WisDOT contract 20260512024 bid tabulation

2290-24-71. Let by Wisconsin DOT on May 12, 2026, Racine. 4 bids received; low bid $7,095,705 by Zignego Company, Inc..

Owner
Wisconsin DOT
Letting
12 MAY 2026
Pay items
228
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zignego Company, Inc.$7,095,705Low
2A.W. Oakes & Son, Inc.$7,380,728+4.0%
3Musson Bros., Inc.$7,503,900+6.0%
4Lalonde Contractors Incorporated$8,302,965+17%
WisDOT contract 20260512024: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zignego Company, Inc.2. A.W. Oakes & Son, Inc.3. Musson Bros., Inc.4. Lalonde Contractors Incorporated
1Clearing (201.0120)ID850$22.50$25.00$22.50$22.50
2Grubbing (201.0220)ID850$12.00$15.00$12.00$12.00
3Removing small pipe culverts (203.0100)EACH29$1,040.00$350.00$736.00$1,040.00
4Removing structure (structure) 01. 2'X2' box culvert, sta 73+17 (203.0220)EACH1$1,550.00$1,000.00$50,000$1,550.00
5Removing structure (structure) 02. 2'X2' box culvert, sta 145+61 (203.0220)EACH1$1,669.00$1,000.00$50,000$1,669.00
6Removing structure (structure) 03. 2'X2' box culvert, sta 188+82 (203.0220)EACH1$1,208.00$1,000.00$50,000$1,208.00
7Removing structure (structure) 04. 2'X2' box culvert, sta 194+46 (203.0220)EACH1$1,321.00$1,000.00$50,000$1,321.00
8Removing structure (structure) 05. C-51-7 (203.0220)EACH1$6,980.00$7,365.00$71,900$6,980.00
9Removing concrete pavement (204.0100)SY410$20.00$15.00$9.60$13.63
10Removing asphaltic surface (204.0110)SY183$20.00$15.00$15.00$15.00
11Removing asphaltic surface butt joints (204.0115)SY74$5.00$0.01$0.01$5.00
12Removing asphaltic surface milling (204.0120)SY61,400$1.30$1.60$1.50$1.30
13Removing curb & gutter (204.0150)LF1,351$8.00$10.00$3.80$7.31
14Removing guardrail (204.0165)LF659$5.00$5.00$2.30$5.00
15Removing surface drains (204.0190)EACH3$500.00$1,200.00$269.00$219.33
16Removing manholes (204.0210)EACH1$1,741.00$1,000.00$1,380.00$1,741.00
17Removing inlets (204.0220)EACH11$862.00$350.00$644.00$862.00
18Removing storm sewer (size) 01. 12-inch (204.0245)LF269$15.00$15.00$21.50$15.00
19Removing storm sewer (size) 02. 15-inch (204.0245)LF129$15.00$15.00$24.50$15.00
20Removing storm sewer (size) 03. 19X30-inch (204.0245)LF210$15.00$24.00$20.00$15.00
21Removing storm sewer (size) 04. 14X23-inch (204.0245)LF147$15.00$15.00$20.00$15.00
22Excavation common (205.0100)CY28,750$11.55$18.40$15.00$21.06
23Excavation for structures culverts (structure) 01. C-51-94 (206.2001)EACH1$11,998$11,500$412,000$11,998
24Backfill granular grade 1 (209.1100)CY7,063$35.24$15.00$20.00$52.89
25Backfill granular grade 2 (209.2100)CY180$80.00$32.00$40.00$64.12
26Backfill structure type B (210.2500)TON999$20.25$15.50$25.00$20.25
27Prepare foundation for asphaltic shoulders (211.0400)STA2$500.00$500.00$500.00$500.00
28Finishing roadway (project) 01. 2240-24-71 (213.0100)EACH1$1,000.00$2,500.00$5,000.00$3,015.00
29Finishing roadway (project) 02. 2290-25-70 (213.0100)EACH1$1,000.00$2,500.00$1,000.00$3,015.00
30Finishing roadway (project) 03. 2290-26-70 (213.0100)EACH1$1,000.00$2,500.00$1,000.00$3,015.00
31Base aggregate dense 3/4-inch (305.0110)TON1,699$31.00$43.00$24.50$26.01
