WisDOT contract 20260915019 bid tabulation
Bradley - Rhinelander; Gatewood Heights Rd to N Rifle Rd (USH 008, Oneida County Bradley - Rhinelander). Let by Wisconsin DOT on September 15, 2026, Oneida. 4 bids received; low bid $4,933,068 by Musson Bros., Inc..
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 101
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Musson Bros., Inc. | $4,933,068 | Low |
| 2 | Northeast Asphalt, Inc | $4,995,099 | +1.0% |
| 3 | American Asphalt of Wisconsin | $5,053,048 | +2.0% |
| 4 | Pitlik & Wick, Inc. | $5,122,308 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Musson Bros., Inc. | 2. Northeast Asphalt, Inc | 3. American Asphalt of Wisconsin | 4. Pitlik & Wick, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 64 | $830.00 | $830.00 | $830.00 | $830.00 |
| 2 | Grubbing (201.0205) | STA | 65 | $325.00 | $325.00 | $325.00 | $325.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 30 | $719.71 | $719.71 | $719.71 | $719.71 |
| 4 | Removing concrete pavement (204.0100) | SY | 7,580 | $0.01 | $0.01 | $0.01 | $0.01 |
| 5 | Removing asphaltic surface (204.0110) | SY | 20 | $19.55 | $19.55 | $19.55 | $19.55 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 685 | $12.70 | $12.70 | $1.00 | $14.55 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 231,970 | $0.90 | $0.90 | $0.50 | $1.10 |
| 8 | Removing curb & gutter (204.0150) | LF | 32 | $22.41 | $22.41 | $22.41 | $22.41 |
| 9 | Removing delineators and markers (204.0180) | EACH | 59 | $30.00 | $30.00 | $30.00 | $30.00 |
| 10 | Excavation common (205.0100) | CY | 24,612 | $14.76 | $14.76 | $14.76 | $14.76 |
| 11 | Borrow (208.0100) | CY | 1,190 | $6.40 | $6.40 | $6.40 | $6.40 |
| 12 | Temporary lane shift during culvert work (208.1500.S) | EACH | 33 | $741.13 | $741.13 | $741.13 | $741.13 |
| 13 | Prepare foundation for asphaltic paving (project) 01. 1590-14-74 (211.0101) | EACH | 1 | $2,250.00 | $2,250.00 | $102,000 | $5,000.00 |
| 14 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 3 | $452.80 | $452.80 | $500.00 | $500.00 |
| 15 | Finishing roadway (project) 01. 1590-14-74 (213.0100) | EACH | 1 | $500.00 | $6,180.11 | $2,557.96 | $5,000.00 |
| 16 | Base aggregate dense 3/4-inch (305.0110) | TON | 5,150 | $22.14 | $22.14 | $22.14 | $22.14 |
| 17 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 16,725 | $15.62 | $15.62 | $15.62 | $15.62 |
| 18 | Tack coat (455.0605) | GAL | 17,630 | $3.00 | $3.00 | $4.00 | $3.25 |
| 19 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $2,860.00 | $2,860.00 | $3,500.00 | $3,500.00 |
| 20 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,450.00 | $3,450.00 | $3,500.00 | $3,500.00 |
| 21 | Incentive density PWL HMA pavement (460.2005) | DOL | 16,645 | $1.00 | $1.00 | $1.00 | $1.00 |
| 22 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 14,490 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | Incentive air voids HMA pavement (460.2010) | DOL | 22,852 | $1.00 | $1.00 | $1.00 | $1.00 |
| 24 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 22,852 | $69.90 | $69.90 | $80.50 | $70.70 |
| 25 | Asphaltic surface (465.0105) | TON | 4,553 | $94.80 | $94.80 | $115.00 | $142.00 |
| 26 | Asphaltic surface patching (465.0110) | TON | 100 | $127.00 | $127.00 | $115.00 | $120.00 |
| 27 | Asphaltic surface driveways and field entrances (465.0120) | TON | 130 | $192.90 | $192.90 | $115.00 | $120.00 |
| 28 | Asphaltic rumble strips, shoulder (465.0520) | LF | 23,260 | $0.38 | $0.38 | $0.34 | $0.41 |
| 29 | Asphaltic rumble strips, centerline (465.0560) | LF | 47,245 | $0.33 | $0.33 | $0.31 | $0.28 |
| 30 | Concrete collars for pipe (520.8000) | EACH | 5 | $1,127.15 | $1,127.15 | $1,127.15 | $1,127.15 |
| 31 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 584 | $145.61 | $145.61 | $145.61 | $145.61 |
| 32 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 432 | $229.73 | $229.73 | $229.73 | $229.73 |
| 33 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 1,134 | $169.82 | $169.82 | $169.82 | $169.82 |
| 34 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 314 | $245.88 | $245.88 | $245.88 | $245.88 |
| 35 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 130 | $320.45 | $320.45 | $320.45 | $320.45 |
| 36 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 2 | $2,016.31 | $2,016.31 | $2,016.31 | $2,016.31 |
| 37 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 43 | $1,678.09 | $1,678.09 | $1,678.09 | $1,678.09 |
| 38 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 16 | $2,803.65 | $2,803.65 | $2,803.65 | $2,803.65 |
| 39 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 4 | $7,921.90 | $7,921.90 | $7,921.90 | $7,921.90 |
| 40 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 32 | $129.16 | $129.16 | $129.16 | $129.16 |
| 41 | Riprap light (606.0100) | CY | 4 | $513.26 | $513.26 | $513.26 | $513.26 |
| 42 | Riprap medium (606.0200) | CY | 50 | $219.47 | $219.47 | $219.47 | $219.47 |
| 43 | Salvaged rail (614.0920) | LF | 230 | $6.00 | $6.00 | $6.00 | $6.00 |
| 44 | Salvaged guardrail end treatments (614.0925) | EACH | 3 | $450.00 | $450.00 | $450.00 | $450.00 |
| 45 | Replacing guardrail rail and hardware (614.0951) | LF | 37.50 | $30.00 | $30.00 | $30.00 | $30.00 |
| 46 | MGS guardrail 3 (614.2300) | LF | 37.50 | $35.00 | $35.00 | $35.00 | $35.00 |
| 47 | MGS guardrail terminal eat (614.2610) | EACH | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 48 | Maintenance and repair of haul roads (project) 01. 1590-14-74 (618.0100) | EACH | 1 | $1.00 | $1.00 | $1.00 | $500.00 |
| 49 | Mobilization (619.1000) | EACH | 1 | $320,055 | $417,340 | $132,042 | $276,587 |
| 50 | Water (624.0100) | MGAL | 355 | $0.01 | $0.01 | $0.01 | $0.01 |
| 51 | Topsoil (625.0100) | SY | 34,375 | $0.01 | $0.01 | $0.01 | $0.01 |
| 52 | Silt fence (628.1504) | LF | 20,275 | $1.63 | $1.63 | $1.63 | $1.63 |
| 53 | Silt fence maintenance (628.1520) | LF | 20,275 | $0.03 | $0.03 | $0.03 | $0.03 |
| 54 | Mobilizations erosion control (628.1905) | EACH | 10 | $203.00 | $203.00 | $203.00 | $203.00 |
| 55 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $303.00 | $303.00 | $303.00 | $303.00 |
| 56 | Erosion mat class I type B (628.2004) | SY | 33,275 | $0.95 | $0.95 | $0.95 | $0.95 |
| 57 | Erosion mat urban class I type B (628.2008) | SY | 1,100 | $2.00 | $2.00 | $2.00 | $2.00 |
| 58 | Temporary ditch checks (628.7504) | LF | 220 | $7.00 | $7.00 | $7.00 | $7.00 |
| 59 | Culvert pipe checks (628.7555) | EACH | 185 | $20.00 | $20.00 | $20.00 | $20.00 |
| 60 | Rock bags (628.7570) | EACH | 2,720 | $5.00 | $5.00 | $5.00 | $5.00 |
| 61 | Fertilizer type B (629.0210) | CWT | 23.50 | $100.00 | $100.00 | $100.00 | $100.00 |
| 62 | Seeding mixture no. 30 (630.0130) | LB | 1,565 | $6.13 | $6.13 | $6.13 | $6.13 |
| 63 | Seed water (630.0500) | MGAL | 795 | $5.00 | $5.00 | $5.00 | $5.00 |
| 64 | Markers culvert end (633.5200) | EACH | 66 | $75.00 | $26.26 | $75.00 | $26.00 |
| 65 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 12 | $110.00 | $110.00 | $110.00 | $110.00 |
| 66 | Signs type II reflective H (637.2210) | SF | 13.50 | $30.00 | $30.00 | $30.00 | $30.00 |
| 67 | Signs type II reflective F (637.2230) | SF | 9 | $35.00 | $35.00 | $35.00 | $35.00 |
| 68 | Moving signs type II (638.2102) | EACH | 20 | $150.00 | $150.00 | $150.00 | $150.00 |
| 69 | Field office type B (642.5001) | EACH | 1 | $30,000 | $14,000 | $12,000 | $10,000 |
| 70 | Traffic control drums (643.0300) | DAY | 18,490 | $0.55 | $0.55 | $0.55 | $0.55 |
| 71 | Traffic control barricades type III (643.0420) | DAY | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 72 | Traffic control warning lights type A (643.0705) | DAY | 1,000 | $0.25 | $0.25 | $0.25 | $0.25 |
| 73 | Traffic control signs (643.0900) | DAY | 9,410 | $0.60 | $0.60 | $0.60 | $0.60 |
| 74 | Traffic control signs fixed message (643.1000) | SF | 36 | $10.20 | $10.20 | $10.20 | $10.20 |
| 75 | Temporary marking line paint 6- inch (643.3165) | LF | 195,180 | $0.37 | $0.30 | $0.30 | $0.30 |
| 76 | Traffic control (643.5000) | EACH | 1 | $3,721.00 | $3,928.00 | $3,721.00 | $3,721.00 |
| 77 | Geotextile type HR (645.0120) | SY | 170 | $16.80 | $16.80 | $16.80 | $16.80 |
| 78 | Geotextile type R (645.0130) | SY | 22 | $13.63 | $13.63 | $13.63 | $13.63 |
| 79 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 2,340 | $0.65 | $0.65 | $0.65 | $0.65 |
| 80 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 212,885 | $1.10 | $1.10 | $1.10 | $1.10 |
| 81 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,515 | $2.00 | $2.00 | $2.00 | $2.00 |
| 82 | Marking arrow epoxy (646.5020) | EACH | 12 | $280.00 | $280.00 | $280.00 | $280.00 |
| 83 | Marking word epoxy (646.5120) | EACH | 5 | $330.00 | $330.00 | $330.00 | $330.00 |
| 84 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,100 | $9.00 | $9.00 | $9.00 | $9.00 |
| 85 | Construction staking subgrade (650.4500) | LF | 3,409 | $0.01 | $0.01 | $0.01 | $0.01 |
| 86 | Construction staking base (650.5000) | LF | 3,409 | $0.01 | $0.01 | $0.01 | $0.01 |
| 87 | Construction staking pipe culverts (650.6000) | EACH | 30 | $150.00 | $150.00 | $150.00 | $150.00 |
| 88 | Construction staking resurfacing reference (650.8000) | LF | 57,490 | $0.06 | $0.06 | $0.06 | $0.06 |
| 89 | Construction staking supplemental control (project) 01. 1590-14-74 (650.9911) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 90 | Construction staking slope stakes (650.9920) | LF | 5,637 | $0.88 | $0.88 | $0.88 | $0.88 |
| 91 | Public land survey monument verify and reset (680.0100) | EACH | 4 | $500.00 | $500.00 | $500.00 | $500.00 |
| 92 | Sawing asphalt (690.0150) | LF | 1,340 | $4.00 | $2.00 | $4.31 | $2.00 |
| 93 | Sawing concrete (690.0250) | LF | 1,203 | $6.00 | $2.95 | $6.57 | $2.95 |
| 94 | Incentive iri ride (740.0440) | DOL | 48,250 | $1.00 | $1.00 | $1.00 | $1.00 |
| 95 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 6,050 | $3.53 | $3.53 | $3.53 | $3.53 |
| 96 | Special 01. fertilizer for lawn type turf (SPV.0030) | CWT | 1 | $275.00 | $275.00 | $275.00 | $275.00 |
| 97 | Special 01. temporary water diversion (SPV.0060) | EACH | 1 | $5,874.76 | $5,874.76 | $5,874.76 | $5,874.76 |
| 98 | Special 01. ditch cleaning (SPV.0090) | LF | 57 | $22.74 | $22.74 | $22.74 | $22.74 |
| 99 | Special 01. tuck pointing (SPV.0165) | SF | 108 | $57.95 | $57.95 | $57.95 | $57.95 |
| 100 | Special 01. protective thermoplastic coating at snowmobile crossing (SPV.0180) | SY | 165 | $160.00 | $160.00 | $160.00 | $135.00 |
| 101 | Special 02. preparing topsoil for lawn type turf (SPV.0180) | SY | 1,125 | $2.40 | $0.70 | $0.70 | $0.70 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.