WisDOT contract 20260915019 bid tabulation

Bradley - Rhinelander; Gatewood Heights Rd to N Rifle Rd (USH 008, Oneida County Bradley - Rhinelander). Let by Wisconsin DOT on September 15, 2026, Oneida. 4 bids received; low bid $4,933,068 by Musson Bros., Inc..

Owner
Wisconsin DOT
Letting
15 SEP 2026
Pay items
101
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Musson Bros., Inc.$4,933,068Low
2Northeast Asphalt, Inc$4,995,099+1.0%
3American Asphalt of Wisconsin$5,053,048+2.0%
4Pitlik & Wick, Inc.$5,122,308+4.0%
WisDOT contract 20260915019: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Musson Bros., Inc.2. Northeast Asphalt, Inc3. American Asphalt of Wisconsin4. Pitlik & Wick, Inc.
1Clearing (201.0105)STA64$830.00$830.00$830.00$830.00
2Grubbing (201.0205)STA65$325.00$325.00$325.00$325.00
3Removing small pipe culverts (203.0100)EACH30$719.71$719.71$719.71$719.71
4Removing concrete pavement (204.0100)SY7,580$0.01$0.01$0.01$0.01
5Removing asphaltic surface (204.0110)SY20$19.55$19.55$19.55$19.55
6Removing asphaltic surface butt joints (204.0115)SY685$12.70$12.70$1.00$14.55
7Removing asphaltic surface milling (204.0120)SY231,970$0.90$0.90$0.50$1.10
8Removing curb & gutter (204.0150)LF32$22.41$22.41$22.41$22.41
9Removing delineators and markers (204.0180)EACH59$30.00$30.00$30.00$30.00
10Excavation common (205.0100)CY24,612$14.76$14.76$14.76$14.76
11Borrow (208.0100)CY1,190$6.40$6.40$6.40$6.40
12Temporary lane shift during culvert work (208.1500.S)EACH33$741.13$741.13$741.13$741.13
13Prepare foundation for asphaltic paving (project) 01. 1590-14-74 (211.0101)EACH1$2,250.00$2,250.00$102,000$5,000.00
14Prepare foundation for asphaltic shoulders (211.0400)STA3$452.80$452.80$500.00$500.00
15Finishing roadway (project) 01. 1590-14-74 (213.0100)EACH1$500.00$6,180.11$2,557.96$5,000.00
16Base aggregate dense 3/4-inch (305.0110)TON5,150$22.14$22.14$22.14$22.14
17Base aggregate dense 1 1/4-inch (305.0120)TON16,725$15.62$15.62$15.62$15.62
18Tack coat (455.0605)GAL17,630$3.00$3.00$4.00$3.25
19HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$2,860.00$2,860.00$3,500.00$3,500.00
20HMA percent within limits (PWL) test strip density (460.0110.S)EACH1$3,450.00$3,450.00$3,500.00$3,500.00
21Incentive density PWL HMA pavement (460.2005)DOL16,645$1.00$1.00$1.00$1.00
22Incentive density HMA pavement longitudinal joints (460.2007)DOL14,490$1.00$1.00$1.00$1.00
23Incentive air voids HMA pavement (460.2010)DOL22,852$1.00$1.00$1.00$1.00
24HMA pavement 4 MT 58-28 S (460.6224)TON22,852$69.90$69.90$80.50$70.70
25Asphaltic surface (465.0105)TON4,553$94.80$94.80$115.00$142.00
26Asphaltic surface patching (465.0110)TON100$127.00$127.00$115.00$120.00
27Asphaltic surface driveways and field entrances (465.0120)TON130$192.90$192.90$115.00$120.00
28Asphaltic rumble strips, shoulder (465.0520)LF23,260$0.38$0.38$0.34$0.41
29Asphaltic rumble strips, centerline (465.0560)LF47,245$0.33$0.33$0.31$0.28
30Concrete collars for pipe (520.8000)EACH5$1,127.15$1,127.15$1,127.15$1,127.15
31Culvert pipe reinforced concrete class III 24-inch (522.0124)LF584$145.61$145.61$145.61$145.61
32Culvert pipe reinforced concrete class III 30-inch (522.0130)LF432$229.73$229.73$229.73$229.73
33Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF1,134$169.82$169.82$169.82$169.82
34Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF314$245.88$245.88$245.88$245.88
35Culvert pipe reinforced concrete class IV 36-inch (522.0436)LF130$320.45$320.45$320.45$320.45
36Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH2$2,016.31$2,016.31$2,016.31$2,016.31
37Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH43$1,678.09$1,678.09$1,678.09$1,678.09
38Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH16$2,803.65$2,803.65$2,803.65$2,803.65
39Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH4$7,921.90$7,921.90$7,921.90$7,921.90
40Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF32$129.16$129.16$129.16$129.16
41Riprap light (606.0100)CY4$513.26$513.26$513.26$513.26
42Riprap medium (606.0200)CY50$219.47$219.47$219.47$219.47
43Salvaged rail (614.0920)LF230$6.00$6.00$6.00$6.00
44Salvaged guardrail end treatments (614.0925)EACH3$450.00$450.00$450.00$450.00
45Replacing guardrail rail and hardware (614.0951)LF37.50$30.00$30.00$30.00$30.00
46MGS guardrail 3 (614.2300)LF37.50$35.00$35.00$35.00$35.00
47MGS guardrail terminal eat (614.2610)EACH1$4,000.00$4,000.00$4,000.00$4,000.00
48Maintenance and repair of haul roads (project) 01. 1590-14-74 (618.0100)EACH1$1.00$1.00$1.00$500.00
49Mobilization (619.1000)EACH1$320,055$417,340$132,042$276,587
50Water (624.0100)MGAL355$0.01$0.01$0.01$0.01
51Topsoil (625.0100)SY34,375$0.01$0.01$0.01$0.01
52Silt fence (628.1504)LF20,275$1.63$1.63$1.63$1.63
53Silt fence maintenance (628.1520)LF20,275$0.03$0.03$0.03$0.03
54Mobilizations erosion control (628.1905)EACH10$203.00$203.00$203.00$203.00
55Mobilizations emergency erosion control (628.1910)EACH5$303.00$303.00$303.00$303.00
56Erosion mat class I type B (628.2004)SY33,275$0.95$0.95$0.95$0.95
57Erosion mat urban class I type B (628.2008)SY1,100$2.00$2.00$2.00$2.00
58Temporary ditch checks (628.7504)LF220$7.00$7.00$7.00$7.00
59Culvert pipe checks (628.7555)EACH185$20.00$20.00$20.00$20.00
60Rock bags (628.7570)EACH2,720$5.00$5.00$5.00$5.00
61Fertilizer type B (629.0210)CWT23.50$100.00$100.00$100.00$100.00
62Seeding mixture no. 30 (630.0130)LB1,565$6.13$6.13$6.13$6.13
63Seed water (630.0500)MGAL795$5.00$5.00$5.00$5.00
64Markers culvert end (633.5200)EACH66$75.00$26.26$75.00$26.00
65Posts wood 4X6-inch X 16-FT (634.0616)EACH12$110.00$110.00$110.00$110.00
66Signs type II reflective H (637.2210)SF13.50$30.00$30.00$30.00$30.00
67Signs type II reflective F (637.2230)SF9$35.00$35.00$35.00$35.00
68Moving signs type II (638.2102)EACH20$150.00$150.00$150.00$150.00
69Field office type B (642.5001)EACH1$30,000$14,000$12,000$10,000
70Traffic control drums (643.0300)DAY18,490$0.55$0.55$0.55$0.55
71Traffic control barricades type III (643.0420)DAY500$1.00$1.00$1.00$1.00
72Traffic control warning lights type A (643.0705)DAY1,000$0.25$0.25$0.25$0.25
73Traffic control signs (643.0900)DAY9,410$0.60$0.60$0.60$0.60
74Traffic control signs fixed message (643.1000)SF36$10.20$10.20$10.20$10.20
75Temporary marking line paint 6- inch (643.3165)LF195,180$0.37$0.30$0.30$0.30
76Traffic control (643.5000)EACH1$3,721.00$3,928.00$3,721.00$3,721.00
77Geotextile type HR (645.0120)SY170$16.80$16.80$16.80$16.80
78Geotextile type R (645.0130)SY22$13.63$13.63$13.63$13.63
79Marking line grooved black epoxy 6-inch (646.2025)LF2,340$0.65$0.65$0.65$0.65
80Marking line grooved wet ref epoxy 6-inch (646.2040)LF212,885$1.10$1.10$1.10$1.10
81Marking line grooved wet ref epoxy 10-inch (646.4040)LF1,515$2.00$2.00$2.00$2.00
82Marking arrow epoxy (646.5020)EACH12$280.00$280.00$280.00$280.00
83Marking word epoxy (646.5120)EACH5$330.00$330.00$330.00$330.00
84Marking diagonal epoxy 12-inch (646.7120)LF1,100$9.00$9.00$9.00$9.00
85Construction staking subgrade (650.4500)LF3,409$0.01$0.01$0.01$0.01
86Construction staking base (650.5000)LF3,409$0.01$0.01$0.01$0.01
87Construction staking pipe culverts (650.6000)EACH30$150.00$150.00$150.00$150.00
88Construction staking resurfacing reference (650.8000)LF57,490$0.06$0.06$0.06$0.06
89Construction staking supplemental control (project) 01. 1590-14-74 (650.9911)EACH1$1,500.00$1,500.00$1,500.00$1,500.00
90Construction staking slope stakes (650.9920)LF5,637$0.88$0.88$0.88$0.88
91Public land survey monument verify and reset (680.0100)EACH4$500.00$500.00$500.00$500.00
92Sawing asphalt (690.0150)LF1,340$4.00$2.00$4.31$2.00
93Sawing concrete (690.0250)LF1,203$6.00$2.95$6.57$2.95
94Incentive iri ride (740.0440)DOL48,250$1.00$1.00$1.00$1.00
95Installing and maintaining climbing turtle exclusion fence (999.2100.S)LF6,050$3.53$3.53$3.53$3.53
96Special 01. fertilizer for lawn type turf (SPV.0030)CWT1$275.00$275.00$275.00$275.00
97Special 01. temporary water diversion (SPV.0060)EACH1$5,874.76$5,874.76$5,874.76$5,874.76
98Special 01. ditch cleaning (SPV.0090)LF57$22.74$22.74$22.74$22.74
99Special 01. tuck pointing (SPV.0165)SF108$57.95$57.95$57.95$57.95
100Special 01. protective thermoplastic coating at snowmobile crossing (SPV.0180)SY165$160.00$160.00$160.00$135.00
101Special 02. preparing topsoil for lawn type turf (SPV.0180)SY1,125$2.40$0.70$0.70$0.70
WisDOT contract 20260915019: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy