WisDOT contract 20260512024 bid tabulation
2290-24-71. Let by Wisconsin DOT on May 12, 2026, Racine. 4 bids received; low bid $7,095,705 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 12 MAY 2026
- Pay items
- 228
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $7,095,705 | Low |
| 2 | A.W. Oakes & Son, Inc. | $7,380,728 | +4.0% |
| 3 | Musson Bros., Inc. | $7,503,900 | +6.0% |
| 4 | Lalonde Contractors Incorporated | $8,302,965 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. A.W. Oakes & Son, Inc. | 3. Musson Bros., Inc. | 4. Lalonde Contractors Incorporated |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 850 | $22.50 | $25.00 | $22.50 | $22.50 |
| 2 | Grubbing (201.0220) | ID | 850 | $12.00 | $15.00 | $12.00 | $12.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 29 | $1,040.00 | $350.00 | $736.00 | $1,040.00 |
| 4 | Removing structure (structure) 01. 2'X2' box culvert, sta 73+17 (203.0220) | EACH | 1 | $1,550.00 | $1,000.00 | $50,000 | $1,550.00 |
| 5 | Removing structure (structure) 02. 2'X2' box culvert, sta 145+61 (203.0220) | EACH | 1 | $1,669.00 | $1,000.00 | $50,000 | $1,669.00 |
| 6 | Removing structure (structure) 03. 2'X2' box culvert, sta 188+82 (203.0220) | EACH | 1 | $1,208.00 | $1,000.00 | $50,000 | $1,208.00 |
| 7 | Removing structure (structure) 04. 2'X2' box culvert, sta 194+46 (203.0220) | EACH | 1 | $1,321.00 | $1,000.00 | $50,000 | $1,321.00 |
| 8 | Removing structure (structure) 05. C-51-7 (203.0220) | EACH | 1 | $6,980.00 | $7,365.00 | $71,900 | $6,980.00 |
| 9 | Removing concrete pavement (204.0100) | SY | 410 | $20.00 | $15.00 | $9.60 | $13.63 |
| 10 | Removing asphaltic surface (204.0110) | SY | 183 | $20.00 | $15.00 | $15.00 | $15.00 |
| 11 | Removing asphaltic surface butt joints (204.0115) | SY | 74 | $5.00 | $0.01 | $0.01 | $5.00 |
| 12 | Removing asphaltic surface milling (204.0120) | SY | 61,400 | $1.30 | $1.60 | $1.50 | $1.30 |
| 13 | Removing curb & gutter (204.0150) | LF | 1,351 | $8.00 | $10.00 | $3.80 | $7.31 |
| 14 | Removing guardrail (204.0165) | LF | 659 | $5.00 | $5.00 | $2.30 | $5.00 |
| 15 | Removing surface drains (204.0190) | EACH | 3 | $500.00 | $1,200.00 | $269.00 | $219.33 |
| 16 | Removing manholes (204.0210) | EACH | 1 | $1,741.00 | $1,000.00 | $1,380.00 | $1,741.00 |
| 17 | Removing inlets (204.0220) | EACH | 11 | $862.00 | $350.00 | $644.00 | $862.00 |
| 18 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 269 | $15.00 | $15.00 | $21.50 | $15.00 |
| 19 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 129 | $15.00 | $15.00 | $24.50 | $15.00 |
| 20 | Removing storm sewer (size) 03. 19X30-inch (204.0245) | LF | 210 | $15.00 | $24.00 | $20.00 | $15.00 |
| 21 | Removing storm sewer (size) 04. 14X23-inch (204.0245) | LF | 147 | $15.00 | $15.00 | $20.00 | $15.00 |
| 22 | Excavation common (205.0100) | CY | 28,750 | $11.55 | $18.40 | $15.00 | $21.06 |
| 23 | Excavation for structures culverts (structure) 01. C-51-94 (206.2001) | EACH | 1 | $11,998 | $11,500 | $412,000 | $11,998 |
| 24 | Backfill granular grade 1 (209.1100) | CY | 7,063 | $35.24 | $15.00 | $20.00 | $52.89 |
| 25 | Backfill granular grade 2 (209.2100) | CY | 180 | $80.00 | $32.00 | $40.00 | $64.12 |
| 26 | Backfill structure type B (210.2500) | TON | 999 | $20.25 | $15.50 | $25.00 | $20.25 |
| 27 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 2 | $500.00 | $500.00 | $500.00 | $500.00 |
| 28 | Finishing roadway (project) 01. 2240-24-71 (213.0100) | EACH | 1 | $1,000.00 | $2,500.00 | $5,000.00 | $3,015.00 |
| 29 | Finishing roadway (project) 02. 2290-25-70 (213.0100) | EACH | 1 | $1,000.00 | $2,500.00 | $1,000.00 | $3,015.00 |
| 30 | Finishing roadway (project) 03. 2290-26-70 (213.0100) | EACH | 1 | $1,000.00 | $2,500.00 | $1,000.00 | $3,015.00 |
| 31 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,699 | $31.00 | $43.00 | $24.50 | $26.01 |
| 32 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 15,603 | $15.00 | $17.00 | $0.01 | $22.61 |
| 33 | Base aggregate open-graded (310.0115) | CY | 76 | $51.00 | $50.00 | $68.50 | $51.00 |
| 34 | Breaker run (311.0110) | TON | 27,321 | $21.43 | $18.00 | $0.01 | $25.76 |
| 35 | Breaker run (311.0115) | CY | 63 | $32.00 | $25.00 | $40.00 | $32.00 |
| 36 | Select crushed material (312.0115) | CY | 3,390 | $0.01 | $0.01 | $0.01 | $56.68 |
| 37 | Coloring concrete wisdot red (405.0100) | CY | 296 | $100.00 | $150.00 | $150.00 | $126.37 |
| 38 | Concrete pavement 8-inch (415.0080) | SY | 25,865 | $71.39 | $69.00 | $69.00 | $77.20 |
| 39 | Concrete truck apron 12-inch (415.2010) | SY | 887 | $112.00 | $86.00 | $86.00 | $105.02 |
| 40 | HMA cold weather paving (450.4000) | TON | 115 | $5.00 | $10.00 | $10.00 | $5.00 |
| 41 | Tack coat (455.0605) | GAL | 4,530 | $3.00 | $2.30 | $2.20 | $3.00 |
| 42 | Incentive density HMA pavement (460.2000) | DOL | 4,410 | $1.00 | $1.00 | $1.00 | $1.00 |
| 43 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 6,890 | $77.50 | $80.00 | $78.00 | $77.50 |
| 44 | Asphaltic surface (465.0105) | TON | 445 | $140.00 | $140.00 | $130.00 | $140.00 |
| 45 | Asphaltic surface driveways and field entrances (465.0120) | TON | 293 | $140.00 | $175.00 | $155.00 | $140.00 |
| 46 | Asphaltic surface temporary (465.0125) | TON | 52 | $140.00 | $350.00 | $340.00 | $140.00 |
| 47 | Asphaltic flumes (465.0315) | SY | 78 | $45.00 | $35.00 | $32.00 | $45.00 |
| 48 | Asphaltic rumble strips, shoulder (465.0520) | LF | 23,500 | $0.36 | $0.30 | $0.28 | $0.28 |
| 49 | Asphaltic rumble strips, centerline (465.0560) | LF | 13,220 | $0.36 | $0.30 | $0.28 | $0.28 |
| 50 | Concrete masonry culverts (504.0100) | CY | 87 | $987.00 | $1,115.00 | $0.01 | $987.00 |
| 51 | Bar steel reinforcement HS structures (505.0400) | LB | 11,220 | $1.18 | $0.01 | $0.01 | $1.18 |
| 52 | Bar steel reinforcement HS coated structures (505.0600) | LB | 1,140 | $1.20 | $0.01 | $0.01 | $1.20 |
| 53 | Concrete surface repair (509.1500) | SF | 50 | $275.00 | $165.00 | $275.00 | $275.00 |
| 54 | Rubberized membrane waterproofing (516.0500) | SY | 18 | $47.00 | $45.00 | $0.01 | $47.00 |
| 55 | Concrete collars for pipe (520.8000) | EACH | 4 | $843.00 | $100.00 | $900.00 | $843.00 |
| 56 | Apron endwalls for culvert pipe steel 15-inch (521.1015) | EACH | 8 | $375.00 | $200.00 | $361.00 | $375.00 |
| 57 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 26 | $404.00 | $230.00 | $390.00 | $404.00 |
| 58 | Apron endwalls for pipe arch steel 21X15-inch (521.1221) | EACH | 8 | $393.00 | $250.00 | $379.00 | $393.00 |
| 59 | Apron endwalls for pipe arch steel 35X24-inch (521.1235) | EACH | 6 | $737.00 | $635.00 | $723.00 | $737.00 |
| 60 | Culvert pipe corrugated steel 15- inch (521.3115) | LF | 177 | $68.00 | $69.00 | $71.00 | $68.00 |
| 61 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 556 | $82.00 | $75.00 | $77.00 | $82.00 |
| 62 | Pipe arch corrugated steel 21X15- inch (521.3721) | LF | 190 | $76.00 | $84.00 | $80.00 | $76.00 |
| 63 | Pipe arch corrugated steel 35X24- inch (521.3735) | LF | 151 | $167.00 | $123.00 | $108.00 | $167.00 |
| 64 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 111 | $155.00 | $140.00 | $119.00 | $155.00 |
| 65 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 174 | $184.00 | $327.00 | $132.00 | $184.00 |
| 66 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 2 | $1,554.00 | $1,200.00 | $1,200.00 | $1,554.00 |
| 67 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 3 | $1,777.00 | $1,700.00 | $1,410.00 | $1,777.00 |
| 68 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 7 | $2,003.00 | $2,400.00 | $1,620.00 | $2,003.00 |
| 69 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 2 | $2,578.00 | $3,000.00 | $2,170.00 | $2,578.00 |
| 70 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 123 | $255.00 | $315.00 | $189.00 | $255.00 |
| 71 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429) | LF | 84 | $310.00 | $290.00 | $239.00 | $310.00 |
| 72 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 4 | $2,253.00 | $2,700.00 | $809.00 | $2,253.00 |
| 73 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 2 | $2,641.00 | $3,500.00 | $857.00 | $2,641.00 |
| 74 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 577 | $23.00 | $42.25 | $42.50 | $39.51 |
| 75 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 5,546 | $22.00 | $22.00 | $22.00 | $31.75 |
| 76 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 2,863 | $26.00 | $25.25 | $25.50 | $39.73 |
| 77 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 1,707 | $25.00 | $26.00 | $26.00 | $40.64 |
| 78 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 751 | $28.00 | $35.50 | $35.50 | $54.82 |
| 79 | Concrete sidewalk 4-inch (602.0405) | SF | 28,865 | $7.00 | $6.15 | $6.20 | $7.90 |
| 80 | Concrete driveway 6-inch (602.0810) | SY | 722 | $75.00 | $75.00 | $75.00 | $84.43 |
| 81 | Concrete surface drains (602.3010) | CY | 10 | $1,100.00 | $1,500.00 | $1,500.00 | $1,142.48 |
| 82 | Riprap medium (606.0200) | CY | 134 | $173.00 | $125.00 | $120.00 | $173.00 |
| 83 | Riprap heavy (606.0300) | CY | 37 | $173.00 | $85.00 | $120.00 | $80.00 |
| 84 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 48 | $107.00 | $96.00 | $109.00 | $107.00 |
| 85 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 189 | $117.00 | $100.00 | $86.00 | $117.00 |
| 86 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 215 | $128.00 | $102.00 | $83.00 | $128.00 |
| 87 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 102 | $125.00 | $115.00 | $102.00 | $125.00 |
| 88 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 136 | $228.00 | $210.00 | $149.00 | $228.00 |
| 89 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 26 | $102.00 | $93.00 | $96.00 | $102.00 |
| 90 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 252 | $103.00 | $84.00 | $81.50 | $103.00 |
| 91 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 753 | $110.00 | $124.00 | $98.00 | $110.00 |
| 92 | Manhole covers type J (611.0530) | EACH | 3 | $782.00 | $645.00 | $753.00 | $782.00 |
| 93 | Inlet covers type F (611.0615) | EACH | 2 | $1,568.00 | $1,900.00 | $2,110.00 | $1,568.00 |
| 94 | Inlet covers type H (611.0624) | EACH | 4 | $1,014.00 | $900.00 | $1,080.00 | $1,014.00 |
| 95 | Inlet covers type H-S (611.0639) | EACH | 27 | $1,014.00 | $900.00 | $1,090.00 | $1,014.00 |
| 96 | Inlet covers type MS (611.0642) | EACH | 1 | $637.00 | $700.00 | $549.00 | $637.00 |
| 97 | Inlet covers type T (611.0652) | EACH | 4 | $1,326.00 | $1,200.00 | $1,300.00 | $1,326.00 |
| 98 | Catch basins 5-FT diameter (611.1005) | EACH | 1 | $5,273.00 | $4,500.00 | $3,770.00 | $5,273.00 |
| 99 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $3,159.00 | $2,900.00 | $2,580.00 | $3,159.00 |
| 100 | Manholes 6-FT diameter (611.2006) | EACH | 1 | $5,280.00 | $5,200.00 | $4,360.00 | $5,280.00 |
| 101 | Manholes 7-FT diameter (611.2007) | EACH | 1 | $9,205.00 | $8,900.00 | $8,040.00 | $9,205.00 |
| 102 | Inlets 3-FT diameter (611.3003) | EACH | 2 | $2,021.00 | $2,200.00 | $1,840.00 | $2,021.00 |
| 103 | Inlets 4-FT diameter (611.3004) | EACH | 8 | $2,606.00 | $2,700.00 | $2,450.00 | $2,606.00 |
| 104 | Inlets 2X2.5-FT (611.3225) | EACH | 4 | $1,837.00 | $2,200.00 | $1,680.00 | $1,837.00 |
| 105 | Inlets 2X3-FT (611.3230) | EACH | 21 | $2,027.00 | $2,500.00 | $1,570.00 | $2,027.00 |
| 106 | Inlets median 2 grate (611.3902) | EACH | 1 | $3,614.00 | $4,000.00 | $3,550.00 | $3,614.00 |
| 107 | Pipe underdrain 6-inch (612.0106) | LF | 1,719 | $16.00 | $16.00 | $9.20 | $16.00 |
| 108 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 270 | $44.00 | $16.00 | $13.00 | $44.00 |
| 109 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 11 | $703.00 | $325.00 | $330.00 | $703.00 |
| 110 | Barrier system grading shaping finishing (614.0010) | EACH | 4 | $2,500.00 | $4,000.00 | $4,440.00 | $2,500.00 |
| 111 | Steel plate beam guard over low- fill culverts class A (614.0340) | LF | 200 | $38.00 | $40.00 | $38.00 | $38.00 |
| 112 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 195 | $25.00 | $45.00 | $17.00 | $25.00 |
| 113 | MGS guardrail 3 (614.2300) | LF | 613.50 | $30.00 | $30.00 | $28.50 | $30.00 |
| 114 | MGS guardrail terminal eat (614.2610) | EACH | 6 | $3,900.00 | $4,000.00 | $4,900.00 | $3,900.00 |
| 115 | Maintenance and repair of haul roads (project) 01. 2290-24-71 (618.0100) | EACH | 1 | $1.00 | $1,500.00 | $0.01 | $0.01 |
| 116 | Maintenance and repair of haul roads (project) 02. 2290-25-70 (618.0100) | EACH | 1 | $1.00 | $1,500.00 | $0.01 | $0.01 |
| 117 | Maintenance and repair of haul roads (project) 03. 2290-26-70 (618.0100) | EACH | 1 | $1.00 | $1,500.00 | $0.01 | $0.01 |
| 118 | Mobilization (619.1000) | EACH | 1 | $349,000 | $525,000 | $996,000 | $368,209 |
| 119 | Concrete median sloped nose (620.0300) | SF | 754 | $16.00 | $16.00 | $16.00 | $18.87 |
| 120 | Water (624.0100) | MGAL | 867 | $1.00 | $33.00 | $0.01 | $0.01 |
| 121 | Topsoil (625.0100) | SY | 5,399 | $5.25 | $6.00 | $9.50 | $5.25 |
| 122 | Salvaged topsoil (625.0500) | SY | 28,114 | $3.00 | $4.50 | $2.50 | $3.23 |
| 123 | Mulching (627.0200) | SY | 3,540 | $0.25 | $0.30 | $0.28 | $0.25 |
| 124 | Silt fence (628.1504) | LF | 9,782 | $1.90 | $2.00 | $2.00 | $1.90 |
| 125 | Silt fence maintenance (628.1520) | LF | 9,782 | $0.01 | $0.01 | $0.01 | $0.01 |
| 126 | Silt fence heavy duty (628.1530.S) | LF | 100 | $10.00 | $11.00 | $11.00 | $10.00 |
| 127 | Silt fence heavy duty maintenance (628.1535.S) | LF | 100 | $0.50 | $0.50 | $2.00 | $0.50 |
| 128 | Mobilizations erosion control (628.1905) | EACH | 14 | $50.00 | $50.00 | $250.00 | $50.00 |
| 129 | Mobilizations emergency erosion control (628.1910) | EACH | 14 | $50.00 | $50.00 | $350.00 | $50.00 |
| 130 | Erosion mat class I type A (628.2002) | SY | 25,354 | $0.89 | $1.00 | $1.00 | $0.89 |
| 131 | Erosion mat urban class I type B (628.2008) | SY | 1,565 | $2.00 | $2.25 | $2.20 | $2.00 |
| 132 | Erosion mat class II type B (628.2023) | SY | 2,668 | $2.00 | $2.00 | $2.00 | $2.00 |
| 133 | Soil stabilizer type B (628.6510) | ACRE | 0.66 | $1,000.00 | $1,200.00 | $1,200.00 | $1,000.00 |
| 134 | Inlet protection type A (628.7005) | EACH | 4 | $50.00 | $55.00 | $85.00 | $50.00 |
| 135 | Inlet protection type C (628.7015) | EACH | 36 | $50.00 | $55.00 | $65.00 | $50.00 |
| 136 | Inlet protection type D (628.7020) | EACH | 6 | $50.00 | $55.00 | $120.00 | $50.00 |
| 137 | Temporary ditch checks (628.7504) | LF | 1,515 | $7.00 | $8.00 | $10.00 | $7.00 |
| 138 | Culvert pipe checks (628.7555) | EACH | 291 | $15.00 | $16.00 | $18.00 | $15.00 |
| 139 | Tracking pads (628.7560) | EACH | 4 | $1.00 | $100.00 | $2,130.00 | $0.01 |
| 140 | Rock bags (628.7570) | EACH | 154 | $15.00 | $15.00 | $12.00 | $15.00 |
| 141 | Fertilizer type A (629.0205) | CWT | 20 | $100.00 | $100.00 | $135.00 | $100.00 |
| 142 | Seeding mixture no. 30 (630.0130) | LB | 1,364 | $9.00 | $10.00 | $10.00 | $9.00 |
| 143 | Seeding temporary (630.0200) | LB | 1,312 | $5.00 | $5.00 | $1.00 | $5.00 |
| 144 | Seed water (630.0500) | MGAL | 675 | $5.00 | $5.00 | $0.01 | $5.00 |
| 145 | Sod lawn (631.1000) | SY | 93 | $10.00 | $12.00 | $17.00 | $10.00 |
| 146 | Markers row (633.5100) | EACH | 46 | $50.00 | $55.00 | $65.00 | $50.00 |
| 147 | Markers culvert end (633.5200) | EACH | 33 | $70.00 | $75.00 | $85.00 | $70.00 |
| 148 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 99 | $100.00 | $110.00 | $125.00 | $100.00 |
| 149 | Posts wood 4X6-inch X 22-FT (634.0622) | EACH | 24 | $100.00 | $110.00 | $225.00 | $100.00 |
| 150 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 73 | $200.00 | $220.00 | $215.00 | $200.00 |
| 151 | Signs type II reflective H (637.2210) | SF | 1,116.55 | $20.75 | $22.00 | $22.00 | $20.75 |
| 152 | Signs type II reflective F (637.2230) | SF | 490.86 | $23.75 | $25.00 | $23.00 | $23.75 |
| 153 | Moving signs type II (638.2102) | EACH | 9 | $100.00 | $100.00 | $50.00 | $100.00 |
| 154 | Removing signs type II (638.2602) | EACH | 131 | $15.00 | $20.00 | $25.00 | $15.00 |
| 155 | Removing small sign supports (638.3000) | EACH | 136 | $15.00 | $20.00 | $25.00 | $15.00 |
| 156 | Field office type C (642.5201) | EACH | 1 | $40,000 | $28,000 | $46,000 | $33,432 |
| 157 | Traffic control drums (643.0300) | DAY | 4,200 | $0.17 | $0.30 | $0.20 | $0.20 |
| 158 | Traffic control barricades type III (643.0420) | DAY | 2,848 | $0.72 | $0.70 | $0.60 | $0.60 |
| 159 | Traffic control warning lights type A (643.0705) | DAY | 5,136 | $0.09 | $0.25 | $0.20 | $0.20 |
| 160 | Traffic control signs (643.0900) | DAY | 30,889 | $0.36 | $0.30 | $0.25 | $0.25 |
| 161 | Traffic control covering signs type II (643.0920) | EACH | 15 | $35.00 | $35.00 | $35.00 | $35.00 |
| 162 | Traffic control signs fixed message (643.1000) | SF | 208 | $16.00 | $20.00 | $15.00 | $15.00 |
| 163 | Traffic control signs PCMS (643.1050) | DAY | 98 | $60.00 | $30.00 | $30.00 | $30.00 |
| 164 | Traffic control cones 42-inch (643.1070) | DAY | 474 | $1.50 | $0.40 | $0.40 | $0.40 |
| 165 | Temporary marking line paint 6- inch (643.3165) | LF | 29,354 | $0.50 | $0.50 | $0.44 | $0.44 |
| 166 | Traffic control (643.5000) | EACH | 1 | $13,287 | $52,000 | $49,800 | $49,750 |
| 167 | Geotextile type C (645.0105) | SY | 211 | $4.00 | $3.00 | $2.90 | $4.00 |
| 168 | Geotextile type DF schedule A (645.0111) | SY | 864 | $1.00 | $3.00 | $2.40 | $1.00 |
| 169 | Geotextile type HR (645.0120) | SY | 431 | $3.00 | $4.00 | $3.40 | $5.00 |
| 170 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 92,547 | $1.50 | $1.33 | $1.30 | $1.28 |
| 171 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,368 | $2.80 | $3.00 | $2.80 | $2.78 |
| 172 | Marking arrow epoxy (646.5020) | EACH | 6 | $320.00 | $375.00 | $374.00 | $374.36 |
| 173 | Marking word epoxy (646.5120) | EACH | 3 | $325.00 | $400.00 | $379.00 | $378.96 |
| 174 | Marking outfall epoxy (646.5520) | EACH | 11 | $85.00 | $50.00 | $48.50 | $48.67 |
| 175 | Marking stop line epoxy 18-inch (646.6120) | LF | 54 | $9.85 | $16.00 | $15.50 | $15.71 |
| 176 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 158 | $9.85 | $16.00 | $15.50 | $15.71 |
| 177 | Cold weather marking epoxy 6-inch (646.6466) | LF | 264 | $0.32 | $10.00 | $9.00 | $9.00 |
| 178 | Marking diagonal epoxy 12-inch (646.7120) | LF | 430 | $9.50 | $16.00 | $15.50 | $15.30 |
| 179 | Marking curb epoxy (646.8120) | LF | 307 | $10.00 | $8.00 | $7.50 | $7.51 |
| 180 | Marking island nose epoxy (646.8220) | EACH | 8 | $310.00 | $300.00 | $283.00 | $282.61 |
| 181 | Marking removal line water blasting 6-inch (646.9012) | LF | 736 | $2.25 | $3.00 | $2.90 | $2.85 |
| 182 | Construction staking storm sewer (650.4000) | EACH | 46 | $130.00 | $150.00 | $130.00 | $130.00 |
| 183 | Construction staking subgrade (650.4500) | LF | 6,458 | $0.01 | $1.00 | $0.01 | $0.01 |
| 184 | Construction staking pipe culverts (650.6000) | EACH | 7 | $180.00 | $150.00 | $180.00 | $180.00 |
| 185 | Construction staking structure layout (structure) 01. C-51-94 (650.6501) | EACH | 1 | $1,700.00 | $1,500.00 | $1,700.00 | $1,700.00 |
| 186 | Construction staking concrete pavement (650.7000) | LF | 6,257 | $0.01 | $1.00 | $0.01 | $0.01 |
| 187 | Construction staking resurfacing reference (650.8000) | LF | 15,386 | $0.25 | $0.50 | $0.25 | $0.25 |
| 188 | Construction staking electrical installations (project) 01. 2290-25- 70 (650.8501) | EACH | 1 | $1,800.00 | $1,500.00 | $1,800.00 | $1,800.00 |
| 189 | Construction staking electrical installations (project) 02. 2290-26- 70 (650.8501) | EACH | 1 | $1,800.00 | $1,500.00 | $1,800.00 | $1,800.00 |
| 190 | Construction staking sidewalk (project) 01. 2290-25-70 (650.9500) | EACH | 1 | $0.01 | $500.00 | $0.01 | $0.01 |
| 191 | Construction staking sidewalk (project) 02. 2290-26-70 (650.9500) | EACH | 1 | $0.01 | $500.00 | $0.01 | $0.01 |
| 192 | Construction staking supplemental control (project) 01. 2290-24-71 (650.9911) | EACH | 1 | $1,200.00 | $2,500.00 | $1,200.00 | $1,200.00 |
| 193 | Construction staking supplemental control (project) 02. 2290-25-70 (650.9911) | EACH | 1 | $10,000 | $2,500.00 | $10,000 | $10,000 |
| 194 | Construction staking supplemental control (project) 03. 2290-26-70 (650.9911) | EACH | 1 | $10,000 | $2,500.00 | $10,000 | $10,000 |
| 195 | Construction staking slope stakes (650.9920) | LF | 6,693 | $0.85 | $1.00 | $0.85 | $0.85 |
| 196 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 3,275 | $8.00 | $8.00 | $8.00 | $8.00 |
| 197 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 624 | $9.00 | $9.00 | $9.00 | $9.00 |
| 198 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 15 | $2,200.00 | $2,300.00 | $2,200.00 | $2,200.00 |
| 199 | Concrete bases type 5 (654.0105) | EACH | 25 | $1,200.00 | $1,300.00 | $1,200.00 | $1,200.00 |
| 200 | Concrete control cabinet bases type L30 (654.0230) | EACH | 2 | $2,200.00 | $2,500.00 | $2,200.00 | $2,200.00 |
| 201 | Electrical wire lighting 12 AWG (655.0610) | LF | 19,214 | $0.86 | $1.00 | $0.86 | $0.86 |
| 202 | Electrical wire lighting 8 AWG (655.0620) | LF | 4,872 | $1.24 | $1.30 | $1.20 | $1.24 |
