WisDOT contract 20260811010 bid tabulation

Green Bay, IH 41; Parkview Rd - STH 29 (IH 041, Brown County Green Bay, IH 41). Let by Wisconsin DOT on August 11, 2026, Brown. 3 bids received; low bid $9,442,152 by Zignego Company, Inc..

Owner
Wisconsin DOT
Letting
11 AUG 2026
Pay items
157
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zignego Company, Inc.$9,442,152Low
2Vinton Construction Company$10,892,824+15%
3Zenith Tech., Inc. - Waukesha$11,624,189+23%
WisDOT contract 20260811010: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zignego Company, Inc.2. Vinton Construction Company3. Zenith Tech., Inc. - Waukesha
1Incentive/disincentive for interim completion of work (108.3100.S)CD15$13,900$13,900$13,900
2Removing structure (structure) 01. B-5-0612 (203.0220)EACH1$22,800$50,000$50,000
3Removing structure (structure) 01. B-5-0618 (203.0220)EACH1$22,800$85,000$85,000
4Removing structure (structure) 02. B-5-0616 (203.0220)EACH1$22,800$95,000$95,000
5Removing structure (structure) 03. B-5-0617 (203.0220)EACH1$22,800$75,000$75,000
6Removing structure (structure) 05. B-5-0619 (203.0220)EACH1$22,800$75,000$75,000
7Removing structure (structure) 06. B-5-0621 (203.0220)EACH1$15,900$50,000$50,000
8Removing structure (structure) 07. B-5-0663 (203.0220)EACH1$22,800$50,000$50,000
9Removing structure (structure) 08. R-5-0243 (203.0220)EACH1$34,300$100,000$100,000
10Removing structure (structure) 09. R-5-0244 (203.0220)EACH1$58,500$190,000$190,000
11Removing concrete pavement (204.0100)SY31,700$10.26$1.50$1.50
12Removing asphaltic surface (204.0110)SY26,800$0.01$0.50$0.50
13Removing concrete barrier (204.0157)LF3,480$30.00$28.50$28.50
14Removing guardrail (204.0165)LF3,650$2.65$2.20$2.20
15Excavation common (205.0100)CY13,796$0.01$24.25$24.25
16Finishing roadway (project) 01. 1130-74-71 (213.0100)EACH1$1,000.00$10,000$1,000.00
17Base aggregate dense 3/4-inch (305.0110)TON340$50.00$40.25$40.25
18Base aggregate dense 1 1/4-inch (305.0120)TON12,200$0.01$16.65$16.65
19Base aggregate open-graded (310.0115)CY1$500.00$240.00$240.00
20Select crushed material (312.0110)TON510$30.00$20.85$20.85
21Concrete base 10-inch (320.0165)SY755$103.00$88.87$88.87
22Drilled tie bars (416.0610)EACH439$30.00$10.00$10.00
23Drilled dowel bars (416.0620)EACH433$30.00$18.50$18.50
24Filling concrete shoulder rumble strips 12-inch (416.9112.S)LF11,840$14.50$17.00$17.00
25HMA cold weather paving (450.4000)TON90$15.30$15.30$15.30
26Tack coat (455.0605)GAL306$5.70$5.70$5.70
27Incentive density HMA pavement (460.2000)DOL710$1.00$1.00$1.00
28HMA pavement 4 LT 58-28 S (460.5224)TON1,100$186.40$162.50$162.50
29Asphaltic rumble strips, shoulder (465.0520)LF2,730$0.30$0.30$0.30
30Protective surface treatment (502.3200)SY1,998$6.80$4.00$4.00
31Pigmented surface sealer (502.3210)SY525$16.00$12.00$12.00
32Adhesive anchors no. 7 bar (502.4207)EACH621$36.00$63.00$63.00
33Concrete masonry retaining walls (504.0500)CY257$1,700.00$1,100.00$1,100.00
34Bar steel reinforcement HS coated structures (505.0600)LB202,280$1.29$1.45$1.45
35Bar steel reinforcement HS stainless structures (505.0800.S)LB3,220$3.74$3.81$3.81
36Bar couplers no. 5 (505.0905)EACH594$38.29$50.00$50.00
37Rubberized membrane waterproofing (516.0500)SY19$71.00$60.00$60.00
38Concrete staining (structure) 01. B- 5-0612 (517.1010.S)SF45$4.54$20.00$20.00
39Concrete staining (structure) 04. B- 5-0618 (517.1010.S)SF45$4.54$20.00$20.00
40Concrete staining (structure) 07. B- 5-0663 (517.1010.S)SF434$4.54$3.00$3.00
41Concrete staining (structure) 08. R- 5-0243 (517.1010.S)SF991$4.54$3.00$3.00
42Concrete staining (structure) 09. R- 5-0244 (517.1010.S)SF1,903$4.54$3.00$3.00
43Concrete staining multi-color (structure) 01. B-5-0612 (517.1015.S)SF64$12.00$5.00$5.00
44Concrete staining multi-color (structure) 04. B-5-0618 (517.1015.S)SF64$12.00$5.00$5.00
45Architectural surface treatment (structure) 01. B-5-0612 (517.1050.S)SF64$43.00$25.00$25.00
46Architectural surface treatment (structure) 04. B-5-0618 (517.1050.S)SF64$43.00$25.00$25.00
47Anchor assemblies poles on structures (531.8990)EACH2$700.00$700.00$700.00
48Concrete curb & gutter 4-inch sloped 30-inch type G (601.0574)LF340$60.00$58.00$58.00
49Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF97$60.00$85.00$85.00
50Concrete surface drains (602.3010)CY8$1,000.00$2,000.00$2,000.00
51Concrete rumble strips, shoulder divided roadway (602.3210)LF14,740$0.90$0.90$0.90
52Concrete barrier type S42 (603.1142)LF431$110.00$241.50$241.50
53Concrete barrier transition type NJ32SF to S36 (603.3113)EACH2$5,400.00$6,400.00$6,400.00
54Concrete barrier transition type S36 to S42 (603.3535)EACH2$5,400.00$6,000.00$6,000.00
55Concrete barrier temporary precast delivered (603.8000)LF10,300$16.84$14.00$14.00
56Concrete barrier temporary precast installed (603.8125)LF18,930$5.40$6.00$6.00
57Anchoring concrete barrier temporary precast (603.8500)LF5,770$5.00$10.00$10.00
58Riprap medium (606.0200)CY50$300.00$140.00$140.00
59Manhole covers type J-special (611.0535)EACH1$2,200.00$1,100.00$1,100.00
60Inlet covers type HM-GJ-S (611.0633)EACH2$1,200.00$1,400.00$1,400.00
61Inlet covers type V (611.0654)EACH22$1,200.00$1,200.00$1,200.00
62Adjusting manhole covers (611.8110)EACH1$2,000.00$600.00$600.00
63Pipe underdrain wrapped 6-inch (612.0406)LF20$200.00$35.00$35.00
64Anchor assemblies for steel plate beam guard (614.0150)EACH7$380.00$450.00$450.00
65Crash cushions permanent low maintenance (614.0805)EACH1$39,550$39,550$39,550
66MGS guardrail 3 (614.2300)LF3,283$26.00$26.15$26.15
67MGS thrie beam transition (614.2500)LF289$92.00$96.00$96.00
68MGS guardrail terminal eat (614.2610)EACH2$3,900.00$3,875.00$3,875.00
69MGS guardrail terminal type 2 (614.2620)EACH2$3,800.00$3,125.00$3,125.00
70Maintenance and repair of haul roads (project) 01. 1130-74-71 (618.0100)EACH1$1.00$0.01$500.00
71Mobilization (619.1000)EACH1$802,000$1,704,000$2,415,000
72Dust control surface treatment (623.0200)SY28,000$0.01$0.01$0.01
73Water (624.0100)MGAL240$30.00$0.01$80.00
74Salvaged topsoil (625.0500)SY6,550$8.00$0.01$0.01
75Silt fence (628.1504)LF5,180$1.95$1.75$1.75
76Silt fence maintenance (628.1520)LF5,180$0.01$0.03$0.03
77Mobilizations erosion control (628.1905)EACH9$350.00$205.00$205.00
78Mobilizations emergency erosion control (628.1910)EACH4$350.00$305.00$305.00
79Erosion mat class I type B (628.2004)SY6,550$1.75$1.05$1.05
80Inlet protection type B (628.7010)EACH30$65.00$60.00$60.00
81Inlet protection type C (628.7015)EACH4$65.00$65.00$65.00
82Temporary ditch checks (628.7504)LF90$5.95$8.95$8.95
83Rock bags (628.7570)EACH50$10.00$8.00$8.00
84Fertilizer type B (629.0210)CWT4.40$85.00$125.00$125.00
85Seeding mixture no. 30 (630.0130)LB300$8.75$8.95$8.95
86Seed water (630.0500)MGAL150$10.00$5.00$5.00
87Delineators barrier wall (633.1000)EACH35$55.00$115.00$115.00
88Moving signs type II (638.2102)EACH6$110.00$150.00$150.00
89Moving small sign supports (638.4000)EACH9$110.00$125.00$125.00
90Field office type C (642.5201)EACH1$20,000$15,000$12,000
91Traffic control drums (643.0300)DAY78,817$0.15$0.15$0.15
92Temporary tape rumble strip orange (643.0320.S)LF3,348$9.00$9.00$9.00
93Traffic control barricades type III (643.0420)DAY2,885$0.45$0.45$0.45
94Traffic control warning lights type A (643.0705)DAY5,352$0.09$0.09$0.09
95Traffic control warning lights type C (643.0715)DAY18,811$0.09$0.09$0.09
96Traffic control connected arrow boards (643.0810)DAY553$7.40$7.40$7.40
97Traffic control signs (643.0900)DAY29,005$0.25$0.25$0.25
98Traffic control covering signs type I (643.0910)EACH27$250.00$250.00$250.00
99Traffic control covering signs type II (643.0920)EACH18$105.00$105.00$105.00
100Traffic control signs fixed message (643.1000)SF450$31.00$31.00$31.00
101Traffic control signs PCMS (643.1050)DAY98$12.50$12.50$12.50
102Dynamic late merge system (643.1100.S)DAY278$180.00$180.00$180.00
103Basic traffic queue warning system (643.1205.S)DAY106$110.00$110.00$110.00
104Traffic control connected work zone start and end location markers (643.1220)DAY414$8.50$8.50$8.50
105Temporary marking line removable tape 6-inch (643.3180)LF86,240$1.75$1.75$1.75
106Temporary marking line removable tape 10-inch (643.3280)LF860$4.00$4.00$4.00
107Traffic control (643.5000)EACH1$205,750$205,750$205,750
108Geotextile type DF schedule A (645.0111)SY7$100.00$10.00$10.00
109Geotextile type HR (645.0120)SY100$10.00$5.00$5.00
110Marking line epoxy 4-inch (646.1020)LF2,800$0.43$0.43$0.43
111Marking line grooved wet ref epoxy 4-inch (646.1040)LF27,265$1.31$1.31$1.31
112Marking line grooved contrast permanent tape 4-inch (646.1555)LF5,320$8.99$8.99$8.99
113Marking line epoxy 8-inch (646.3020)LF325$1.17$1.17$1.17
114Marking line grooved contrast permanent tape 8-inch (646.3555)LF5,430$15.45$15.45$15.45
115Marking railroad crossing epoxy (646.5320)EACH2$2,454.12$2,454.12$2,454.12
116Cold weather marking epoxy 4-inch (646.6464)LF7,850$0.01$0.01$0.01
117Cold weather marking epoxy 8-inch (646.6468)LF83$0.01$0.01$0.01
118Marking removal line 4-inch (646.9000)LF23,700$0.30$0.30$0.30
119Marking removal line grooved contrast permanent tape 4-inch (646.9055)LF4,570$3.05$3.05$3.05
120Marking removal line 8-inch (646.9100)LF520$0.45$0.45$0.45
121Marking removal line grooved contrast permanent tape 8-inch (646.9155)LF4,480$3.50$3.50$3.50
122Construction staking curb gutter and curb & gutter (650.5500)LF55$2.00$2.00$2.00
123Construction staking concrete pavement (650.7000)LF11,514$0.90$2.50$2.50
124Construction staking electrical installations (project) 01. 1130-74- 71 (650.8501)EACH1$1,000.00$1,000.00$1,000.00
125Construction staking supplemental control (project) 01. 1130-74-71 (650.9911)EACH1$10.00$10.00$10.00
126Construction staking slope stakes (650.9920)LF4,099$1.24$1.24$1.24
127Conduit rigid metallic 2-inch (652.0125)LF204$175.00$175.00$175.00
128Conduit rigid metallic 3-inch (652.0135)LF120$186.00$186.00$186.00
129Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF467$12.00$12.00$12.00
130Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF3,960$14.00$14.00$14.00
131Junction boxes 18X12X6-inch (653.0222)EACH2$2,950.00$2,950.00$2,950.00
132Adjusting pull boxes (653.0900)EACH23$975.00$975.00$975.00
133Sawing asphalt (690.0150)LF72$2.25$2.35$1.89
134Sawing concrete (690.0250)LF7,650$2.35$2.35$2.65
135Incentive strength concrete structures (715.0502)DOL8,084$1.00$1.00$1.00
136Incentive strength concrete barrier (715.0603)DOL1,455$1.00$1.00$1.00
137Incentive flexural strength concrete pavement (715.0715)DOL8,656$1.00$1.00$1.00
138On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,500$5.00$5.00$5.00
139On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS3,280$5.00$5.00$5.00
140Special 01. HPC masonry structures (SPV.0035)CY1,095$1,000.00$800.00$800.00
141Special 01. combination work zone digital speed limit - speed feedback trailer (SPV.0045)DAY544$21.00$21.00$21.00
142Special 01. sawing concrete barrier single slope (SPV.0060)EACH17$225.00$225.00$600.00
143Special 03. concrete barrier transition type V56 to S56 (SPV.0060)EACH4$12,000$17,500$17,500
144Special 04. pulling and reconnecting electrical wiring (SPV.0060)EACH10$4,500.00$4,500.00$4,500.00
145Special 05. salvage and reinstall luminaire (SPV.0060)EACH4$1,750.00$1,750.00$1,750.00
146Special 06. stand pipe connection (SPV.0060)EACH1$730.00$1,200.00$1,200.00
147Special 07. manhole covers type J bolted (SPV.0060)EACH1$1,800.00$1,500.00$1,500.00
148Special 08. drain slotted vane type A 3-foot (SPV.0060)EACH16$1,450.00$5,600.00$5,600.00
149Special 09. concrete base median barrier type 1 (SPV.0060)EACH1$26,575$26,575$26,575
150Special 10. concrete base median barrier type 2 (SPV.0060)EACH7$28,575$28,575$28,575
151Special 11. anchor bolt cover shroud (SPV.0060)EACH8$525.00$525.00$525.00
152Special 01. concrete barrier type S56 (36-inch wide base) (SPV.0090)LF2,910$144.00$236.00$236.00
153Special 02. removing rumble strips (SPV.0090)LF2,890$7.25$7.25$7.25
154Special 01. longitudinal grooving bridge deck (SPV.0165)SF17,395$3.26$0.70$3.26
155Special 01. concrete pavement 10 1/2-inch special (SPV.0180)SY3,300$85.00$81.24$81.24
156Special 02. concrete pavement 12- inch special (SPV.0180)SY24,730$88.00$77.10$77.10
157Special 03. concrete pavement approach slab special (SPV.0180)SY1,350$220.00$268.00$238.00
WisDOT contract 20260811010: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of August 11, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy