WisDOT contract 20260310023 bid tabulation
C Appleton, Lawe Street; College Avenue to Wisconsin Avenue (LOC STR, Outagamie County C Appleton, Lawe Street). Let by Wisconsin DOT on March 10, 2026, Outagamie. 3 bids received; low bid $4,005,078 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 148
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $4,005,078 | Low |
| 2 | Zignego Company, Inc. | $4,248,048 | +6.0% |
| 3 | James Peterson Sons, Inc. | $4,554,842 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Zignego Company, Inc. | 3. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0220) | ID | 720 | $7.39 | $7.39 | $7.50 |
| 2 | Removing concrete pavement (204.0100) | SY | 13,900 | $1.00 | $0.10 | $8.00 |
| 3 | Removing curb & gutter (204.0150) | LF | 110 | $5.00 | $10.00 | $10.00 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 3,900 | $7.60 | $8.80 | $4.00 |
| 5 | Removing fence (204.0170) | LF | 95 | $6.00 | $10.00 | $7.00 |
| 6 | Removing concrete bases (204.0195) | EACH | 2 | $250.00 | $250.00 | $250.00 |
| 7 | Removing manholes (204.0210) | EACH | 20 | $461.75 | $400.00 | $600.00 |
| 8 | Removing inlets (204.0220) | EACH | 29 | $341.85 | $400.00 | $500.00 |
| 9 | Removing storm sewer (size) 01. 8- inch (204.0245) | LF | 64 | $10.90 | $12.00 | $37.54 |
| 10 | Removing storm sewer (size) 02. 12-inch (204.0245) | LF | 1,346 | $18.99 | $13.00 | $31.14 |
| 11 | Removing storm sewer (size) 03. 15-inch (204.0245) | LF | 380 | $16.75 | $14.00 | $38.23 |
| 12 | Removing storm sewer (size) 04. 18-inch (204.0245) | LF | 264 | $18.10 | $15.00 | $27.22 |
| 13 | Removing storm sewer (size) 05. 21-inch (204.0245) | LF | 282 | $23.13 | $18.00 | $41.53 |
| 14 | Removing storm sewer (size) 06. 24-inch (204.0245) | LF | 106 | $20.33 | $20.00 | $18.82 |
| 15 | Removing storm sewer (size) 07. 27-inch (204.0245) | LF | 636 | $21.31 | $24.00 | $42.53 |
| 16 | Abandoning manholes (204.0250) | EACH | 7 | $572.07 | $415.00 | $1,000.00 |
| 17 | Abandoning inlets (204.0260) | EACH | 1 | $442.00 | $515.00 | $1,000.00 |
| 18 | Abandoning wells (204.0265) | EACH | 4 | $575.00 | $1,000.00 | $1,000.00 |
| 19 | Abandoning sewer (204.0291.S) | CY | 16 | $198.44 | $260.00 | $400.00 |
| 20 | Removing (item description) 01. sanitary sewer manhole (204.9060.S) | EACH | 1 | $660.00 | $496.00 | $600.00 |
| 21 | Removing (item description) 01. sanitary sewer pipe (204.9090.S) | LF | 85 | $15.41 | $12.00 | $10.00 |
| 22 | Excavation common (205.0100) | CY | 8,600 | $23.70 | $25.77 | $20.50 |
| 23 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 2,690 | $56.00 | $50.52 | $50.00 |
| 24 | Finishing roadway (project) 01. 4984-24-75 (213.0100) | EACH | 1 | $5,000.00 | $1,000.00 | $5,000.00 |
| 25 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 12,400 | $15.23 | $23.42 | $21.07 |
| 26 | Concrete pavement 8-inch (415.0080) | SY | 12,750 | $64.62 | $70.43 | $67.71 |
| 27 | Concrete pavement gaps (415.0210) | EACH | 1 | $2,000.00 | $1,000.00 | $569.98 |
| 28 | Concrete pavement hes 8-inch (415.1080) | SY | 100 | $69.62 | $100.00 | $77.59 |
| 29 | Concrete pavement joint filling (415.4100) | SY | 14,700 | $1.20 | $1.50 | $1.95 |
| 30 | Drilled tie bars (416.0610) | EACH | 154 | $10.00 | $30.00 | $9.70 |
| 31 | Drilled dowel bars (416.0620) | EACH | 300 | $16.50 | $30.00 | $14.06 |
| 32 | Tack coat (455.0605) | GAL | 36 | $7.25 | $4.00 | $7.25 |
| 33 | Asphaltic surface (465.0105) | TON | 170 | $220.00 | $155.00 | $220.00 |
| 34 | Asphaltic surface driveways and field entrances (465.0120) | TON | 17 | $220.00 | $585.00 | $220.00 |
| 35 | Concrete collars for pipe (520.8000) | EACH | 8 | $892.19 | $500.00 | $608.13 |
| 36 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 75 | $65.00 | $60.00 | $87.50 |
| 37 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 240 | $65.00 | $55.00 | $45.52 |
| 38 | Concrete curb & gutter integral 30- inch type D (601.0452) | LF | 6,890 | $25.00 | $23.18 | $12.16 |
| 39 | Concrete curb pedestrian (601.0600) | LF | 70 | $45.00 | $55.00 | $58.52 |
| 40 | Concrete sidewalk 4-inch (602.0405) | SF | 36,560 | $6.65 | $6.15 | $4.89 |
| 41 | Concrete sidewalk 7-inch (602.0420) | SF | 2,870 | $8.25 | $6.85 | $11.11 |
| 42 | Curb ramp detectable warning field natural patina (602.0515) | SF | 796 | $34.00 | $32.00 | $50.27 |
| 43 | Concrete driveway 7-inch (602.0815) | SY | 540 | $74.70 | $61.65 | $72.18 |
| 44 | Concrete steps (602.1500) | SF | 20 | $85.00 | $79.00 | $93.29 |
| 45 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 1,317 | $133.71 | $132.00 | $150.23 |
| 46 | Storm sewer pipe reinforced concrete class III 27-inch (608.0327) | LF | 10 | $217.26 | $250.00 | $225.78 |
| 47 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 250 | $203.40 | $267.00 | $296.04 |
| 48 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 37 | $278.33 | $340.00 | $394.79 |
| 49 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 761 | $80.00 | $82.00 | $115.13 |
| 50 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 503 | $87.50 | $85.00 | $122.69 |
| 51 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 126 | $112.13 | $109.00 | $140.48 |
| 52 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 859 | $110.79 | $128.00 | $124.75 |
| 53 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 378 | $146.02 | $166.00 | $167.41 |
| 54 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 273 | $207.37 | $235.00 | $235.00 |
| 55 | Reconstructing manholes (611.0420) | EACH | 1 | $1,803.50 | $3,016.00 | $1,684.10 |
| 56 | Manhole covers type J (611.0530) | EACH | 36 | $474.94 | $561.00 | $1,105.00 |
| 57 | Inlet covers type C (611.0612) | EACH | 3 | $497.09 | $586.00 | $1,139.23 |
| 58 | Inlet covers type H (611.0624) | EACH | 23 | $710.20 | $825.00 | $1,542.11 |
| 59 | Inlet covers type H-S (611.0639) | EACH | 23 | $710.20 | $825.00 | $1,542.11 |
| 60 | Manholes 4-FT diameter (611.2004) | EACH | 8 | $4,462.32 | $3,465.00 | $3,183.35 |
| 61 | Manholes 5-FT diameter (611.2005) | EACH | 20 | $5,949.08 | $5,378.00 | $4,510.62 |
| 62 | Manholes 6-FT diameter (611.2006) | EACH | 5 | $8,920.09 | $8,390.00 | $8,137.39 |
| 63 | Manholes 7-FT diameter (611.2007) | EACH | 1 | $12,985 | $12,645 | $11,719 |
| 64 | Inlets 3-FT diameter (611.3003) | EACH | 2 | $3,083.27 | $2,524.00 | $1,382.31 |
| 65 | Inlets 4-FT diameter (611.3004) | EACH | 5 | $3,795.21 | $3,022.00 | $2,246.05 |
| 66 | Inlets 2X3-FT (611.3230) | EACH | 42 | $2,613.04 | $2,574.00 | $1,570.62 |
| 67 | Adjusting inlet covers (611.8115) | EACH | 2 | $500.00 | $577.00 | $624.32 |
| 68 | Pipe underdrain 6-inch (612.0106) | LF | 100 | $33.81 | $90.00 | $94.96 |
| 69 | Insulation board polystyrene (inch) 01. 4-inch (612.0902.S) | SY | 100 | $10.00 | $32.00 | $27.00 |
| 70 | Mobilization (619.1000) | EACH | 1 | $310,000 | $228,000 | $407,244 |
| 71 | Concrete median sloped nose (620.0300) | SF | 100 | $15.00 | $13.00 | $13.42 |
| 72 | Water (624.0100) | MGAL | 200 | $0.01 | $50.00 | $60.00 |
| 73 | Topsoil (625.0100) | SY | 7,500 | $0.01 | $11.37 | $14.32 |
| 74 | Mobilizations erosion control (628.1905) | EACH | 10 | $200.00 | $250.00 | $200.00 |
| 75 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $0.01 | $1.00 | $100.00 |
| 76 | Erosion mat urban class I type A (628.2006) | SY | 7,500 | $0.01 | $2.25 | $1.75 |
| 77 | Inlet protection type A (628.7005) | EACH | 81 | $20.00 | $50.00 | $5.00 |
| 78 | Inlet protection type B (628.7010) | EACH | 7 | $20.00 | $100.00 | $65.00 |
| 79 | Inlet protection type C (628.7015) | EACH | 90 | $20.00 | $100.00 | $68.00 |
| 80 | Inlet protection type D (628.7020) | EACH | 22 | $20.00 | $150.00 | $135.00 |
| 81 | Fertilizer type B (629.0210) | CWT | 6 | $90.00 | $350.00 | $100.00 |
| 82 | Seeding mixture no. 40 (630.0140) | LB | 150 | $277.00 | $10.00 | $8.75 |
| 83 | Seed water (630.0500) | MGAL | 180 | $0.01 | $20.00 | $1.00 |
| 84 | Field office type C (642.5201) | EACH | 1 | $12,000 | $20,000 | $20,000 |
| 85 | Traffic control drums (643.0300) | DAY | 7,000 | $0.15 | $0.15 | $0.15 |
| 86 | Traffic control barricades type III (643.0420) | DAY | 7,100 | $0.45 | $0.45 | $0.45 |
| 87 | Traffic control warning lights type A (643.0705) | DAY | 14,200 | $0.10 | $0.10 | $0.10 |
| 88 | Traffic control signs (643.0900) | DAY | 21,960 | $0.17 | $0.17 | $0.17 |
| 89 | Traffic control signs fixed message (643.1000) | SF | 100 | $15.00 | $15.00 | $15.00 |
| 90 | Traffic control signs PCMS (643.1050) | DAY | 14 | $45.00 | $45.00 | $45.00 |
| 91 | Traffic control (643.5000) | EACH | 1 | $23,450 | $23,450 | $23,450 |
| 92 | Temporary pedestrian surface matting (644.1440) | SF | 1,350 | $3.25 | $3.25 | $3.25 |
| 93 | Temporary pedestrian curb ramp (644.1601) | DAY | 1,080 | $5.00 | $5.00 | $5.00 |
| 94 | Temporary pedestrian detectable warning field (644.1605) | SF | 180 | $7.00 | $7.00 | $7.00 |
| 95 | Temporary pedestrian barricade (644.1810) | LF | 1,530 | $6.00 | $6.00 | $6.00 |
| 96 | Temporary audible message devices (644.1900.S) | DAY | 2,120 | $1.50 | $1.50 | $1.50 |
| 97 | Geotextile type DF schedule A (645.0111) | SY | 50 | $5.31 | $19.00 | $9.80 |
| 98 | Geogrid type SR-2 (645.0145.S) | SY | 16,860 | $1.50 | $1.40 | $2.03 |
| 99 | Marking line epoxy 4-inch (646.1020) | LF | 5,560 | $0.40 | $0.40 | $0.40 |
| 100 | Marking line epoxy 6-inch (646.2020) | LF | 7,830 | $0.55 | $0.55 | $0.55 |
| 101 | Marking line epoxy 8-inch (646.3020) | LF | 570 | $1.06 | $1.06 | $1.06 |
| 102 | Marking arrow epoxy (646.5020) | EACH | 32 | $220.05 | $220.05 | $220.05 |
| 103 | Marking word epoxy (646.5120) | EACH | 4 | $430.91 | $430.91 | $430.91 |
| 104 | Marking symbol epoxy (646.5220) | EACH | 23 | $207.04 | $207.04 | $207.04 |
| 105 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $2,802.14 | $2,802.14 | $2,802.14 |
| 106 | Marking stop line epoxy 18-inch (646.6120) | LF | 175 | $17.88 | $17.88 | $17.88 |
| 107 | Marking diagonal epoxy 12-inch (646.7120) | LF | 210 | $17.40 | $17.40 | $17.40 |
| 108 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 590 | $16.92 | $16.92 | $16.92 |
| 109 | Marking curb epoxy (646.8120) | LF | 120 | $8.54 | $8.54 | $8.54 |
| 110 | Marking island nose epoxy (646.8220) | EACH | 8 | $322.21 | $322.21 | $322.21 |
| 111 | Marking removal line water blasting 4-inch (646.9010) | LF | 2,030 | $1.15 | $1.15 | $1.15 |
| 112 | Marking removal line water blasting 8-inch (646.9110) | LF | 170 | $1.80 | $1.80 | $1.80 |
| 113 | Marking removal line water blasting wide (646.9210) | LF | 270 | $2.50 | $2.50 | $2.50 |
| 114 | Marking removal special marking water blasting (646.9310) | EACH | 6 | $360.00 | $360.00 | $360.00 |
| 115 | Construction staking storm sewer (650.4000) | EACH | 85 | $95.00 | $95.00 | $95.00 |
| 116 | Construction staking subgrade (650.4500) | LF | 4,028 | $0.01 | $0.01 | $0.01 |
| 117 | Construction staking base (650.5000) | LF | 148 | $0.55 | $0.55 | $0.55 |
| 118 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 240 | $2.75 | $2.75 | $2.75 |
| 119 | Construction staking concrete pavement (650.7000) | LF | 3,880 | $1.25 | $0.40 | $1.25 |
| 120 | Construction staking electrical installations (project) 01. 4984-24- 75 (650.8501) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 121 | Construction staking curb ramps (650.9000) | EACH | 75 | $69.00 | $69.00 | $69.00 |
| 122 | Construction staking sidewalk (project) 01. 4984-24-75 (650.9500) | EACH | 1 | $100.00 | $100.00 | $100.00 |
| 123 | Construction staking supplemental control (project) 01. 4984-24-75 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 |
| 124 | Conduit rigid nonmetallic schedule 80 1 1/2-inch (652.0320) | LF | 50 | $10.00 | $10.00 | $10.00 |
| 125 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 255 | $12.00 | $12.00 | $12.00 |
| 126 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 1 | $2,200.00 | $2,200.00 | $2,200.00 |
| 127 | Concrete bases type 2 (654.0102) | EACH | 7 | $1,875.00 | $1,875.00 | $1,875.00 |
| 128 | Sawing asphalt (690.0150) | LF | 630 | $1.39 | $1.39 | $1.75 |
| 129 | Sawing concrete (690.0250) | LF | 2,480 | $2.25 | $2.25 | $2.35 |
| 130 | Incentive compressive strength concrete pavement (715.0720) | DOL | 3,765 | $1.00 | $1.00 | $1.00 |
| 131 | Incentive iri ride (740.0440) | DOL | 2,552 | $1.00 | $1.00 | $1.00 |
| 132 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 |
| 133 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 | $5.00 |
| 134 | Special 01. push button station base (SPV.0060) | EACH | 2 | $600.00 | $600.00 | $600.00 |
| 135 | Special 03. adjusting sanitary manhole covers (SPV.0060) | EACH | 19 | $520.00 | $600.00 | $1,244.44 |
| 136 | Special 04. storm sewer doghouse manhole reconstruction (SPV.0060) | EACH | 1 | $21,954 | $87,207 | $26,320 |
| 137 | Special 05. temporary sanitary sewer bypass intersection (SPV.0060) | EACH | 1 | $9,900.00 | $5,200.00 | $25,000 |
| 138 | Special 06. salvage and reinstall traffic signal equipment lawe ST and college ave (SPV.0060) | EACH | 1 | $750.00 | $750.00 | $750.00 |
| 139 | Special 01. concrete curb & gutter 24-inch type A special (SPV.0090) | LF | 290 | $55.00 | $55.00 | $45.30 |
| 140 | Special 02. storm sewer lateral 6- inch (SPV.0090) | LF | 1,650 | $80.53 | $95.00 | $142.04 |
| 141 | Special 03. storm sewer lateral 8- inch (SPV.0090) | LF | 108 | $97.37 | $90.00 | $205.71 |
| 142 | Special 04. storm sewer pipe PVC 12-inch (SPV.0090) | LF | 184 | $92.13 | $88.00 | $190.34 |
| 143 | Special 05. storm sewer pipe PVC 18-inch (SPV.0090) | LF | 10 | $109.88 | $106.00 | $260.57 |
| 144 | Special 06. sanitary sewer pipe PVC 8-inch (SPV.0090) | LF | 10 | $173.89 | $183.00 | $248.49 |
| 145 | Special 07. sanitary sewer pipe PVC 18-inch (SPV.0090) | LF | 75 | $228.09 | $204.00 | $275.13 |
| 146 | Special 08. marking crosswalk epoxy block style 18-inch (SPV.0090) | LF | 606 | $16.30 | $16.30 | $16.30 |
| 147 | Special 01. concrete driveway 5- inch (SPV.0180) | SY | 1,110 | $64.00 | $60.75 | $52.96 |
| 148 | Special 01. sanitary manhole 4-FT diameter (SPV.0200) | VF | 12 | $866.96 | $644.00 | $642.94 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.