WisDOT contract 20260714009 bid tabulation
Merrill - Rhinelander; STH 64 to Big Hay Meadow Creek (STH 017, Lincoln County Merrill - Rhinelander). Let by Wisconsin DOT on July 14, 2026, Lincoln. 6 bids received; low bid $7,167,024 by James Peterson Sons, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 JUL 2026
- Pay items
- 104
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | James Peterson Sons, Inc. | $7,167,024 | Low |
| 2 | American Asphalt of Wisconsin | $7,304,838 | +2.0% |
| 3 | Northeast Asphalt, Inc | $7,620,475 | +6.0% |
| 4 | Musson Bros., Inc. | $7,669,372 | +7.0% |
| 5 | Michels Road & Stone, Inc. | $8,240,501 | +15% |
| 6 | Integrity Grading and Excavating, Inc. | $8,623,888 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. James Peterson Sons, Inc. | 2. American Asphalt of Wisconsin | 3. Northeast Asphalt, Inc | 4. Musson Bros., Inc. | 5. Michels Road & Stone, Inc. | 6. Integrity Grading and Excavating, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 2 | $1,000.00 | $4,000.00 | $2,000.00 | $1,411.72 | $4,000.00 | $4,000.00 |
| 2 | Grubbing (201.0205) | STA | 2 | $1,000.00 | $2,300.00 | $2,000.00 | $1,411.72 | $2,300.00 | $2,300.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 1 | $500.00 | $500.00 | $500.00 | $390.72 | $750.00 | $1,157.41 |
| 4 | Removing asphaltic surface (204.0110) | SY | 6 | $25.00 | $25.00 | $25.00 | $11.04 | $50.00 | $87.53 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 400 | $5.41 | $5.41 | $5.90 | $5.41 | $5.41 | $5.41 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 62,810 | $3.96 | $3.96 | $1.60 | $3.96 | $3.96 | $3.96 |
| 7 | Removing curb & gutter (204.0150) | LF | 278 | $5.00 | $5.00 | $5.00 | $17.57 | $4.00 | $7.74 |
| 8 | Removing delineators and markers (204.0180) | EACH | 3 | $50.00 | $50.00 | $20.00 | $50.00 | $50.00 | $50.00 |
| 9 | Removing concrete bases (204.0195) | EACH | 1 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 |
| 10 | Removing (item description) 01. removing apron endwalls (204.9060.S) | EACH | 5 | $275.00 | $275.00 | $275.00 | $263.61 | $400.00 | $241.94 |
| 11 | Excavation common (205.0100) | CY | 62,673 | $9.77 | $9.77 | $9.77 | $16.58 | $14.90 | $16.00 |
| 12 | Prepare foundation for asphaltic paving (project) 01. 9030-07-72 (211.0101) | EACH | 1 | $95,395 | $95,395 | $48,530 | $45,395 | $95,395 | $46,450 |
| 13 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 10 | $33.56 | $33.56 | $350.00 | $362.36 | $33.56 | $33.56 |
| 14 | Finishing roadway (project) 01. 9030-07-72 (213.0100) | EACH | 1 | $5,000.00 | $2,500.00 | $3,500.00 | $1,000.00 | $5,000.00 | $500.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 14,460 | $18.28 | $18.28 | $18.28 | $19.68 | $20.50 | $25.54 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 104,590 | $11.32 | $11.32 | $11.32 | $12.12 | $13.90 | $16.00 |
| 17 | Pulverize and relay (325.0100) | SY | 25,940 | $0.74 | $0.74 | $0.55 | $0.74 | $0.74 | $0.74 |
| 18 | HMA cold weather paving (450.4000) | TON | 5,140 | $0.10 | $0.10 | $3.00 | $0.10 | $0.10 | $0.10 |
| 19 | Tack coat (455.0605) | GAL | 17,605 | $3.89 | $3.89 | $3.10 | $3.89 | $3.89 | $3.89 |
| 20 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $4,500.00 | $4,500.00 | $2,620.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 21 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 3 | $4,500.00 | $4,500.00 | $3,450.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 22 | Incentive density PWL HMA pavement (460.2005) | DOL | 40,880 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 25,830 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 24 | Incentive air voids HMA pavement (460.2010) | DOL | 53,350 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 37,950 | $64.37 | $64.37 | $67.50 | $64.37 | $64.37 | $64.37 |
| 26 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 15,650 | $64.37 | $64.37 | $81.70 | $64.37 | $64.37 | $64.37 |
| 27 | Asphaltic surface patching (465.0110) | TON | 3 | $299.38 | $299.38 | $305.00 | $299.38 | $299.38 | $299.38 |
| 28 | Asphaltic surface driveways and field entrances (465.0120) | TON | 190 | $204.84 | $204.84 | $156.70 | $204.84 | $204.84 | $204.84 |
| 29 | Asphaltic flumes (465.0315) | SY | 167 | $49.30 | $39.30 | $53.30 | $39.30 | $39.30 | $39.30 |
| 30 | Asphaltic rumble strips, centerline (465.0560) | LF | 35,955 | $0.17 | $0.62 | $0.35 | $0.28 | $0.38 | $0.17 |
| 31 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 2 | $250.00 | $250.00 | $250.00 | $310.86 | $350.00 | $661.17 |
| 32 | Culvert pipe class III-A 12-inch (520.3312) | LF | 26 | $45.00 | $45.00 | $45.00 | $46.66 | $57.50 | $45.46 |
| 33 | Concrete collars for pipe (520.8000) | EACH | 3 | $1,000.00 | $1,000.00 | $1,000.00 | $772.52 | $450.00 | $909.79 |
| 34 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 30 | $173.00 | $173.00 | $173.00 | $322.81 | $219.00 | $181.39 |
| 35 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 3 | $1,960.00 | $1,960.00 | $1,960.00 | $2,178.43 | $1,500.00 | $2,333.74 |
| 36 | Concrete curb type J (601.0120) | LF | 98 | $61.35 | $61.96 | $61.35 | $61.35 | $61.35 | $70.00 |
| 37 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 578 | $46.38 | $46.84 | $46.38 | $46.38 | $46.38 | $62.50 |
| 38 | Concrete sidewalk 5-inch (602.0410) | SF | 319 | $15.77 | $15.93 | $15.77 | $15.77 | $15.77 | $15.50 |
| 39 | Riprap medium (606.0200) | CY | 4 | $150.00 | $150.00 | $150.00 | $323.16 | $160.00 | $156.64 |
| 40 | Maintenance and repair of haul roads (project) 01. 9030-07-72 (618.0100) | EACH | 1 | $100.00 | $1.00 | $1.00 | $100.00 | $1.00 | $500.00 |
| 41 | Mobilization (619.1000) | EACH | 1 | $338,667 | $408,650 | $612,300 | $415,907 | $694,073 | $770,000 |
| 42 | Concrete median sloped nose (620.0300) | SF | 145 | $17.12 | $17.29 | $17.12 | $17.12 | $17.12 | $19.50 |
| 43 | Water (624.0100) | MGAL | 1,203 | $40.00 | $40.00 | $40.00 | $1.00 | $60.00 | $35.00 |
| 44 | Topsoil (625.0100) | SY | 18,530 | $3.06 | $3.06 | $3.06 | $0.87 | $4.80 | $5.35 |
| 45 | Silt fence (628.1504) | LF | 11,695 | $1.75 | $1.75 | $1.90 | $1.75 | $1.75 | $1.75 |
| 46 | Silt fence maintenance (628.1520) | LF | 11,695 | $0.03 | $0.03 | $0.01 | $0.03 | $0.03 | $0.03 |
| 47 | Mobilizations erosion control (628.1905) | EACH | 15 | $343.00 | $343.00 | $0.01 | $343.00 | $343.00 | $343.00 |
| 48 | Mobilizations emergency erosion control (628.1910) | EACH | 7 | $103.00 | $103.00 | $0.01 | $103.00 | $103.00 | $103.00 |
| 49 | Erosion mat urban class I type B (628.2008) | SY | 18,530 | $1.75 | $1.75 | $1.90 | $1.75 | $1.75 | $1.75 |
| 50 | Temporary ditch checks (628.7504) | LF | 840 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 51 | Culvert pipe checks (628.7555) | EACH | 134 | $10.00 | $10.00 | $30.00 | $10.00 | $10.00 | $10.00 |
| 52 | Rock bags (628.7570) | EACH | 335 | $4.00 | $4.00 | $10.00 | $4.00 | $4.00 | $4.00 |
| 53 | Fertilizer type B (629.0210) | CWT | 56 | $115.00 | $115.00 | $0.01 | $115.00 | $115.00 | $115.00 |
| 54 | Seeding mixture no. 30 (630.0130) | LB | 3,570 | $7.00 | $7.00 | $0.01 | $7.00 | $7.00 | $7.00 |
| 55 | Seed water (630.0500) | MGAL | 1,810 | $1.00 | $1.00 | $0.01 | $1.00 | $1.00 | $1.00 |
| 56 | Markers culvert end (633.5200) | EACH | 3 | $75.00 | $75.00 | $70.00 | $75.00 | $75.00 | $75.00 |
| 57 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 2 | $250.00 | $250.00 | $200.00 | $250.00 | $250.00 | $250.00 |
| 58 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 3 | $275.00 | $275.00 | $240.00 | $275.00 | $275.00 | $275.00 |
| 59 | Signs type II reflective H (637.2210) | SF | 18.60 | $35.00 | $35.00 | $25.00 | $35.00 | $35.00 | $35.00 |
| 60 | Signs type II reflective F (637.2230) | SF | 4.50 | $70.00 | $70.00 | $40.00 | $70.00 | $70.00 | $70.00 |
| 61 | Moving signs type II (638.2102) | EACH | 11 | $125.00 | $125.00 | $20.00 | $125.00 | $125.00 | $125.00 |
| 62 | Removing signs type II (638.2602) | EACH | 1 | $50.00 | $50.00 | $20.00 | $50.00 | $50.00 | $50.00 |
| 63 | Moving small sign supports (638.4000) | EACH | 11 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 64 | Field office type B (642.5001) | EACH | 1 | $16,000 | $15,000 | $21,100 | $20,000 | $24,200 | $26,000 |
| 65 | Traffic control barricades type III (643.0420) | DAY | 12,321 | $0.35 | $0.35 | $0.35 | $0.35 | $0.35 | $0.35 |
| 66 | Traffic control warning lights type A (643.0705) | DAY | 21,978 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 67 | Traffic control signs (643.0900) | DAY | 125,874 | $0.18 | $0.18 | $0.18 | $0.18 | $0.18 | $0.18 |
| 68 | Traffic control covering signs type I (643.0910) | EACH | 2 | $400.00 | $400.00 | $400.00 | $400.00 | $400.00 | $400.00 |
| 69 | Traffic control covering signs type II (643.0920) | EACH | 11 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 70 | Traffic control signs fixed message (643.1000) | SF | 36 | $11.60 | $11.60 | $11.60 | $11.60 | $11.60 | $11.60 |
| 71 | Temporary marking line epoxy 6- inch (643.3170) | LF | 35,605 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 | $0.44 |
| 72 | Temporary marking line epoxy 10- inch (643.3270) | LF | 1,922 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 | $1.55 |
| 73 | Temporary marking stop line epoxy 18-inch (643.3820) | LF | 170 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $17.00 |
| 74 | Traffic control (643.5000) | EACH | 1 | $3,500.00 | $35,000 | $3,842.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 75 | Geotextile type HR (645.0120) | SY | 14 | $35.00 | $35.00 | $35.00 | $12.01 | $10.00 | $28.59 |
| 76 | Marking line epoxy 6-inch (646.2020) | LF | 2,551 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 | $0.50 |
| 77 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 149,640 | $1.15 | $1.15 | $1.15 | $1.15 | $1.15 | $1.26 |
| 78 | Marking line epoxy 10-inch (646.4020) | LF | 217 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 | $1.50 |
| 79 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 2,305 | $2.10 | $2.10 | $2.10 | $2.10 | $2.10 | $2.90 |
| 80 | Marking arrow epoxy (646.5020) | EACH | 8 | $260.00 | $260.00 | $260.00 | $260.00 | $260.00 | $273.50 |
| 81 | Marking word epoxy (646.5120) | EACH | 4 | $350.00 | $350.00 | $350.00 | $350.00 | $350.00 | $279.00 |
| 82 | Marking stop line epoxy 18-inch (646.6120) | LF | 280 | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 | $13.30 |
| 83 | Marking diagonal epoxy 12-inch (646.7120) | LF | 401 | $11.00 | $11.00 | $11.00 | $11.00 | $11.00 | $13.00 |
| 84 | Marking chevron epoxy 12-inch (646.7320) | LF | 398 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $19.00 |
| 85 | Marking island nose epoxy (646.8220) | EACH | 4 | $340.00 | $340.00 | $340.00 | $340.00 | $340.00 | $305.00 |
| 86 | Locating no-passing zones (648.0100) | MI | 8.19 | $400.00 | $400.00 | $400.00 | $400.00 | $400.00 | $545.00 |
| 87 | Construction staking subgrade (650.4500) | LF | 25,656 | $0.01 | $0.65 | $0.01 | $0.01 | $0.01 | $0.01 |
| 88 | Construction staking base (650.5000) | LF | 25,656 | $0.01 | $0.01 | $0.65 | $0.65 | $0.65 | $0.65 |
| 89 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 479 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 90 | Construction staking pipe culverts (650.6000) | EACH | 1 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 91 | Construction staking resurfacing reference (650.8000) | LF | 17,414 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 92 | Construction staking sidewalk (project) 01. 9030-07-72 (650.9500) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 93 | Construction staking supplemental control (project) 01. 9030-07-72 (650.9911) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 94 | Construction staking slope stakes (650.9920) | LF | 43,031 | $0.65 | $0.65 | $0.65 | $0.65 | $0.65 | $0.65 |
| 95 | Removing pull boxes (653.0905) | EACH | 1 | $400.00 | $400.00 | $400.00 | $400.00 | $400.00 | $400.00 |
| 96 | Concrete bases type 1 (654.0101) | EACH | 1 | $2,250.00 | $2,250.00 | $2,250.00 | $2,250.00 | $2,250.00 | $2,250.00 |
| 97 | Sawing asphalt (690.0150) | LF | 1,743 | $1.80 | $1.80 | $1.80 | $1.80 | $1.80 | $1.80 |
| 98 | Incentive iri ride (740.0440) | DOL | 32,610 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 99 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 1,576 | $3.73 | $3.73 | $5.00 | $3.73 | $3.73 | $3.73 |
| 100 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 101 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 102 | Special 01. removing existing stop sign flashing assembly (SPV.0060) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 103 | Special 02. stop sign flashing assembly (SPV.0060) | EACH | 1 | $7,527.00 | $7,527.00 | $7,527.00 | $7,527.00 | $7,527.00 | $7,527.00 |
| 104 | Special 01. protective thermoplastic coating (SPV.0180) | SY | 253 | $160.00 | $160.00 | $160.00 | $160.00 | $160.00 | $135.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of July 14, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.