WisDOT contract 20260811005 bid tabulation
5865-02-64. Let by Wisconsin DOT on August 11, 2026, Vernon. 5 bids received; low bid $7,123,105 by Hoffman Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 11 AUG 2026
- Pay items
- 200
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hoffman Construction Company | $7,123,105 | Low |
| 2 | James Peterson Sons, Inc. | $7,390,553 | +4.0% |
| 3 | Gerke Excavating Inc | $7,531,737 | +6.0% |
| 4 | A-1 Excavating LLC | $7,654,321 | +7.0% |
| 5 | Integrity Grading and Excavating, Inc. | $8,830,433 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hoffman Construction Company | 2. James Peterson Sons, Inc. | 3. Gerke Excavating Inc | 4. A-1 Excavating LLC | 5. Integrity Grading and Excavating, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 26 | $1,150.00 | $1,150.00 | $1,207.50 | $1,200.00 | $1,150.00 |
| 2 | Grubbing (201.0205) | STA | 26 | $650.00 | $650.00 | $682.50 | $700.00 | $650.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 12 | $1,000.00 | $1,430.00 | $229.02 | $700.00 | $1,750.86 |
| 4 | Removing structure (structure) 01. C-62-302 (203.0220) | EACH | 1 | $10,695 | $17,883 | $11,230 | $8,000.00 | $10,695 |
| 5 | Removing structure (structure) 02. B-62-984 (203.0220) | EACH | 1 | $92,000 | $92,000 | $96,600 | $95,000 | $92,000 |
| 6 | Removing asphaltic surface (204.0110) | SY | 357 | $5.00 | $10.10 | $6.43 | $9.00 | $16.01 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 1,138 | $3.00 | $3.00 | $3.44 | $4.00 | $3.00 |
| 8 | Removing curb & gutter (204.0150) | LF | 650 | $4.00 | $10.00 | $7.06 | $6.00 | $8.67 |
| 9 | Removing concrete sidewalk (204.0155) | SY | 199 | $7.50 | $10.00 | $10.79 | $12.00 | $16.55 |
| 10 | Removing guardrail (204.0165) | LF | 8,364 | $2.65 | $2.50 | $2.78 | $2.75 | $2.65 |
| 11 | Removing cable barrier (204.0167) | LF | 1,460 | $3.00 | $3.50 | $3.15 | $3.50 | $3.00 |
| 12 | Excavation common (205.0100) | CY | 15,754 | $20.50 | $26.34 | $15.84 | $28.00 | $38.57 |
| 13 | Excavation for structures bridges (structure) 01. B-62-984 (206.1001) | EACH | 1 | $1,505.00 | $28,000 | $29,400 | $30,000 | $28,000 |
| 14 | Excavation for structures culverts (structure) 01. C-62-335 (206.2001) | EACH | 1 | $75,000 | $13,000 | $25,578 | $38,500 | $27,360 |
| 15 | Temporary lane shift during culvert work (208.1500.S) | EACH | 11 | $0.01 | $8,200.00 | $7,588.61 | $500.00 | $2,145.99 |
| 16 | Backfill granular grade 2 (209.2500) | TON | 4,650 | $26.50 | $17.28 | $33.65 | $38.00 | $36.16 |
| 17 | Backfill structure type A (210.1500) | TON | 171 | $30.00 | $90.00 | $94.50 | $100.00 | $90.00 |
| 18 | Backfill structure type B (210.2500) | TON | 1,153 | $25.00 | $29.17 | $22.05 | $35.00 | $21.00 |
| 19 | Prepare foundation for asphaltic paving (project) 01. 5865-02-64 (211.0101) | EACH | 1 | $68,914 | $68,914 | $72,360 | $69,414 | $68,914 |
| 20 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 487 | $57.83 | $57.83 | $60.72 | $63.00 | $57.83 |
| 21 | Finishing roadway (project) 01. 5865-02-64 (213.0100) | EACH | 1 | $100.00 | $10,000 | $6,885.89 | $500.00 | $500.00 |
| 22 | Base aggregate dense 3/4-inch (305.0110) | TON | 3,279 | $35.00 | $22.22 | $28.76 | $27.00 | $52.31 |
| 23 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 11,018 | $21.25 | $26.46 | $20.94 | $21.00 | $33.81 |
| 24 | Base aggregate open-graded (310.0110) | TON | 440 | $0.01 | $45.63 | $25.20 | $56.00 | $63.43 |
| 25 | Breaker run (311.0110) | TON | 11,995 | $30.00 | $21.06 | $20.53 | $20.00 | $29.12 |
| 26 | Tack coat (455.0605) | GAL | 6,260 | $3.00 | $3.00 | $3.15 | $3.50 | $3.00 |
| 27 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $10,000 | $10,000 | $10,500 | $10,500 | $10,000 |
| 28 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $10,000 | $10,000 | $10,500 | $10,500 | $10,000 |
| 29 | Incentive density HMA pavement (460.2000) | DOL | 210 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 30 | Incentive density PWL HMA pavement (460.2005) | DOL | 17,790 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 31 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 7,540 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 32 | Incentive air voids HMA pavement (460.2010) | DOL | 22,699 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 33 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 22,808 | $89.58 | $89.58 | $94.06 | $90.00 | $89.58 |
| 34 | Asphaltic surface driveways and field entrances (465.0120) | TON | 78 | $209.15 | $209.15 | $219.61 | $230.00 | $209.15 |
| 35 | Asphaltic flumes (465.0315) | SY | 260 | $60.12 | $60.12 | $63.13 | $65.00 | $60.12 |
| 36 | Asphaltic rumble strips, centerline (465.0560) | LF | 31,293 | $0.33 | $0.95 | $0.27 | $0.30 | $0.28 |
| 37 | Concrete masonry bridges (502.0100) | CY | 35 | $1,525.00 | $1,525.00 | $1,601.25 | $1,575.00 | $1,525.00 |
| 38 | Protective surface treatment (502.3200) | SY | 994 | $4.00 | $4.00 | $24.15 | $5.00 | $4.00 |
| 39 | Pigmented surface sealer reseal (502.3205) | SY | 203 | $23.00 | $23.00 | $24.15 | $26.00 | $23.00 |
| 40 | Pigmented surface sealer (502.3210) | SY | 47 | $13.00 | $13.00 | $13.65 | $23.00 | $13.00 |
| 41 | Protective surface treatment reseal (502.3215) | SY | 24 | $295.00 | $295.00 | $309.75 | $305.00 | $295.00 |
| 42 | Adhesive anchors no. 5 bar (502.4205) | EACH | 72 | $29.50 | $29.50 | $30.98 | $35.00 | $29.50 |
| 43 | Concrete masonry culverts (504.0100) | CY | 121 | $819.00 | $1,376.00 | $859.95 | $1,527.00 | $819.00 |
| 44 | Bar steel reinforcement HS structures (505.0400) | LB | 19,350 | $2.50 | $2.50 | $1.31 | $3.00 | $1.24 |
| 45 | Bar steel reinforcement HS coated structures (505.0600) | LB | 3,090 | $2.85 | $2.85 | $2.35 | $3.00 | $2.24 |
| 46 | Preparation decks type 1 (509.0301) | SY | 404 | $185.00 | $185.00 | $194.25 | $188.00 | $185.00 |
| 47 | Preparation decks type 2 (509.0302) | SY | 161 | $276.00 | $276.00 | $289.80 | $281.00 | $276.00 |
| 48 | Cleaning decks (509.0500) | SY | 144 | $46.00 | $46.00 | $48.30 | $51.00 | $46.00 |
| 49 | Cleaning decks to reapply concrete masonry overlay (509.0505.S) | SY | 850 | $16.00 | $16.00 | $55.79 | $17.00 | $16.00 |
| 50 | Concrete surface repair (509.1500) | SF | 483 | $172.00 | $172.00 | $180.60 | $175.00 | $172.00 |
| 51 | Concrete masonry overlay decks (509.2500) | CY | 106 | $1,115.00 | $1,115.00 | $1,170.75 | $1,120.00 | $1,115.00 |
| 52 | Removing concrete masonry deck overlay (structure) 01. B-62-29 (509.9005.S) | SY | 850 | $53.13 | $53.13 | $55.79 | $56.00 | $53.13 |
| 53 | Temporary shoring (structure) 01. B-62-984 (511.1200) | SF | 640 | $69.00 | $69.00 | $72.45 | $73.00 | $69.00 |
| 54 | Rubberized membrane waterproofing (516.0500) | SY | 34 | $63.00 | $63.00 | $55.50 | $69.00 | $52.86 |
| 55 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 7 | $900.00 | $634.06 | $932.92 | $770.00 | $1,112.78 |
| 56 | Culvert pipe class III-A 24-inch (520.3324) | LF | 182 | $80.00 | $298.75 | $115.80 | $142.00 | $126.80 |
| 57 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 1 | $550.00 | $276.04 | $853.48 | $480.00 | $1,033.66 |
| 58 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 6 | $200.00 | $257.96 | $301.84 | $116.00 | $327.57 |
| 59 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 19X30-inch (522.2319) | LF | 160 | $155.00 | $416.19 | $244.09 | $176.00 | $348.63 |
| 60 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (522.2324) | LF | 36 | $180.00 | $461.44 | $308.07 | $280.00 | $379.07 |
| 61 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 7 | $1,650.00 | $1,879.30 | $2,062.57 | $1,850.00 | $3,037.81 |
| 62 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 2 | $2,150.00 | $2,299.20 | $2,502.66 | $2,360.00 | $3,438.65 |
| 63 | Piling cip concrete 14 X 0.375-inch (550.2146) | LF | 420 | $135.00 | $135.00 | $141.75 | $138.00 | $135.00 |
| 64 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,920 | $20.39 | $20.39 | $21.41 | $21.00 | $20.39 |
| 65 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 2,435 | $21.98 | $21.98 | $23.08 | $22.50 | $21.98 |
| 66 | Concrete sidewalk 4-inch (602.0405) | SF | 3,685 | $8.11 | $8.11 | $8.52 | $8.65 | $8.11 |
| 67 | Curb ramp detectable warning field yellow (602.0505) | SF | 40 | $60.34 | $60.34 | $63.36 | $61.50 | $60.34 |
| 68 | Concrete driveway 6-inch (602.0810) | SY | 205 | $81.04 | $81.04 | $85.09 | $87.00 | $81.04 |
| 69 | Concrete barrier temporary precast delivered (603.8000) | LF | 508 | $12.52 | $12.52 | $13.15 | $62.00 | $12.52 |
| 70 | Concrete barrier temporary precast installed (603.8125) | LF | 1,016 | $7.40 | $7.40 | $7.77 | $7.00 | $7.40 |
| 71 | Riprap medium (606.0200) | CY | 17 | $185.00 | $71.26 | $118.06 | $100.00 | $166.76 |
| 72 | Riprap heavy (606.0300) | CY | 187 | $150.00 | $71.26 | $71.14 | $100.00 | $166.76 |
| 73 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 147 | $48.50 | $111.91 | $78.48 | $78.00 | $110.03 |
| 74 | Storm sewer pipe class III-A 15- inch (608.3015) | LF | 134 | $52.00 | $68.36 | $62.47 | $82.00 | $114.61 |
| 75 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 825 | $56.50 | $59.46 | $67.82 | $89.00 | $102.24 |
| 76 | Storm sewer pipe class III-A 24- inch (608.3024) | LF | 621 | $67.50 | $68.72 | $80.35 | $102.00 | $119.93 |
| 77 | Manhole covers type J (611.0530) | EACH | 6 | $450.00 | $1,257.63 | $902.39 | $930.00 | $842.26 |
| 78 | Inlet covers type F (611.0615) | EACH | 4 | $2,250.00 | $3,167.93 | $2,214.47 | $2,200.00 | $1,071.15 |
| 79 | Inlet covers type H (611.0624) | EACH | 8 | $1,050.00 | $1,832.77 | $1,168.78 | $1,190.00 | $1,071.15 |
| 80 | Inlet covers type MS (611.0642) | EACH | 6 | $800.00 | $630.75 | $905.85 | $950.00 | $877.06 |
| 81 | Inlet covers type MS-A (611.0645) | EACH | 2 | $800.00 | $658.75 | $953.87 | $975.00 | $1,015.26 |
| 82 | Manholes 4-FT diameter (611.2004) | EACH | 6 | $2,800.00 | $2,891.21 | $3,228.18 | $3,210.00 | $4,682.02 |
| 83 | Inlets 3-FT diameter (611.3003) | EACH | 2 | $2,050.00 | $1,954.19 | $2,751.46 | $2,280.00 | $4,130.74 |
| 84 | Inlets 4-FT diameter (611.3004) | EACH | 8 | $2,450.00 | $2,472.03 | $3,097.28 | $2,860.00 | $4,448.62 |
| 85 | Inlets 2.5X3-FT (611.3253) | EACH | 2 | $2,050.00 | $2,031.94 | $2,926.79 | $2,600.00 | $4,290.87 |
| 86 | Inlets median 1 grate (611.3901) | EACH | 4 | $3,050.00 | $2,525.12 | $4,937.43 | $3,900.00 | $4,992.86 |
| 87 | Inlets median 2 grate (611.3902) | EACH | 2 | $4,000.00 | $3,987.63 | $5,523.52 | $4,650.00 | $5,529.50 |
| 88 | Pipe underdrain 6-inch (612.0106) | LF | 75 | $25.00 | $20.00 | $44.29 | $30.00 | $18.04 |
| 89 | Crash cushions temporary (614.0905) | EACH | 2 | $3,550.00 | $4,750.00 | $3,727.50 | $4,050.00 | $3,800.00 |
| 90 | MGS guardrail 3 (614.2300) | LF | 2,450 | $26.00 | $30.00 | $27.30 | $26.50 | $26.00 |
| 91 | MGS guardrail 3 K (614.2330) | LF | 5,900 | $37.00 | $42.00 | $38.85 | $37.50 | $37.00 |
| 92 | MGS guardrail 3 L (614.2340) | LF | 112.50 | $33.00 | $30.00 | $34.65 | $36.00 | $33.00 |
| 93 | MGS guardrail short radius (614.2350) | LF | 112.50 | $37.90 | $40.00 | $39.80 | $41.00 | $37.90 |
| 94 | MGS thrie beam transition (614.2500) | LF | 630.40 | $92.00 | $95.00 | $96.60 | $93.00 | $92.00 |
| 95 | MGS guardrail terminal eat (614.2610) | EACH | 38 | $3,755.00 | $4,000.00 | $3,942.75 | $3,855.00 | $3,755.00 |
| 96 | MGS guardrail terminal type 2 (614.2620) | EACH | 2 | $2,900.00 | $3,000.00 | $3,045.00 | $3,400.00 | $2,900.00 |
| 97 | MGS guardrail short radius terminal (614.2630) | EACH | 1 | $2,300.00 | $2,200.00 | $2,415.00 | $2,800.00 | $2,300.00 |
| 98 | Maintenance and repair of haul roads (project) 01. 5865-02-64 (618.0100) | EACH | 1 | $100.00 | $1.00 | $1.16 | $500.00 | $500.00 |
| 99 | Mobilization (619.1000) | EACH | 1 | $479,065 | $461,933 | $653,518 | $508,618 | $822,285 |
| 100 | Water (624.0100) | MGAL | 143.20 | $140.00 | $75.00 | $27.50 | $50.00 | $63.83 |
| 101 | Topsoil (625.0100) | SY | 1,651 | $5.00 | $11.19 | $9.14 | $7.00 | $12.47 |
| 102 | Salvaged topsoil (625.0500) | SY | 10,380 | $5.00 | $1.65 | $0.96 | $5.00 | $5.38 |
| 103 | Mulching (627.0200) | SY | 5,411 | $0.45 | $0.50 | $0.47 | $0.70 | $0.45 |
| 104 | Silt fence (628.1504) | LF | 11,800 | $2.15 | $2.00 | $2.26 | $2.25 | $2.15 |
| 105 | Silt fence maintenance (628.1520) | LF | 23,600 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 106 | Mobilizations erosion control (628.1905) | EACH | 8 | $500.00 | $100.00 | $525.00 | $550.00 | $500.00 |
| 107 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $100.00 | $100.00 | $105.00 | $150.00 | $100.00 |
| 108 | Erosion mat urban class I type B (628.2008) | SY | 8,200 | $2.10 | $1.70 | $2.21 | $2.25 | $2.10 |
| 109 | Erosion mat class II type B (628.2023) | SY | 500 | $2.20 | $2.25 | $2.31 | $2.50 | $2.20 |
| 110 | Inlet protection type A (628.7005) | EACH | 24 | $106.00 | $125.00 | $111.30 | $116.00 | $106.00 |
| 111 | Inlet protection type B (628.7010) | EACH | 5 | $73.00 | $70.00 | $76.65 | $83.00 | $73.00 |
| 112 | Inlet protection type C (628.7015) | EACH | 15 | $72.00 | $75.00 | $75.60 | $82.00 | $72.00 |
| 113 | Temporary ditch checks (628.7504) | LF | 348 | $8.95 | $9.00 | $9.40 | $10.00 | $8.95 |
| 114 | Culvert pipe checks (628.7555) | EACH | 45 | $16.00 | $22.00 | $16.80 | $26.00 | $16.00 |
| 115 | Fertilizer type B (629.0210) | CWT | 14.50 | $93.00 | $100.00 | $97.65 | $100.00 | $93.00 |
| 116 | Seeding mixture no. 30 (630.0130) | LB | 663 | $8.80 | $9.00 | $9.24 | $10.00 | $8.80 |
| 117 | Seeding mixture no. 40 (630.0140) | LB | 175 | $12.00 | $12.00 | $12.60 | $13.00 | $12.00 |
| 118 | Seeding mixture no. 75 (630.0175) | LB | 21.80 | $115.00 | $200.00 | $120.75 | $120.00 | $115.00 |
| 119 | Seeding temporary (630.0200) | LB | 510 | $3.55 | $4.00 | $3.73 | $4.00 | $3.55 |
| 120 | Seed water (630.0500) | MGAL | 493 | $0.01 | $10.00 | $0.01 | $0.01 | $0.01 |
| 121 | Markers culvert end (633.5200) | EACH | 16 | $71.00 | $65.00 | $74.55 | $81.00 | $71.00 |
| 122 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 8 | $92.00 | $85.00 | $96.60 | $102.00 | $92.00 |
| 123 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 31 | $95.00 | $90.00 | $99.75 | $105.00 | $95.00 |
| 124 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 11 | $97.00 | $95.00 | $101.85 | $107.00 | $97.00 |
| 125 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 6 | $105.00 | $100.00 | $110.25 | $115.00 | $105.00 |
| 126 | Moving signs type II (638.2102) | EACH | 57 | $119.00 | $150.00 | $124.95 | $124.00 | $119.00 |
| 127 | Field office type C (642.5201) | EACH | 1 | $5,000.00 | $22,763 | $10,215 | $15,000 | $20,000 |
| 128 | Traffic control drums (643.0300) | DAY | 24,500 | $0.20 | $0.20 | $0.21 | $0.25 | $0.50 |
| 129 | Traffic control barricades type III (643.0420) | DAY | 10,207 | $0.45 | $0.45 | $0.47 | $0.50 | $1.00 |
| 130 | Traffic control warning lights type A (643.0705) | DAY | 20,414 | $0.01 | $0.01 | $0.01 | $0.05 | $0.10 |
| 131 | Traffic control warning lights type C (643.0715) | DAY | 975 | $0.01 | $0.01 | $0.01 | $1.00 | $0.25 |
| 132 | Traffic control signs (643.0900) | DAY | 54,504 | $0.25 | $0.25 | $0.26 | $0.30 | $0.25 |
| 133 | Traffic control covering signs type II (643.0920) | EACH | 9 | $45.00 | $45.00 | $47.25 | $65.00 | $25.00 |
| 134 | Traffic control signs PCMS (643.1050) | DAY | 14 | $60.00 | $60.00 | $63.00 | $70.00 | $100.00 |
| 135 | Temporary marking line removable tape 4-inch (643.3150) | LF | 5,152 | $2.50 | $2.50 | $2.63 | $3.00 | $1.50 |
| 136 | Temporary marking line paint 6- inch (643.3165) | LF | 74,182 | $0.42 | $0.42 | $0.44 | $0.50 | $0.18 |
| 137 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 22 | $8.00 | $8.00 | $8.40 | $18.00 | $10.00 |
| 138 | Traffic control (643.5000) | EACH | 1 | $45,200 | $45,200 | $47,460 | $65,200 | $30,000 |
| 139 | Temporary pedestrian surface matting (644.1440) | SF | 240 | $1.00 | $1.00 | $1.05 | $3.00 | $7.00 |
| 140 | Temporary pedestrian barricade (644.1810) | LF | 517 | $2.00 | $2.00 | $2.10 | $4.00 | $5.00 |
| 141 | Temporary audible message devices (644.1900.S) | DAY | 120 | $4.00 | $4.00 | $4.20 | $9.00 | $10.00 |
| 142 | Geotextile type C (645.0105) | SY | 252 | $6.50 | $5.95 | $4.73 | $3.00 | $4.50 |
| 143 | Geotextile type HR (645.0120) | SY | 424 | $5.30 | $3.45 | $3.94 | $4.00 | $1.89 |
| 144 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 150,482 | $1.05 | $1.05 | $1.10 | $1.10 | $1.19 |
| 145 | Marking removal line 4-inch (646.9000) | LF | 1,564 | $1.75 | $1.75 | $1.84 | $2.00 | $1.25 |
| 146 | Locating no-passing zones (648.0100) | MI | 7.20 | $625.00 | $625.00 | $656.25 | $800.00 | $532.93 |
| 147 | Construction staking storm sewer (650.4000) | EACH | 23 | $350.00 | $350.00 | $367.50 | $400.00 | $350.00 |
| 148 | Construction staking subgrade (650.4500) | LF | 7,856 | $0.01 | $0.01 | $0.26 | $0.01 | $0.01 |
| 149 | Construction staking base (650.5000) | LF | 7,856 | $0.01 | $1.00 | $1.05 | $1.20 | $1.00 |
| 150 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 4,355 | $5.00 | $5.00 | $5.25 | $5.20 | $5.00 |
| 151 | Construction staking pipe culverts (650.6000) | EACH | 9 | $300.00 | $300.00 | $315.00 | $350.00 | $300.00 |
| 152 | Construction staking structure layout (structure) 01. C-62-335 (650.6501) | EACH | 1 | $2,000.00 | $2,000.00 | $1,050.00 | $2,500.00 | $2,000.00 |
| 153 | Construction staking structure layout (structure) 02. B-62-984 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $2,100.00 | $3,500.00 | $3,000.00 |
| 154 | Construction staking resurfacing reference (650.8000) | LF | 38,150 | $0.12 | $0.12 | $0.13 | $0.15 | $0.12 |
| 155 | Construction staking curb ramps (650.9000) | EACH | 4 | $200.00 | $200.00 | $210.00 | $250.00 | $200.00 |
| 156 | Construction staking sidewalk (project) 01. 5865-02-64 (650.9500) | EACH | 1 | $1,000.00 | $1,000.00 | $1,050.00 | $1,100.00 | $1,000.00 |
| 157 | Construction staking supplemental control (project) 01.5865-02-64 (650.9911) | EACH | 1 | $2,000.00 | $2,000.00 | $2,100.00 | $2,500.00 | $2,000.00 |
| 158 | Construction staking slope stakes (650.9920) | LF | 7,856 | $0.75 | $0.75 | $0.79 | $0.80 | $0.75 |
| 159 | Sawing asphalt (690.0150) | LF | 5,482 | $1.64 | $1.64 | $2.05 | $2.00 | $1.64 |
| 160 | Sawing concrete (690.0250) | LF | 78 | $3.95 | $3.95 | $3.25 | $6.00 | $3.95 |
| 161 | Incentive strength concrete structures (715.0502) | DOL | 936 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 162 | Incentive iri ride (740.0440) | DOL | 28,800 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 163 | Installing and maintaining bird deterrent system (station) 01. 132+17.1 (999.2000.S) | EACH | 1 | $10,500 | $10,500 | $11,025 | $100.00 | $10,500 |
| 164 | Installing and maintaining bird deterrent system (station) 02. 184+01.4 (999.2000.S) | EACH | 1 | $2,550.00 | $1,500.00 | $2,677.50 | $100.00 | $2,550.00 |
| 165 | Installing and maintaining bird deterrent system (station) 03. 252+98.5 (999.2000.S) | EACH | 1 | $2,600.00 | $2,600.00 | $2,730.00 | $100.00 | $2,600.00 |
| 166 | Installing and maintaining bird deterrent system (station) 04. 431+53.0 (999.2000.S) | EACH | 1 | $2,900.00 | $2,900.00 | $3,045.00 | $100.00 | $2,900.00 |
| 167 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 7,200 | $2.55 | $5.00 | $2.68 | $2.75 | $2.55 |
| 168 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 169 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 170 | Special 001. verify landmark reference monuments (SPV.0060) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,200.00 | $1,000.00 |
| 171 | Special 200. remove existing sanitary manhole (SPV.0060) | EACH | 4 | $1,200.00 | $500.00 | $734.70 | $750.00 | $1,806.79 |
| 172 | Special 201. 48" sanitary sewer manhole (SPV.0060) | EACH | 3 | $4,500.00 | $4,808.66 | $4,118.54 | $5,460.00 | $5,432.78 |
| 173 | Special 202. 8" X 6" PVC wye (SPV.0060) | EACH | 1 | $500.00 | $131.60 | $1,427.74 | $400.00 | $94.00 |
| 174 | Special 203. 8" X 4" PVC wye (SPV.0060) | EACH | 21 | $250.00 | $110.60 | $501.08 | $300.00 | $79.00 |
| 175 | Special 204. connect to existing sanitary sewer main (SPV.0060) | EACH | 2 | $2,000.00 | $2,181.44 | $1,329.66 | $2,200.00 | $10,590 |
| 176 | Special 206. connect to existing sanitary sewer service (SPV.0060) | EACH | 22 | $125.00 | $282.80 | $700.30 | $200.00 | $1,837.85 |
| 177 | Special 207. remove & salvage existing hydrants & valves (SPV.0060) | EACH | 6 | $1,500.00 | $1,787.26 | $1,245.50 | $500.00 | $2,626.30 |
| 178 | Special 209. 8" gate valves & boxes (SPV.0060) | EACH | 5 | $4,200.00 | $3,805.20 | $3,499.20 | $3,750.00 | $2,718.00 |
| 179 | Special 210. 6" gate valves & boxes (SPV.0060) | EACH | 5 | $3,400.00 | $2,707.60 | $2,544.58 | $2,750.00 | $1,934.00 |
| 180 | Special 211. fire hydrant (SPV.0060) | EACH | 3 | $7,000.00 | $8,163.00 | $8,099.27 | $7,950.00 | $8,420.59 |
| 181 | Special 212. 8" tapping saddle (SPV.0060) | EACH | 22 | $400.00 | $250.42 | $620.82 | $160.00 | $179.00 |
| 182 | Special 213. 1" corporation stop (SPV.0060) | EACH | 21 | $180.00 | $141.40 | $394.91 | $730.00 | $103.00 |
| 183 | Special 214. 2" corporation stop (SPV.0060) | EACH | 1 | $420.00 | $522.20 | $1,641.04 | $1,260.00 | $374.00 |
| 184 | Special 215. 1" curb stop & box (SPV.0060) | EACH | 21 | $330.00 | $431.20 | $577.10 | $530.00 | $310.00 |
| 185 | Special 216. connect to existing main (SPV.0060) | EACH | 5 | $2,000.00 | $2,990.64 | $1,707.91 | $2,400.00 | $10,745 |
| 186 | Special 217. connect to existing service (SPV.0060) | EACH | 22 | $200.00 | $295.90 | $715.53 | $200.00 | $1,783.64 |
| 187 | Special 218. temporary water services (SPV.0060) | EACH | 1 | $8,500.00 | $16,500 | $14,769 | $13,255 | $71,532 |
| 188 | Special 200. special fittings (SPV.0085) | LB | 1,200 | $10.00 | $7.20 | $11.31 | $1.00 | $5.14 |
| 189 | Special 200. remove existing sanitary sewer pipe (SPV.0090) | LF | 834 | $8.00 | $2.00 | $16.43 | $5.00 | $27.41 |
| 190 | Special 201. 8" sanitary sewer main (SPV.0090) | LF | 906 | $80.00 | $61.78 | $83.12 | $97.00 | $197.67 |
| 191 | Special 202. 2" HDPE sanitary sewer forcemain (SPV.0090) | LF | 96 | $100.00 | $46.67 | $49.96 | $93.00 | $474.73 |
| 192 | Special 203. 6" sanitary sewer service pipe (SPV.0090) | LF | 37 | $110.00 | $45.44 | $59.28 | $98.00 | $229.33 |
| 193 | Special 204. 4" sanitary sewer service pipe (SPV.0090) | LF | 495 | $50.00 | $43.91 | $43.73 | $74.00 | $224.99 |
| 194 | Special 205. remove existing watermain (SPV.0090) | LF | 1,121 | $10.00 | $2.00 | $5.91 | $9.00 | $29.50 |
| 195 | Special 206. 8" watermain (SPV.0090) | LF | 1,039 | $87.00 | $80.61 | $97.89 | $144.00 | $136.45 |
| 196 | Special 207. 6" watermain (SPV.0090) | LF | 64 | $100.00 | $102.49 | $95.12 | $157.00 | $148.62 |
| 197 | Special 208. 6" class 52 ductile iron pipe hydrant lead (SPV.0090) | LF | 40 | $100.00 | $105.87 | $156.05 | $160.00 | $152.87 |
| 198 | Special 209. 1" copper water service (SPV.0090) | LF | 484 | $54.00 | $55.45 | $48.71 | $90.00 | $235.66 |
| 199 | Special 210. 2" copper water service (SPV.0090) | LF | 19 | $200.00 | $88.84 | $110.70 | $142.00 | $284.54 |
| 200 | Special 001. removing asphaltic surface milling (SPV.0180) | SY | 100,500 | $2.00 | $2.00 | $2.21 | $2.10 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 11, 2026. Compiled by Mirage Metrics.