32Base aggregate dense 1 1/4-inch (305.0120)TON15,603$15.00$17.00$0.01$22.61
33Base aggregate open-graded (310.0115)CY76$51.00$50.00$68.50$51.00
34Breaker run (311.0110)TON27,321$21.43$18.00$0.01$25.76
35Breaker run (311.0115)CY63$32.00$25.00$40.00$32.00
36Select crushed material (312.0115)CY3,390$0.01$0.01$0.01$56.68
37Coloring concrete wisdot red (405.0100)CY296$100.00$150.00$150.00$126.37
38Concrete pavement 8-inch (415.0080)SY25,865$71.39$69.00$69.00$77.20
39Concrete truck apron 12-inch (415.2010)SY887$112.00$86.00$86.00$105.02
40HMA cold weather paving (450.4000)TON115$5.00$10.00$10.00$5.00
41Tack coat (455.0605)GAL4,530$3.00$2.30$2.20$3.00
42Incentive density HMA pavement (460.2000)DOL4,410$1.00$1.00$1.00$1.00
43HMA pavement 4 MT 58-28 S (460.6224)TON6,890$77.50$80.00$78.00$77.50
44Asphaltic surface (465.0105)TON445$140.00$140.00$130.00$140.00
45Asphaltic surface driveways and field entrances (465.0120)TON293$140.00$175.00$155.00$140.00
46Asphaltic surface temporary (465.0125)TON52$140.00$350.00$340.00$140.00
47Asphaltic flumes (465.0315)SY78$45.00$35.00$32.00$45.00
48Asphaltic rumble strips, shoulder (465.0520)LF23,500$0.36$0.30$0.28$0.28
49Asphaltic rumble strips, centerline (465.0560)LF13,220$0.36$0.30$0.28$0.28
50Concrete masonry culverts (504.0100)CY87$987.00$1,115.00$0.01$987.00
51Bar steel reinforcement HS structures (505.0400)LB11,220$1.18$0.01$0.01$1.18
52Bar steel reinforcement HS coated structures (505.0600)LB1,140$1.20$0.01$0.01$1.20
53Concrete surface repair (509.1500)SF50$275.00$165.00$275.00$275.00
54Rubberized membrane waterproofing (516.0500)SY18$47.00$45.00$0.01$47.00
55Concrete collars for pipe (520.8000)EACH4$843.00$100.00$900.00$843.00
56Apron endwalls for culvert pipe steel 15-inch (521.1015)EACH8$375.00$200.00$361.00$375.00
57Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH26$404.00$230.00$390.00$404.00
58Apron endwalls for pipe arch steel 21X15-inch (521.1221)EACH8$393.00$250.00$379.00$393.00
59Apron endwalls for pipe arch steel 35X24-inch (521.1235)EACH6$737.00$635.00$723.00$737.00
60Culvert pipe corrugated steel 15- inch (521.3115)LF177$68.00$69.00$71.00$68.00
61Culvert pipe corrugated steel 18- inch (521.3118)LF556$82.00$75.00$77.00$82.00
62Pipe arch corrugated steel 21X15- inch (521.3721)LF190$76.00$84.00$80.00$76.00
63Pipe arch corrugated steel 35X24- inch (521.3735)LF151$167.00$123.00$108.00$167.00
64Culvert pipe reinforced concrete class III 30-inch (522.0130)LF111$155.00$140.00$119.00$155.00
65Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF174$184.00$327.00$132.00$184.00
66Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015)EACH2$1,554.00$1,200.00$1,200.00$1,554.00
67Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH3$1,777.00$1,700.00$1,410.00$1,777.00
68Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH7$2,003.00$2,400.00$1,620.00$2,003.00
69Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH2$2,578.00$3,000.00$2,170.00$2,578.00
70Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424)LF123$255.00$315.00$189.00$255.00
71Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429)LF84$310.00$290.00$239.00$310.00
72Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624)EACH4$2,253.00$2,700.00$809.00$2,253.00
73Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629)EACH2$2,641.00$3,500.00$857.00$2,641.00
74Concrete curb & gutter 18-inch type A (601.0405)LF577$23.00$42.25$42.50$39.51
75Concrete curb & gutter 30-inch type A (601.0409)LF5,546$22.00$22.00$22.00$31.75
76Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF2,863$26.00$25.25$25.50$39.73
77Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF1,707$25.00$26.00$26.00$40.64
78Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF751$28.00$35.50$35.50$54.82
79Concrete sidewalk 4-inch (602.0405)SF28,865$7.00$6.15$6.20$7.90
80Concrete driveway 6-inch (602.0810)SY722$75.00$75.00$75.00$84.43
81Concrete surface drains (602.3010)CY10$1,100.00$1,500.00$1,500.00$1,142.48
82Riprap medium (606.0200)CY134$173.00$125.00$120.00$173.00
83Riprap heavy (606.0300)CY37$173.00$85.00$120.00$80.00
84Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF48$107.00$96.00$109.00$107.00
85Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF189$117.00$100.00$86.00$117.00
86Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF215$128.00$102.00$83.00$128.00
87Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF102$125.00$115.00$102.00$125.00
88Storm sewer pipe reinforced concrete class III 36-inch (608.0336)LF136$228.00$210.00$149.00$228.00
89Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF26$102.00$93.00$96.00$102.00
90Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF252$103.00$84.00$81.50$103.00
91Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF753$110.00$124.00$98.00$110.00
92Manhole covers type J (611.0530)EACH3$782.00$645.00$753.00$782.00
93Inlet covers type F (611.0615)EACH2$1,568.00$1,900.00$2,110.00$1,568.00
94Inlet covers type H (611.0624)EACH4$1,014.00$900.00$1,080.00$1,014.00
95Inlet covers type H-S (611.0639)EACH27$1,014.00$900.00$1,090.00$1,014.00
96Inlet covers type MS (611.0642)EACH1$637.00$700.00$549.00$637.00
97Inlet covers type T (611.0652)EACH4$1,326.00$1,200.00$1,300.00$1,326.00
98Catch basins 5-FT diameter (611.1005)EACH1$5,273.00$4,500.00$3,770.00$5,273.00
99Manholes 4-FT diameter (611.2004)EACH1$3,159.00$2,900.00$2,580.00$3,159.00
100Manholes 6-FT diameter (611.2006)EACH1$5,280.00$5,200.00$4,360.00$5,280.00
101Manholes 7-FT diameter (611.2007)EACH1$9,205.00$8,900.00$8,040.00$9,205.00
102Inlets 3-FT diameter (611.3003)EACH2$2,021.00$2,200.00$1,840.00$2,021.00
103Inlets 4-FT diameter (611.3004)EACH8$2,606.00$2,700.00$2,450.00$2,606.00
104Inlets 2X2.5-FT (611.3225)EACH4$1,837.00$2,200.00$1,680.00$1,837.00
105Inlets 2X3-FT (611.3230)EACH21$2,027.00$2,500.00$1,570.00$2,027.00
106Inlets median 2 grate (611.3902)EACH1$3,614.00$4,000.00$3,550.00$3,614.00
107Pipe underdrain 6-inch (612.0106)LF1,719$16.00$16.00$9.20$16.00
108Pipe underdrain unperforated 6- inch (612.0206)LF270$44.00$16.00$13.00$44.00
109Apron endwalls for underdrain reinforced concrete 6-inch (612.0806)EACH11$703.00$325.00$330.00$703.00
110Barrier system grading shaping finishing (614.0010)EACH4$2,500.00$4,000.00$4,440.00$2,500.00
111Steel plate beam guard over low- fill culverts class A (614.0340)LF200$38.00$40.00$38.00$38.00
112Guardrail mow strip emulsified asphalt (614.0397)SY195$25.00$45.00$17.00$25.00
113MGS guardrail 3 (614.2300)LF613.50$30.00$30.00$28.50$30.00
114MGS guardrail terminal eat (614.2610)EACH6$3,900.00$4,000.00$4,900.00$3,900.00
115Maintenance and repair of haul roads (project) 01. 2290-24-71 (618.0100)EACH1$1.00$1,500.00$0.01$0.01
116Maintenance and repair of haul roads (project) 02. 2290-25-70 (618.0100)EACH1$1.00$1,500.00$0.01$0.01
117Maintenance and repair of haul roads (project) 03. 2290-26-70 (618.0100)EACH1$1.00$1,500.00$0.01$0.01
118Mobilization (619.1000)EACH1$349,000$525,000$996,000$368,209
119Concrete median sloped nose (620.0300)SF754$16.00$16.00$16.00$18.87
120Water (624.0100)MGAL867$1.00$33.00$0.01$0.01
121Topsoil (625.0100)SY5,399$5.25$6.00$9.50$5.25
122Salvaged topsoil (625.0500)SY28,114$3.00$4.50$2.50$3.23
123Mulching (627.0200)SY3,540$0.25$0.30$0.28$0.25
124Silt fence (628.1504)LF9,782$1.90$2.00$2.00$1.90
125Silt fence maintenance (628.1520)LF9,782$0.01$0.01$0.01$0.01
126Silt fence heavy duty (628.1530.S)LF100$10.00$11.00$11.00$10.00
127Silt fence heavy duty maintenance (628.1535.S)LF100$0.50$0.50$2.00$0.50
128Mobilizations erosion control (628.1905)EACH14$50.00$50.00$250.00$50.00
129Mobilizations emergency erosion control (628.1910)EACH14$50.00$50.00$350.00$50.00
130Erosion mat class I type A (628.2002)SY25,354$0.89$1.00$1.00$0.89
131Erosion mat urban class I type B (628.2008)SY1,565$2.00$2.25$2.20$2.00
132Erosion mat class II type B (628.2023)SY2,668$2.00$2.00$2.00$2.00
133Soil stabilizer type B (628.6510)ACRE0.66$1,000.00$1,200.00$1,200.00$1,000.00
134Inlet protection type A (628.7005)EACH4$50.00$55.00$85.00$50.00
135Inlet protection type C (628.7015)EACH36$50.00$55.00$65.00$50.00
136Inlet protection type D (628.7020)EACH6$50.00$55.00$120.00$50.00
137Temporary ditch checks (628.7504)LF1,515$7.00$8.00$10.00$7.00
138Culvert pipe checks (628.7555)EACH291$15.00$16.00$18.00$15.00
139Tracking pads (628.7560)EACH4$1.00$100.00$2,130.00$0.01
140Rock bags (628.7570)EACH154$15.00$15.00$12.00$15.00
141Fertilizer type A (629.0205)CWT20$100.00$100.00$135.00$100.00
142Seeding mixture no. 30 (630.0130)LB1,364$9.00$10.00$10.00$9.00
143Seeding temporary (630.0200)LB1,312$5.00$5.00$1.00$5.00
144Seed water (630.0500)MGAL675$5.00$5.00$0.01$5.00
145Sod lawn (631.1000)SY93$10.00$12.00$17.00$10.00
146Markers row (633.5100)EACH46$50.00$55.00$65.00$50.00
147Markers culvert end (633.5200)EACH33$70.00$75.00$85.00$70.00
148Posts wood 4X6-inch X 18-FT (634.0618)EACH99$100.00$110.00$125.00$100.00
149Posts wood 4X6-inch X 22-FT (634.0622)EACH24$100.00$110.00$225.00$100.00
150Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH73$200.00$220.00$215.00$200.00
151Signs type II reflective H (637.2210)SF1,116.55$20.75$22.00$22.00$20.75
152Signs type II reflective F (637.2230)SF490.86$23.75$25.00$23.00$23.75
153Moving signs type II (638.2102)EACH9$100.00$100.00$50.00$100.00
154Removing signs type II (638.2602)EACH131$15.00$20.00$25.00$15.00
155Removing small sign supports (638.3000)EACH136$15.00$20.00$25.00$15.00
156Field office type C (642.5201)EACH1$40,000$28,000$46,000$33,432
157Traffic control drums (643.0300)DAY4,200$0.17$0.30$0.20$0.20
158Traffic control barricades type III (643.0420)DAY2,848$0.72$0.70$0.60$0.60
159Traffic control warning lights type A (643.0705)DAY5,136$0.09$0.25$0.20$0.20
160Traffic control signs (643.0900)DAY30,889$0.36$0.30$0.25$0.25
161Traffic control covering signs type II (643.0920)EACH15$35.00$35.00$35.00$35.00
162Traffic control signs fixed message (643.1000)SF208$16.00$20.00$15.00$15.00
163Traffic control signs PCMS (643.1050)DAY98$60.00$30.00$30.00$30.00
164Traffic control cones 42-inch (643.1070)DAY474$1.50$0.40$0.40$0.40
165Temporary marking line paint 6- inch (643.3165)LF29,354$0.50$0.50$0.44$0.44
166Traffic control (643.5000)EACH1$13,287$52,000$49,800$49,750
167Geotextile type C (645.0105)SY211$4.00$3.00$2.90$4.00
168Geotextile type DF schedule A (645.0111)SY864$1.00$3.00$2.40$1.00
169Geotextile type HR (645.0120)SY431$3.00$4.00$3.40$5.00
170Marking line grooved wet ref epoxy 6-inch (646.2040)LF92,547$1.50$1.33$1.30$1.28
171Marking line grooved wet ref epoxy 10-inch (646.4040)LF1,368$2.80$3.00$2.80$2.78
172Marking arrow epoxy (646.5020)EACH6$320.00$375.00$374.00$374.36
173Marking word epoxy (646.5120)EACH3$325.00$400.00$379.00$378.96
174Marking outfall epoxy (646.5520)EACH11$85.00$50.00$48.50$48.67
175Marking stop line epoxy 18-inch (646.6120)LF54$9.85$16.00$15.50$15.71
176Marking dotted extension epoxy 18-inch (646.6320)LF158$9.85$16.00$15.50$15.71
177Cold weather marking epoxy 6-inch (646.6466)LF264$0.32$10.00$9.00$9.00
178Marking diagonal epoxy 12-inch (646.7120)LF430$9.50$16.00$15.50$15.30
179Marking curb epoxy (646.8120)LF307$10.00$8.00$7.50$7.51
180Marking island nose epoxy (646.8220)EACH8$310.00$300.00$283.00$282.61
181Marking removal line water blasting 6-inch (646.9012)LF736$2.25$3.00$2.90$2.85
182Construction staking storm sewer (650.4000)EACH46$130.00$150.00$130.00$130.00
183Construction staking subgrade (650.4500)LF6,458$0.01$1.00$0.01$0.01
184Construction staking pipe culverts (650.6000)EACH7$180.00$150.00$180.00$180.00
185Construction staking structure layout (structure) 01. C-51-94 (650.6501)EACH1$1,700.00$1,500.00$1,700.00$1,700.00
186Construction staking concrete pavement (650.7000)LF6,257$0.01$1.00$0.01$0.01
187Construction staking resurfacing reference (650.8000)LF15,386$0.25$0.50$0.25$0.25
188Construction staking electrical installations (project) 01. 2290-25- 70 (650.8501)EACH1$1,800.00$1,500.00$1,800.00$1,800.00
189Construction staking electrical installations (project) 02. 2290-26- 70 (650.8501)EACH1$1,800.00$1,500.00$1,800.00$1,800.00
190Construction staking sidewalk (project) 01. 2290-25-70 (650.9500)EACH1$0.01$500.00$0.01$0.01
191Construction staking sidewalk (project) 02. 2290-26-70 (650.9500)EACH1$0.01$500.00$0.01$0.01
192Construction staking supplemental control (project) 01. 2290-24-71 (650.9911)EACH1$1,200.00$2,500.00$1,200.00$1,200.00
193Construction staking supplemental control (project) 02. 2290-25-70 (650.9911)EACH1$10,000$2,500.00$10,000$10,000
194Construction staking supplemental control (project) 03. 2290-26-70 (650.9911)EACH1$10,000$2,500.00$10,000$10,000
195Construction staking slope stakes (650.9920)LF6,693$0.85$1.00$0.85$0.85
196Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF3,275$8.00$8.00$8.00$8.00
197Conduit rigid nonmetallic schedule 80 2-inch (652.0325)LF624$9.00$9.00$9.00$9.00
198Pull boxes non-conductive 24X42- inch (653.0164)EACH15$2,200.00$2,300.00$2,200.00$2,200.00
199Concrete bases type 5 (654.0105)EACH25$1,200.00$1,300.00$1,200.00$1,200.00
200Concrete control cabinet bases type L30 (654.0230)EACH2$2,200.00$2,500.00$2,200.00$2,200.00
201Electrical wire lighting 12 AWG (655.0610)LF19,214$0.86$1.00$0.86$0.86
202Electrical wire lighting 8 AWG (655.0620)LF4,872$1.24$1.30$1.20$1.24
203Electrical wire lighting 2 AWG (655.0635)LF60$3.01$3.10$3.00$3.01
204Electrical service meter breaker pedestal (location) 01. 4 mile road (656.0201)EACH1$2,500.00$2,500.00$2,500.00$2,500.00
205Electrical service meter breaker pedestal (location) 02. 5 mile road (656.0201)EACH1$2,500.00$2,500.00$2,500.00$2,500.00
206Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH25$650.00$700.00$650.00$650.00
207Poles type 5-aluminum (657.0322)EACH25$2,300.00$2,300.00$2,300.00$2,300.00
208Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610)EACH13$290.00$300.00$290.00$290.00
209Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH9$310.00$325.00$310.00$310.00
210Luminaire arms truss type 4 1/2- inch clamp 10-FT (657.0705)EACH3$440.00$450.00$440.00$440.00
211Luminaires utility LED C (659.1125)EACH25$245.00$275.00$245.00$245.00
212Lighting control cabinets 120/240 30-inch (659.2130)EACH2$9,500.00$9,500.00$9,500.00$9,500.00
213Sawing asphalt (690.0150)LF389$2.50$3.00$3.00$1.30
214Sawing concrete (690.0250)LF318$2.50$3.00$3.00$2.25
215Incentive strength concrete structures (715.0502)DOL522$1.00$1.00$1.00$1.00
216Incentive compressive strength concrete pavement (715.0720)DOL7,927$1.00$1.00$1.00$1.00
217Incentive iri ride (740.0440)DOL16,730$1.00$1.00$1.00$1.00
218On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,600$5.00$5.00$5.00$5.00
219On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS4,400$5.00$5.00$5.00$5.00
220Special 01. removing solar flashing beacon and pole STH 38 NB at 4 mile road (SPV.0060)EACH1$1,200.00$1,300.00$1,200.00$1,200.00
221Special 02. removing solar flashing beacon and pole STH 38 SB at 4 mile road (SPV.0060)EACH1$1,200.00$1,300.00$1,200.00$1,200.00
222Special 03. removing solar flashing beacon and pole STH 38 NB at 5 mile road (SPV.0060)EACH1$1,200.00$1,300.00$1,200.00$1,200.00
223Special 04. removing solar flashing beacon and pole STH 38 SB at 5 mile road (SPV.0060)EACH1$1,200.00$1,300.00$1,200.00$1,200.00
224Special 05. utility line opening (ulo) (SPV.0060)EACH15$1.00$500.00$926.00$1,952.00
225Special 06. temporary lighting system, 4 mile RD roundabout (SPV.0060)EACH1$5,000.00$6,000.00$5,000.00$5,000.00
226Special 07. temporary water diversion - box culvert C-51-94 (SPV.0060)EACH1$11,865$10,000$164,000$11,865
227Special 08. section corner monuments (SPV.0060)EACH1$1,000.00$500.00$1,380.00$0.01
228Special 01. asphaltic repair (SPV.0195)TON360$140.00$200.00$180.00$140.00
WisDOT contract 20260512024: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of May 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy