WisDOT contract 20260714003 bid tabulation

V Cambria - STH 73 (CTH P); Kikkert Court to STH 73 (CTH P, Columbia County V Cambria - STH 73 (CTH P)). Let by Wisconsin DOT on July 14, 2026, Columbia. 7 bids received; low bid $6,246,800 by Mashuda Contractors, Inc..

Owner
Wisconsin DOT
Letting
14 JUL 2026
Pay items
151
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Mashuda Contractors, Inc.$6,246,800Low
2Northeast Asphalt, Inc$6,541,327+5.0%
3James Peterson Sons, Inc.$6,603,106+6.0%
4Hoffman Construction Company$6,867,289+10%
5Meise Construction Inc$7,162,513+15%
6Musson Bros., Inc.$7,174,811+15%
7Integrity Grading and Excavating, Inc.$7,516,218+20%
WisDOT contract 20260714003: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Mashuda Contractors, Inc.2. Northeast Asphalt, Inc3. James Peterson Sons, Inc.4. Hoffman Construction Company5. Meise Construction Inc6. Musson Bros., Inc.
1Clearing (201.0105)STA35$430.00$685.75$300.00$685.75$883.00$300.00
2Grubbing (201.0205)STA35$430.00$369.25$300.00$369.25$883.00$300.00
3Removing small pipe culverts (203.0100)EACH46$425.00$425.00$350.00$550.00$845.00$461.37
4Removing structure (structure) 01. 3-FT X 3-FT concrete box, sta. 57+09 (203.0220)EACH1$1,500.00$1,500.00$1,250.00$2,600.00$6,400.00$3,930.78
5Removing structure (structure) 02. 3-FT X 5-FT concrete box, sta. 68+33 (203.0220)EACH1$2,500.00$2,500.00$1,500.00$5,300.00$6,854.00$3,930.78
6Removing structure (structure) 03. 2-FT X 3-FT concrete box, sta. 238+17 (203.0220)EACH1$1,250.00$1,250.00$1,000.00$2,000.00$5,200.00$3,930.78
7Removing structure (structure) 04. 2-FT X 3-FT concrete box, sta. 250+50 (203.0220)EACH1$1,250.00$1,250.00$1,000.00$2,250.00$5,500.00$3,930.78
8Removing concrete pavement (204.0100)SY425$8.50$8.50$5.55$3.00$7.00$10.80
9Removing curb & gutter (204.0150)LF900$4.00$4.00$2.00$5.00$6.00$6.35
10Removing concrete sidewalk (204.0155)SY285$10.00$10.00$5.00$7.00$4.00$12.21
11Removing inlets (204.0220)EACH4$500.00$500.00$450.00$350.00$2,200.00$539.96
12Removing storm sewer (size) 01. 12-inch (204.0245)LF350$22.50$22.50$5.00$11.00$55.00$20.28
13Excavation common (205.0100)CY53,800$5.65$5.65$8.22$30.00$7.00$15.68
14Borrow (208.0100)CY15,020$8.07$8.07$14.40$0.01$10.00$5.73
15Finishing roadway (project) 01. 6994-00-72 (213.0100)EACH1$2,500.00$4,750.00$2,500.00$5,000.00$20,000$500.00
16Base aggregate dense 3/4-inch (305.0110)TON4,740$25.03$25.03$22.67$35.33$24.68$21.28
17Base aggregate dense 1 1/4-inch (305.0120)TON89,600$16.11$16.11$16.04$0.01$18.86$13.32
18HMA cold weather paving (450.4000)TON1,790$3.00$3.00$3.00$3.50$3.45$3.00
19Tack coat (455.0605)GAL5,840$3.00$3.00$3.00$3.40$3.45$3.00
20HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$2,750.00$2,750.00$2,750.00$3,500.00$3,163.00$2,750.00
21HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$3,865.00$3,865.00$3,865.00$3,500.00$4,445.00$3,865.00
22Incentive density PWL HMA pavement (460.2005)DOL20,484$1.00$1.00$1.00$1.00$1.00$1.00
