WisDOT contract 20260811010 bid tabulation
Green Bay, IH 41; Parkview Rd - STH 29 (IH 041, Brown County Green Bay, IH 41). Let by Wisconsin DOT on August 11, 2026, Brown. 3 bids received; low bid $9,442,152 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 AUG 2026
- Pay items
- 157
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $9,442,152 | Low |
| 2 | Vinton Construction Company | $10,892,824 | +15% |
| 3 | Zenith Tech., Inc. - Waukesha | $11,624,189 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. Vinton Construction Company | 3. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|
| 1 | Incentive/disincentive for interim completion of work (108.3100.S) | CD | 15 | $13,900 | $13,900 | $13,900 |
| 2 | Removing structure (structure) 01. B-5-0612 (203.0220) | EACH | 1 | $22,800 | $50,000 | $50,000 |
| 3 | Removing structure (structure) 01. B-5-0618 (203.0220) | EACH | 1 | $22,800 | $85,000 | $85,000 |
| 4 | Removing structure (structure) 02. B-5-0616 (203.0220) | EACH | 1 | $22,800 | $95,000 | $95,000 |
| 5 | Removing structure (structure) 03. B-5-0617 (203.0220) | EACH | 1 | $22,800 | $75,000 | $75,000 |
| 6 | Removing structure (structure) 05. B-5-0619 (203.0220) | EACH | 1 | $22,800 | $75,000 | $75,000 |
| 7 | Removing structure (structure) 06. B-5-0621 (203.0220) | EACH | 1 | $15,900 | $50,000 | $50,000 |
| 8 | Removing structure (structure) 07. B-5-0663 (203.0220) | EACH | 1 | $22,800 | $50,000 | $50,000 |
| 9 | Removing structure (structure) 08. R-5-0243 (203.0220) | EACH | 1 | $34,300 | $100,000 | $100,000 |
| 10 | Removing structure (structure) 09. R-5-0244 (203.0220) | EACH | 1 | $58,500 | $190,000 | $190,000 |
| 11 | Removing concrete pavement (204.0100) | SY | 31,700 | $10.26 | $1.50 | $1.50 |
| 12 | Removing asphaltic surface (204.0110) | SY | 26,800 | $0.01 | $0.50 | $0.50 |
| 13 | Removing concrete barrier (204.0157) | LF | 3,480 | $30.00 | $28.50 | $28.50 |
| 14 | Removing guardrail (204.0165) | LF | 3,650 | $2.65 | $2.20 | $2.20 |
| 15 | Excavation common (205.0100) | CY | 13,796 | $0.01 | $24.25 | $24.25 |
| 16 | Finishing roadway (project) 01. 1130-74-71 (213.0100) | EACH | 1 | $1,000.00 | $10,000 | $1,000.00 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 340 | $50.00 | $40.25 | $40.25 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 12,200 | $0.01 | $16.65 | $16.65 |
| 19 | Base aggregate open-graded (310.0115) | CY | 1 | $500.00 | $240.00 | $240.00 |
| 20 | Select crushed material (312.0110) | TON | 510 | $30.00 | $20.85 | $20.85 |
| 21 | Concrete base 10-inch (320.0165) | SY | 755 | $103.00 | $88.87 | $88.87 |
| 22 | Drilled tie bars (416.0610) | EACH | 439 | $30.00 | $10.00 | $10.00 |
| 23 | Drilled dowel bars (416.0620) | EACH | 433 | $30.00 | $18.50 | $18.50 |
| 24 | Filling concrete shoulder rumble strips 12-inch (416.9112.S) | LF | 11,840 | $14.50 | $17.00 | $17.00 |
| 25 | HMA cold weather paving (450.4000) | TON | 90 | $15.30 | $15.30 | $15.30 |
| 26 | Tack coat (455.0605) | GAL | 306 | $5.70 | $5.70 | $5.70 |
| 27 | Incentive density HMA pavement (460.2000) | DOL | 710 | $1.00 | $1.00 | $1.00 |
| 28 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 1,100 | $186.40 | $162.50 | $162.50 |
| 29 | Asphaltic rumble strips, shoulder (465.0520) | LF | 2,730 | $0.30 | $0.30 | $0.30 |
| 30 | Protective surface treatment (502.3200) | SY | 1,998 | $6.80 | $4.00 | $4.00 |
| 31 | Pigmented surface sealer (502.3210) | SY | 525 | $16.00 | $12.00 | $12.00 |
| 32 | Adhesive anchors no. 7 bar (502.4207) | EACH | 621 | $36.00 | $63.00 | $63.00 |
| 33 | Concrete masonry retaining walls (504.0500) | CY | 257 | $1,700.00 | $1,100.00 | $1,100.00 |
| 34 | Bar steel reinforcement HS coated structures (505.0600) | LB | 202,280 | $1.29 | $1.45 | $1.45 |
| 35 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 3,220 | $3.74 | $3.81 | $3.81 |
| 36 | Bar couplers no. 5 (505.0905) | EACH | 594 | $38.29 | $50.00 | $50.00 |
| 37 | Rubberized membrane waterproofing (516.0500) | SY | 19 | $71.00 | $60.00 | $60.00 |
| 38 | Concrete staining (structure) 01. B- 5-0612 (517.1010.S) | SF | 45 | $4.54 | $20.00 | $20.00 |
| 39 | Concrete staining (structure) 04. B- 5-0618 (517.1010.S) | SF | 45 | $4.54 | $20.00 | $20.00 |
| 40 | Concrete staining (structure) 07. B- 5-0663 (517.1010.S) | SF | 434 | $4.54 | $3.00 | $3.00 |
| 41 | Concrete staining (structure) 08. R- 5-0243 (517.1010.S) | SF | 991 | $4.54 | $3.00 | $3.00 |
| 42 | Concrete staining (structure) 09. R- 5-0244 (517.1010.S) | SF | 1,903 | $4.54 | $3.00 | $3.00 |
| 43 | Concrete staining multi-color (structure) 01. B-5-0612 (517.1015.S) | SF | 64 | $12.00 | $5.00 | $5.00 |
| 44 | Concrete staining multi-color (structure) 04. B-5-0618 (517.1015.S) | SF | 64 | $12.00 | $5.00 | $5.00 |
| 45 | Architectural surface treatment (structure) 01. B-5-0612 (517.1050.S) | SF | 64 | $43.00 | $25.00 | $25.00 |
| 46 | Architectural surface treatment (structure) 04. B-5-0618 (517.1050.S) | SF | 64 | $43.00 | $25.00 | $25.00 |
| 47 | Anchor assemblies poles on structures (531.8990) | EACH | 2 | $700.00 | $700.00 | $700.00 |
| 48 | Concrete curb & gutter 4-inch sloped 30-inch type G (601.0574) | LF | 340 | $60.00 | $58.00 | $58.00 |
| 49 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 97 | $60.00 | $85.00 | $85.00 |
| 50 | Concrete surface drains (602.3010) | CY | 8 | $1,000.00 | $2,000.00 | $2,000.00 |
| 51 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 14,740 | $0.90 | $0.90 | $0.90 |
| 52 | Concrete barrier type S42 (603.1142) | LF | 431 | $110.00 | $241.50 | $241.50 |
| 53 | Concrete barrier transition type NJ32SF to S36 (603.3113) | EACH | 2 | $5,400.00 | $6,400.00 | $6,400.00 |
| 54 | Concrete barrier transition type S36 to S42 (603.3535) | EACH | 2 | $5,400.00 | $6,000.00 | $6,000.00 |
| 55 | Concrete barrier temporary precast delivered (603.8000) | LF | 10,300 | $16.84 | $14.00 | $14.00 |
| 56 | Concrete barrier temporary precast installed (603.8125) | LF | 18,930 | $5.40 | $6.00 | $6.00 |
| 57 | Anchoring concrete barrier temporary precast (603.8500) | LF | 5,770 | $5.00 | $10.00 | $10.00 |
| 58 | Riprap medium (606.0200) | CY | 50 | $300.00 | $140.00 | $140.00 |
| 59 | Manhole covers type J-special (611.0535) | EACH | 1 | $2,200.00 | $1,100.00 | $1,100.00 |
| 60 | Inlet covers type HM-GJ-S (611.0633) | EACH | 2 | $1,200.00 | $1,400.00 | $1,400.00 |
| 61 | Inlet covers type V (611.0654) | EACH | 22 | $1,200.00 | $1,200.00 | $1,200.00 |
| 62 | Adjusting manhole covers (611.8110) | EACH | 1 | $2,000.00 | $600.00 | $600.00 |
| 63 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 20 | $200.00 | $35.00 | $35.00 |
| 64 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 7 | $380.00 | $450.00 | $450.00 |
| 65 | Crash cushions permanent low maintenance (614.0805) | EACH | 1 | $39,550 | $39,550 | $39,550 |
| 66 | MGS guardrail 3 (614.2300) | LF | 3,283 | $26.00 | $26.15 | $26.15 |
| 67 | MGS thrie beam transition (614.2500) | LF | 289 | $92.00 | $96.00 | $96.00 |
| 68 | MGS guardrail terminal eat (614.2610) | EACH | 2 | $3,900.00 | $3,875.00 | $3,875.00 |
| 69 | MGS guardrail terminal type 2 (614.2620) | EACH | 2 | $3,800.00 | $3,125.00 | $3,125.00 |
| 70 | Maintenance and repair of haul roads (project) 01. 1130-74-71 (618.0100) | EACH | 1 | $1.00 | $0.01 | $500.00 |
| 71 | Mobilization (619.1000) | EACH | 1 | $802,000 | $1,704,000 | $2,415,000 |
| 72 | Dust control surface treatment (623.0200) | SY | 28,000 | $0.01 | $0.01 | $0.01 |
| 73 | Water (624.0100) | MGAL | 240 | $30.00 | $0.01 | $80.00 |
| 74 | Salvaged topsoil (625.0500) | SY | 6,550 | $8.00 | $0.01 | $0.01 |
| 75 | Silt fence (628.1504) | LF | 5,180 | $1.95 | $1.75 | $1.75 |
| 76 | Silt fence maintenance (628.1520) | LF | 5,180 | $0.01 | $0.03 | $0.03 |
| 77 | Mobilizations erosion control (628.1905) | EACH | 9 | $350.00 | $205.00 | $205.00 |
| 78 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $350.00 | $305.00 | $305.00 |
| 79 | Erosion mat class I type B (628.2004) | SY | 6,550 | $1.75 | $1.05 | $1.05 |
| 80 | Inlet protection type B (628.7010) | EACH | 30 | $65.00 | $60.00 | $60.00 |
| 81 | Inlet protection type C (628.7015) | EACH | 4 | $65.00 | $65.00 | $65.00 |
| 82 | Temporary ditch checks (628.7504) | LF | 90 | $5.95 | $8.95 | $8.95 |
| 83 | Rock bags (628.7570) | EACH | 50 | $10.00 | $8.00 | $8.00 |
| 84 | Fertilizer type B (629.0210) | CWT | 4.40 | $85.00 | $125.00 | $125.00 |
| 85 | Seeding mixture no. 30 (630.0130) | LB | 300 | $8.75 | $8.95 | $8.95 |
| 86 | Seed water (630.0500) | MGAL | 150 | $10.00 | $5.00 | $5.00 |
| 87 | Delineators barrier wall (633.1000) | EACH | 35 | $55.00 | $115.00 | $115.00 |
| 88 | Moving signs type II (638.2102) | EACH | 6 | $110.00 | $150.00 | $150.00 |
| 89 | Moving small sign supports (638.4000) | EACH | 9 | $110.00 | $125.00 | $125.00 |
| 90 | Field office type C (642.5201) | EACH | 1 | $20,000 | $15,000 | $12,000 |
| 91 | Traffic control drums (643.0300) | DAY | 78,817 | $0.15 | $0.15 | $0.15 |
| 92 | Temporary tape rumble strip orange (643.0320.S) | LF | 3,348 | $9.00 | $9.00 | $9.00 |
| 93 | Traffic control barricades type III (643.0420) | DAY | 2,885 | $0.45 | $0.45 | $0.45 |
| 94 | Traffic control warning lights type A (643.0705) | DAY | 5,352 | $0.09 | $0.09 | $0.09 |
| 95 | Traffic control warning lights type C (643.0715) | DAY | 18,811 | $0.09 | $0.09 | $0.09 |
| 96 | Traffic control connected arrow boards (643.0810) | DAY | 553 | $7.40 | $7.40 | $7.40 |
| 97 | Traffic control signs (643.0900) | DAY | 29,005 | $0.25 | $0.25 | $0.25 |
| 98 | Traffic control covering signs type I (643.0910) | EACH | 27 | $250.00 | $250.00 | $250.00 |
| 99 | Traffic control covering signs type II (643.0920) | EACH | 18 | $105.00 | $105.00 | $105.00 |
| 100 | Traffic control signs fixed message (643.1000) | SF | 450 | $31.00 | $31.00 | $31.00 |
| 101 | Traffic control signs PCMS (643.1050) | DAY | 98 | $12.50 | $12.50 | $12.50 |
| 102 | Dynamic late merge system (643.1100.S) | DAY | 278 | $180.00 | $180.00 | $180.00 |
| 103 | Basic traffic queue warning system (643.1205.S) | DAY | 106 | $110.00 | $110.00 | $110.00 |
| 104 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 414 | $8.50 | $8.50 | $8.50 |
| 105 | Temporary marking line removable tape 6-inch (643.3180) | LF | 86,240 | $1.75 | $1.75 | $1.75 |
| 106 | Temporary marking line removable tape 10-inch (643.3280) | LF | 860 | $4.00 | $4.00 | $4.00 |
| 107 | Traffic control (643.5000) | EACH | 1 | $205,750 | $205,750 | $205,750 |
| 108 | Geotextile type DF schedule A (645.0111) | SY | 7 | $100.00 | $10.00 | $10.00 |
| 109 | Geotextile type HR (645.0120) | SY | 100 | $10.00 | $5.00 | $5.00 |
| 110 | Marking line epoxy 4-inch (646.1020) | LF | 2,800 | $0.43 | $0.43 | $0.43 |
| 111 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 27,265 | $1.31 | $1.31 | $1.31 |
| 112 | Marking line grooved contrast permanent tape 4-inch (646.1555) | LF | 5,320 | $8.99 | $8.99 | $8.99 |
| 113 | Marking line epoxy 8-inch (646.3020) | LF | 325 | $1.17 | $1.17 | $1.17 |
| 114 | Marking line grooved contrast permanent tape 8-inch (646.3555) | LF | 5,430 | $15.45 | $15.45 | $15.45 |
| 115 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $2,454.12 | $2,454.12 | $2,454.12 |
| 116 | Cold weather marking epoxy 4-inch (646.6464) | LF | 7,850 | $0.01 | $0.01 | $0.01 |
| 117 | Cold weather marking epoxy 8-inch (646.6468) | LF | 83 | $0.01 | $0.01 | $0.01 |
| 118 | Marking removal line 4-inch (646.9000) | LF | 23,700 | $0.30 | $0.30 | $0.30 |
| 119 | Marking removal line grooved contrast permanent tape 4-inch (646.9055) | LF | 4,570 | $3.05 | $3.05 | $3.05 |
| 120 | Marking removal line 8-inch (646.9100) | LF | 520 | $0.45 | $0.45 | $0.45 |
| 121 | Marking removal line grooved contrast permanent tape 8-inch (646.9155) | LF | 4,480 | $3.50 | $3.50 | $3.50 |
| 122 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 55 | $2.00 | $2.00 | $2.00 |
| 123 | Construction staking concrete pavement (650.7000) | LF | 11,514 | $0.90 | $2.50 | $2.50 |
| 124 | Construction staking electrical installations (project) 01. 1130-74- 71 (650.8501) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 125 | Construction staking supplemental control (project) 01. 1130-74-71 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 |
| 126 | Construction staking slope stakes (650.9920) | LF | 4,099 | $1.24 | $1.24 | $1.24 |
| 127 | Conduit rigid metallic 2-inch (652.0125) | LF | 204 | $175.00 | $175.00 | $175.00 |
| 128 | Conduit rigid metallic 3-inch (652.0135) | LF | 120 | $186.00 | $186.00 | $186.00 |
| 129 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 467 | $12.00 | $12.00 | $12.00 |
| 130 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 3,960 | $14.00 | $14.00 | $14.00 |
| 131 | Junction boxes 18X12X6-inch (653.0222) | EACH | 2 | $2,950.00 | $2,950.00 | $2,950.00 |
| 132 | Adjusting pull boxes (653.0900) | EACH | 23 | $975.00 | $975.00 | $975.00 |
| 133 | Sawing asphalt (690.0150) | LF | 72 | $2.25 | $2.35 | $1.89 |
| 134 | Sawing concrete (690.0250) | LF | 7,650 | $2.35 | $2.35 | $2.65 |
| 135 | Incentive strength concrete structures (715.0502) | DOL | 8,084 | $1.00 | $1.00 | $1.00 |
| 136 | Incentive strength concrete barrier (715.0603) | DOL | 1,455 | $1.00 | $1.00 | $1.00 |
| 137 | Incentive flexural strength concrete pavement (715.0715) | DOL | 8,656 | $1.00 | $1.00 | $1.00 |
| 138 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,500 | $5.00 | $5.00 | $5.00 |
| 139 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,280 | $5.00 | $5.00 | $5.00 |
| 140 | Special 01. HPC masonry structures (SPV.0035) | CY | 1,095 | $1,000.00 | $800.00 | $800.00 |
| 141 | Special 01. combination work zone digital speed limit - speed feedback trailer (SPV.0045) | DAY | 544 | $21.00 | $21.00 | $21.00 |
| 142 | Special 01. sawing concrete barrier single slope (SPV.0060) | EACH | 17 | $225.00 | $225.00 | $600.00 |
| 143 | Special 03. concrete barrier transition type V56 to S56 (SPV.0060) | EACH | 4 | $12,000 | $17,500 | $17,500 |
| 144 | Special 04. pulling and reconnecting electrical wiring (SPV.0060) | EACH | 10 | $4,500.00 | $4,500.00 | $4,500.00 |
| 145 | Special 05. salvage and reinstall luminaire (SPV.0060) | EACH | 4 | $1,750.00 | $1,750.00 | $1,750.00 |
| 146 | Special 06. stand pipe connection (SPV.0060) | EACH | 1 | $730.00 | $1,200.00 | $1,200.00 |
| 147 | Special 07. manhole covers type J bolted (SPV.0060) | EACH | 1 | $1,800.00 | $1,500.00 | $1,500.00 |
| 148 | Special 08. drain slotted vane type A 3-foot (SPV.0060) | EACH | 16 | $1,450.00 | $5,600.00 | $5,600.00 |
| 149 | Special 09. concrete base median barrier type 1 (SPV.0060) | EACH | 1 | $26,575 | $26,575 | $26,575 |
| 150 | Special 10. concrete base median barrier type 2 (SPV.0060) | EACH | 7 | $28,575 | $28,575 | $28,575 |
| 151 | Special 11. anchor bolt cover shroud (SPV.0060) | EACH | 8 | $525.00 | $525.00 | $525.00 |
| 152 | Special 01. concrete barrier type S56 (36-inch wide base) (SPV.0090) | LF | 2,910 | $144.00 | $236.00 | $236.00 |
| 153 | Special 02. removing rumble strips (SPV.0090) | LF | 2,890 | $7.25 | $7.25 | $7.25 |
| 154 | Special 01. longitudinal grooving bridge deck (SPV.0165) | SF | 17,395 | $3.26 | $0.70 | $3.26 |
| 155 | Special 01. concrete pavement 10 1/2-inch special (SPV.0180) | SY | 3,300 | $85.00 | $81.24 | $81.24 |
| 156 | Special 02. concrete pavement 12- inch special (SPV.0180) | SY | 24,730 | $88.00 | $77.10 | $77.10 |
| 157 | Special 03. concrete pavement approach slab special (SPV.0180) | SY | 1,350 | $220.00 | $268.00 | $238.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 11, 2026. Compiled by Mirage Metrics.