WisDOT contract 20260310004 bid tabulation

1660-02-73. Let by Wisconsin DOT on March 10, 2026, Crawford. 2 bids received; low bid $3,435,189 by Gerke Excavating Inc.

Owner
Wisconsin DOT
Letting
10 MAR 2026
Pay items
204
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Gerke Excavating Inc$3,435,189Low
2Zignego Company, Inc.$3,607,136+5.0%
WisDOT contract 20260310004: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Gerke Excavating Inc2. Zignego Company, Inc.
1Grubbing (201.0220)ID50$46.20$30.00
2Removing concrete pavement (204.0100)SY12,850$5.21$5.44
3Removing asphaltic surface butt joints (204.0115)SY29$33.40$150.00
4Removing curb & gutter (204.0150)LF631$2.53$2.64
5Removing concrete sidewalk (204.0155)SY2,016$2.80$2.87
6Removing concrete bases (204.0195)EACH18$156.13$161.50
7Removing manholes (204.0210)EACH7$377.24$391.79
8Removing inlets (204.0220)EACH24$376.65$391.18
9Removing storm sewer (size) 01. 12-inch (204.0245)LF720$11.60$12.05
10Removing storm sewer (size) 02. 15-inch (204.0245)LF69$16.51$17.15
11Removing storm sewer (size) 03. 18-inch (204.0245)LF413$11.95$12.41
12Removing storm sewer (size) 04. 24-inch (204.0245)LF382$11.93$12.39
13Removing storm sewer (size) 05. 42-inch (204.0245)LF451$13.47$13.99
14Sealing pipes (204.0280)EACH1$1,376.03$1,420.18
15Removing (item description) 01. street light (204.9060.S)EACH18$381.44$363.28
16Excavation common (205.0100)CY7,945$20.58$21.59
17Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON255$140.55$143.21
18Finishing roadway (project) 01. 1660-02-73 (213.0100)EACH1$6,431.19$1,000.00
19Base aggregate dense 1 1/4-inch (305.0120)TON5,523$15.63$15.92
20Coloring concrete wisdot red (405.0100)CY399$105.00$100.00
21Stamping colored concrete (405.1000)CY13$315.00$300.00
22Concrete pavement 10-inch (415.0100)SY8,878$94.50$94.00
23Concrete pavement gaps (415.0210)EACH2$1,050.00$1,000.00
24Concrete pavement hes 10-inch (415.1100)SY44$105.00$200.00
25Concrete truck apron 12-inch (415.2010)SY1,197$94.50$151.10
26Concrete pavement joint filling (415.4100)SY10,121$4.67$2.00
27Drilled tie bars (416.0610)EACH28$15.75$30.00
28Drilled dowel bars (416.0620)EACH173$21.00$30.00
29Tack coat (455.0605)GAL2$37.80$36.00
30Asphaltic surface (465.0105)TON51$148.31$141.25
31Asphaltic surface driveways and field entrances (465.0120)TON26$148.31$141.25
32Asphaltic surface temporary (465.0125)TON279$148.31$141.25
33Asphaltic curb (465.0310)LF558$21.00$20.00
34Asphaltic flumes (465.0315)SY15$73.50$70.00
35Concrete collars for pipe (520.8000)EACH9$1,221.02$1,254.47
36Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH1$1,935.71$1,952.58
37Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH1$1,235.90$1,252.77
38Drilling shaft 42-inch (531.2042)LF18$262.50$250.00
39Foundation single-shaft type MC-III (structure) 01. S-12-15 (531.5130)EACH1$9,975.00$9,500.00
40Monotube cantilever type III (structure) 01. S-12-15 (532.5130)EACH1$25,200$24,000
41Concrete curb & gutter 18-inch type A (601.0405)LF184$26.25$25.00
42Concrete curb & gutter 30-inch type A (601.0409)LF4,742$21.00$21.00
43Concrete curb & gutter 30-inch type D (601.0411)LF100$21.00$21.00
44Concrete curb & gutter 4-inch sloped 30-inch type G (601.0574)LF991$25.20$24.00
45Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF590$25.20$24.00
46Concrete curb pedestrian (601.0600)LF88$73.50$70.00
47Concrete sidewalk 5-inch (602.0410)SF27,340$5.78$5.60
48Curb ramp detectable warning field yellow (602.0505)SF120$47.25$45.00
49Curb ramp detectable warning field natural patina (602.0515)SF320$47.25$45.00
50Concrete driveway 6-inch (602.0810)SY485$56.70$54.00
51Concrete surface drains (602.3010)CY1.44$840.00$800.00
52Riprap medium (606.0200)CY16$90.79$92.57
53Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF20$123.31$126.66
54Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF20$125.81$129.16
55Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF52$62.23$63.52
56Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF90$76.98$78.27
57Storm sewer pipe reinforced concrete class III 42-inch (608.0342)LF373$169.73$171.40
58Storm sewer pipe class III-B 12- inch (608.3612)LF49$77.78$79.87
59Storm sewer pipe class III-B 15- inch (608.3615)LF946$47.50$48.37
60Storm sewer pipe class III-B 18- inch (608.3618)LF353$54.29$55.17
61Storm sewer pipe class III-B 24- inch (608.3624)LF439$70.50$71.38
62Manhole covers type J (611.0530)EACH4$815.38$826.53
63Inlet covers type DW (611.0613)EACH1$1,171.08$1,182.14
64Inlet covers type H (611.0624)EACH17$1,118.53$1,129.69
65Inlet covers type H-S (611.0639)EACH14$1,081.02$1,092.18
66Inlet covers type T (611.0652)EACH6$1,379.01$1,390.17
67Catch basins 5-FT diameter (611.1005)EACH1$4,305.89$4,339.44
68Catch basins 6-FT diameter (611.1006)EACH3$6,711.26$6,753.11
69Manholes 4-FT diameter (611.2004)EACH2$3,262.24$3,295.71
70Manholes 5-FT diameter (611.2005)EACH1$4,190.99$4,232.91
71Manholes 7-FT diameter (611.2007)EACH4$8,454.40$8,504.58
72Inlets 4-FT diameter (611.3004)EACH29$2,999.30$3,032.75
73Inlets 2X3-FT (611.3230)EACH5$2,630.53$2,663.99
74Cover plates temporary (611.8120.S)EACH3$388.81$400.00
75MGS guardrail temporary thrie beam transition (614.1100)LF79$86.10$82.00
76MGS guardrail temporary terminal eat (614.1200)EACH2$3,360.00$3,200.00
77Maintenance and repair of haul roads (project) 01. 1660-02-73 (618.0100)EACH1$0.01$1.00
78Mobilization (619.1000)EACH1$137,254$280,000
79Concrete median sloped nose (620.0300)SF452$12.60$12.00
80Water (624.0100)MGAL83$27.90$28.96
81Topsoil (625.0100)SY6,837$5.82$5.88
82Mulching (627.0200)SY2,831$0.42$0.40
83Silt fence (628.1504)LF1,145$2.57$2.45
84Silt fence maintenance (628.1520)LF1,145$0.01$0.01
85Mobilizations erosion control (628.1905)EACH5$105.00$100.00
86Mobilizations emergency erosion control (628.1910)EACH5$105.00$100.00
87Erosion mat urban class I type A (628.2006)SY4,006$1.89$1.80
88Inlet protection type C (628.7015)EACH36$63.00$60.00
89Culvert pipe checks (628.7555)EACH8$26.25$25.00
90Fertilizer type B (629.0210)CWT4.37$105.00$100.00
91Seeding mixture no. 40 (630.0140)LB304$14.70$14.00
92Seeding mixture no. 80 (630.0180)LB3$210.00$200.00
93Seed water (630.0500)MGAL159$21.00$20.00
94Posts wood 4X6-inch X 14-FT (634.0614)EACH33$89.25$85.00
95Posts wood 4X6-inch X 16-FT (634.0616)EACH12$94.50$90.00
96Posts wood 4X6-inch X 18-FT (634.0618)EACH6$99.75$95.00
97Posts tubular steel 2X2-inch X 11- FT (634.0811)EACH2$183.75$175.00
98Posts tubular steel 2X2-inch X 12- FT (634.0812)EACH4$194.25$185.00
99Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH2$204.75$195.00
100Signs type II reflective H (637.2210)SF367.05$22.05$21.00
101Signs type II reflective F (637.2230)SF146.25$23.10$22.00
102Removing signs type II (638.2602)EACH50$36.75$35.00
103Removing small sign supports (638.3000)EACH62$36.75$35.00
104Field office type C (642.5201)EACH1$10,188$20,000
105Traffic control drums (643.0300)DAY6,656$0.79$0.75
106Traffic control barricades type III (643.0420)DAY4,176$1.05$1.00
107Traffic control flexible tubular marker posts (643.0500)EACH47$26.25$25.00
108Traffic control flexible tubular marker bases (643.0600)EACH47$26.25$25.00
109Traffic control warning lights type A (643.0705)DAY4,019$0.16$0.15
110Traffic control warning lights type C (643.0715)DAY1,288$0.21$0.20
111Traffic control signs (643.0900)DAY32,796$0.26$0.25
112Traffic control covering signs type II (643.0920)EACH2$26.25$25.00
113Traffic control signs fixed message (643.1000)SF87.50$26.25$25.00
114Traffic control signs PCMS (643.1050)DAY262$47.25$45.00
115Temporary marking line paint 6- inch (643.3165)LF1,424$1.31$1.50
116Temporary marking line removable tape 6-inch (643.3180)LF9,172$1.58$1.50
117Temporary marking line paint 10- inch (643.3265)LF249$2.47$2.35
118Temporary marking removable mask out tape 8-inch (643.3980)LF991$2.63$2.50
119Traffic control (643.5000)EACH1$21,000$20,000
120Temporary pedestrian surface matting (644.1440)SF1,063$9.45$9.00
121Temporary pedestrian curb ramp (644.1601)DAY225$10.50$10.00
122Temporary pedestrian detectable warning field (644.1605)SF40$8.40$8.00
123Temporary pedestrian barricade (644.1810)LF1,148$4.20$4.00
124Temporary audible message devices (644.1900.S)DAY1,373$5.25$5.00
125Geotextile type HR (645.0120)SY88$7.89$7.98
126Marking line epoxy 6-inch (646.2020)LF3,444$0.89$0.85
127Marking line grooved wet ref epoxy 6-inch (646.2040)LF1,403$2.47$2.35
128Marking line epoxy 10-inch (646.4020)LF808$1.94$1.85
129Marking arrow epoxy (646.5020)EACH7$667.80$636.00
130Marking word epoxy (646.5120)EACH2$676.20$644.00
131Marking dotted extension epoxy 18-inch (646.6320)LF213$28.09$26.75
132Cold weather marking epoxy 6-inch (646.6466)LF2,060$0.89$0.85
133Cold weather marking epoxy 10- inch (646.6470)LF243$1.94$1.85
134Marking diagonal epoxy 12-inch (646.7120)LF270$27.30$26.00
135Marking crosswalk epoxy transverse line 6-inch (646.7420)LF436$26.57$25.30
136Marking island nose epoxy (646.8220)EACH3$506.10$482.00
137Marking parking stall epoxy (646.8320)LF174$9.14$8.70
138Marking removal line 4-inch (646.9000)LF117$10.50$10.00
139Marking removal line 10-inch (646.9102)LF225$1.05$1.00
140Marking removal special marking (646.9300)EACH2$105.00$100.00
141Construction staking storm sewer (650.4000)EACH41$315.00$300.00
142Construction staking subgrade (650.4500)LF2,938$1.05$1.00
143Construction staking concrete pavement (650.7000)LF2,938$1.05$1.00
144Construction staking electrical installations (project) 01. 1660-02- 73 (650.8501)EACH1$10,500$10,000
145Construction staking curb ramps (650.9000)EACH24$525.00$500.00
146Construction staking sidewalk (project) 01. 1660-02-73 (650.9500)EACH1$3,150.00$3,000.00
147Construction staking supplemental control (project) 01. 1660-02-73 (650.9911)EACH1$3,150.00$3,000.00
148Construction staking slope stakes (650.9920)LF2,938$1.58$1.50
149Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF830$11.98$11.41
150Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF1,455$16.20$15.43
151Pull boxes non-conductive 24X42- inch (653.0164)EACH20$2,413.73$2,298.79
152Removing pull boxes (653.0905)EACH18$318.68$303.50
153Concrete bases type 5 (654.0105)EACH18$1,034.50$985.24
154Concrete control cabinet bases type L30 (654.0230)EACH1$2,308.50$2,198.57
155Electrical wire lighting 12 AWG (655.0610)LF2,540$1.09$1.04
156Electrical wire lighting 10 AWG (655.0615)LF13,865$1.48$1.41
157Electrical wire lighting 6 AWG (655.0625)LF3,200$2.42$2.30
158Electrical service meter breaker pedestal (location) 01. ush 18 & iowa ST (656.0201)EACH1$3,003.55$2,860.52
159Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH18$900.84$857.94
160Poles type 5-aluminum (657.0322)EACH18$3,242.77$3,088.35
161Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610)EACH14$726.04$691.47
162Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710)EACH4$1,223.25$1,165.00
163Luminaires utility LED C (659.1125)EACH18$565.67$538.73
164Sawing asphalt (690.0150)LF217$2.05$1.95
165Sawing concrete (690.0250)LF1,067$2.68$2.55
166Incentive compressive strength concrete pavement (715.0720)DOL3,022.50$1.00$1.00
167On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00
168On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,320$5.00$5.00
169Special 01. inlet covers flat temporary (SPV.0060)EACH3$1,200.78$1,211.96
170Special 02. removing decorative lighting system (SPV.0060)EACH1$7,882.07$7,506.73
171Special 03. pull boxes special (SPV.0060)EACH5$708.81$675.06
172Special 04. concrete bases type 7 modified (SPV.0060)EACH5$1,250.29$1,190.75
173Special 05. powder coating light poles (SPV.0060)EACH18$123.07$117.21
174Special 06. temporary lighting system (ush 18 & iowa ST) (SPV.0060)EACH1$22,780$21,696
175Special 07. temporary lighting system (ush 18 & wisconsin ST) (SPV.0060)EACH1$20,749$19,761
176Special 10. reinstalling salvaged festoon pole (SPV.0060)EACH5$436.40$415.62
177Special 11. festoon receptacle (SPV.0060)EACH2$730.97$696.16
178Special 12. modify poles type 5 - aluminum (SPV.0060)EACH2$186.22$177.35
179Special 16. research and locate existing land parcel monuments (SPV.0060)EACH7$1,050.00$1,000.00
180Special 17. verify and replace existing land parcel monuments (SPV.0060)EACH7$1,050.00$1,000.00
181Special 18. utility line opening (ulo) (SPV.0060)EACH5$990.34$1,023.80
182Special 20. lighting control cabinets 120/240 30-inch special (SPV.0060)EACH1$9,779.22$9,313.54
183Special 21. temporary storm sewer connection (SPV.0060)EACH2$1,135.19$1,168.66
184Special 22. powder coating overhead sign structure S-12-15 (SPV.0060)EACH1$2,625.00$2,500.00
185Special 30. gate valve W/ box, 6- inch (SPV.0060)EACH3$2,604.04$2,615.22
186Special 31. relocate existing hydrant (SPV.0060)EACH1$1,084.23$1,117.79
187Special 32. 1-inch corporation stop (SPV.0060)EACH2$1,117.63$1,151.11
188Special 33. 1-inch curb valve W/ box (SPV.0060)EACH2$1,294.35$1,327.82
189Special 34. connect to existing water main (SPV.0060)EACH3$1,350.14$1,383.59
190Special 35. adjust existing valve (SPV.0060)EACH1$1,137.57$1,171.12
191Special 36. connect to existing sanitary sewer (SPV.0060)EACH2$2,177.92$2,211.40
192Special 37. adjust existing manhole casting (SPV.0060)EACH2$694.10$710.88
193Special 38. sanitary manhole, 48- inch precast concrete, W/ casing (SPV.0060)EACH2$9,642.12$9,742.47
194Special 39. sanitary wye, 18-inch X 4-inch, PVC (SPV.0060)EACH3$2,122.84$2,156.28
195Special 40. abandon existing sanitary mains and manholes, project 1660-02-75 (SPV.0060)EACH1$5,187.31$5,363.50
196Special 41. abandon existing water mains, valves, hydrants, project 1660-02-75 (SPV.0060)EACH1$2,882.41$2,970.50
197Special 42. 2-inch corporation stop (SPV.0060)EACH1$2,614.10$2,681.05
198Special 43. 2-inch curb valve W/ box (SPV.0060)EACH1$2,815.07$2,882.02
199Special 01. porfile curb cut (SPV.0090)LF160$26.25$25.00
200Special 30. water service, 1-inch copper (SPV.0090)LF88$62.82$64.35
201Special 31. water main, 6-inch, DI, class 52 (SPV.0090)LF605$98.46$100.13
202Special 32. sanitary sewer lateral, 4-inch, PVC, SDR 35, W/ 10 AWG tracer wire (SPV.0090)LF133$52.73$54.31
203Special 33. sanitary sewer, 18-inch, PVC, SDR 35 (SPV.0090)LF756$153.61$156.91
204Special 34. water service PE SDR 9, 2-inch W/ 10 AWG tracer wire (SPV.0090)LF33$76.05$78.19
WisDOT contract 20260310004: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy