WisDOT contract 20260811013 bid tabulation
Appleton - Black Creek; CTH S Intersection (STH 047, Outagamie County Appleton - Black Creek). Let by Wisconsin DOT on August 11, 2026, Outagamie. 4 bids received; low bid $2,504,777 by Relyco Plus, LLC.
- Owner
- Wisconsin DOT
- Letting
- 11 AUG 2026
- Pay items
- 132
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Relyco Plus, LLC | $2,504,777 | Low |
| 2 | Michels Road & Stone, Inc. | $2,613,740 | +4.0% |
| 3 | MCC, Inc. | $2,714,985 | +8.0% |
| 4 | Zignego Company, Inc. | $3,034,117 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Relyco Plus, LLC | 2. Michels Road & Stone, Inc. | 3. MCC, Inc. | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 5 | $545.00 | $1,975.00 | $800.00 | $800.00 |
| 2 | Clearing (201.0120) | ID | 8 | $50.00 | $85.00 | $40.00 | $40.00 |
| 3 | Grubbing (201.0205) | STA | 5 | $545.00 | $550.00 | $400.00 | $400.00 |
| 4 | Grubbing (201.0220) | ID | 8 | $50.00 | $85.00 | $30.00 | $30.00 |
| 5 | Removing small pipe culverts (203.0100) | EACH | 7 | $584.60 | $650.00 | $135.00 | $1,000.00 |
| 6 | Removing concrete pavement (204.0100) | SY | 920 | $2.00 | $8.00 | $10.00 | $9.65 |
| 7 | Removing curb & gutter (204.0150) | LF | 440 | $5.00 | $8.00 | $5.55 | $5.50 |
| 8 | Removing fence (204.0170) | LF | 75 | $5.00 | $5.00 | $3.00 | $3.00 |
| 9 | Removing concrete bases (204.0195) | EACH | 2 | $200.00 | $200.00 | $200.00 | $225.00 |
| 10 | Removing (item description) 01. flashing stop sign assembly (204.9060.S) | EACH | 2 | $550.00 | $550.00 | $550.00 | $550.00 |
| 11 | Excavation common (205.0100) | CY | 17,916 | $13.49 | $11.30 | $12.00 | $12.35 |
| 12 | Select borrow (208.1100) | CY | 5,952 | $27.00 | $23.70 | $22.55 | $21.85 |
| 13 | Finishing roadway (project) 01. 6240-32-71 (213.0100) | EACH | 1 | $4,000.00 | $5,000.00 | $4,675.00 | $5,305.00 |
| 14 | Obliterating old road (214.0100) | STA | 4 | $825.00 | $700.00 | $490.00 | $550.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,480 | $27.40 | $17.80 | $28.85 | $28.00 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 10,290 | $12.79 | $9.90 | $16.25 | $15.75 |
| 17 | Base aggregate open-graded (310.0110) | TON | 3 | $89.99 | $25.00 | $25.00 | $200.00 |
| 18 | Select crushed material (312.0110) | TON | 12,820 | $14.60 | $17.30 | $16.00 | $15.50 |
| 19 | Coloring concrete wisdot red (405.0100) | CY | 889 | $80.00 | $80.00 | $80.00 | $100.00 |
| 20 | Concrete truck apron 12-inch (415.2010) | SY | 2,220 | $90.00 | $90.00 | $90.00 | $122.00 |
| 21 | Tack coat (455.0605) | GAL | 1,255 | $3.20 | $3.20 | $3.75 | $4.90 |
| 22 | Incentive density HMA pavement (460.2000) | DOL | 4,190 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | HMA pavement 3 HT 58-28 S (460.7223) | TON | 5,215 | $75.10 | $75.10 | $89.25 | $74.45 |
| 24 | HMA pavement 4 HT 58-28 H (460.7424) | TON | 1,265 | $99.95 | $99.95 | $96.20 | $92.25 |
| 25 | Asphaltic surface driveways and field entrances (465.0120) | TON | 20 | $134.20 | $134.20 | $225.00 | $158.00 |
| 26 | Asphaltic flumes (465.0315) | SY | 63 | $57.10 | $57.10 | $120.00 | $63.30 |
| 27 | Asphaltic rumble strips, shoulder (465.0520) | LF | 2,931 | $0.55 | $0.55 | $1.25 | $1.33 |
| 28 | Apron endwalls for culvert pipe sloped cross drains steel 36-inch 4 to 1 (521.0336) | EACH | 2 | $5,045.25 | $4,589.00 | $3,300.00 | $3,000.00 |
| 29 | Apron endwalls for culvert pipe sloped side drains steel 18-inch 6 to 1 (521.1518) | EACH | 4 | $1,131.85 | $3,579.00 | $1,000.00 | $3,000.00 |
| 30 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 100 | $84.08 | $87.00 | $80.00 | $200.00 |
| 31 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 96 | $118.51 | $155.00 | $155.00 | $250.00 |
| 32 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 72 | $210.59 | $259.00 | $259.00 | $250.00 |
| 33 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 5 | $1,272.93 | $1,270.00 | $1,270.00 | $2,000.00 |
| 34 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 1 | $1,336.23 | $1,374.00 | $1,374.00 | $2,000.00 |
| 35 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $2,080.37 | $1,654.00 | $1,654.00 | $2,000.00 |
| 36 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429) | LF | 104 | $274.44 | $353.00 | $353.00 | $250.00 |
| 37 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 2 | $1,972.21 | $1,800.00 | $1,800.00 | $2,000.00 |
| 38 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 2 | $3,455.19 | $2,900.00 | $2,900.00 | $4,000.00 |
| 39 | Concrete sidewalk 4-inch (602.0405) | SF | 12,110 | $6.85 | $6.55 | $6.55 | $8.00 |
| 40 | Riprap medium (606.0200) | CY | 47 | $100.00 | $200.00 | $80.00 | $87.50 |
| 41 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 39 | $80.97 | $94.00 | $94.00 | $300.00 |
| 42 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 233 | $80.36 | $89.00 | $89.00 | $180.00 |
| 43 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 97 | $181.03 | $195.00 | $195.00 | $200.00 |
| 44 | Inlet covers type HM (611.0627) | EACH | 4 | $727.84 | $810.00 | $810.00 | $2,000.00 |
| 45 | Inlet covers type HM-S (611.0636) | EACH | 6 | $727.84 | $810.00 | $810.00 | $2,000.00 |
| 46 | Inlet covers type H-S (611.0639) | EACH | 2 | $730.48 | $810.00 | $810.00 | $2,000.00 |
| 47 | Inlet covers type T (611.0652) | EACH | 2 | $999.50 | $1,101.00 | $1,101.00 | $2,000.00 |
| 48 | Manholes 5-FT diameter (611.2005) | EACH | 3 | $5,845.83 | $5,600.00 | $5,600.00 | $7,900.00 |
| 49 | Inlets 2X3-FT (611.3230) | EACH | 9 | $2,831.54 | $3,062.00 | $3,062.00 | $4,995.00 |
| 50 | Pipe underdrain 6-inch (612.0106) | LF | 48 | $25.96 | $40.00 | $40.00 | $20.00 |
| 51 | Maintenance and repair of haul roads (project) 01. 6240-32-71 (618.0100) | EACH | 1 | $0.01 | $1.00 | $95.00 | $1.00 |
| 52 | Mobilization (619.1000) | EACH | 1 | $85,500 | $189,506 | $190,000 | $242,000 |
| 53 | Concrete median sloped nose (620.0300) | SF | 400 | $15.00 | $15.00 | $15.00 | $20.00 |
| 54 | Water (624.0100) | MGAL | 71 | $40.00 | $55.00 | $36.00 | $200.00 |
| 55 | Salvaged topsoil (625.0500) | SY | 20,660 | $1.89 | $2.80 | $1.60 | $1.95 |
| 56 | Mulching (627.0200) | SY | 6,510 | $0.30 | $0.30 | $0.38 | $0.38 |
| 57 | Silt fence (628.1504) | LF | 815 | $2.00 | $2.00 | $2.05 | $2.05 |
| 58 | Silt fence maintenance (628.1520) | LF | 815 | $0.01 | $0.01 | $0.01 | $0.01 |
| 59 | Mobilizations erosion control (628.1905) | EACH | 4 | $1.00 | $1.00 | $275.00 | $275.00 |
| 60 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $1.00 | $1.00 | $275.00 | $275.00 |
| 61 | Erosion mat class I type B (628.2004) | SY | 7,510 | $0.98 | $0.98 | $1.05 | $1.05 |
| 62 | Erosion mat urban class I type A (628.2006) | SY | 2,940 | $1.75 | $1.75 | $1.80 | $1.80 |
| 63 | Erosion mat class II type C (628.2027) | SY | 3,100 | $3.75 | $3.75 | $3.75 | $3.75 |
| 64 | Inlet protection type C (628.7015) | EACH | 14 | $70.00 | $70.00 | $65.00 | $65.00 |
| 65 | Temporary ditch checks (628.7504) | LF | 430 | $9.00 | $9.00 | $5.95 | $5.95 |
| 66 | Culvert pipe checks (628.7555) | EACH | 8 | $30.00 | $30.00 | $20.00 | $20.00 |
| 67 | Tracking pads (628.7560) | EACH | 4 | $0.01 | $1,200.00 | $900.00 | $1,000.00 |
| 68 | Rock bags (628.7570) | EACH | 25 | $30.00 | $30.00 | $12.00 | $12.00 |
| 69 | Fertilizer type B (629.0210) | CWT | 13 | $75.00 | $75.00 | $85.00 | $85.00 |
| 70 | Seeding mixture no. 20 (630.0120) | LB | 148 | $7.50 | $7.50 | $8.95 | $8.95 |
| 71 | Seeding mixture no. 30 (630.0130) | LB | 735 | $7.50 | $7.50 | $8.50 | $8.50 |
| 72 | Seed water (630.0500) | MGAL | 464 | $1.00 | $1.00 | $9.00 | $9.00 |
| 73 | Markers culvert end (633.5200) | EACH | 18 | $65.00 | $65.00 | $70.00 | $70.00 |
| 74 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 29 | $75.00 | $75.00 | $100.00 | $100.00 |
| 75 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 7 | $80.00 | $80.00 | $105.00 | $105.00 |
| 76 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 14 | $95.00 | $95.00 | $135.00 | $135.00 |
| 77 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 4 | $150.00 | $150.00 | $225.00 | $225.00 |
| 78 | Signs type II reflective H (637.2210) | SF | 401.58 | $23.00 | $23.00 | $22.00 | $22.00 |
| 79 | Signs type II reflective F (637.2230) | SF | 100.49 | $24.50 | $24.50 | $24.00 | $24.00 |
| 80 | Removing signs type II (638.2602) | EACH | 15 | $25.00 | $25.00 | $30.00 | $30.00 |
| 81 | Removing small sign supports (638.3000) | EACH | 16 | $25.00 | $25.00 | $30.00 | $30.00 |
| 82 | Field office type B (642.5001) | EACH | 1 | $11,000 | $6,000.00 | $16,300 | $20,000 |
| 83 | Traffic control barricades type III (643.0420) | DAY | 1,980 | $0.45 | $0.45 | $0.65 | $0.65 |
| 84 | Traffic control warning lights type A (643.0705) | DAY | 2,760 | $0.01 | $0.20 | $0.15 | $0.15 |
| 85 | Traffic control signs (643.0900) | DAY | 19,020 | $0.30 | $0.40 | $0.40 | $0.40 |
| 86 | Traffic control covering signs type II (643.0920) | EACH | 20 | $27.00 | $85.00 | $75.00 | $75.00 |
| 87 | Traffic control signs fixed message (643.1000) | SF | 52 | $14.00 | $18.00 | $24.00 | $24.00 |
| 88 | Traffic control signs PCMS (643.1050) | DAY | 140 | $60.00 | $68.00 | $50.00 | $50.00 |
| 89 | Traffic control (643.5000) | EACH | 1 | $15,500 | $2,500.00 | $3,500.00 | $3,500.00 |
| 90 | Geotextile type DF schedule A (645.0111) | SY | 26 | $7.21 | $7.00 | $7.00 | $10.00 |
| 91 | Geotextile type HR (645.0120) | SY | 96 | $5.00 | $5.00 | $7.00 | $10.00 |
| 92 | Marking line epoxy 6-inch (646.2020) | LF | 3,225 | $1.00 | $0.88 | $0.56 | $1.00 |
| 93 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 10,300 | $1.55 | $1.41 | $1.52 | $1.55 |
| 94 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 348 | $3.00 | $4.00 | $3.15 | $3.00 |
| 95 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 152 | $20.00 | $15.00 | $20.00 | $20.00 |
| 96 | Marking diagonal epoxy 12-inch (646.7120) | LF | 431 | $9.75 | $12.00 | $19.15 | $9.75 |
| 97 | Marking curb epoxy (646.8120) | LF | 232 | $8.00 | $10.00 | $9.45 | $8.00 |
| 98 | Marking island nose epoxy (646.8220) | EACH | 4 | $305.00 | $250.00 | $352.00 | $305.00 |
| 99 | Marking removal line 4-inch (646.9000) | LF | 125 | $5.00 | $4.00 | $2.00 | $5.00 |
| 100 | Construction staking storm sewer (650.4000) | EACH | 14 | $125.00 | $125.00 | $125.00 | $125.00 |
| 101 | Construction staking subgrade (650.4500) | LF | 4,231 | $0.01 | $0.01 | $0.01 | $0.01 |
| 102 | Construction staking base (650.5000) | LF | 4,231 | $0.75 | $0.75 | $0.75 | $0.75 |
| 103 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 4,779 | $0.90 | $0.90 | $0.90 | $0.90 |
| 104 | Construction staking pipe culverts (650.6000) | EACH | 4 | $200.00 | $200.00 | $200.00 | $200.00 |
| 105 | Construction staking electrical installations (project) 01. 6240-32- 71 (650.8501) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 106 | Construction staking sidewalk (project) 01. 6240-32-71 (650.9500) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 |
| 107 | Construction staking supplemental control (project) 01. 6240-32-71 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 108 | Construction staking slope stakes (650.9920) | LF | 4,231 | $1.25 | $1.25 | $1.25 | $1.25 |
| 109 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,085 | $10.00 | $10.00 | $10.00 | $10.00 |
| 110 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 8 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 |
| 111 | Removing pull boxes (653.0905) | EACH | 2 | $75.00 | $75.00 | $75.00 | $75.00 |
| 112 | Concrete bases type 5 (654.0105) | EACH | 18 | $1,750.00 | $1,750.00 | $1,750.00 | $1,750.00 |
| 113 | Concrete control cabinet bases type 10 (654.0220) | EACH | 1 | $2,200.00 | $2,200.00 | $2,200.00 | $2,200.00 |
| 114 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,700 | $1.10 | $1.10 | $1.10 | $1.10 |
| 115 | Electrical wire lighting 10 AWG (655.0615) | LF | 8,519 | $1.25 | $1.25 | $1.25 | $1.25 |
| 116 | Electrical service meter breaker pedestal (location) 01. STH 47 roundabout (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 |
| 117 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 18 | $645.00 | $645.00 | $645.00 | $645.00 |
| 118 | Poles type 5-aluminum (657.0322) | EACH | 18 | $1,995.00 | $1,995.00 | $1,995.00 | $1,995.00 |
| 119 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 18 | $800.00 | $800.00 | $800.00 | $800.00 |
| 120 | Luminaires utility LED B (659.1120) | EACH | 18 | $400.00 | $400.00 | $400.00 | $400.00 |
| 121 | Sawing asphalt (690.0150) | LF | 136 | $2.50 | $2.50 | $6.15 | $2.25 |
| 122 | Sawing concrete (690.0250) | LF | 3 | $7.00 | $7.00 | $25.00 | $3.25 |
| 123 | Incentive compressive strength concrete pavement (715.0720) | DOL | 670 | $1.00 | $1.00 | $1.00 | $1.00 |
| 124 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 |
| 125 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 | $5.00 | $5.00 |
| 126 | Special 01. foundation backfill (SPV.0035) | CY | 1,720 | $30.60 | $40.00 | $32.89 | $40.00 |
| 127 | Special 01. inlet 2 X 2.5-FT special (SPV.0060) | EACH | 2 | $2,570.96 | $3,100.00 | $3,100.00 | $5,000.00 |
| 128 | Special 01. low maintenance seed mix (SPV.0085) | LB | 12 | $15.00 | $15.00 | $125.00 | $125.00 |
| 129 | Special 01. concrete curb & gutter 18-inch type A modified (SPV.0090) | LF | 170 | $24.00 | $24.00 | $24.00 | $60.00 |
| 130 | Special 02. concrete curb & gutter 30-inch type D modified (SPV.0090) | LF | 972 | $24.00 | $24.00 | $24.00 | $60.00 |
| 131 | Special 03. concrete curb & gutter 4-inch sloped 36-inch type D modified (SPV.0090) | LF | 3,252 | $24.00 | $24.00 | $24.00 | $43.18 |
| 132 | Special 04. concrete curb & gutter 4-inch sloped 30-inch type R modified (SPV.0090) | LF | 385 | $24.00 | $24.00 | $24.00 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 11, 2026. Compiled by Mirage Metrics.