WisDOT contract 20260414015 bid tabulation
Mount Pleasant - Racine; North Ohio Street to Fairway Drive (CTH C, Racine County Mount Pleasant - Racine). Let by Wisconsin DOT on April 14, 2026, Racine. 5 bids received; low bid $3,657,258 by A.W. Oakes & Son, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 APR 2026
- Pay items
- 154
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A.W. Oakes & Son, Inc. | $3,657,258 | Low |
| 2 | Musson Bros., Inc. | $3,763,157 | +3.0% |
| 3 | Zignego Company, Inc. | $3,820,726 | +4.0% |
| 4 | Stark Pavement Corporation | $3,935,458 | +8.0% |
| 5 | Lalonde Contractors Incorporated | $3,977,321 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A.W. Oakes & Son, Inc. | 2. Musson Bros., Inc. | 3. Zignego Company, Inc. | 4. Stark Pavement Corporation | 5. Lalonde Contractors Incorporated |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 7 | $100.00 | $100.00 | $100.00 | $101.00 | $100.00 |
| 2 | Clearing (201.0120) | ID | 46 | $25.00 | $10.00 | $10.00 | $10.10 | $10.00 |
| 3 | Grubbing (201.0205) | STA | 7 | $1,200.00 | $700.00 | $700.00 | $707.00 | $700.00 |
| 4 | Grubbing (201.0220) | ID | 46 | $100.00 | $40.00 | $40.00 | $40.40 | $40.00 |
| 5 | Removing concrete pavement (204.0100) | SY | 24,100 | $7.00 | $4.10 | $4.51 | $13.10 | $7.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 66 | $15.00 | $26.50 | $10.00 | $9.00 | $15.26 |
| 7 | Removing concrete bases (204.0195) | EACH | 10 | $350.00 | $211.00 | $500.00 | $348.46 | $331.87 |
| 8 | Removing manholes (204.0210) | EACH | 1 | $735.00 | $704.00 | $1,250.00 | $735.00 | $700.00 |
| 9 | Removing inlets (204.0220) | EACH | 21 | $365.00 | $376.00 | $550.00 | $498.75 | $475.00 |
| 10 | Removing storm sewer (size) 001. 12-inch (204.0245) | LF | 174 | $22.00 | $34.00 | $35.00 | $14.70 | $14.00 |
| 11 | Removing storm sewer (size) 002. 15-inch (204.0245) | LF | 50 | $22.00 | $36.50 | $35.00 | $14.70 | $14.00 |
| 12 | Removing storm sewer (size) 003. 18-inch (204.0245) | LF | 58 | $22.00 | $43.50 | $35.00 | $14.70 | $14.00 |
| 13 | Removing (item description) 001. removing traffic signals (204.9060.S) | EACH | 1 | $3,000.00 | $2,552.94 | $2,552.94 | $2,680.59 | $2,552.94 |
| 14 | Excavation common (205.0100) | CY | 14,858 | $14.00 | $11.00 | $18.40 | $8.32 | $18.96 |
| 15 | Finishing roadway (project) 001. 2390-09-73 (213.0100) | EACH | 1 | $2,470.10 | $100.00 | $1,000.00 | $2,500.00 | $3,208.00 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 14,875 | $15.00 | $0.10 | $16.54 | $8.45 | $22.14 |
| 17 | Concrete pavement 8 1/2-inch (415.0085) | SY | 21,390 | $61.90 | $62.00 | $72.00 | $58.75 | $64.31 |
| 18 | Concrete pavement joint filling (415.4100) | SY | 22,320 | $2.00 | $1.90 | $1.50 | $2.20 | $1.84 |
| 19 | Drilled tie bars (416.0610) | EACH | 52 | $10.00 | $10.00 | $20.00 | $18.00 | $18.04 |
| 20 | Drilled dowel bars (416.0620) | EACH | 270 | $15.00 | $20.00 | $20.00 | $25.00 | $22.37 |
| 21 | Asphaltic surface temporary (465.0125) | TON | 60 | $290.00 | $135.00 | $135.00 | $135.00 | $135.00 |
| 22 | Concrete collars for pipe (520.8000) | EACH | 10 | $465.00 | $280.00 | $1,000.00 | $1,214.85 | $1,157.00 |
| 23 | Concrete curb integral type D (601.0150) | LF | 5,840 | $6.00 | $20.00 | $16.00 | $28.00 | $19.85 |
| 24 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 1,590 | $28.00 | $23.00 | $23.00 | $25.50 | $34.76 |
| 25 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 1,190 | $31.00 | $26.00 | $27.40 | $26.50 | $44.82 |
| 26 | Concrete curb pedestrian (601.0600) | LF | 216 | $50.00 | $40.00 | $35.60 | $55.00 | $49.72 |
| 27 | Concrete sidewalk 5-inch (602.0410) | SF | 18,987 | $7.10 | $8.00 | $6.65 | $8.50 | $8.10 |
| 28 | Curb ramp detectable warning field yellow (602.0505) | SF | 166 | $55.00 | $45.00 | $47.50 | $50.00 | $43.87 |
| 29 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 95 | $75.00 | $58.00 | $67.75 | $60.00 | $64.83 |
| 30 | Concrete driveway 6-inch (602.0810) | SY | 415 | $72.00 | $72.00 | $78.50 | $85.00 | $72.18 |
| 31 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 1,473 | $107.00 | $96.00 | $98.00 | $101.85 | $97.00 |
| 32 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 50 | $110.00 | $233.00 | $135.00 | $103.95 | $99.00 |
| 33 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 50 | $115.00 | $189.00 | $135.00 | $141.75 | $135.00 |
| 34 | Reconstructing manholes (611.0420) | EACH | 1 | $1,600.00 | $1,500.00 | $1,250.00 | $2,641.80 | $2,516.00 |
| 35 | Manhole covers type J (611.0530) | EACH | 10 | $650.00 | $809.00 | $975.00 | $761.25 | $725.00 |
| 36 | Inlet covers type H (611.0624) | EACH | 57 | $900.00 | $1,090.00 | $950.00 | $992.25 | $945.00 |
| 37 | Manholes 3-FT diameter (611.2003) | EACH | 1 | $4,400.00 | $1,950.00 | $3,500.00 | $2,677.50 | $2,550.00 |
| 38 | Manholes 4-FT diameter (611.2004) | EACH | 8 | $4,100.00 | $2,390.00 | $4,200.00 | $3,045.00 | $2,900.00 |
| 39 | Manholes 6-FT diameter (611.2006) | EACH | 2 | $9,100.00 | $6,050.00 | $8,000.00 | $7,323.75 | $6,975.00 |
| 40 | Inlets 4-FT diameter (611.3004) | EACH | 16 | $3,050.00 | $2,140.00 | $3,350.00 | $2,520.00 | $2,400.00 |
| 41 | Inlets 2X3-FT (611.3230) | EACH | 40 | $2,800.00 | $1,430.00 | $2,500.00 | $1,927.80 | $1,836.00 |
| 42 | Adjusting manhole covers (611.8110) | EACH | 9 | $720.00 | $612.00 | $750.00 | $588.00 | $560.00 |
| 43 | Adjusting inlet covers (611.8115) | EACH | 1 | $720.00 | $612.00 | $750.00 | $588.00 | $560.00 |
| 44 | Mobilization (619.1000) | EACH | 1 | $170,000 | $660,091 | $89,000 | $408,287 | $206,084 |
| 45 | Concrete median sloped nose (620.0300) | SF | 165 | $16.00 | $15.00 | $26.90 | $45.00 | $20.08 |
| 46 | Water (624.0100) | MGAL | 349 | $45.00 | $0.01 | $50.00 | $10.60 | $0.01 |
| 47 | Topsoil (625.0100) | SY | 1,180 | $6.00 | $10.00 | $5.00 | $8.93 | $11.00 |
| 48 | Silt fence (628.1504) | LF | 413 | $3.00 | $2.00 | $3.00 | $2.10 | $2.14 |
| 49 | Silt fence maintenance (628.1520) | LF | 413 | $0.01 | $0.25 | $0.01 | $0.26 | $0.03 |
| 50 | Mobilizations erosion control (628.1905) | EACH | 9 | $50.00 | $225.00 | $50.00 | $236.25 | $100.00 |
| 51 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $50.00 | $225.00 | $50.00 | $236.25 | $25.00 |
| 52 | Erosion mat urban class I type B (628.2008) | SY | 1,180 | $2.00 | $1.85 | $2.00 | $1.94 | $1.99 |
| 53 | Inlet protection type A (628.7005) | EACH | 70 | $50.00 | $35.00 | $50.00 | $36.75 | $50.00 |
| 54 | Inlet protection type C (628.7015) | EACH | 55 | $50.00 | $65.00 | $50.00 | $68.25 | $50.00 |
| 55 | Inlet protection type D (628.7020) | EACH | 3 | $100.00 | $125.00 | $100.00 | $131.25 | $120.00 |
| 56 | Tracking pads (628.7560) | EACH | 2 | $1.00 | $500.00 | $1.00 | $1.06 | $0.01 |
| 57 | Fertilizer type B (629.0210) | CWT | 9 | $100.00 | $125.00 | $100.00 | $131.25 | $80.00 |
| 58 | Seeding mixture no. 30 (630.0130) | LB | 53 | $8.50 | $10.50 | $8.50 | $11.03 | $10.00 |
| 59 | Seeding temporary (630.0200) | LB | 32 | $5.00 | $7.50 | $5.00 | $7.88 | $2.00 |
| 60 | Seed water (630.0500) | MGAL | 27 | $5.00 | $25.00 | $5.00 | $26.25 | $6.00 |
| 61 | Sod water (631.0300) | MGAL | 45 | $20.00 | $65.00 | $20.00 | $68.25 | $20.00 |
| 62 | Sod lawn (631.1000) | SY | 2,202 | $9.00 | $7.10 | $8.00 | $7.46 | $8.00 |
| 63 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 55 | $115.00 | $115.00 | $115.00 | $120.75 | $125.00 |
| 64 | Signs type II reflective H (637.2210) | SF | 311.44 | $21.00 | $22.50 | $21.00 | $23.63 | $21.10 |
| 65 | Signs type II reflective F (637.2230) | SF | 49.25 | $23.00 | $27.50 | $22.90 | $28.88 | $23.10 |
| 66 | Moving signs type II (638.2102) | EACH | 18 | $100.00 | $125.00 | $20.00 | $131.25 | $50.00 |
| 67 | Removing signs type II (638.2602) | EACH | 41 | $20.00 | $25.00 | $100.00 | $26.25 | $10.00 |
| 68 | Field office type B (642.5001) | EACH | 1 | $14,000 | $25,000 | $20,000 | $20,000 | $26,664 |
| 69 | Traffic control drums (643.0300) | DAY | 44,295 | $0.25 | $0.20 | $0.20 | $0.21 | $0.20 |
| 70 | Traffic control barricades type III (643.0420) | DAY | 6,278 | $0.50 | $0.50 | $0.50 | $0.53 | $0.50 |
| 71 | Traffic control flexible tubular marker posts (643.0500) | EACH | 584 | $20.00 | $20.00 | $20.00 | $21.20 | $20.00 |
| 72 | Traffic control flexible tubular marker bases (643.0600) | EACH | 508 | $5.00 | $5.00 | $5.00 | $5.30 | $5.00 |
| 73 | Traffic control warning lights type A (643.0705) | DAY | 13,475 | $0.10 | $0.05 | $0.05 | $0.06 | $0.05 |
| 74 | Traffic control warning lights type C (643.0715) | DAY | 6,760 | $0.10 | $0.05 | $0.05 | $0.06 | $0.05 |
| 75 | Traffic control connected arrow boards (643.0810) | DAY | 586 | $20.00 | $18.00 | $18.00 | $19.08 | $18.00 |
| 76 | Traffic control signs (643.0900) | DAY | 11,142 | $0.35 | $0.35 | $0.35 | $0.37 | $0.35 |
| 77 | Traffic control signs PCMS (643.1050) | DAY | 14 | $75.00 | $75.00 | $75.00 | $79.50 | $75.00 |
| 78 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 447 | $10.00 | $10.00 | $10.00 | $10.60 | $10.00 |
| 79 | Temporary marking line paint 6- inch (643.3165) | LF | 21,577 | $0.40 | $0.37 | $0.37 | $0.39 | $0.37 |
| 80 | Temporary marking arrow paint (643.3505) | EACH | 11 | $115.00 | $115.00 | $115.00 | $121.90 | $115.00 |
| 81 | Temporary marking stop line paint 18-inch (643.3805) | LF | 237 | $6.00 | $5.50 | $5.50 | $5.83 | $5.50 |
| 82 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 244 | $3.00 | $2.60 | $2.60 | $2.76 | $2.60 |
| 83 | Traffic control (643.5000) | EACH | 1 | $35,000 | $33,500 | $33,500 | $35,510 | $33,500 |
| 84 | Temporary pedestrian surface plate (644.1430) | SF | 60 | $6.00 | $18.00 | $12.00 | $19.08 | $18.00 |
| 85 | Temporary pedestrian curb ramp (644.1601) | DAY | 21 | $20.00 | $20.00 | $24.00 | $21.20 | $20.00 |
| 86 | Temporary pedestrian detectable warning field (644.1605) | SF | 20 | $20.00 | $20.00 | $4.00 | $5.30 | $20.00 |
| 87 | Temporary pedestrian barricade (644.1810) | LF | 610 | $5.00 | $5.00 | $5.00 | $5.30 | $5.00 |
| 88 | Temporary audible message devices (644.1900.S) | DAY | 178 | $5.00 | $5.00 | $5.00 | $5.30 | $5.00 |
| 89 | Marking line epoxy 4-inch (646.1020) | LF | 6,879 | $0.75 | $0.75 | $0.75 | $0.89 | $0.75 |
| 90 | Marking line epoxy 8-inch (646.3020) | LF | 662 | $1.50 | $1.50 | $1.50 | $1.79 | $1.50 |
| 91 | Marking arrow epoxy (646.5020) | EACH | 26 | $225.00 | $225.00 | $225.00 | $268.42 | $225.00 |
| 92 | Marking word epoxy (646.5120) | EACH | 2 | $250.00 | $245.00 | $245.00 | $292.28 | $245.00 |
| 93 | Marking stop line epoxy 18-inch (646.6120) | LF | 166 | $14.00 | $13.25 | $13.25 | $15.81 | $13.25 |
| 94 | Cold weather marking epoxy 4-inch (646.6464) | LF | 6,878 | $1.20 | $1.15 | $1.15 | $1.37 | $1.15 |
| 95 | Cold weather marking epoxy 8-inch (646.6468) | LF | 662 | $2.50 | $2.30 | $2.30 | $2.74 | $2.30 |
| 96 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 472 | $11.00 | $10.50 | $10.50 | $12.53 | $10.50 |
| 97 | Marking curb epoxy (646.8120) | LF | 54 | $9.00 | $8.25 | $8.25 | $9.84 | $8.25 |
| 98 | Marking island nose epoxy (646.8220) | EACH | 2 | $300.00 | $275.00 | $275.00 | $328.07 | $275.00 |
| 99 | Marking removal line 4-inch (646.9000) | LF | 3,997 | $0.60 | $0.50 | $0.50 | $0.53 | $0.50 |
| 100 | Marking removal special marking (646.9300) | EACH | 2 | $125.00 | $115.00 | $115.00 | $121.90 | $115.00 |
| 101 | Construction staking storm sewer (650.4000) | EACH | 67 | $150.00 | $120.00 | $120.00 | $132.00 | $120.00 |
| 102 | Construction staking subgrade (650.4500) | LF | 3,239 | $1.00 | $0.01 | $0.01 | $0.02 | $0.01 |
| 103 | Construction staking concrete pavement (650.7000) | LF | 3,239 | $2.00 | $0.01 | $0.01 | $0.02 | $1.50 |
| 104 | Construction staking electrical installations (project) 001. 2390-09- 73 (650.8501) | EACH | 1 | $2,500.00 | $850.00 | $850.00 | $935.00 | $850.00 |
| 105 | Construction staking curb ramps (650.9000) | EACH | 21 | $150.00 | $130.00 | $130.00 | $143.00 | $130.00 |
| 106 | Construction staking sidewalk (project) 001. 2390-09-73 (650.9500) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,750.00 | $2,500.00 |
| 107 | Construction staking supplemental control (project) 001. 2390-09-73 (650.9911) | EACH | 1 | $3,500.00 | $10,000 | $10,000 | $11,000 | $10,000 |
| 108 | Construction staking slope stakes (650.9920) | LF | 886 | $1.00 | $1.10 | $1.10 | $1.21 | $1.10 |
| 109 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 60 | $7.00 | $6.54 | $6.54 | $6.87 | $6.54 |
| 110 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 745 | $9.00 | $8.43 | $8.43 | $8.85 | $8.43 |
| 111 | Conduit special 3-inch (652.0615) | LF | 540 | $26.00 | $24.87 | $24.87 | $26.11 | $24.87 |
| 112 | Pull boxes steel 24X42-inch (653.0140) | EACH | 13 | $1,400.00 | $1,360.64 | $1,360.64 | $1,428.67 | $1,360.64 |
| 113 | Removing pull boxes (653.0905) | EACH | 16 | $125.00 | $114.86 | $114.86 | $120.60 | $114.86 |
| 114 | Concrete bases type 1 (654.0101) | EACH | 4 | $950.00 | $915.31 | $915.31 | $961.08 | $915.31 |
| 115 | Concrete bases type 2 (654.0102) | EACH | 2 | $1,500.00 | $1,451.66 | $1,451.66 | $1,524.24 | $1,451.66 |
| 116 | Concrete bases type 10-special (654.0120) | EACH | 2 | $10,000 | $9,836.21 | $9,836.21 | $10,328 | $9,836.21 |
| 117 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $3,000.00 | $2,603.43 | $2,603.43 | $2,733.60 | $2,603.43 |
| 118 | Cable traffic signal 5-14 AWG (655.0230) | LF | 611 | $1.65 | $1.55 | $1.55 | $1.63 | $1.55 |
| 119 | Cable traffic signal 7-14 AWG (655.0240) | LF | 463 | $2.00 | $1.95 | $1.95 | $2.05 | $1.95 |
| 120 | Cable traffic signal 9-14 AWG (655.0250) | LF | 256 | $2.20 | $2.02 | $2.02 | $2.12 | $2.02 |
| 121 | Cable traffic signal 12-14 AWG (655.0260) | LF | 195 | $3.00 | $2.95 | $2.95 | $3.10 | $2.95 |
| 122 | Cable traffic signal 15-14 AWG (655.0270) | LF | 536 | $3.50 | $3.44 | $3.44 | $3.61 | $3.44 |
| 123 | Cable traffic signal 21-12 AWG (655.0285) | LF | 332 | $4.50 | $4.33 | $4.33 | $4.55 | $4.33 |
| 124 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,608 | $1.25 | $1.12 | $1.12 | $1.18 | $1.12 |
| 125 | Traffic signal evp detector cable (655.0900) | LF | 464 | $1.50 | $1.35 | $1.35 | $1.42 | $1.35 |
| 126 | Electrical service meter breaker pedestal (location) 001. CTH C & spring valley DR (656.0201) | EACH | 1 | $1,850.00 | $1,755.73 | $1,755.73 | $1,843.52 | $1,755.73 |
| 127 | Pedestal bases (657.0100) | EACH | 4 | $350.00 | $339.14 | $339.14 | $356.10 | $339.14 |
| 128 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 2 | $800.00 | $777.02 | $777.02 | $815.87 | $777.02 |
| 129 | Poles type 2 (657.0305) | EACH | 2 | $3,000.00 | $2,745.46 | $2,745.46 | $2,882.73 | $2,745.46 |
| 130 | Poles type 9-special (657.0347) | EACH | 2 | $14,000 | $13,648 | $13,648 | $14,330 | $13,648 |
| 131 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 2 | $1,000.00 | $974.53 | $974.53 | $1,023.26 | $974.53 |
| 132 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $1,050.00 | $1,031.91 | $1,031.91 | $1,083.51 | $1,031.91 |
| 133 | Monotube arms 45-FT-special (657.0546) | EACH | 2 | $7,000.00 | $6,691.19 | $6,691.19 | $7,025.75 | $6,691.19 |
| 134 | Traffic signal face 3S 12-inch (658.0173) | EACH | 11 | $850.00 | $830.22 | $830.22 | $871.73 | $830.22 |
| 135 | Traffic signal face 4S 12-inch (658.0174) | EACH | 4 | $1,100.00 | $1,074.12 | $1,074.12 | $1,127.83 | $1,074.12 |
| 136 | Traffic signal face 5S 12-inch (658.0175) | EACH | 2 | $1,350.00 | $1,294.18 | $1,294.18 | $1,358.89 | $1,294.18 |
| 137 | Pedestrian signal face 16-inch (658.0416) | EACH | 4 | $550.00 | $535.28 | $535.28 | $562.04 | $535.28 |
| 138 | Signal mounting hardware (location) 001. CTH C & spring valley DR (658.5070) | EACH | 1 | $5,500.00 | $5,306.61 | $5,306.61 | $5,571.94 | $5,306.61 |
| 139 | Temporary traffic signals for intersections (location) 001. CTH C & spring valley DR (661.0201) | EACH | 1 | $41,000 | $40,058 | $40,058 | $42,060 | $40,058 |
| 140 | Sawing asphalt (690.0150) | LF | 362 | $2.00 | $1.20 | $1.39 | $1.86 | $1.20 |
| 141 | Sawing concrete (690.0250) | LF | 5,146 | $2.00 | $2.25 | $2.15 | $2.23 | $2.25 |
| 142 | Incentive compressive strength concrete pavement (715.0720) | DOL | 6,501 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 143 | Incentive iri ride (740.0440) | DOL | 5,870 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 144 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 145 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,800 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 146 | Special 001. backfill slurry (SPV.0035) | CY | 10 | $100.00 | $153.00 | $350.00 | $127.05 | $121.00 |
| 147 | Special 101. adjusting sanitary manholes (SPV.0060) | EACH | 11 | $1,750.00 | $1,640.00 | $1,350.00 | $2,126.25 | $2,025.00 |
| 148 | Special 102. reconstructing sanitary manholes (SPV.0060) | EACH | 1 | $3,300.00 | $2,360.00 | $3,000.00 | $3,466.05 | $3,301.00 |
| 149 | Special 103. 12" eccentric plug valve & box (SPV.0060) | EACH | 2 | $18,000 | $17,300 | $25,000 | $25,725 | $24,500 |
| 150 | Special 104. 18" eccentric plug valve & box (SPV.0060) | EACH | 1 | $34,000 | $31,900 | $30,000 | $52,433 | $49,936 |
| 151 | Special 105. evp system installation, CTH C & spring valley DR. (SPV.0060) | EACH | 1 | $11,500 | $11,386 | $11,386 | $11,955 | $11,386 |
| 152 | Special 106. furn and install audible ped push button system at CTH C & spring valley DR (SPV.0060) | EACH | 1 | $8,000.00 | $7,851.66 | $7,851.66 | $8,244.24 | $7,851.66 |
| 153 | Special 107. furn and install signal cabinet and controller at CTH C & spring valley DR (SPV.0060) | EACH | 1 | $31,000 | $30,328 | $30,328 | $31,844 | $30,328 |
| 154 | Special 108. vehicular video detection system 4 cameras (SPV.0060) | EACH | 1 | $34,000 | $32,867 | $32,867 | $34,511 | $32,867 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 14, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.