffic control signs fixed message (643.1000) | SF | 87.50 | $26.25 | $25.00 |
| 114 | Traffic control signs PCMS (643.1050) | DAY | 262 | $47.25 | $45.00 |
| 115 | Temporary marking line paint 6- inch (643.3165) | LF | 1,424 | $1.31 | $1.50 |
| 116 | Temporary marking line removable tape 6-inch (643.3180) | LF | 9,172 | $1.58 | $1.50 |
| 117 | Temporary marking line paint 10- inch (643.3265) | LF | 249 | $2.47 | $2.35 |
| 118 | Temporary marking removable mask out tape 8-inch (643.3980) | LF | 991 | $2.63 | $2.50 |
| 119 | Traffic control (643.5000) | EACH | 1 | $21,000 | $20,000 |
| 120 | Temporary pedestrian surface matting (644.1440) | SF | 1,063 | $9.45 | $9.00 |
| 121 | Temporary pedestrian curb ramp (644.1601) | DAY | 225 | $10.50 | $10.00 |
| 122 | Temporary pedestrian detectable warning field (644.1605) | SF | 40 | $8.40 | $8.00 |
| 123 | Temporary pedestrian barricade (644.1810) | LF | 1,148 | $4.20 | $4.00 |
| 124 | Temporary audible message devices (644.1900.S) | DAY | 1,373 | $5.25 | $5.00 |
| 125 | Geotextile type HR (645.0120) | SY | 88 | $7.89 | $7.98 |
| 126 | Marking line epoxy 6-inch (646.2020) | LF | 3,444 | $0.89 | $0.85 |
| 127 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 1,403 | $2.47 | $2.35 |
| 128 | Marking line epoxy 10-inch (646.4020) | LF | 808 | $1.94 | $1.85 |
| 129 | Marking arrow epoxy (646.5020) | EACH | 7 | $667.80 | $636.00 |
| 130 | Marking word epoxy (646.5120) | EACH | 2 | $676.20 | $644.00 |
| 131 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 213 | $28.09 | $26.75 |
| 132 | Cold weather marking epoxy 6-inch (646.6466) | LF | 2,060 | $0.89 | $0.85 |
| 133 | Cold weather marking epoxy 10- inch (646.6470) | LF | 243 | $1.94 | $1.85 |
| 134 | Marking diagonal epoxy 12-inch (646.7120) | LF | 270 | $27.30 | $26.00 |
| 135 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 436 | $26.57 | $25.30 |
| 136 | Marking island nose epoxy (646.8220) | EACH | 3 | $506.10 | $482.00 |
| 137 | Marking parking stall epoxy (646.8320) | LF | 174 | $9.14 | $8.70 |
| 138 | Marking removal line 4-inch (646.9000) | LF | 117 | $10.50 | $10.00 |
| 139 | Marking removal line 10-inch (646.9102) | LF | 225 | $1.05 | $1.00 |
| 140 | Marking removal special marking (646.9300) | EACH | 2 | $105.00 | $100.00 |
| 141 | Construction staking storm sewer (650.4000) | EACH | 41 | $315.00 | $300.00 |
| 142 | Construction staking subgrade (650.4500) | LF | 2,938 | $1.05 | $1.00 |
| 143 | Construction staking concrete pavement (650.7000) | LF | 2,938 | $1.05 | $1.00 |
| 144 | Construction staking electrical installations (project) 01. 1660-02- 73 (650.8501) | EACH | 1 | $10,500 | $10,000 |
| 145 | Construction staking curb ramps (650.9000) | EACH | 24 | $525.00 | $500.00 |
| 146 | Construction staking sidewalk (project) 01. 1660-02-73 (650.9500) | EACH | 1 | $3,150.00 | $3,000.00 |
| 147 | Construction staking supplemental control (project) 01. 1660-02-73 (650.9911) | EACH | 1 | $3,150.00 | $3,000.00 |
| 148 | Construction staking slope stakes (650.9920) | LF | 2,938 | $1.58 | $1.50 |
| 149 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 830 | $11.98 | $11.41 |
| 150 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,455 | $16.20 | $15.43 |
| 151 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 20 | $2,413.73 | $2,298.79 |
| 152 | Removing pull boxes (653.0905) | EACH | 18 | $318.68 | $303.50 |
| 153 | Concrete bases type 5 (654.0105) | EACH | 18 | $1,034.50 | $985.24 |
| 154 | Concrete control cabinet bases type L30 (654.0230) | EACH | 1 | $2,308.50 | $2,198.57 |
| 155 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,540 | $1.09 | $1.04 |
| 156 | Electrical wire lighting 10 AWG (655.0615) | LF | 13,865 | $1.48 | $1.41 |
| 157 | Electrical wire lighting 6 AWG (655.0625) | LF | 3,200 | $2.42 | $2.30 |
| 158 | Electrical service meter breaker pedestal (location) 01. ush 18 & iowa ST (656.0201) | EACH | 1 | $3,003.55 | $2,860.52 |
| 159 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 18 | $900.84 | $857.94 |
| 160 | Poles type 5-aluminum (657.0322) | EACH | 18 | $3,242.77 | $3,088.35 |
| 161 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 14 | $726.04 | $691.47 |
| 162 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 4 | $1,223.25 | $1,165.00 |
| 163 | Luminaires utility LED C (659.1125) | EACH | 18 | $565.67 | $538.73 |
| 164 | Sawing asphalt (690.0150) | LF | 217 | $2.05 | $1.95 |
| 165 | Sawing concrete (690.0250) | LF | 1,067 | $2.68 | $2.55 |
| 166 | Incentive compressive strength concrete pavement (715.0720) | DOL | 3,022.50 | $1.00 | $1.00 |
| 167 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 |
| 168 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 |
| 169 | Special 01. inlet covers flat temporary (SPV.0060) | EACH | 3 | $1,200.78 | $1,211.96 |
| 170 | Special 02. removing decorative lighting system (SPV.0060) | EACH | 1 | $7,882.07 | $7,506.73 |
| 171 | Special 03. pull boxes special (SPV.0060) | EACH | 5 | $708.81 | $675.06 |
| 172 | Special 04. concrete bases type 7 modified (SPV.0060) | EACH | 5 | $1,250.29 | $1,190.75 |
| 173 | Special 05. powder coating light poles (SPV.0060) | EACH | 18 | $123.07 | $117.21 |
| 174 | Special 06. temporary lighting system (ush 18 & iowa ST) (SPV.0060) | EACH | 1 | $22,780 | $21,696 |
| 175 | Special 07. temporary lighting system (ush 18 & wisconsin ST) (SPV.0060) | EACH | 1 | $20,749 | $19,761 |
| 176 | Special 10. reinstalling salvaged festoon pole (SPV.0060) | EACH | 5 | $436.40 | $415.62 |
| 177 | Special 11. festoon receptacle (SPV.0060) | EACH | 2 | $730.97 | $696.16 |
| 178 | Special 12. modify poles type 5 - aluminum (SPV.0060) | EACH | 2 | $186.22 | $177.35 |
| 179 | Special 16. research and locate existing land parcel monuments (SPV.0060) | EACH | 7 | $1,050.00 | $1,000.00 |
| 180 | Special 17. verify and replace existing land parcel monuments (SPV.0060) | EACH | 7 | $1,050.00 | $1,000.00 |
| 181 | Special 18. utility line opening (ulo) (SPV.0060) | EACH | 5 | $990.34 | $1,023.80 |
| 182 | Special 20. lighting control cabinets 120/240 30-inch special (SPV.0060) | EACH | 1 | $9,779.22 | $9,313.54 |
| 183 | Special 21. temporary storm sewer connection (SPV.0060) | EACH | 2 | $1,135.19 | $1,168.66 |
| 184 | Special 22. powder coating overhead sign structure S-12-15 (SPV.0060) | EACH | 1 | $2,625.00 | $2,500.00 |
| 185 | Special 30. gate valve W/ box, 6- inch (SPV.0060) | EACH | 3 | $2,604.04 | $2,615.22 |
| 186 | Special 31. relocate existing hydrant (SPV.0060) | EACH | 1 | $1,084.23 | $1,117.79 |
| 187 | Special 32. 1-inch corporation stop (SPV.0060) | EACH | 2 | $1,117.63 | $1,151.11 |
| 188 | Special 33. 1-inch curb valve W/ box (SPV.0060) | EACH | 2 | $1,294.35 | $1,327.82 |
| 189 | Special 34. connect to existing water main (SPV.0060) | EACH | 3 | $1,350.14 | $1,383.59 |
| 190 | Special 35. adjust existing valve (SPV.0060) | EACH | 1 | $1,137.57 | $1,171.12 |
| 191 | Special 36. connect to existing sanitary sewer (SPV.0060) | EACH | 2 | $2,177.92 | $2,211.40 |
| 192 | Special 37. adjust existing manhole casting (SPV.0060) | EACH | 2 | $694.10 | $710.88 |
| 193 | Special 38. sanitary manhole, 48- inch precast concrete, W/ casing (SPV.0060) | EACH | 2 | $9,642.12 | $9,742.47 |
| 194 | Special 39. sanitary wye, 18-inch X 4-inch, PVC (SPV.0060) | EACH | 3 | $2,122.84 | $2,156.28 |
| 195 | Special 40. abandon existing sanitary mains and manholes, project 1660-02-75 (SPV.0060) | EACH | 1 | $5,187.31 | $5,363.50 |
| 196 | Special 41. abandon existing water mains, valves, hydrants, project 1660-02-75 (SPV.0060) | EACH | 1 | $2,882.41 | $2,970.50 |
| 197 | Special 42. 2-inch corporation stop (SPV.0060) | EACH | 1 | $2,614.10 | $2,681.05 |
| 198 | Special 43. 2-inch curb valve W/ box (SPV.0060) | EACH | 1 | $2,815.07 | $2,882.02 |
| 199 | Special 01. porfile curb cut (SPV.0090) | LF | 160 | $26.25 | $25.00 |
| 200 | Special 30. water service, 1-inch copper (SPV.0090) | LF | 88 | $62.82 | $64.35 |
| 201 | Special 31. water main, 6-inch, DI, class 52 (SPV.0090) | LF | 605 | $98.46 | $100.13 |
| 202 | Special 32. sanitary sewer lateral, 4-inch, PVC, SDR 35, W/ 10 AWG tracer wire (SPV.0090) | LF | 133 | $52.73 | $54.31 |
| 203 | Special 33. sanitary sewer, 18-inch, PVC, SDR 35 (SPV.0090) | LF | 756 | $153.61 | $156.91 |
| 204 | Special 34. water service PE SDR 9, 2-inch W/ 10 AWG tracer wire (SPV.0090) | LF | 33 | $76.05 | $78.19 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.