WisDOT contract 20260714009 bid tabulation

Merrill - Rhinelander; STH 64 to Big Hay Meadow Creek (STH 017, Lincoln County Merrill - Rhinelander). Let by Wisconsin DOT on July 14, 2026, Lincoln. 6 bids received; low bid $7,167,024 by James Peterson Sons, Inc..

Owner
Wisconsin DOT
Letting
14 JUL 2026
Pay items
104
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1James Peterson Sons, Inc.$7,167,024Low
2American Asphalt of Wisconsin$7,304,838+2.0%
3Northeast Asphalt, Inc$7,620,475+6.0%
4Musson Bros., Inc.$7,669,372+7.0%
5Michels Road & Stone, Inc.$8,240,501+15%
6Integrity Grading and Excavating, Inc.$8,623,888+20%
WisDOT contract 20260714009: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. James Peterson Sons, Inc.2. American Asphalt of Wisconsin3. Northeast Asphalt, Inc4. Musson Bros., Inc.5. Michels Road & Stone, Inc.6. Integrity Grading and Excavating, Inc.
1Clearing (201.0105)STA2$1,000.00$4,000.00$2,000.00$1,411.72$4,000.00$4,000.00
2Grubbing (201.0205)STA2$1,000.00$2,300.00$2,000.00$1,411.72$2,300.00$2,300.00
3Removing small pipe culverts (203.0100)EACH1$500.00$500.00$500.00$390.72$750.00$1,157.41
4Removing asphaltic surface (204.0110)SY6$25.00$25.00$25.00$11.04$50.00$87.53
5Removing asphaltic surface butt joints (204.0115)SY400$5.41$5.41$5.90$5.41$5.41$5.41
6Removing asphaltic surface milling (204.0120)SY62,810$3.96$3.96$1.60$3.96$3.96$3.96
7Removing curb & gutter (204.0150)LF278$5.00$5.00$5.00$17.57$4.00$7.74
8Removing delineators and markers (204.0180)EACH3$50.00$50.00$20.00$50.00$50.00$50.00
9Removing concrete bases (204.0195)EACH1$750.00$750.00$750.00$750.00$750.00$750.00
10Removing (item description) 01. removing apron endwalls (204.9060.S)EACH5$275.00$275.00$275.00$263.61$400.00$241.94
11Excavation common (205.0100)CY62,673$9.77$9.77$9.77$16.58$14.90$16.00
12Prepare foundation for asphaltic paving (project) 01. 9030-07-72 (211.0101)EACH1$95,395$95,395$48,530$45,395$95,395$46,450
13Prepare foundation for asphaltic shoulders (211.0400)STA10$33.56$33.56$350.00$362.36$33.56$33.56
14Finishing roadway (project) 01. 9030-07-72 (213.0100)EACH1$5,000.00$2,500.00$3,500.00$1,000.00$5,000.00$500.00
15Base aggregate dense 3/4-inch (305.0110)TON14,460$18.28$18.28$18.28$19.68$20.50$25.54
16Base aggregate dense 1 1/4-inch (305.0120)TON104,590$11.32$11.32$11.32$12.12$13.90$16.00
17Pulverize and relay (325.0100)SY25,940$0.74$0.74$0.55$0.74$0.74$0.74
18HMA cold weather paving (450.4000)TON5,140$0.10$0.10$3.00$0.10$0.10$0.10
19Tack coat (455.0605)GAL17,605$3.89$3.89$3.10$3.89$3.89$3.89
20HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$4,500.00$4,500.00$2,620.00$4,500.00$4,500.00$4,500.00
21HMA percent within limits (PWL) test strip density (460.0110.S)EACH3$4,500.00$4,500.00$3,450.00$4,500.00$4,500.00$4,500.00
22Incentive density PWL HMA pavement (460.2005)DOL40,880$1.00$1.00$1.00$1.00$1.00$1.00
23Incentive density HMA pavement longitudinal joints (460.2007)DOL25,830$1.00$1.00$1.00$1.00$1.00$1.00
24Incentive air voids HMA pavement (460.2010)DOL53,350$1.00$1.00$1.00$1.00$1.00$1.00
25HMA pavement 3 MT 58-28 S (460.6223)TON37,950$64.37$64.37$67.50$64.37$64.37$64.37
26HMA pavement 4 MT 58-34 S (460.6244)TON15,650$64.37$64.37$81.70$64.37$64.37$64.37
27Asphaltic surface patching (465.0110)TON3$299.38$299.38$305.00$299.38$299.38$299.38
28Asphaltic surface driveways and field entrances (465.0120)TON190$204.84$204.84$156.70$204.84$204.84$204.84
29Asphaltic flumes (465.0315)SY167$49.30$39.30$53.30$39.30$39.30$39.30
30Asphaltic rumble strips, centerline (465.0560)LF35,955$0.17$0.62$0.35$0.28$0.38$0.17
31Apron endwalls for culvert pipe 12- inch (520.1012)EACH2$250.00$250.00$250.00$310.86$350.00$661.17
32Culvert pipe class III-A 12-inch (520.3312)LF26$45.00$45.00$45.00$46.66$57.50$45.46
33Concrete collars for pipe (520.8000)EACH3$1,000.00$1,000.00$1,000.00$772.52$450.00$909.79
34Culvert pipe reinforced concrete class III 24-inch (522.0124)LF30$173.00$173.00$173.00$322.81$219.00$181.39
35Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH3$1,960.00$1,960.00$1,960.00$2,178.43$1,500.00$2,333.74
36Concrete curb type J (601.0120)LF98$61.35$61.96$61.35$61.35$61.35$70.00
37Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF578$46.38$46.84$46.38$46.38$46.38$62.50
38Concrete sidewalk 5-inch (602.0410)SF319$15.77$15.93$15.77$15.77$15.77$15.50
39Riprap medium (606.0200)CY4$150.00$150.00$150.00$323.16$160.00$156.64
40Maintenance and repair of haul roads (project) 01. 9030-07-72 (618.0100)EACH1$100.00$1.00$1.00$100.00$1.00$500.00
41Mobilization (619.1000)EACH1$338,667$408,650$612,300$415,907$694,073$770,000
42Concrete median sloped nose (620.0300)SF145$17.12$17.29$17.12$17.12$17.12$19.50
43Water (624.0100)MGAL1,203$40.00$40.00$40.00$1.00$60.00$35.00
44Topsoil (625.0100)SY18,530$3.06$3.06$3.06$0.87$4.80$5.35
45Silt fence (628.1504)LF11,695$1.75$1.75$1.90$1.75$1.75$1.75
46Silt fence maintenance (628.1520)LF11,695$0.03$0.03$0.01$0.03$0.03$0.03
47Mobilizations erosion control (628.1905)EACH15$343.00$343.00$0.01$343.00$343.00$343.00
48Mobilizations emergency erosion control (628.1910)EACH7$103.00$103.00$0.01$103.00$103.00$103.00
49Erosion mat urban class I type B (628.2008)SY18,530$1.75$1.75$1.90$1.75$1.75$1.75
50Temporary ditch checks (628.7504)LF840$5.00$5.00$5.00$5.00$5.00$5.00
51Culvert pipe checks (628.7555)EACH134$10.00$10.00$30.00$10.00$10.00$10.00
52Rock bags (628.7570)EACH335$4.00$4.00$10.00$4.00$4.00$4.00
53Fertilizer type B (629.0210)CWT56$115.00$115.00$0.01$115.00$115.00$115.00
54Seeding mixture no. 30 (630.0130)LB3,570$7.00$7.00$0.01$7.00$7.00$7.00
55Seed water (630.0500)MGAL1,810$1.00$1.00$0.01$1.00$1.00$1.00
56Markers culvert end (633.5200)EACH3$75.00$75.00$70.00$75.00$75.00$75.00
57Posts tubular steel 2X2-inch X 8-FT (634.0808)EACH2$250.00$250.00$200.00$250.00$250.00$250.00
58Posts tubular steel 2X2-inch X 12- FT (634.0812)EACH3$275.00$275.00$240.00$275.00$275.00$275.00
59Signs type II reflective H (637.2210)SF18.60$35.00$35.00$25.00$35.00$35.00$35.00
60Signs type II reflective F (637.2230)SF4.50$70.00$70.00$40.00$70.00$70.00$70.00
61Moving signs type II (638.2102)EACH11$125.00$125.00$20.00$125.00$125.00$125.00
62Removing signs type II (638.2602)EACH1$50.00$50.00$20.00$50.00$50.00$50.00
63Moving small sign supports (638.4000)EACH11$100.00$100.00$100.00$100.00$100.00$100.00
64Field office type B (642.5001)EACH1$16,000$15,000$21,100$20,000$24,200$26,000
65Traffic control barricades type III (643.0420)DAY12,321$0.35$0.35$0.35$0.35$0.35$0.35
66Traffic control warning lights type A (643.0705)DAY21,978$0.10$0.10$0.10$0.10$0.10$0.10
67Traffic control signs (643.0900)DAY125,874$0.18$0.18$0.18$0.18$0.18$0.18
68Traffic control covering signs type I (643.0910)EACH2$400.00$400.00$400.00$400.00$400.00$400.00
69Traffic control covering signs type II (643.0920)EACH11$25.00$25.00$25.00$25.00$25.00$25.00
70Traffic control signs fixed message (643.1000)SF36$11.60$11.60$11.60$11.60$11.60$11.60
71Temporary marking line epoxy 6- inch (643.3170)LF35,605$0.60$0.60$0.60$0.60$0.60$0.44
72Temporary marking line epoxy 10- inch (643.3270)LF1,922$1.20$1.20$1.20$1.20$1.20$1.55
73Temporary marking stop line epoxy 18-inch (643.3820)LF170$12.00$12.00$12.00$12.00$12.00$17.00
74Traffic control (643.5000)EACH1$3,500.00$35,000$3,842.00$3,500.00$3,500.00$3,500.00
75Geotextile type HR (645.0120)SY14$35.00$35.00$35.00$12.01$10.00$28.59
76Marking line epoxy 6-inch (646.2020)LF2,551$0.75$0.75$0.75$0.75$0.75$0.50
77Marking line grooved wet ref epoxy 6-inch (646.2040)LF149,640$1.15$1.15$1.15$1.15$1.15$1.26
78Marking line epoxy 10-inch (646.4020)LF217$1.25$1.25$1.25$1.25$1.25$1.50
79Marking line grooved wet ref epoxy 10-inch (646.4040)LF2,305$2.10$2.10$2.10$2.10$2.10$2.90
80Marking arrow epoxy (646.5020)EACH8$260.00$260.00$260.00$260.00$260.00$273.50
81Marking word epoxy (646.5120)EACH4$350.00$350.00$350.00$350.00$350.00$279.00
82Marking stop line epoxy 18-inch (646.6120)LF280$18.00$18.00$18.00$18.00$18.00$13.30
83Marking diagonal epoxy 12-inch (646.7120)LF401$11.00$11.00$11.00$11.00$11.00$13.00
84Marking chevron epoxy 12-inch (646.7320)LF398$13.00$13.00$13.00$13.00$13.00$19.00
85Marking island nose epoxy (646.8220)EACH4$340.00$340.00$340.00$340.00$340.00$305.00
86Locating no-passing zones (648.0100)MI8.19$400.00$400.00$400.00$400.00$400.00$545.00
87Construction staking subgrade (650.4500)LF25,656$0.01$0.65$0.01$0.01$0.01$0.01
88Construction staking base (650.5000)LF25,656$0.01$0.01$0.65$0.65$0.65$0.65
89Construction staking curb gutter and curb & gutter (650.5500)LF479$2.00$2.00$2.00$2.00$2.00$2.00
90Construction staking pipe culverts (650.6000)EACH1$125.00$125.00$125.00$125.00$125.00$125.00
91Construction staking resurfacing reference (650.8000)LF17,414$0.10$0.10$0.10$0.10$0.10$0.10
92Construction staking sidewalk (project) 01. 9030-07-72 (650.9500)EACH1$500.00$500.00$500.00$500.00$500.00$500.00
93Construction staking supplemental control (project) 01. 9030-07-72 (650.9911)EACH1$2,000.00$2,000.00$2,000.00$2,000.00$2,000.00$2,000.00
94Construction staking slope stakes (650.9920)LF43,031$0.65$0.65$0.65$0.65$0.65$0.65
95Removing pull boxes (653.0905)EACH1$400.00$400.00$400.00$400.00$400.00$400.00
96Concrete bases type 1 (654.0101)EACH1$2,250.00$2,250.00$2,250.00$2,250.00$2,250.00$2,250.00
97Sawing asphalt (690.0150)LF1,743$1.80$1.80$1.80$1.80$1.80$1.80
98Incentive iri ride (740.0440)DOL32,610$1.00$1.00$1.00$1.00$1.00$1.00
99Installing and maintaining climbing turtle exclusion fence (999.2100.S)LF1,576$3.73$3.73$5.00$3.73$3.73$3.73
100On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS200$5.00$5.00$5.00$5.00$5.00$5.00
101On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS200$5.00$5.00$5.00$5.00$5.00$5.00
102Special 01. removing existing stop sign flashing assembly (SPV.0060)EACH1$500.00$500.00$500.00$500.00$500.00$500.00
103Special 02. stop sign flashing assembly (SPV.0060)EACH1$7,527.00$7,527.00$7,527.00$7,527.00$7,527.00$7,527.00
104Special 01. protective thermoplastic coating (SPV.0180)SY253$160.00$160.00$160.00$160.00$160.00$135.00
WisDOT contract 20260714009: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of July 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy