WisDOT contract 20260310024 bid tabulation
Marinette Co, CTH A; Rosa Avenue to CTH X (CTH A, Marinette County Marinette Co, CTH A). Let by Wisconsin DOT on March 10, 2026, Marinette. 3 bids received; low bid $7,316,767 by James Peterson Sons, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 125
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | James Peterson Sons, Inc. | $7,316,767 | Low |
| 2 | Musson Bros., Inc. | $7,347,695 | 0.0% |
| 3 | Northeast Asphalt, Inc | $7,435,021 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. James Peterson Sons, Inc. | 2. Musson Bros., Inc. | 3. Northeast Asphalt, Inc |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 158 | $372.00 | $500.00 | $500.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 92 | $717.00 | $562.32 | $562.32 |
| 3 | Removing asphaltic surface (204.0110) | SY | 1,611 | $7.50 | $4.38 | $4.38 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 1,143 | $39.80 | $39.80 | $39.80 |
| 5 | Removing inlets (204.0220) | EACH | 1 | $750.00 | $543.25 | $543.25 |
| 6 | Removing storm sewer (size) 01. 15-inch (204.0245) | LF | 63 | $75.00 | $15.43 | $15.43 |
| 7 | Excavation common (205.0100) | CY | 62,733 | $10.85 | $10.03 | $10.03 |
| 8 | Finishing roadway (project) 01. 9258-05-73 (213.0100) | EACH | 1 | $5,000.00 | $100.00 | $1,500.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 6,674 | $24.64 | $24.35 | $24.35 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 31,527 | $21.64 | $19.99 | $19.99 |
| 11 | Base aggregate open-graded (310.0110) | TON | 12 | $75.00 | $115.21 | $115.21 |
| 12 | Select crushed material (312.0110) | TON | 718 | $22.69 | $16.81 | $16.81 |
| 13 | Pulverize and relay (325.0100) | SY | 193,656 | $1.07 | $1.38 | $2.10 |
| 14 | QMP pulverize and relay compaction (374.1020.S) | SY | 193,656 | $0.22 | $0.84 | $0.84 |
| 15 | HMA cold weather paving (450.4000) | TON | 6,740 | $3.20 | $3.20 | $0.01 |
| 16 | Tack coat (455.0605) | GAL | 7,692 | $3.00 | $3.00 | $3.00 |
| 17 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $2,860.00 | $2,860.00 | $2,860.00 |
| 18 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $4,320.00 | $4,320.00 | $4,320.00 |
| 19 | Incentive density PWL HMA pavement (460.2005) | DOL | 25,580 | $1.00 | $1.00 | $1.00 |
| 20 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 18,230 | $1.00 | $1.00 | $1.00 |
| 21 | Incentive air voids HMA pavement (460.2010) | DOL | 33,960 | $1.00 | $1.00 | $1.00 |
| 22 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 19,080 | $72.10 | $72.10 | $72.10 |
| 23 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 14,872 | $83.70 | $83.70 | $83.70 |
| 24 | Material transfer vehicle (460.9000.S) | EACH | 1 | $55,860 | $55,680 | $55,680 |
| 25 | Asphaltic surface driveways and field entrances (465.0120) | TON | 277 | $187.00 | $187.00 | $187.00 |
| 26 | Asphaltic flumes (465.0315) | SY | 35 | $94.00 | $84.00 | $84.00 |
| 27 | Asphaltic rumble strips, centerline (465.0560) | LF | 42,200 | $0.43 | $0.43 | $0.43 |
| 28 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 2 | $231.00 | $250.87 | $250.87 |
| 29 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 130 | $277.00 | $309.18 | $309.18 |
| 30 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 6 | $414.00 | $417.26 | $417.26 |
| 31 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 6 | $713.00 | $661.39 | $661.39 |
| 32 | Culvert pipe class III-A non-metal 12-inch (520.3412) | LF | 66 | $75.09 | $71.72 | $71.72 |
| 33 | Culvert pipe class III-A non-metal 18-inch (520.3418) | LF | 2,696 | $85.33 | $69.49 | $69.49 |
| 34 | Culvert pipe class III-A non-metal 24-inch (520.3424) | LF | 250 | $176.64 | $165.27 | $165.27 |
| 35 | Culvert pipe class III-A non-metal 30-inch (520.3430) | LF | 202 | $153.86 | $148.89 | $148.89 |
| 36 | Culvert pipe reinforced concrete class IV 12-inch (522.0412) | LF | 229 | $158.28 | $93.82 | $93.82 |
| 37 | Culvert pipe reinforced concrete class IV 15-inch (522.0415) | LF | 113 | $161.15 | $97.12 | $97.12 |
| 38 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 220 | $190.00 | $97.12 | $97.12 |
| 39 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 266 | $190.26 | $107.92 | $107.92 |
| 40 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 140 | $228.67 | $192.88 | $192.88 |
| 41 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 10 | $1,386.00 | $1,447.24 | $1,447.24 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 7 | $1,452.00 | $1,522.54 | $1,522.54 |
| 43 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 13 | $1,596.00 | $1,636.70 | $1,636.70 |
| 44 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 12 | $1,835.00 | $1,849.25 | $1,849.25 |
| 45 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 4 | $2,119.00 | $2,902.41 | $2,902.41 |
| 46 | Culvert pipe corrugated aluminum 48-inch (525.0148) | LF | 62 | $258.13 | $177.21 | $177.21 |
| 47 | Apron endwalls for culvert pipe aluminum 48-inch (525.0348) | EACH | 2 | $2,137.00 | $2,170.79 | $2,170.79 |
| 48 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 3,005 | $21.85 | $21.85 | $21.85 |
| 49 | Riprap medium (606.0200) | CY | 119 | $92.85 | $131.32 | $131.32 |
| 50 | Riprap heavy (606.0300) | CY | 60 | $92.85 | $121.51 | $121.51 |
| 51 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 53 | $151.02 | $124.25 | $124.25 |
| 52 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 48 | $151.87 | $118.25 | $118.25 |
| 53 | Inlet covers type HM (611.0627) | EACH | 1 | $946.00 | $1,581.63 | $1,581.63 |
| 54 | Inlet covers type MS (611.0642) | EACH | 1 | $630.00 | $639.53 | $639.53 |
| 55 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $4,896.00 | $4,534.35 | $4,534.35 |
| 56 | Inlets median 1 grate (611.3901) | EACH | 1 | $3,676.00 | $3,283.04 | $3,283.04 |
| 57 | Adjusting manhole covers (611.8110) | EACH | 1 | $750.00 | $1,051.03 | $1,051.03 |
| 58 | Pipe underdrain 6-inch (612.0106) | LF | 200 | $18.00 | $7.67 | $7.67 |
| 59 | MGS guardrail 3 (614.2300) | LF | 925 | $26.00 | $35.00 | $35.00 |
| 60 | MGS guardrail terminal eat (614.2610) | EACH | 6 | $3,415.00 | $3,275.00 | $3,275.00 |
| 61 | Maintenance and repair of haul roads (project) 01. 9258-05-73 (618.0100) | EACH | 1 | $150.00 | $543.56 | $10.00 |
| 62 | Mobilization (619.1000) | EACH | 1 | $598,930 | $1,150,000 | $1,110,640 |
| 63 | Water (624.0100) | MGAL | 1,446 | $45.00 | $37.50 | $37.50 |
| 64 | Salvaged topsoil (625.0500) | SY | 196,600 | $0.80 | $0.01 | $0.01 |
| 65 | Mulching (627.0200) | SY | 7,850 | $0.33 | $0.15 | $0.15 |
| 66 | Silt fence (628.1504) | LF | 14,600 | $1.55 | $1.00 | $1.00 |
| 67 | Silt fence maintenance (628.1520) | LF | 14,600 | $0.03 | $0.01 | $0.01 |
| 68 | Mobilizations erosion control (628.1905) | EACH | 14 | $303.00 | $250.00 | $250.00 |
| 69 | Mobilizations emergency erosion control (628.1910) | EACH | 7 | $101.00 | $0.01 | $0.01 |
| 70 | Erosion mat class I type B (628.2004) | SY | 87,200 | $0.93 | $0.16 | $0.16 |
| 71 | Erosion mat urban class I type B (628.2008) | SY | 101,600 | $1.50 | $0.37 | $0.37 |
| 72 | Inlet protection type A (628.7005) | EACH | 2 | $150.00 | $100.00 | $100.00 |
| 73 | Inlet protection type B (628.7010) | EACH | 3 | $50.00 | $25.00 | $25.00 |
| 74 | Temporary ditch checks (628.7504) | LF | 184 | $8.00 | $5.00 | $5.00 |
| 75 | Culvert pipe checks (628.7555) | EACH | 324 | $10.00 | $12.00 | $12.00 |
| 76 | Rock bags (628.7570) | EACH | 122 | $10.00 | $12.00 | $12.00 |
| 77 | Fertilizer type A (629.0205) | CWT | 124.50 | $75.00 | $120.00 | $120.00 |
| 78 | Seeding mixture no. 20 (630.0120) | LB | 8,800 | $6.25 | $1.25 | $1.25 |
| 79 | Seeding mixture no. 40 (630.0140) | LB | 350 | $8.13 | $1.25 | $1.25 |
| 80 | Seeding temporary (630.0200) | LB | 5,310 | $4.05 | $1.00 | $1.00 |
| 81 | Seed water (630.0500) | MGAL | 4,410 | $1.00 | $0.01 | $0.01 |
| 82 | Sod water (631.0300) | MGAL | 1 | $50.00 | $1,000.00 | $1,000.00 |
| 83 | Sod erosion control sandy soil (631.1200) | SY | 45 | $10.00 | $40.00 | $40.00 |
| 84 | Markers culvert end (633.5200) | EACH | 68 | $65.00 | $58.00 | $58.00 |
| 85 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 14 | $95.00 | $107.00 | $107.00 |
| 86 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 42 | $97.00 | $110.00 | $110.00 |
| 87 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 24 | $101.00 | $120.00 | $120.00 |
| 88 | Signs type II reflective H (637.2210) | SF | 372.87 | $20.00 | $14.00 | $14.00 |
| 89 | Signs type II reflective F (637.2230) | SF | 435.25 | $22.00 | $20.00 | $20.00 |
| 90 | Moving signs type II (638.2102) | EACH | 5 | $115.00 | $25.00 | $25.00 |
| 91 | Removing signs type II (638.2602) | EACH | 108 | $15.00 | $10.00 | $10.00 |
| 92 | Removing small sign supports (638.3000) | EACH | 74 | $15.00 | $10.00 | $10.00 |
| 93 | Moving small sign supports (638.4000) | EACH | 5 | $115.00 | $100.00 | $100.00 |
| 94 | Field office type B (642.5001) | EACH | 1 | $10,000 | $10,000 | $17,890 |
| 95 | Traffic control drums (643.0300) | DAY | 70 | $0.20 | $2.76 | $2.76 |
| 96 | Traffic control barricades type III (643.0420) | DAY | 700 | $0.50 | $1.44 | $1.44 |
| 97 | Traffic control warning lights type A (643.0705) | DAY | 1,400 | $0.15 | $0.28 | $0.28 |
| 98 | Traffic control signs (643.0900) | DAY | 5,258 | $0.30 | $0.35 | $0.35 |
| 99 | Traffic control covering signs type II (643.0920) | EACH | 2 | $110.00 | $92.38 | $92.38 |
| 100 | Traffic control signs PCMS (643.1050) | DAY | 114 | $25.00 | $48.30 | $48.30 |
| 101 | Temporary marking line paint 6- inch (643.3165) | LF | 161,636 | $0.09 | $0.09 | $0.09 |
| 102 | Traffic control (643.5000) | EACH | 1 | $17,000 | $19,135 | $19,135 |
| 103 | Geotextile type DF schedule A (645.0111) | SY | 112 | $6.06 | $7.51 | $7.51 |
| 104 | Geotextile type HR (645.0120) | SY | 374 | $4.15 | $4.87 | $4.87 |
| 105 | Marking line epoxy 6-inch (646.2020) | LF | 161,762 | $0.50 | $0.50 | $0.50 |
| 106 | Cold weather marking epoxy 6-inch (646.6466) | LF | 161,762 | $0.01 | $0.01 | $0.01 |
| 107 | Locating no-passing zones (648.0100) | MI | 8.21 | $500.00 | $500.00 | $499.76 |
| 108 | Construction staking storm sewer (650.4000) | EACH | 4 | $85.00 | $85.00 | $85.00 |
| 109 | Construction staking subgrade (650.4500) | LF | 6,060 | $0.01 | $0.01 | $0.01 |
| 110 | Construction staking base (650.5000) | LF | 45,572 | $0.50 | $0.50 | $0.50 |
| 111 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,005 | $0.75 | $0.75 | $0.75 |
| 112 | Construction staking pipe culverts (650.6000) | EACH | 30 | $100.00 | $100.00 | $100.00 |
| 113 | Construction staking resurfacing reference (650.8000) | LF | 39,512 | $0.01 | $0.01 | $0.01 |
| 114 | Construction staking supplemental control (project) 01. 9258-05-73 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 |
| 115 | Construction staking slope stakes (650.9920) | LF | 45,572 | $0.75 | $0.75 | $0.75 |
| 116 | Public land reference monument verify and reset (680.0100) | EACH | 11 | $630.00 | $630.00 | $630.00 |
| 117 | Sawing asphalt (690.0150) | LF | 450 | $1.95 | $1.95 | $1.95 |
| 118 | Incentive iri ride (740.0440) | DOL | 34,520 | $1.00 | $1.00 | $1.00 |
| 119 | Maintaining climbing turtle exclusion fence (999.2105.S) | LF | 20,100 | $0.25 | $0.01 | $0.01 |
| 120 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 |
| 121 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,100 | $5.00 | $5.00 | $5.00 |
| 122 | Special 01. foundation backfill (SPV.0035) | CY | 7,545 | $19.38 | $0.01 | $0.01 |
| 123 | Special 01. adjusting water valve box (SPV.0060) | EACH | 1 | $250.00 | $1,320.41 | $1,320.41 |
| 124 | Special 02. adjusting sanitary manhole covers (SPV.0060) | EACH | 7 | $1,050.00 | $999.89 | $999.89 |
| 125 | Special 01. removing excess pulverized material (SPV.0180) | SY | 21,199 | $0.84 | $4.90 | $4.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.