23Incentive density HMA pavement longitudinal joints (460.2007)DOL4,850$1.00$1.00$1.00$1.00$1.00$1.00
24Incentive air voids HMA pavement (460.2010)DOL29,760$1.00$1.00$1.00$1.00$1.00$1.00
25HMA pavement 3 LT 58-28 S (460.5223)TON16,030$67.30$67.30$67.30$66.48$68.00$67.30
26HMA pavement 4 LT 58-28 S (460.5224)TON13,730$73.40$73.40$73.40$76.48$74.00$73.40
27Asphaltic surface driveways and field entrances (465.0120)TON207$165.40$165.40$165.40$175.00$190.00$165.40
28Asphaltic flumes (465.0315)SY246$63.10$63.10$63.10$65.00$146.00$63.10
29Asphaltic rumble strips, shoulder (465.0520)LF46,540$0.30$0.30$0.30$0.19$0.30$0.14
30Asphaltic rumble strips, centerline (465.0560)LF20,090$0.30$0.30$0.30$0.25$0.30$0.17
31Concrete masonry endwalls (504.0900)CY10$1,300.00$1,300.00$1,300.00$1,300.00$2,140.00$1,300.00
32Apron endwalls for culvert pipe sloped cross drains steel 42-inch 4 to 1 (521.0342)EACH4$6,529.00$6,529.00$6,290.92$8,100.00$8,200.00$6,908.99
33Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH2$373.00$373.00$212.55$400.00$940.00$289.74
34Apron endwalls for culvert pipe steel 15-inch (521.1015)EACH2$393.00$393.00$234.17$420.00$982.00$310.23
35Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH2$430.00$430.00$272.04$470.00$1,006.00$347.08
36Apron endwalls for culvert pipe steel 24-inch (521.1024)EACH16$486.00$486.00$380.53$540.00$1,071.00$470.56
37Apron endwalls for culvert pipe steel 30-inch (521.1030)EACH8$719.00$719.00$726.92$830.00$1,357.00$2,076.74
38Apron endwalls for culvert pipe steel 36-inch (521.1036)EACH2$941.00$941.00$916.23$1,060.00$1,564.00$1,030.92
39Apron endwalls for culvert pipe steel 72-inch (521.1072)EACH4$3,897.00$3,897.00$4,419.39$4,500.00$5,373.00$3,918.45
40Apron endwalls for culvert pipe sloped side drains steel 18-inch 6 to 1 (521.1518)EACH62$1,084.00$1,084.00$856.18$1,500.00$1,664.00$1,803.70
41Apron endwalls for culvert pipe sloped side drains steel 24-inch 6 to 1 (521.1524)EACH2$1,844.00$1,844.00$1,592.08$2,600.00$2,418.00$1,993.64
42Apron endwalls for culvert pipe sloped side drains steel 30-inch 6 to 1 (521.1530)EACH2$2,659.00$2,659.00$2,419.85$3,500.00$3,200.00$2,903.76
43Pipe cattle pass corrugated steel (521.1900)LF86$395.00$395.00$408.53$362.00$329.00$424.34
44Culvert pipe corrugated steel 12- inch (521.3112)LF38$57.25$57.25$91.25$60.00$95.00$87.77
45Culvert pipe corrugated steel 15- inch (521.3115)LF36$65.25$65.25$96.55$68.00$100.00$92.72
46Culvert pipe corrugated steel 18- inch (521.3118)LF1,172$71.80$71.80$85.21$72.00$105.00$91.78
47Culvert pipe corrugated steel 24- inch (521.3124)LF542$101.50$101.50$101.65$82.00$113.00$105.76
48Culvert pipe corrugated steel 30- inch (521.3130)LF380$127.25$127.25$142.99$122.00$130.00$126.84
49Culvert pipe corrugated steel 36- inch (521.3136)LF60$126.50$126.50$154.22$134.00$139.00$157.83
50Culvert pipe corrugated steel 42- inch (521.3142)LF124$223.25$223.25$220.47$196.00$215.00$221.16
51Culvert pipe corrugated steel 72- inch (521.3172)LF198$476.25$476.25$449.54$344.00$355.00$449.52
52Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH1$804.00$804.00$1,059.80$1,600.00$2,022.00$1,342.39
53Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH1$1,015.00$1,015.00$1,308.18$1,850.00$2,188.00$2,092.78
54Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 14X23-inch (522.2614)EACH1$808.00$808.00$1,064.22$1,600.00$2,932.00$1,509.76
55Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624)EACH1$1,252.00$1,252.00$1,556.80$2,200.00$3,595.00$2,506.73
56Concrete curb & gutter 30-inch type D (601.0411)LF2,135$26.38$26.38$26.38$26.38$30.00$41.50
57Concrete sidewalk 4-inch (602.0405)SF8,100$8.15$8.15$8.15$8.15$8.00$10.00
58Concrete sidewalk 6-inch (602.0415)SF770$15.10$15.10$15.10$15.10$10.00$10.75
59Concrete driveway 6-inch (602.0810)SY410$85.05$85.05$85.05$85.05$81.00$71.00
60Concrete steps (602.1500)SF99$80.00$130.33$80.00$130.33$134.00$80.00
61Riprap light (606.0100)CY26$110.00$110.00$195.00$142.00$95.00$191.33
62Riprap heavy (606.0300)CY35$95.00$95.00$175.00$188.00$95.00$245.55
63Grouted riprap heavy (606.0700)CY11$450.00$450.00$778.00$254.00$400.00$623.78
64Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF369$79.00$79.00$84.92$60.00$83.00$120.74
65Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF431$88.50$88.50$99.15$60.00$87.00$98.87
66Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF303$100.00$100.00$100.47$70.00$105.00$135.45
67Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 14X23-inch (608.2414)LF50$130.00$130.00$145.90$114.00$220.00$194.74
68Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424)LF456$209.75$209.75$194.31$212.00$200.00$269.77
69Manhole covers type J (611.0530)EACH5$820.00$820.00$841.39$786.00$500.00$729.89
70Inlet covers type H (611.0624)EACH10$1,100.00$1,100.00$1,702.52$1,100.00$500.00$1,022.63
71Inlet covers type H-S (611.0639)EACH5$1,100.00$1,100.00$1,278.20$950.00$500.00$1,022.63
72Inlet covers type MS-A (611.0645)EACH3$960.00$960.00$1,190.12$850.00$500.00$856.74
73Manholes 3-FT diameter (611.2003)EACH1$2,694.00$2,694.00$1,884.06$2,000.00$2,500.00$1,616.20
74Manholes 4-FT diameter (611.2004)EACH1$3,033.00$3,033.00$2,465.79$2,300.00$3,513.00$2,041.71
75Manholes 5-FT diameter (611.2005)EACH3$3,360.00$3,360.00$2,964.34$3,400.00$4,500.00$3,322.28
76Inlets 4-FT diameter (611.3004)EACH6$2,462.00$2,462.00$1,972.44$2,300.00$3,231.00$1,909.11
77Inlets 2X3-FT (611.3230)EACH9$1,806.00$1,806.00$1,308.30$1,600.00$2,760.00$1,292.95
78Inlets median 1 grate (611.3901)EACH3$2,769.00$2,769.00$2,035.41$3,400.00$3,511.00$2,603.09
79Adjusting manhole covers (611.8110)EACH1$1,200.00$1,200.00$625.79$2,500.00$461.00$1,133.67
80Maintenance and repair of haul roads (project) 01. 6994-00-72 (618.0100)EACH1$100.00$10.00$1,500.00$100.00$20,000$100.00
81Mobilization (619.1000)EACH1$261,795$534,500$349,465$976,416$235,000$567,168
82Water (624.0100)MGAL1,400$30.00$30.00$15.00$0.01$35.00$2.00
83Topsoil (625.0100)SY2,180$0.01$0.01$2.35$6.00$5.00$6.43
84Salvaged topsoil (625.0500)SY90,500$0.01$0.01$0.98$0.01$1.00$1.02
85Mulching (627.0200)SY139,600$0.35$0.35$0.35$0.35$0.34$0.35
86Silt fence (628.1504)LF22,000$1.95$1.95$1.95$1.95$2.00$1.95
87Silt fence maintenance (628.1520)LF44,000$0.01$0.01$0.01$0.01$0.14$0.01
88Mobilizations erosion control (628.1905)EACH10$100.00$100.00$100.00$100.00$288.00$100.00
89Mobilizations emergency erosion control (628.1910)EACH8$100.00$100.00$100.00$100.00$500.00$100.00
90Erosion mat class I type B (628.2004)SY39,700$1.00$1.00$1.00$1.00$1.90$1.00
91Erosion mat urban class I type B (628.2008)SY640$2.25$2.25$2.25$2.25$1.97$2.25
92Erosion mat class II type B (628.2023)SY730$2.25$2.25$2.25$2.25$3.27$2.25
93Inlet protection type A (628.7005)EACH18$75.00$75.00$75.00$75.00$175.00$75.00
94Inlet protection type C (628.7015)EACH15$70.00$70.00$70.00$70.00$115.00$70.00
95Temporary ditch checks (628.7504)LF2,160$8.25$8.25$8.25$8.25$5.52$8.25
96Culvert pipe checks (628.7555)EACH200$19.00$19.00$19.00$19.00$32.00$19.00
97Fertilizer type B (629.0210)CWT97$85.00$85.00$85.00$85.00$95.00$85.00
98Seeding mixture no. 30 (630.0130)LB6,810$8.75$8.75$8.75$8.75$10.35$8.75
99Seeding mixture no. 40 (630.0140)LB170$12.00$12.00$12.00$12.00$10.35$12.00
100Seeding borrow pit (630.0300)LB850$8.75$8.75$8.75$8.75$4.75$8.75
101Seed water (630.0500)MGAL4,000$1.00$1.00$1.00$1.00$5.75$1.00
102Markers row (633.5100)EACH202$65.00$65.00$65.00$65.00$72.00$65.00
103Markers culvert end (633.5200)EACH34$70.00$70.00$70.00$70.00$72.00$70.00
104Posts wood 4X6-inch X 14-FT (634.0614)EACH7$85.00$85.00$85.00$85.00$100.00$85.00
105Posts wood 4X6-inch X 16-FT (634.0616)EACH44$90.00$90.00$90.00$90.00$105.00$90.00
106Posts wood 4X6-inch X 18-FT (634.0618)EACH5$95.00$95.00$95.00$95.00$120.00$95.00
107Signs type II reflective H (637.2210)SF114.76$23.00$23.00$23.00$23.00$30.00$23.00
108Signs type II reflective F (637.2230)SF180.42$24.00$24.00$24.00$24.00$30.00$24.00
109Moving signs type II (638.2102)EACH20$200.00$200.00$200.00$200.00$175.00$200.00
110Removing signs type II (638.2602)EACH41$35.00$35.00$35.00$35.00$52.00$35.00
111Removing small sign supports (638.3000)EACH41$35.00$35.00$35.00$35.00$52.00$35.00
112Moving small sign supports (638.4000)EACH9$100.00$100.00$100.00$100.00$52.00$100.00
113Field office type B (642.5001)EACH1$15,000$19,750$8,350.00$25,000$15,000$15,000
114Traffic control drums (643.0300)DAY2,478$0.46$0.25$0.25$0.25$0.23$0.46
115Traffic control barricades type III (643.0420)DAY3,402$0.66$0.45$0.45$0.45$0.69$0.66
116Traffic control warning lights type A (643.0705)DAY6,804$0.13$0.01$0.01$0.01$0.12$0.13
117Traffic control signs (643.0900)DAY5,218$0.74$0.20$0.20$0.20$0.46$0.74
118Traffic control covering signs type II (643.0920)EACH4$40.00$40.00$40.00$40.00$58.00$40.00
119Traffic control signs PCMS with TMC communications (643.1051)DAY28$55.00$94.22$94.22$94.22$75.00$55.00
120Temporary marking line removable tape 6-inch (643.3180)LF115$2.25$4.00$4.00$4.00$4.60$2.25
121Traffic control (643.5000)EACH1$5,855.00$14,500$14,500$14,500$25,300$5,855.00
122Temporary pedestrian surface matting (644.1440)SF262$8.00$3.00$3.00$3.00$9.20$8.00
123Temporary pedestrian curb ramp (644.1601)DAY112$10.40$11.00$11.00$11.00$19.55$10.40
124Temporary pedestrian detectable warning field (644.1605)SF40$16.00$8.00$8.00$8.00$23.00$16.00
125Temporary pedestrian barricade (644.1810)LF170$8.25$4.00$4.00$4.00$11.50$8.25
126Temporary audible message devices (644.1900.S)DAY70$4.70$4.00$4.00$4.00$8.00$4.70
127Geotextile type HR (645.0120)SY120$11.50$11.50$7.10$15.00$3.00$6.83
128Geotextile type R (645.0130)SY110$9.75$9.75$6.00$15.00$3.00$5.76
129Geotextile type sas (645.0140)SY36$50.00$50.00$17.00$50.00$3.00$14.92
130Marking line epoxy 6-inch (646.2020)LF82,100$0.55$0.55$0.55$0.55$0.63$0.50
131Marking railroad crossing epoxy (646.5320)EACH7$350.00$350.00$350.00$350.00$403.00$2,697.00
132Marking stop line epoxy 18-inch (646.6120)LF54$17.00$17.00$17.00$17.00$20.00$17.10
133Marking crosswalk epoxy transverse line 6-inch (646.7420)LF666$13.25$13.25$13.25$13.25$15.00$11.70
134Marking removal line 4-inch (646.9000)LF310$1.00$3.50$3.50$3.50$3.70$5.75
135Locating no-passing zones (648.0100)MI4.58$750.00$750.00$750.00$750.00$863.00$549.40
136Construction staking storm sewer (650.4000)EACH28$100.00$100.00$100.00$400.00$750.00$400.00
137Construction staking subgrade (650.4500)LF24,890$0.01$0.01$0.01$0.01$0.20$0.01
138Construction staking base (650.5000)LF24,890$0.75$0.75$0.75$2.00$0.50$2.00
139Construction staking curb gutter and curb & gutter (650.5500)LF9,245$0.95$0.95$0.95$2.00$1.35$2.00
140Construction staking pipe culverts (650.6000)EACH19$150.00$150.00$150.00$400.00$400.00$400.00
141Construction staking curb ramps (650.9000)EACH9$175.00$175.00$175.00$400.00$300.00$400.00
142Construction staking sidewalk (project) 01. 6994-00-72 (650.9500)EACH1$1,500.00$1,500.00$1,500.00$5,000.00$1,000.00$5,000.00
143Construction staking supplemental control (project) 01. 6994-00-72 (650.9911)EACH1$2,300.00$2,300.00$2,300.00$25,000$8,000.00$25,000
144Construction staking slope stakes (650.9920)LF24,890$0.75$0.75$0.75$1.50$1.00$1.50
145Public land survey monument verify and reset (680.0100)EACH8$800.00$800.00$800.00$1,500.00$1,000.00$1,500.00
146Sawing asphalt (690.0150)LF621$2.01$2.00$1.95$2.00$2.25$5.00
147Sawing concrete (690.0250)LF352$3.15$2.00$2.35$2.00$3.40$8.00
148Incentive iri ride (740.0440)DOL18,340$1.00$1.00$1.00$1.00$1.00$1.00
149On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00$5.00$5.00
150On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS3,200$5.00$5.00$5.00$5.00$5.00$5.00
151Special 01. concrete curb & gutter 4-inch sloped 24-inch type D (SPV.0090)LF7,110$22.66$22.66$22.66$22.66$30.00$26.00
WisDOT contract 20260714003: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of July 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy