WisDOT contract 20261013031 bid tabulation

Frederic - Mckinley; STH 35 to Bass Lake Lane (STH 048, Polk County Frederick - McKinley). Let by Wisconsin DOT on October 13, 2026, Polk. 1 bid received; low bid $8,494,443 by Monarch Paving Company.

Owner
Wisconsin DOT
Letting
13 OCT 2026
Pay items
151
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Monarch Paving Company$8,494,443Low
WisDOT contract 20261013031: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Monarch Paving Company
1Clearing (201.0105)STA25$1,170.00
2Grubbing (201.0205)STA25$370.00
3Removing small pipe culverts (203.0100)EACH13$985.00
4Removing concrete pavement (204.0100)SY65$62.00
5Removing concrete surface partial depth (204.0109.S)SF860$9.08
6Removing asphaltic surface (204.0110)SY695$17.40
7Removing asphaltic surface butt joints (204.0115)SY1,240$24.41
8Removing asphaltic surface milling (204.0120)SY17,200$7.79
9Removing curb & gutter (204.0150)LF1,030$15.75
10Removing concrete sidewalk (204.0155)SY255$18.00
11Removing guardrail (204.0165)LF4,300$3.00
12Removing delineators and markers (204.0180)EACH96$24.60
13Removing concrete bases (204.0195)EACH1$600.00
14Abandoning wells (204.0265)EACH1$21,500
15Excavation common (205.0100)CY9,059$12.75
16Borrow (208.0100)CY4,200$29.14
17Temporary lane shift during culvert work (208.1500.S)EACH26$10.00
18Backfill coarse aggregate (size) 01. no. 2 (209.0300.S)CY15$162.00
19Prepare foundation for asphaltic paving (project) 01. 8820-00-70 (211.0101)EACH1$7,500.00
20Prepare foundation for asphaltic shoulders (211.0400)STA32$200.00
21Prepare foundation for cir base layer (project) 01. 8820-00-70 (211.0700.S)EACH1$18,400
22Base repair for cir layer (211.0800.S)CY500$50.83
23Finishing roadway (project) 01. 8820-00-70 (213.0100)EACH1$5,600.00
24Base aggregate dense 3/4-inch (305.0110)TON8,750$34.95
25Base aggregate dense 1 1/4-inch (305.0120)TON5,600$25.05
26Shaping shoulders (305.0500)STA1,010$18.29
27Cir asphaltic base layer (327.1000.S)SY186,380$4.10
28Coloring concrete custom (405.0200)CY4$144.17
29HMA cold weather paving (450.4000)TON800$3.15
30Tack coat (455.0605)GAL26,200$2.32
31Asphalt stabilizing agent (455.0770.S)TON835$350.00
32HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$13,800
33HMA pavement 5 MT 58-34 S (460.6245)TON33,715$99.59
34Material transfer vehicle (460.9000.S)EACH1$30,880
35Asphaltic surface (465.0105)TON1,699$121.40
36Asphaltic surface patching (465.0110)TON435$163.20
37Asphaltic surface driveways and field entrances (465.0120)TON40$200.00
38Asphaltic flumes (465.0315)SY18$55.40
39Asphaltic rumble strips, centerline (465.0560)LF46,265$0.53
40Railing pipe (513.2001)LF3$2,860.00
41Apron endwalls for culvert pipe 30- inch (520.1030)EACH10$1,165.00
42Apron endwalls for culvert pipe 36- inch (520.1036)EACH2$1,655.00
43Culvert pipe temporary 48-inch (520.2048)LF96$252.00
44Culvert pipe class III-A non-metal 30-inch (520.3430)LF290$143.50
45Culvert pipe class III-A non-metal 36-inch (520.3436)LF66$179.40
46Culvert pipe class III-B non-metal 30-inch (520.3630)LF120$300.00
47Cleaning culvert pipes (520.8700)EACH19$2,250.00
48Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF54$215.00
49Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF178$252.00
50Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH2$1,788.00
51Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH6$2,146.00
52Culvert pipe reinforced concrete horizontal elliptical class HE-III 68X106-inch (522.2368)LF84$1,044.00
53Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429)LF50$396.00
54Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629)EACH2$3,505.00
55Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 68X106-inch (522.2668)EACH2$13,611
56Concrete curb & gutter 30-inch type D (601.0411)LF560$85.74
57Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF410$36.64
58Concrete curb pedestrian (601.0600)LF75$39.75
59Concrete sidewalk 5-inch (602.0410)SF2,935$17.05
60Curb ramp detectable warning field yellow (602.0505)SF200$60.38
61Curb ramp detectable warning field radial yellow (602.0605)SF90$68.05
62Concrete driveway 6-inch (602.0810)SY60$39.90
63Concrete steps (602.1500)SF24$159.35
64Concrete surface drains (602.3010)CY1$2,281.70
65Riprap medium (606.0200)CY645$79.50
66Cover plates temporary (611.8120.S)EACH5$350.00
67Insulation board polystyrene (inch) 01. 4-inch (612.0902.S)SY8$130.00
68Guardrail mow strip asphalt (614.0396)SY1,120$39.46
69MGS guardrail 3 (614.2300)LF1,538$30.50
70MGS guardrail 3 K (614.2330)LF2,125$54.30
71MGS guardrail short radius (614.2350)LF100$37.00
72MGS thrie beam transition (614.2500)LF154$105.00
73MGS guardrail terminal eat (614.2610)EACH18$3,862.00
74Maintenance and repair of haul roads (project) 01. 8820-00-70 (618.0100)EACH1$1.00
75Mobilization (619.1000)EACH1$708,000
76Water (624.0100)MGAL80$45.00
77Topsoil (625.0100)SY24,810$2.44
78Erosion bales (628.1104)EACH630$14.85
79Silt fence (628.1504)LF12,500$2.05
80Silt fence maintenance (628.1520)LF12,500$0.01
81Silt fence heavy duty (628.1530.S)LF1,700$10.00
82Silt fence heavy duty maintenance (628.1535.S)LF1,700$0.01
83Mobilizations erosion control (628.1905)EACH8$640.00
84Mobilizations emergency erosion control (628.1910)EACH4$10.00
85Erosion mat class I type B (628.2004)SY22,080$1.20
86Erosion mat urban class I type A (628.2006)SY220$1.85
87Erosion mat class II type C (628.2027)SY1,810$2.25
88Erosion mat class III type B (628.2033)SY700$21.00
89Polyethylene sheeting (628.5505)SY400$3.60
90Temporary ditch checks (628.7504)LF1,200$6.90
91Culvert pipe checks (628.7555)EACH130$15.00
92Fertilizer type B (629.0210)CWT12$82.00
93Seeding mixture no. 30 (630.0130)LB450$9.70
94Seeding mixture no. 40 (630.0140)LB4$125.00
95Seeding mixture no. 60 (630.0160)LB20$29.00
96Seed water (630.0500)MGAL560$1.00
97Markers culvert end (633.5200)EACH96$58.00
98Posts wood 4X6-inch X 16-FT (634.0616)EACH3$120.00
99Signs type II reflective F (637.2230)SF33$29.00
100Moving signs type II (638.2102)EACH30$92.50
101Field office type B (642.5001)EACH1$16,000
102Traffic control drums (643.0300)DAY3,825$0.50
103Traffic control barricades type III (643.0420)DAY40$1.00
104Traffic control warning lights type A (643.0705)DAY80$0.25
105Traffic control warning lights type C (643.0715)DAY80$0.25
106Traffic control signs (643.0900)DAY13,900$2.00
107Traffic control signs fixed message (643.1000)SF64$12.25
108Temporary marking line paint 6- inch (643.3165)LF263,100$0.32
109Temporary marking line removable tape 6-inch (643.3180)LF2,075$2.00
110Temporary marking removable mask out tape 6-inch (643.3960)LF1,170$2.95
111Traffic control (643.5000)EACH1$146,000
112Temporary pedestrian surface matting (644.1440)SF165$7.00
113Temporary pedestrian curb ramp (644.1601)DAY120$5.50
114Temporary pedestrian detectable warning field (644.1605)SF184$6.00
115Temporary pedestrian barricade (644.1810)LF1,180$9.00
116Geotextile type HR (645.0120)SY1,790$6.00
117Marking line grooved wet ref epoxy 6-inch (646.2040)LF178,000$1.05
118Marking line grooved wet ref epoxy 10-inch (646.4040)LF2,130$1.90
119Marking stop line epoxy 18-inch (646.6120)LF350$22.00
120Cold weather marking epoxy 6-inch (646.6466)LF17,800$0.20
121Cold weather marking epoxy 10- inch (646.6470)LF210$0.47
122Marking diagonal epoxy 12-inch (646.7120)LF40$9.00
123Marking crosswalk epoxy transverse line 6-inch (646.7420)LF740$13.00
124Marking crosswalk epoxy block style 24-inch (646.7520)LF90$25.00
125Marking parking stall epoxy (646.8320)LF130$35.00
126Construction staking subgrade (650.4500)LF6,233$0.50
127Construction staking base (650.5000)LF6,233$0.75
128Construction staking curb gutter and curb & gutter (650.5500)LF965$1.40
129Construction staking pipe culverts (650.6000)EACH12$300.00
130Construction staking resurfacing reference (650.8000)LF58,967$0.11
131Construction staking curb ramps (650.9000)EACH20$150.00
132Construction staking sidewalk (project) 01. 8820-00-70 (650.9500)EACH1$1,000.00
133Construction staking supplemental control (project) 01. 8820-00-70 (650.9911)EACH1$2,500.00
134Construction staking slope stakes (650.9920)LF6,233$0.85
135Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF16$34.00
136Install conduit into existing item (652.0700.S)EACH1$270.00
137Concrete bases type 5 (654.0105)EACH1$2,700.00
138Public land survey monument verify and reset (680.0100)EACH15$355.00
139Sawing asphalt (690.0150)LF6,939$2.25
140Sawing concrete (690.0250)LF228$2.75
141Incentive iri ride (740.0440)DOL45,000$1.00
142Special 01. incentive density PWL HMA pavement (SPV.0055)DOL24,440$1.00
143Special 02. incentive air voids HMA pavement (SPV.0055)DOL33,715$1.00
144Special 03. incentive density HMA pavement longitudinal joints (SPV.0055)DOL23,590$1.00
145Special 01. inlet covers type H-D (SPV.0060)EACH3$1,395.00
146Special 02. adjusting water valve boxes (SPV.0060)EACH23$1,044.00
147Special 03. adjusting sanitary manhole covers (SPV.0060)EACH7$1,140.00
148Special 04. joint ties for concrete pipe (SPV.0060)EACH36$611.00
149Special 05. remove and reinstall street light assembly (SPV.0060)EACH1$3,090.00
150Special 01. ditch cleaning (SPV.0090)LF90$40.00
151Special 01. infill riprap (SPV.0195)TON575$50.00
WisDOT contract 20261013031: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy