WisDOT contract 20260310017 bid tabulation
City Racine, Ohio St; Washington Ave to Graceland Blvd (LOC STR, Racine County City Racine, Ohio St). Let by Wisconsin DOT on March 10, 2026, Racine. 5 bids received; low bid $3,621,950 by Stark Pavement Corporation.
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 174
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stark Pavement Corporation | $3,621,950 | Low |
| 2 | Lalonde Contractors Incorporated | $3,754,862 | +4.0% |
| 3 | A.W. Oakes & Son, Inc. | $3,967,597 | +10% |
| 4 | Musson Bros., Inc. | $4,009,777 | +11% |
| 5 | Zignego Company, Inc. | $4,119,871 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stark Pavement Corporation | 2. Lalonde Contractors Incorporated | 3. A.W. Oakes & Son, Inc. | 4. Musson Bros., Inc. | 5. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 290 | $30.00 | $38.50 | $45.00 | $39.65 | $38.50 |
| 2 | Grubbing (201.0220) | ID | 290 | $20.00 | $7.50 | $10.00 | $7.72 | $7.50 |
| 3 | Removing concrete pavement (204.0100) | SY | 23,060 | $15.81 | $3.66 | $19.80 | $21.50 | $21.50 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 970 | $12.29 | $10.60 | $10.00 | $7.10 | $7.10 |
| 5 | Removing concrete bases (204.0195) | EACH | 13 | $505.66 | $379.36 | $350.00 | $249.00 | $400.00 |
| 6 | Removing inlets (204.0220) | EACH | 15 | $250.00 | $250.00 | $560.00 | $291.00 | $250.00 |
| 7 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 690 | $16.00 | $16.00 | $25.00 | $34.00 | $16.00 |
| 8 | Excavation common (205.0100) | CY | 19,674 | $10.62 | $20.07 | $12.00 | $0.01 | $0.01 |
| 9 | Finishing roadway (project) 01. 2703-00-76 (213.0100) | EACH | 1 | $5,000.00 | $2,510.00 | $2,500.00 | $1,000.00 | $1,000.00 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 10,309 | $11.20 | $21.64 | $16.00 | $11.50 | $11.50 |
| 11 | Breaker run (311.0110) | TON | 12,620 | $6.06 | $24.51 | $0.01 | $11.50 | $11.50 |
| 12 | Concrete pavement 8-inch (415.0080) | SY | 19,214 | $57.90 | $59.22 | $62.00 | $60.77 | $69.00 |
| 13 | Concrete pavement gaps (415.0210) | EACH | 8 | $1,600.00 | $1,150.33 | $500.00 | $1,030.00 | $1.00 |
| 14 | Concrete pavement joint filling (415.4100) | SY | 21,356 | $1.90 | $1.38 | $2.00 | $2.21 | $2.00 |
| 15 | Drilled tie bars (416.0610) | EACH | 631 | $12.00 | $14.25 | $10.00 | $12.36 | $20.00 |
| 16 | Drilled dowel bars (416.0620) | EACH | 546 | $16.00 | $18.30 | $20.00 | $22.66 | $20.00 |
| 17 | Asphaltic surface driveways and field entrances (465.0120) | TON | 13 | $150.00 | $150.00 | $200.00 | $154.50 | $150.00 |
| 18 | Asphaltic surface temporary (465.0125) | TON | 161 | $120.00 | $120.00 | $150.00 | $123.60 | $120.00 |
| 19 | Concrete collars for pipe (520.8000) | EACH | 7 | $1,000.00 | $1,000.00 | $750.00 | $481.00 | $900.00 |
| 20 | Concrete curb type D (601.0110) | LF | 5 | $200.00 | $65.27 | $35.00 | $30.90 | $38.36 |
| 21 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 5,426 | $24.25 | $26.79 | $25.00 | $23.69 | $29.57 |
| 22 | Concrete curb & gutter integral 30- inch type D (601.0452) | LF | 4,153 | $29.10 | $17.65 | $17.00 | $23.69 | $24.18 |
| 23 | Concrete curb pedestrian (601.0600) | LF | 50 | $45.00 | $58.73 | $50.00 | $46.35 | $33.50 |
| 24 | Concrete sidewalk 4-inch (602.0405) | SF | 10,200 | $8.25 | $7.96 | $8.30 | $8.24 | $5.56 |
| 25 | Concrete sidewalk 5-inch (602.0410) | SF | 9,100 | $9.75 | $8.48 | $8.30 | $8.50 | $9.65 |
| 26 | Curb ramp detectable warning field yellow (602.0505) | SF | 360 | $44.00 | $43.06 | $55.00 | $46.35 | $34.53 |
| 27 | Concrete driveway 6-inch (602.0810) | SY | 1,001 | $72.00 | $69.00 | $72.00 | $72.10 | $68.81 |
| 28 | Concrete driveway 8-inch (602.0820) | SY | 57 | $85.00 | $91.76 | $77.00 | $77.25 | $105.60 |
| 29 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 970 | $71.00 | $71.00 | $110.00 | $95.00 | $71.00 |
| 30 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 16 | $108.00 | $108.00 | $185.00 | $149.00 | $108.00 |
| 31 | Reconstructing manholes (611.0420) | EACH | 7 | $600.00 | $600.00 | $2,500.00 | $1,580.00 | $600.00 |
| 32 | Manhole covers type J-special (611.0535) | EACH | 1 | $600.00 | $600.00 | $700.00 | $827.00 | $600.00 |
| 33 | Inlet covers type H (611.0624) | EACH | 16 | $895.00 | $895.00 | $1,000.00 | $1,160.00 | $895.00 |
| 34 | Inlet covers type H-S (611.0639) | EACH | 4 | $895.00 | $895.00 | $1,000.00 | $1,160.00 | $895.00 |
| 35 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $4,250.00 | $4,250.00 | $4,400.00 | $4,070.00 | $4,250.00 |
| 36 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $5,250.00 | $5,250.00 | $4,600.00 | $4,200.00 | $5,250.00 |
| 37 | Inlets 4-FT diameter (611.3004) | EACH | 13 | $2,115.00 | $2,115.00 | $3,400.00 | $2,010.00 | $2,115.00 |
| 38 | Inlets 2X3-FT (611.3230) | EACH | 6 | $1,400.00 | $1,400.00 | $3,100.00 | $1,330.00 | $1,400.00 |
| 39 | Adjusting manhole covers (611.8110) | EACH | 1 | $700.00 | $700.00 | $1,200.00 | $606.00 | $700.00 |
| 40 | Mobilization (619.1000) | EACH | 1 | $189,370 | $124,850 | $269,000 | $524,254 | $530,000 |
| 41 | Concrete median sloped nose (620.0300) | SF | 192 | $14.00 | $22.44 | $16.00 | $17.51 | $25.32 |
| 42 | Dust control surface treatment (623.0200) | SY | 26,900 | $0.10 | $0.01 | $0.01 | $0.01 | $0.01 |
| 43 | Water (624.0100) | MGAL | 210 | $42.41 | $0.01 | $65.00 | $0.01 | $0.01 |
| 44 | Topsoil (625.0100) | SY | 3,062 | $5.00 | $4.95 | $5.50 | $8.50 | $4.95 |
| 45 | Mulching (627.0200) | SY | 610 | $0.50 | $0.55 | $1.00 | $0.77 | $0.55 |
| 46 | Mobilizations erosion control (628.1905) | EACH | 9 | $100.00 | $200.00 | $100.00 | $206.00 | $200.00 |
| 47 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $50.00 | $200.00 | $50.00 | $257.50 | $200.00 |
| 48 | Erosion mat urban class I type A (628.2006) | SY | 650 | $5.00 | $1.90 | $2.00 | $2.32 | $1.90 |
| 49 | Soil stabilizer type B (628.6510) | ACRE | 0.20 | $100.00 | $750.00 | $200.00 | $1,287.50 | $750.00 |
| 50 | Inlet protection type A (628.7005) | EACH | 22 | $50.00 | $95.00 | $1.00 | $46.35 | $95.00 |
| 51 | Inlet protection type C (628.7015) | EACH | 42 | $70.00 | $55.00 | $75.00 | $72.10 | $55.00 |
| 52 | Inlet protection type D (628.7020) | EACH | 4 | $100.00 | $90.00 | $120.00 | $97.85 | $90.00 |
| 53 | Tracking pads (628.7560) | EACH | 6 | $1.09 | $0.01 | $100.00 | $100.00 | $1,600.00 |
| 54 | Fertilizer type B (629.0210) | CWT | 6 | $80.00 | $85.00 | $80.00 | $123.60 | $85.00 |
| 55 | Seeding mixture no. 40 (630.0140) | LB | 28 | $12.00 | $12.75 | $10.00 | $15.45 | $12.75 |
| 56 | Seeding temporary (630.0200) | LB | 16 | $5.00 | $5.00 | $1.00 | $7.21 | $5.00 |
| 57 | Seed water (630.0500) | MGAL | 15 | $1.00 | $40.00 | $0.01 | $41.20 | $40.00 |
| 58 | Sod water (631.0300) | MGAL | 63 | $30.00 | $40.00 | $35.00 | $66.95 | $40.00 |
| 59 | Sod lawn (631.1000) | SY | 2,880 | $8.00 | $7.95 | $8.00 | $7.72 | $7.95 |
| 60 | Posts tubular steel 2X2-inch X 16- FT (634.0816) | EACH | 30 | $215.00 | $230.00 | $225.00 | $247.20 | $230.00 |
| 61 | Signs type II reflective H (637.2210) | SF | 372.40 | $21.00 | $22.00 | $23.00 | $24.72 | $22.00 |
| 62 | Signs type II reflective H folding (637.2215) | SF | 20.72 | $27.00 | $25.00 | $25.00 | $46.35 | $25.00 |
| 63 | Removing signs type II (638.2602) | EACH | 55 | $20.00 | $25.00 | $15.00 | $36.05 | $25.00 |
| 64 | Removing small sign supports (638.3000) | EACH | 15 | $20.00 | $25.00 | $15.00 | $51.50 | $25.00 |
| 65 | Field office type B (642.5001) | EACH | 1 | $14,000 | $16,064 | $22,000 | $25,000 | $20,000 |
| 66 | Traffic control drums (643.0300) | DAY | 37,207 | $0.25 | $0.25 | $0.30 | $0.26 | $0.25 |
| 67 | Traffic control barricades type III (643.0420) | DAY | 12,032 | $0.50 | $0.50 | $0.55 | $0.51 | $0.50 |
| 68 | Traffic control flexible tubular marker posts (643.0500) | EACH | 294 | $22.00 | $22.00 | $25.00 | $22.66 | $22.00 |
| 69 | Traffic control flexible tubular marker bases (643.0600) | EACH | 294 | $6.00 | $6.00 | $7.00 | $6.18 | $6.00 |
| 70 | Traffic control warning lights type A (643.0705) | DAY | 23,590 | $0.10 | $0.10 | $0.15 | $0.10 | $0.10 |
| 71 | Traffic control warning lights type C (643.0715) | DAY | 9,552 | $0.10 | $0.10 | $0.15 | $0.10 | $0.10 |
| 72 | Traffic control connected arrow boards (643.0810) | DAY | 514 | $20.00 | $20.00 | $20.00 | $20.60 | $20.00 |
| 73 | Traffic control signs (643.0900) | DAY | 28,173 | $0.20 | $0.20 | $0.25 | $0.21 | $0.20 |
| 74 | Traffic control signs PCMS (643.1050) | DAY | 21 | $100.00 | $100.00 | $100.00 | $103.00 | $100.00 |
| 75 | Temporary marking line paint 4- inch (643.3105) | LF | 6,939 | $0.75 | $0.75 | $1.00 | $0.77 | $0.75 |
| 76 | Temporary marking line removable tape 4-inch (643.3150) | LF | 14,484 | $1.00 | $1.00 | $1.10 | $1.03 | $1.00 |
| 77 | Temporary marking line removable tape 6-inch (643.3180) | LF | 4,963 | $1.50 | $1.50 | $1.60 | $1.54 | $1.50 |
| 78 | Temporary marking line removable tape 8-inch (643.3250) | LF | 195 | $1.65 | $1.65 | $2.00 | $1.70 | $1.65 |
| 79 | Temporary marking arrow removable tape (643.3550) | EACH | 5 | $50.00 | $50.00 | $75.00 | $51.50 | $50.00 |
| 80 | Temporary marking word removable tape (643.3650) | EACH | 3 | $100.00 | $100.00 | $110.00 | $103.00 | $100.00 |
| 81 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 186 | $5.00 | $5.00 | $5.00 | $5.15 | $5.00 |
| 82 | Traffic control (643.5000) | EACH | 1 | $10,000 | $10,000 | $22,000 | $10,300 | $10,000 |
| 83 | Temporary pedestrian surface matting (644.1440) | SF | 372 | $5.00 | $5.00 | $6.00 | $5.15 | $5.00 |
| 84 | Temporary pedestrian curb ramp (644.1601) | DAY | 644 | $7.00 | $7.00 | $8.00 | $7.21 | $7.00 |
| 85 | Temporary pedestrian detectable warning field (644.1605) | SF | 128 | $5.00 | $5.00 | $6.00 | $5.15 | $5.00 |
| 86 | Temporary pedestrian barricade (644.1810) | LF | 2,181 | $4.00 | $4.00 | $4.00 | $4.12 | $4.00 |
| 87 | Temporary audible message devices (644.1900.S) | DAY | 608 | $3.00 | $3.00 | $3.00 | $3.09 | $3.00 |
| 88 | Geotextile type SR (645.0135) | SY | 11,770 | $2.39 | $2.81 | $0.01 | $0.01 | $0.01 |
| 89 | Marking line epoxy 4-inch (646.1020) | LF | 11,983 | $0.76 | $0.98 | $1.10 | $1.01 | $0.98 |
| 90 | Marking line epoxy 8-inch (646.3020) | LF | 575 | $1.52 | $1.20 | $1.35 | $1.24 | $1.20 |
| 91 | Marking arrow epoxy (646.5020) | EACH | 31 | $227.25 | $270.00 | $300.00 | $278.10 | $270.00 |
| 92 | Marking symbol epoxy (646.5220) | EACH | 30 | $303.00 | $255.00 | $300.00 | $262.65 | $255.00 |
| 93 | Marking stop line epoxy 18-inch (646.6120) | LF | 127 | $12.63 | $14.10 | $15.00 | $14.52 | $14.10 |
| 94 | Marking diagonal epoxy 12-inch (646.7120) | LF | 66 | $10.10 | $11.50 | $12.00 | $11.84 | $11.50 |
| 95 | Marking chevron epoxy 24-inch (646.7220) | LF | 12 | $14.14 | $19.75 | $20.00 | $20.34 | $19.75 |
| 96 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,719 | $11.11 | $9.25 | $10.00 | $9.53 | $9.25 |
| 97 | Marking curb epoxy (646.8120) | LF | 80 | $7.83 | $12.10 | $13.00 | $12.46 | $12.10 |
| 98 | Marking island nose epoxy (646.8220) | EACH | 8 | $303.00 | $235.00 | $275.00 | $242.05 | $235.00 |
| 99 | Marking removal line 4-inch (646.9000) | LF | 3,242 | $0.51 | $0.51 | $0.60 | $0.53 | $0.65 |
| 100 | Marking removal line 8-inch (646.9100) | LF | 200 | $0.65 | $0.65 | $1.00 | $0.67 | $1.00 |
| 101 | Marking removal line wide (646.9200) | LF | 50 | $1.00 | $1.00 | $1.00 | $1.03 | $100.00 |
| 102 | Marking removal special marking (646.9300) | EACH | 5 | $100.00 | $100.00 | $100.00 | $103.00 | $100.00 |
| 103 | Construction staking storm sewer (650.4000) | EACH | 40 | $120.00 | $120.00 | $125.00 | $123.60 | $120.00 |
| 104 | Construction staking subgrade (650.4500) | LF | 6,261 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 105 | Construction staking concrete pavement (650.7000) | LF | 6,261 | $0.01 | $0.01 | $2.00 | $0.01 | $0.01 |
| 106 | Construction staking electrical installations (project) 01. 2703-00- 76 (650.8501) | EACH | 1 | $3,000.00 | $3,000.00 | $7,500.00 | $3,090.00 | $3,000.00 |
| 107 | Construction staking curb ramps (650.9000) | EACH | 30 | $130.00 | $130.00 | $100.00 | $133.90 | $130.00 |
| 108 | Construction staking sidewalk (project) 01. 2703-00-76 (650.9500) | EACH | 1 | $4,800.00 | $4,800.00 | $5,000.00 | $4,944.00 | $4,800.00 |
| 109 | Construction staking supplemental control (project) 01. 2703-00-76 (650.9911) | EACH | 1 | $12,000 | $12,000 | $5,000.00 | $12,360 | $12,000 |
| 110 | Construction staking slope stakes (650.9920) | LF | 6,261 | $0.75 | $0.75 | $1.00 | $0.77 | $0.75 |
| 111 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 561 | $10.50 | $10.50 | $11.00 | $10.81 | $10.50 |
| 112 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 913 | $12.42 | $12.42 | $13.00 | $12.79 | $12.42 |
| 113 | Pull boxes steel 24X36-inch (653.0135) | EACH | 1 | $1,234.00 | $1,234.00 | $1,300.00 | $1,271.02 | $1,234.00 |
| 114 | Pull boxes steel 24X42-inch (653.0140) | EACH | 8 | $1,350.20 | $1,350.20 | $1,500.00 | $1,390.71 | $1,350.20 |
| 115 | Removing pull boxes (653.0905) | EACH | 9 | $170.00 | $170.00 | $200.00 | $175.10 | $170.00 |
| 116 | Concrete bases type 1 (654.0101) | EACH | 3 | $1,175.80 | $1,175.80 | $1,200.00 | $1,211.07 | $1,175.80 |
| 117 | Concrete bases type 2 (654.0102) | EACH | 1 | $1,424.80 | $1,424.80 | $1,500.00 | $1,467.54 | $1,424.80 |
| 118 | Concrete bases type 5 (654.0105) | EACH | 2 | $1,412.80 | $1,412.80 | $1,500.00 | $1,455.18 | $1,412.80 |
| 119 | Concrete bases type 10 (654.0110) | EACH | 2 | $7,169.00 | $7,169.00 | $7,400.00 | $7,384.07 | $7,169.00 |
| 120 | Concrete bases type 10-special (654.0120) | EACH | 2 | $8,558.00 | $8,558.00 | $9,000.00 | $8,814.74 | $8,558.00 |
| 121 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $3,360.00 | $3,360.00 | $3,500.00 | $3,460.80 | $3,360.00 |
| 122 | Cable traffic signal 5-14 AWG (655.0230) | LF | 811 | $1.90 | $1.90 | $2.00 | $1.96 | $1.90 |
| 123 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,331 | $3.53 | $3.53 | $4.00 | $3.64 | $3.53 |
| 124 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 506 | $2.53 | $2.53 | $3.00 | $2.61 | $2.53 |
| 125 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,211 | $1.25 | $1.25 | $2.00 | $1.29 | $1.25 |
| 126 | Electrical wire lighting 12 AWG (655.0610) | LF | 576 | $1.21 | $1.21 | $1.50 | $1.25 | $1.21 |
| 127 | Electrical wire lighting 8 AWG (655.0620) | LF | 573 | $1.80 | $1.80 | $2.00 | $1.85 | $1.80 |
| 128 | Electrical wire lighting 4 AWG (655.0630) | LF | 1,146 | $2.95 | $2.95 | $3.30 | $3.04 | $2.95 |
| 129 | Electrical service meter breaker pedestal (location) 01. ohio street and kinzie avenue (656.0201) | EACH | 1 | $1,980.00 | $1,980.00 | $2,000.00 | $2,039.40 | $1,980.00 |
| 130 | Pedestal bases (657.0100) | EACH | 3 | $281.00 | $281.00 | $300.00 | $289.43 | $281.00 |
| 131 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 1 | $716.00 | $716.00 | $800.00 | $737.48 | $716.00 |
| 132 | Poles type 3 (657.0310) | EACH | 1 | $3,514.20 | $3,514.20 | $3,700.00 | $3,619.63 | $3,514.20 |
| 133 | Poles type 9 (657.0345) | EACH | 1 | $8,160.80 | $8,160.80 | $8,500.00 | $8,405.62 | $8,160.80 |
| 134 | Poles type 10 (657.0350) | EACH | 1 | $9,650.80 | $9,650.80 | $10,300 | $9,940.32 | $9,650.80 |
| 135 | Poles type 10-special (657.0352) | EACH | 2 | $12,697 | $12,697 | $13,500 | $13,078 | $12,697 |
| 136 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 2 | $640.00 | $640.00 | $700.00 | $659.20 | $640.00 |
| 137 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $724.00 | $724.00 | $800.00 | $745.72 | $724.00 |
| 138 | Monotube arms 25-FT (657.0525) | EACH | 2 | $5,011.00 | $5,011.00 | $5,500.00 | $5,161.33 | $5,011.00 |
| 139 | Monotube arms 45-FT-special (657.0546) | EACH | 2 | $6,768.00 | $6,768.00 | $7,000.00 | $6,971.04 | $6,768.00 |
| 140 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 1 | $332.00 | $332.00 | $350.00 | $341.96 | $332.00 |
| 141 | Luminaire arms steel 6-FT (657.0806) | EACH | 3 | $849.00 | $849.00 | $900.00 | $874.47 | $849.00 |
| 142 | Traffic signal face 3S 12-inch (658.0173) | EACH | 18 | $763.40 | $763.40 | $800.00 | $786.30 | $763.40 |
| 143 | Traffic signal face 4S 12-inch (658.0174) | EACH | 2 | $1,034.20 | $1,034.20 | $1,200.00 | $1,065.23 | $1,034.20 |
| 144 | Pedestrian signal face 16-inch (658.0416) | EACH | 8 | $432.00 | $432.00 | $500.00 | $444.96 | $432.00 |
| 145 | Pedestrian push buttons (658.0500) | EACH | 8 | $364.00 | $364.00 | $400.00 | $374.92 | $364.00 |
| 146 | Signal mounting hardware (location) 01. ohio street and kinzie avenue (658.5070) | EACH | 1 | $5,892.00 | $5,892.00 | $6,000.00 | $6,068.76 | $5,892.00 |
| 147 | Luminaires utility LED C (659.1125) | EACH | 4 | $292.00 | $292.00 | $300.00 | $300.76 | $292.00 |
| 148 | Temporary traffic signals for intersections (location) 01. ohio street and kinzie avenue (661.0201) | EACH | 1 | $44,892 | $44,892 | $49,000 | $46,239 | $44,892 |
| 149 | Field system integrator (670.0101) | EACH | 1 | $22,644 | $22,644 | $26,000 | $23,323 | $22,644 |
| 150 | ITS documentation (670.0201) | EACH | 1 | $6,264.00 | $6,264.00 | $7,000.00 | $6,451.92 | $6,264.00 |
| 151 | Remove cable (674.0300) | LF | 539 | $2.04 | $2.04 | $2.30 | $2.10 | $2.04 |
| 152 | Reinstall cable (674.0400) | LF | 539 | $2.48 | $2.48 | $3.00 | $2.55 | $2.48 |
| 153 | Fiber optic termination (678.0400) | EACH | 4 | $286.00 | $286.00 | $300.00 | $294.58 | $286.00 |
| 154 | Communication system testing (678.0501) | EACH | 1 | $4,512.00 | $4,512.00 | $5,000.00 | $4,647.36 | $4,512.00 |
| 155 | Sawing asphalt (690.0150) | LF | 83 | $2.02 | $1.95 | $2.00 | $2.01 | $1.39 |
| 156 | Sawing concrete (690.0250) | LF | 3,861 | $2.12 | $2.55 | $2.00 | $2.63 | $2.50 |
| 157 | Incentive compressive strength concrete pavement (715.0720) | DOL | 5,764 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 158 | Incentive iri ride (740.0440) | DOL | 6,736 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 159 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 160 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 161 | Special 01. sealing manhole openings (SPV.0060) | EACH | 10 | $150.00 | $150.00 | $400.00 | $392.00 | $150.00 |
| 162 | Special 02. storm sewer tap (SPV.0060) | EACH | 10 | $500.00 | $500.00 | $800.00 | $312.00 | $500.00 |
| 163 | Special 03. maintenance of lighting (SPV.0060) | EACH | 1 | $6,834.00 | $6,834.00 | $7,500.00 | $7,039.02 | $6,834.00 |
| 164 | Special 04. adjust sanitary sewer manhole covers (SPV.0060) | EACH | 8 | $700.00 | $700.00 | $1,100.00 | $243.00 | $700.00 |
| 165 | Special 05. traffic signal controller and cabinet (SPV.0060) | EACH | 1 | $27,246 | $27,246 | $30,000 | $28,063 | $27,246 |
| 166 | Special 06. utility line opening (ulo) (SPV.0060) | EACH | 4 | $1,200.00 | $1,200.00 | $1,250.00 | $926.00 | $1,200.00 |
| 167 | Special 07. section corner monuments (SPV.0060) | EACH | 1 | $750.00 | $500.00 | $500.00 | $467.00 | $1,000.00 |
| 168 | Special 08. relocating existing lighting unit (SPV.0060) | EACH | 2 | $986.00 | $986.00 | $1,000.00 | $1,015.58 | $986.00 |
| 169 | Special 09. remove and salvage traffic signal equipment; ohio street and kinzie avenue (SPV.0060) | EACH | 1 | $5,610.00 | $5,610.00 | $6,000.00 | $5,778.30 | $5,610.00 |
| 170 | Special 10. ethernet switches (SPV.0060) | EACH | 1 | $4,605.00 | $4,605.00 | $5,000.00 | $4,743.15 | $4,605.00 |
| 171 | Special 11. traffic signal detection system; ohio street and kinzie avenue (SPV.0060) | EACH | 1 | $39,323 | $39,323 | $44,000 | $40,503 | $39,323 |
| 172 | Special 12. fiber optic termination panel (SPV.0060) | EACH | 1 | $1,443.00 | $1,443.00 | $1,600.00 | $1,486.29 | $1,443.00 |
| 173 | Special 13. adjust street lighting pull box covers (SPV.0060) | EACH | 2 | $412.00 | $412.00 | $500.00 | $424.36 | $412.00 |
| 174 | Special 01. street sweeping (SPV.0075) | HRS | 50 | $200.00 | $114.00 | $250.00 | $206.00 | $300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.