| 203 | Electrical wire lighting 2 AWG (655.0635) | LF | 60 | $3.01 | $3.10 | $3.00 | $3.01 |
| 204 | Electrical service meter breaker pedestal (location) 01. 4 mile road (656.0201) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 205 | Electrical service meter breaker pedestal (location) 02. 5 mile road (656.0201) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 206 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 25 | $650.00 | $700.00 | $650.00 | $650.00 |
| 207 | Poles type 5-aluminum (657.0322) | EACH | 25 | $2,300.00 | $2,300.00 | $2,300.00 | $2,300.00 |
| 208 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 13 | $290.00 | $300.00 | $290.00 | $290.00 |
| 209 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 9 | $310.00 | $325.00 | $310.00 | $310.00 |
| 210 | Luminaire arms truss type 4 1/2- inch clamp 10-FT (657.0705) | EACH | 3 | $440.00 | $450.00 | $440.00 | $440.00 |
| 211 | Luminaires utility LED C (659.1125) | EACH | 25 | $245.00 | $275.00 | $245.00 | $245.00 |
| 212 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 2 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 |
| 213 | Sawing asphalt (690.0150) | LF | 389 | $2.50 | $3.00 | $3.00 | $1.30 |
| 214 | Sawing concrete (690.0250) | LF | 318 | $2.50 | $3.00 | $3.00 | $2.25 |
| 215 | Incentive strength concrete structures (715.0502) | DOL | 522 | $1.00 | $1.00 | $1.00 | $1.00 |
| 216 | Incentive compressive strength concrete pavement (715.0720) | DOL | 7,927 | $1.00 | $1.00 | $1.00 | $1.00 |
| 217 | Incentive iri ride (740.0440) | DOL | 16,730 | $1.00 | $1.00 | $1.00 | $1.00 |
| 218 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,600 | $5.00 | $5.00 | $5.00 | $5.00 |
| 219 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 220 | Special 01. removing solar flashing beacon and pole STH 38 NB at 4 mile road (SPV.0060) | EACH | 1 | $1,200.00 | $1,300.00 | $1,200.00 | $1,200.00 |
| 221 | Special 02. removing solar flashing beacon and pole STH 38 SB at 4 mile road (SPV.0060) | EACH | 1 | $1,200.00 | $1,300.00 | $1,200.00 | $1,200.00 |
| 222 | Special 03. removing solar flashing beacon and pole STH 38 NB at 5 mile road (SPV.0060) | EACH | 1 | $1,200.00 | $1,300.00 | $1,200.00 | $1,200.00 |
| 223 | Special 04. removing solar flashing beacon and pole STH 38 SB at 5 mile road (SPV.0060) | EACH | 1 | $1,200.00 | $1,300.00 | $1,200.00 | $1,200.00 |
| 224 | Special 05. utility line opening (ulo) (SPV.0060) | EACH | 15 | $1.00 | $500.00 | $926.00 | $1,952.00 |
| 225 | Special 06. temporary lighting system, 4 mile RD roundabout (SPV.0060) | EACH | 1 | $5,000.00 | $6,000.00 | $5,000.00 | $5,000.00 |
| 226 | Special 07. temporary water diversion - box culvert C-51-94 (SPV.0060) | EACH | 1 | $11,865 | $10,000 | $164,000 | $11,865 |
| 227 | Special 08. section corner monuments (SPV.0060) | EACH | 1 | $1,000.00 | $500.00 | $1,380.00 | $0.01 |
| 228 | Special 01. asphaltic repair (SPV.0195) | TON | 360 | $140.00 | $200.00 | $180.00 | $140.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 12, 2026. Compiled by Mirage Metrics.