WisDOT contract 20260310028 bid tabulation
V Biron, CTH U; Biron Drive South to Huffman Road (CTH U, Wood County V Biron, CTH U). Let by Wisconsin DOT on March 10, 2026, Wood. 6 bids received; low bid $6,235,820 by Earth, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 193
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Earth, Inc. | $6,235,820 | Low |
| 2 | A-1 Excavating LLC | $6,969,455 | +12% |
| 3 | Haas Sons, Inc. | $6,998,751 | +12% |
| 4 | James Peterson Sons, Inc. | $7,050,034 | +13% |
| 5 | Gerke Excavating Inc | $7,244,940 | +16% |
| 6 | Hoffman Construction Company | $7,434,701 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Earth, Inc. | 2. A-1 Excavating LLC | 3. Haas Sons, Inc. | 4. James Peterson Sons, Inc. | 5. Gerke Excavating Inc | 6. Hoffman Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 31 | $900.00 | $840.00 | $680.36 | $775.00 | $394.86 | $394.86 |
| 2 | Removing concrete pavement (204.0100) | SY | 11,555 | $5.00 | $6.20 | $7.66 | $3.68 | $7.97 | $10.00 |
| 3 | Removing curb & gutter (204.0150) | LF | 690 | $4.00 | $6.60 | $4.12 | $3.25 | $2.48 | $10.00 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 1,760 | $5.00 | $9.90 | $4.13 | $2.00 | $7.47 | $10.00 |
| 5 | Removing guardrail (204.0165) | LF | 215 | $6.00 | $3.20 | $5.00 | $3.00 | $5.00 | $3.00 |
| 6 | Removing cable barrier (204.0167) | LF | 6,590 | $6.00 | $6.30 | $4.25 | $6.00 | $4.25 | $6.00 |
| 7 | Removing manholes (204.0210) | EACH | 5 | $1,000.00 | $540.00 | $649.82 | $450.00 | $689.31 | $300.00 |
| 8 | Removing inlets (204.0220) | EACH | 18 | $400.00 | $540.00 | $605.06 | $350.00 | $574.42 | $300.00 |
| 9 | Removing storm sewer (size) 01. 6- inch (204.0245) | LF | 335 | $6.00 | $12.00 | $11.51 | $13.00 | $11.75 | $10.00 |
| 10 | Removing storm sewer (size) 02. 8- inch (204.0245) | LF | 166 | $8.00 | $14.00 | $11.53 | $15.00 | $11.86 | $10.00 |
| 11 | Removing storm sewer (size) 03. 12-inch (204.0245) | LF | 692 | $10.00 | $15.00 | $15.38 | $28.36 | $15.06 | $10.00 |
| 12 | Removing storm sewer (size) 04. 18-inch (204.0245) | LF | 45 | $13.00 | $20.00 | $34.37 | $30.52 | $25.73 | $10.00 |
| 13 | Excavation common (205.0100) | CY | 20,273 | $11.00 | $12.50 | $8.57 | $12.67 | $18.04 | $10.00 |
| 14 | Excavation marsh (205.0400) | CY | 1,922 | $21.00 | $25.00 | $17.61 | $15.78 | $9.37 | $15.00 |
| 15 | Borrow (208.0100) | CY | 412 | $16.00 | $20.00 | $30.51 | $10.00 | $37.40 | $15.00 |
| 16 | Backfill coarse aggregate (size) 01. no. 2 (209.0300.S) | CY | 470 | $30.00 | $60.00 | $30.40 | $37.00 | $60.58 | $75.00 |
| 17 | Backfill granular grade 2 (209.2100) | CY | 889 | $18.50 | $10.00 | $33.54 | $29.75 | $23.78 | $10.00 |
| 18 | Finishing roadway (project) 01. 6934-06-73 (213.0100) | EACH | 1 | $10,000 | $5,000.00 | $5,000.00 | $5,000.00 | $9,326.25 | $500.00 |
| 19 | Obliterating old road (214.0100) | STA | 3 | $1,000.00 | $1,400.00 | $800.00 | $500.00 | $5,554.90 | $1,000.00 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 185 | $18.00 | $30.00 | $38.34 | $26.00 | $37.65 | $50.35 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 28,695 | $15.50 | $21.00 | $16.26 | $18.32 | $20.58 | $0.01 |
| 22 | Concrete pavement 8-inch (415.0080) | SY | 5 | $100.00 | $130.00 | $123.46 | $123.46 | $123.46 | $100.00 |
| 23 | HMA cold weather paving (450.4000) | TON | 5,505 | $2.50 | $2.70 | $2.50 | $2.50 | $2.50 | $2.50 |
| 24 | Tack coat (455.0605) | GAL | 2,045 | $6.00 | $5.40 | $5.13 | $5.13 | $5.13 | $5.13 |
| 25 | Incentive density HMA pavement (460.2000) | DOL | 6,030 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 26 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 5,294 | $92.00 | $97.00 | $104.16 | $91.78 | $91.78 | $91.78 |
| 27 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 4,118 | $97.25 | $102.00 | $97.20 | $97.20 | $97.20 | $97.20 |
| 28 | Asphaltic surface (465.0105) | TON | 1,923 | $142.50 | $150.00 | $142.33 | $142.33 | $142.33 | $142.33 |
| 29 | Asphaltic surface driveways and field entrances (465.0120) | TON | 174 | $184.75 | $201.00 | $184.57 | $184.57 | $184.57 | $184.57 |
| 30 | Asphaltic surface temporary (465.0125) | TON | 34 | $230.00 | $310.00 | $227.80 | $227.80 | $227.80 | $227.80 |
| 31 | Railing steel pedestrian type C6 (513.8031) | LF | 818 | $305.00 | $300.00 | $487.25 | $448.50 | $354.26 | $405.00 |
| 32 | Concrete collars for pipe (520.8000) | EACH | 8 | $1,200.00 | $1,250.00 | $1,195.69 | $668.00 | $1,256.25 | $1,200.00 |
| 33 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 3 | $1,100.00 | $2,040.00 | $1,279.83 | $2,046.00 | $1,629.30 | $1,500.00 |
| 34 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,350.00 | $2,340.00 | $1,422.71 | $1,436.00 | $1,786.16 | $1,600.00 |
| 35 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,650.00 | $2,640.00 | $1,880.65 | $1,868.00 | $1,957.97 | $1,800.00 |
| 36 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 1 | $2,150.00 | $3,040.00 | $2,126.67 | $2,121.00 | $2,795.52 | $2,100.00 |
| 37 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 1 | $2,000.00 | $3,040.00 | $1,967.66 | $1,789.00 | $6,088.72 | $1,900.00 |
| 38 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 1,944 | $17.00 | $16.50 | $15.71 | $15.71 | $15.71 | $16.16 |
| 39 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 8,464 | $18.00 | $18.00 | $16.86 | $16.86 | $16.86 | $17.13 |
| 40 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 150 | $30.00 | $20.00 | $19.20 | $19.20 | $19.20 | $28.85 |
| 41 | Concrete curb pedestrian (601.0600) | LF | 27 | $72.00 | $36.00 | $34.02 | $34.02 | $34.02 | $70.00 |
| 42 | Concrete sidewalk 4-inch (602.0405) | SF | 16,600 | $7.00 | $7.50 | $6.46 | $6.46 | $6.46 | $6.35 |
| 43 | Concrete sidewalk 6-inch (602.0415) | SF | 2,170 | $8.00 | $12.90 | $11.60 | $11.60 | $11.60 | $7.00 |
| 44 | Curb ramp detectable warning field natural patina (602.0515) | SF | 340 | $40.00 | $60.00 | $57.30 | $57.30 | $57.30 | $35.00 |
| 45 | Concrete driveway 6-inch (602.0810) | SY | 289 | $64.00 | $62.00 | $52.44 | $52.44 | $52.44 | $63.00 |
| 46 | Riprap medium (606.0200) | CY | 5 | $120.00 | $111.00 | $137.15 | $100.00 | $199.17 | $170.00 |
| 47 | Riprap heavy (606.0300) | CY | 3,195 | $56.00 | $66.00 | $82.94 | $83.25 | $70.47 | $85.00 |
| 48 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 76 | $70.00 | $88.00 | $84.80 | $140.25 | $104.27 | $80.00 |
| 49 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 639 | $70.00 | $73.00 | $66.97 | $123.00 | $65.38 | $90.00 |
| 50 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 1,390 | $68.00 | $67.00 | $71.62 | $108.00 | $57.78 | $80.00 |
| 51 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 779 | $70.00 | $70.00 | $69.97 | $106.50 | $60.68 | $85.00 |
| 52 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 658 | $74.00 | $73.00 | $68.70 | $105.51 | $67.22 | $90.00 |
| 53 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 243 | $98.50 | $105.00 | $101.16 | $133.00 | $95.99 | $100.00 |
| 54 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 60 | $148.00 | $162.00 | $140.08 | $193.00 | $137.84 | $175.00 |
| 55 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 541 | $160.00 | $167.00 | $169.42 | $198.25 | $163.65 | $185.00 |
| 56 | Storm sewer pipe composite 8-inch (608.6008) | LF | 6 | $80.00 | $125.00 | $80.47 | $64.50 | $209.96 | $100.00 |
| 57 | Reconstructing manholes (611.0420) | EACH | 3 | $1,750.00 | $1,025.00 | $2,384.43 | $1,192.00 | $2,053.01 | $1,500.00 |
| 58 | Manhole covers type J (611.0530) | EACH | 32 | $1,050.00 | $1,100.00 | $1,220.49 | $1,139.00 | $730.50 | $750.00 |
| 59 | Inlet covers type H (611.0624) | EACH | 35 | $1,150.00 | $1,350.00 | $1,327.93 | $1,498.00 | $908.70 | $1,050.00 |
| 60 | Inlet covers type H-S (611.0639) | EACH | 7 | $1,180.00 | $1,350.00 | $973.39 | $1,498.00 | $908.77 | $1,050.00 |
| 61 | Inlet covers type MS (611.0642) | EACH | 1 | $1,100.00 | $1,100.00 | $756.36 | $700.00 | $670.23 | $800.00 |
| 62 | Catch basins 4-FT diameter (611.1004) | EACH | 12 | $3,500.00 | $3,810.00 | $3,723.31 | $3,700.00 | $3,702.27 | $4,000.00 |
| 63 | Catch basins 6-FT diameter (611.1006) | EACH | 12 | $8,000.00 | $7,220.00 | $7,731.16 | $7,079.00 | $6,607.66 | $7,500.00 |
| 64 | Manholes 3-FT diameter (611.2003) | EACH | 3 | $2,100.00 | $2,740.00 | $2,274.57 | $1,812.00 | $2,626.16 | $2,500.00 |
| 65 | Manholes 4-FT diameter (611.2004) | EACH | 13 | $3,400.00 | $3,460.00 | $3,656.88 | $2,983.00 | $3,307.56 | $4,000.00 |
| 66 | Manholes 5-FT diameter (611.2005) | EACH | 8 | $5,800.00 | $5,430.00 | $5,114.47 | $4,683.00 | $4,811.06 | $5,500.00 |
| 67 | Manholes 6-FT diameter (611.2006) | EACH | 8 | $8,000.00 | $7,380.00 | $7,361.71 | $6,486.00 | $3,164.34 | $7,500.00 |
| 68 | Inlets 4-FT diameter (611.3004) | EACH | 3 | $3,600.00 | $4,020.00 | $3,502.36 | $3,119.00 | $3,411.26 | $4,000.00 |
| 69 | Inlets 2X3-FT (611.3230) | EACH | 15 | $2,300.00 | $2,580.00 | $2,260.37 | $1,722.50 | $2,746.45 | $2,500.00 |
| 70 | Inlets median 1 grate (611.3901) | EACH | 1 | $2,500.00 | $3,300.00 | $3,187.59 | $2,471.00 | $3,255.29 | $3,000.00 |
| 71 | Adjusting manhole covers (611.8110) | EACH | 5 | $750.00 | $800.00 | $973.39 | $653.00 | $482.50 | $1,200.00 |
| 72 | Pipe underdrain 6-inch (612.0106) | LF | 1,125 | $24.00 | $14.00 | $11.53 | $46.33 | $8.69 | $10.00 |
| 73 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 407 | $6.00 | $6.50 | $11.52 | $6.00 | $9.24 | $6.00 |
| 74 | Cable barrier type 1 (613.1100.S) | LF | 6,103 | $25.00 | $26.00 | $46.00 | $24.65 | $46.00 | $24.65 |
| 75 | Cable barrier end terminal type 1 (613.1200.S) | EACH | 4 | $6,500.00 | $6,825.00 | $7,550.00 | $6,500.00 | $7,550.00 | $6,500.00 |
| 76 | MGS guardrail 3 (614.2300) | LF | 653 | $33.00 | $34.00 | $26.00 | $32.50 | $26.00 | $32.50 |
| 77 | MGS guardrail short radius (614.2350) | LF | 57 | $39.00 | $40.00 | $26.00 | $38.50 | $26.00 | $38.50 |
| 78 | MGS guardrail short radius terminal (614.2630) | EACH | 4 | $2,300.00 | $2,415.00 | $2,513.00 | $2,300.00 | $2,513.00 | $2,300.00 |
| 79 | Mobilization (619.1000) | EACH | 1 | $225,000 | $336,000 | $328,710 | $428,450 | $486,385 | $1,582,749 |
| 80 | Water (624.0100) | MGAL | 402 | $25.00 | $10.00 | $66.63 | $60.00 | $28.75 | $0.01 |
| 81 | Topsoil (625.0100) | SY | 29,740 | $2.00 | $6.00 | $9.51 | $4.86 | $6.01 | $4.00 |
| 82 | Silt fence (628.1504) | LF | 17,410 | $2.10 | $2.10 | $2.05 | $2.00 | $2.05 | $2.00 |
| 83 | Silt fence maintenance (628.1520) | LF | 17,410 | $0.01 | $0.01 | $0.03 | $0.01 | $0.03 | $0.01 |
| 84 | Mobilizations erosion control (628.1905) | EACH | 12 | $200.00 | $210.00 | $293.00 | $200.00 | $293.00 | $200.00 |
| 85 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $100.00 | $105.00 | $193.00 | $100.00 | $193.00 | $100.00 |
| 86 | Erosion mat urban class I type A (628.2006) | SY | 29,740 | $1.75 | $1.90 | $1.65 | $1.75 | $1.65 | $1.75 |
| 87 | Turbidity barriers (628.6005) | SY | 390 | $40.00 | $48.00 | $42.00 | $50.00 | $42.00 | $50.00 |
| 88 | Inlet protection type A (628.7005) | EACH | 48 | $125.00 | $158.00 | $100.00 | $150.00 | $100.00 | $150.00 |
| 89 | Inlet protection type C (628.7015) | EACH | 41 | $125.00 | $63.00 | $50.00 | $60.00 | $50.00 | $60.00 |
| 90 | Inlet protection type D (628.7020) | EACH | 13 | $125.00 | $131.00 | $105.00 | $125.00 | $105.00 | $125.00 |
| 91 | Temporary ditch checks (628.7504) | LF | 75 | $15.00 | $9.50 | $9.25 | $9.00 | $9.25 | $9.00 |
| 92 | Culvert pipe checks (628.7555) | EACH | 15 | $25.00 | $21.00 | $25.00 | $20.00 | $25.00 | $20.00 |
| 93 | Fertilizer type B (629.0210) | CWT | 6.20 | $80.00 | $79.00 | $115.00 | $75.00 | $115.00 | $75.00 |
| 94 | Seeding mixture no. 30 (630.0130) | LB | 440 | $8.00 | $8.20 | $7.95 | $7.75 | $7.95 | $7.75 |
| 95 | Seeding mixture no. 40 (630.0140) | LB | 896 | $9.00 | $9.40 | $7.95 | $8.95 | $7.95 | $8.95 |
| 96 | Seed water (630.0500) | MGAL | 663 | $10.00 | $10.50 | $5.00 | $10.00 | $5.00 | $10.00 |
| 97 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 28 | $80.00 | $79.00 | $95.00 | $75.00 | $95.00 | $75.00 |
| 98 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 24 | $90.00 | $95.00 | $99.00 | $90.00 | $99.00 | $90.00 |
| 99 | Signs type II reflective H (637.2210) | SF | 408 | $22.00 | $23.00 | $22.00 | $21.50 | $22.00 | $21.50 |
| 100 | Moving signs type II (638.2102) | EACH | 1 | $100.00 | $105.00 | $150.00 | $100.00 | $150.00 | $100.00 |
| 101 | Removing signs type II (638.2602) | EACH | 37 | $35.00 | $37.00 | $15.00 | $35.00 | $15.00 | $35.00 |
| 102 | Removing small sign supports (638.3000) | EACH | 27 | $35.00 | $37.00 | $15.00 | $35.00 | $15.00 | $35.00 |
| 103 | Field office type C (642.5201) | EACH | 1 | $12,000 | $17,325 | $17,995 | $17,500 | $12,323 | $15,000 |
| 104 | Traffic control drums (643.0300) | DAY | 4,659 | $0.60 | $0.22 | $0.50 | $0.20 | $0.60 | $0.50 |
| 105 | Traffic control barricades type III (643.0420) | DAY | 3,429 | $1.00 | $0.54 | $1.00 | $0.50 | $1.00 | $1.00 |
| 106 | Traffic control warning lights type A (643.0705) | DAY | 8,549 | $0.25 | $0.10 | $0.25 | $0.08 | $0.25 | $0.25 |
| 107 | Traffic control warning lights type C (643.0715) | DAY | 665 | $0.30 | $0.10 | $0.35 | $0.08 | $0.30 | $0.35 |
| 108 | Traffic control signs (643.0900) | DAY | 27,253 | $0.50 | $0.22 | $0.35 | $0.20 | $0.50 | $0.35 |
| 109 | Traffic control (643.5000) | EACH | 1 | $15,000 | $55,500 | $12,000 | $25,350 | $3,469.00 | $12,000 |
| 110 | Temporary pedestrian surface asphalt (644.1410) | SF | 8,130 | $3.10 | $4.00 | $4.39 | $5.75 | $3.09 | $5.09 |
| 111 | Temporary pedestrian curb ramp (644.1601) | DAY | 574 | $10.00 | $8.00 | $7.50 | $7.35 | $10.00 | $7.50 |
| 112 | Temporary pedestrian detectable warning field (644.1605) | SF | 200 | $10.00 | $6.00 | $8.00 | $5.50 | $10.00 | $8.00 |
| 113 | Temporary pedestrian barricade (644.1810) | LF | 8,940 | $20.00 | $4.00 | $2.50 | $3.75 | $20.00 | $2.50 |
| 114 | Geotextile type DF schedule B (645.0112) | SY | 1,440 | $2.50 | $3.00 | $2.27 | $1.25 | $2.43 | $3.00 |
| 115 | Geotextile type HR (645.0120) | SY | 6,600 | $3.50 | $4.00 | $2.81 | $2.00 | $2.15 | $3.50 |
| 116 | Marking line epoxy 6-inch (646.2020) | LF | 40,660 | $0.60 | $0.50 | $0.58 | $0.49 | $1.00 | $0.49 |
| 117 | Marking arrow epoxy (646.5020) | EACH | 15 | $275.00 | $268.00 | $270.00 | $255.05 | $210.00 | $255.05 |
| 118 | Marking symbol epoxy (646.5220) | EACH | 15 | $275.00 | $256.00 | $260.00 | $243.56 | $245.00 | $243.56 |
| 119 | Marking stop line epoxy 18-inch (646.6120) | LF | 152 | $19.00 | $17.00 | $19.00 | $15.80 | $18.75 | $15.80 |
| 120 | Cold weather marking epoxy 6-inch (646.6466) | LF | 26,250 | $0.75 | $0.50 | $0.50 | $0.49 | $1.25 | $0.49 |
| 121 | Marking crosswalk paint block style 24-inch (646.7505) | LF | 276 | $25.00 | $17.00 | $25.00 | $16.25 | $25.85 | $16.25 |
| 122 | Marking parking stall epoxy (646.8320) | LF | 297 | $6.00 | $5.50 | $6.00 | $5.13 | $6.25 | $5.13 |
| 123 | Construction staking storm sewer (650.4000) | EACH | 82 | $135.00 | $142.00 | $135.00 | $135.00 | $110.00 | $135.00 |
| 124 | Construction staking subgrade (650.4500) | LF | 12,103 | $0.10 | $0.01 | $0.01 | $0.01 | $0.65 | $0.01 |
| 125 | Construction staking base (650.5000) | LF | 12,103 | $0.67 | $0.70 | $0.67 | $0.67 | $0.35 | $0.01 |
| 126 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 10,558 | $0.62 | $0.70 | $0.62 | $0.62 | $0.80 | $0.62 |
| 127 | Construction staking curb ramps (650.9000) | EACH | 25 | $135.00 | $142.00 | $135.00 | $135.00 | $150.00 | $135.00 |
| 128 | Construction staking sidewalk (project) 01. 6943-06-73 (650.9500) | EACH | 1 | $1,200.00 | $1,260.00 | $1,200.00 | $1,200.00 | $2,500.00 | $1,200.00 |
| 129 | Construction staking supplemental control (project) 01. 6943-06-73 (650.9911) | EACH | 1 | $1,200.00 | $1,260.00 | $1,200.00 | $1,200.00 | $2,500.00 | $1,200.00 |
| 130 | Construction staking slope stakes (650.9920) | LF | 12,103 | $0.77 | $0.80 | $0.77 | $0.77 | $1.15 | $0.77 |
| 131 | Conduit rigid nonmetallic schedule 80 3-inch (652.0335) | LF | 130 | $24.00 | $27.00 | $20.00 | $25.50 | $25.50 | $25.50 |
| 132 | Sawing asphalt (690.0150) | LF | 3,216 | $2.20 | $2.00 | $1.50 | $1.50 | $1.50 | $1.50 |
| 133 | Sawing concrete (690.0250) | LF | 366 | $3.20 | $3.00 | $2.30 | $2.30 | $2.30 | $2.30 |
| 134 | Incentive iri ride (740.0440) | DOL | 8,940 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 135 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 136 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,760 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 137 | Special 01. fertilizer for lawn type turf (SPV.0030) | CWT | 12.50 | $75.00 | $79.00 | $125.00 | $75.00 | $125.00 | $75.00 |
| 138 | Special 01. borrow special (SPV.0035) | CY | 13,903 | $8.50 | $18.00 | $13.06 | $11.62 | $16.87 | $15.00 |
| 139 | Special 01. utility line opening (SPV.0060) | EACH | 1 | $1,000.00 | $500.00 | $833.39 | $1,250.00 | $1,152.53 | $500.00 |
| 140 | Special 02. remove 4-inch valve (SPV.0060) | EACH | 3 | $250.00 | $550.00 | $1,679.15 | $500.00 | $384.18 | $550.00 |
| 141 | Special 03. remove 6-inch valve (SPV.0060) | EACH | 10 | $350.00 | $550.00 | $1,679.15 | $550.00 | $382.71 | $550.00 |
| 142 | Special 04. remove 8-inch valve (SPV.0060) | EACH | 1 | $450.00 | $550.00 | $1,679.15 | $600.00 | $380.52 | $550.00 |
| 143 | Special 05. remove hydrant & auxiliary valve (SPV.0060) | EACH | 6 | $1,000.00 | $750.00 | $1,195.69 | $2,250.00 | $1,767.40 | $750.00 |
| 144 | Special 06. watermain 4-inch bend (SPV.0060) | EACH | 2 | $500.00 | $420.00 | $615.48 | $302.00 | $401.04 | $420.00 |
| 145 | Special 07. watermain 6-inch bend (SPV.0060) | EACH | 9 | $610.00 | $650.00 | $729.25 | $445.00 | $783.49 | $650.00 |
| 146 | Special 08. watermain 8-inch bend (SPV.0060) | EACH | 4 | $680.00 | $900.00 | $984.57 | $590.00 | $645.23 | $900.00 |
| 147 | Special 09. watermain 10-inch bend (SPV.0060) | EACH | 8 | $1,070.00 | $1,270.00 | $1,270.62 | $973.00 | $935.26 | $1,270.00 |
| 148 | Special 10. watermain 12-inch bend (SPV.0060) | EACH | 11 | $1,300.00 | $1,610.00 | $1,518.47 | $1,283.00 | $1,233.01 | $1,610.00 |
| 149 | Special 11. watermain 10X10X4 tee (SPV.0060) | EACH | 1 | $1,400.00 | $1,480.00 | $1,650.73 | $1,239.00 | $1,151.72 | $1,480.00 |
| 150 | Special 12. watermain 10X10X6 tee (SPV.0060) | EACH | 1 | $1,480.00 | $1,560.00 | $1,743.12 | $1,347.00 | $1,227.91 | $1,560.00 |
| 151 | Special 13. watermain 10X10X10 tee (SPV.0060) | EACH | 1 | $1,800.00 | $1,860.00 | $2,154.91 | $1,695.00 | $1,466.03 | $1,860.00 |
| 152 | Special 14. watermain 12X12X8 tee (SPV.0060) | EACH | 1 | $1,750.00 | $1,930.00 | $2,178.86 | $1,574.00 | $1,476.25 | $1,930.00 |
| 153 | Special 15. watermain 12X12X10 tee (SPV.0060) | EACH | 1 | $2,000.00 | $2,470.00 | $2,502.24 | $1,954.00 | $1,738.56 | $2,470.00 |
| 154 | Special 16. watermain 12X12X12 tee (SPV.0060) | EACH | 2 | $1,900.00 | $2,790.00 | $2,662.64 | $2,000.00 | $1,777.20 | $2,790.00 |
| 155 | Special 17. watermain 10X6 reducer (SPV.0060) | EACH | 2 | $920.00 | $1,060.00 | $977.55 | $728.00 | $796.23 | $1,060.00 |
| 156 | Special 18. watermain 12X6 reducer (SPV.0060) | EACH | 2 | $1,000.00 | $1,330.00 | $1,131.18 | $904.00 | $1,018.55 | $1,330.00 |
| 157 | Special 19. watermain 12X10 reducer (SPV.0060) | EACH | 1 | $1,100.00 | $1,570.00 | $1,379.67 | $1,063.00 | $1,117.04 | $1,570.00 |
| 158 | Special 20. 4-inch watermain connection (SPV.0060) | EACH | 1 | $600.00 | $3,240.00 | $879.33 | $2,056.00 | $1,391.27 | $3,240.00 |
| 159 | Special 21. 6-inch watermain connection (SPV.0060) | EACH | 6 | $700.00 | $3,850.00 | $2,057.92 | $2,157.00 | $2,089.79 | $3,850.00 |
| 160 | Special 22. 8-inch watermain connection (SPV.0060) | EACH | 3 | $850.00 | $3,420.00 | $1,348.39 | $2,261.00 | $1,568.14 | $3,420.00 |
| 161 | Special 23. 10-inch watermain connection (SPV.0060) | EACH | 1 | $1,200.00 | $4,650.00 | $1,745.14 | $2,538.00 | $1,805.35 | $4,650.00 |
| 162 | Special 24. 12-inch watermain connection (SPV.0060) | EACH | 1 | $1,350.00 | $5,760.00 | $2,128.23 | $2,666.00 | $1,921.88 | $5,760.00 |
| 163 | Special 25. watermain 4-inch valve (SPV.0060) | EACH | 1 | $2,200.00 | $1,910.00 | $2,575.00 | $2,204.00 | $2,014.85 | $1,910.00 |
| 164 | Special 26. watermain 6-inch valve (SPV.0060) | EACH | 4 | $2,370.00 | $2,230.00 | $2,941.36 | $2,603.00 | $2,342.01 | $2,230.00 |
| 165 | Special 27. watermain 8-inch valve (SPV.0060) | EACH | 1 | $3,500.00 | $3,010.00 | $3,976.29 | $3,664.00 | $3,209.92 | $3,010.00 |
| 166 | Special 28. watermain 10-inch valve (SPV.0060) | EACH | 6 | $4,600.00 | $4,240.00 | $5,494.38 | $5,379.00 | $4,865.80 | $4,240.00 |
| 167 | Special 29. watermain 12-inch valve (SPV.0060) | EACH | 8 | $5,800.00 | $5,100.00 | $6,763.82 | $6,524.00 | $5,989.04 | $5,100.00 |
| 168 | Special 30. hydrant complete, auxiliary valve & all fittings (SPV.0060) | EACH | 10 | $10,500 | $10,320 | $11,678 | $11,188 | $10,496 | $10,320 |
| 169 | Special 31. service brass, tap, box, saddle, corp & valve (SPV.0060) | EACH | 10 | $1,800.00 | $1,080.00 | $1,296.26 | $1,025.00 | $1,807.21 | $1,080.00 |
| 170 | Special 32. adjusting water valve boxes (SPV.0060) | EACH | 9 | $250.00 | $320.00 | $529.54 | $458.00 | $422.31 | $320.00 |
| 171 | Special 33. adjusting double flush risers (SPV.0060) | EACH | 1 | $2,500.00 | $2,520.00 | $652.35 | $1,405.00 | $2,499.26 | $2,520.00 |
| 172 | Special 34. hydrant 12-inch vertical extension (SPV.0060) | EACH | 1 | $2,000.00 | $1,730.00 | $2,484.92 | $1,601.00 | $2,148.99 | $1,730.00 |
| 173 | Special 35. hydrant 6-inch vertical extension (SPV.0060) | EACH | 1 | $1,750.00 | $1,560.00 | $2,270.05 | $1,422.00 | $1,984.03 | $1,560.00 |
| 174 | Special 36. relocate hydrant (SPV.0060) | EACH | 1 | $5,200.00 | $2,850.00 | $4,634.57 | $3,588.00 | $3,197.84 | $2,850.00 |
| 175 | Special 37. adjusting air release manhole (SPV.0060) | EACH | 1 | $2,500.00 | $1,900.00 | $1,726.73 | $682.00 | $2,700.71 | $1,900.00 |
| 176 | Special 01. 4-inch dia. perforated wall drain - wrapped (SPV.0090) | LF | 115 | $6.00 | $6.00 | $13.68 | $5.50 | $24.13 | $5.50 |
| 177 | Special 02. watermain construction staking (SPV.0090) | LF | 4,277 | $0.68 | $1.00 | $0.68 | $0.68 | $2.25 | $0.68 |
| 178 | Special 03. 4-inch watermain, open cut (SPV.0090) | LF | 26 | $70.00 | $137.00 | $131.64 | $190.00 | $63.39 | $137.00 |
| 179 | Special 04. 6-inch watermain, open cut (SPV.0090) | LF | 124 | $72.00 | $91.00 | $112.19 | $190.00 | $91.58 | $91.00 |
| 180 | Special 05. 8-inch watermain, open cut (SPV.0090) | LF | 171 | $75.00 | $107.00 | $103.98 | $196.00 | $68.47 | $107.00 |
| 181 | Special 06. 10-inch watermain, open cut (SPV.0090) | LF | 1,088 | $82.00 | $112.00 | $73.29 | $145.00 | $75.84 | $112.00 |
| 182 | Special 07. 12-inch watermain, open cut (SPV.0090) | LF | 2,768 | $90.00 | $120.00 | $85.06 | $143.00 | $119.24 | $120.00 |
| 183 | Special 08. 12-inch watermain, directionally bored (SPV.0090) | LF | 100 | $170.00 | $387.00 | $194.67 | $428.00 | $266.10 | $387.00 |
| 184 | Special 10. 1-inch CTS HDPE water service (SPV.0090) | LF | 179 | $60.00 | $92.00 | $134.80 | $138.00 | $65.14 | $92.00 |
| 185 | Special 11. storm sewer pipe composite 6-inch (SPV.0090) | LF | 9 | $80.00 | $121.00 | $69.31 | $128.00 | $139.97 | $100.00 |
| 186 | Special 01. wall modular block mechanically stabilized earth (R-71- 0024) (SPV.0165) | SF | 1,011 | $69.00 | $90.00 | $118.67 | $68.50 | $105.77 | $73.50 |
| 187 | Special 02. wall modular block gravity (R-71-0025) (SPV.0165) | SF | 852 | $69.00 | $78.00 | $106.66 | $63.00 | $96.26 | $66.00 |
| 188 | Special 03. wall modular block gravity (R-71-0026) (SPV.0165) | SF | 483 | $69.00 | $78.00 | $106.66 | $63.00 | $96.48 | $66.00 |
| 189 | Special 04. salvage and reset landscape rock (SPV.0165) | SF | 3,200 | $6.00 | $10.00 | $11.58 | $12.00 | $9.00 | $5.00 |
| 190 | Special 05. insulation (SPV.0165) | SF | 737 | $5.00 | $4.00 | $2.09 | $3.32 | $4.35 | $4.00 |
| 191 | Special 01. removing concrete pavement special (SPV.0180) | SY | 19,490 | $15.00 | $8.00 | $11.50 | $6.46 | $9.66 | $10.00 |
| 192 | Special 02. preparing topsoil for lawn type turf (SPV.0180) | SY | 19,910 | $1.00 | $1.00 | $0.53 | $0.80 | $0.53 | $0.80 |
| 193 | Special 01. infill riprap river embankment (SPV.0195) | TON | 1,056 | $24.00 | $50.00 | $31.21 | $31.31 | $27.08 | $45.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.