WisDOT contract 20261110015 bid tabulation

Milwaukee - Mequon; 0.1 Mi S of Fairlane to Teutonia (STH 057, Milwaukee County Milwaukee - Mequon). Let by Wisconsin DOT on November 10, 2026, Milwaukee. 5 bids received; low bid $3,862,192 by Payne and Dolan, Inc.

Owner
Wisconsin DOT
Letting
10 NOV 2026
Pay items
197
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Payne and Dolan, Inc$3,862,192Low
2Rock Road Companies, Inc.$3,939,006+2.0%
3Vinton Construction Company$3,986,535+3.0%
4Zignego Company, Inc.$4,259,263+10%
5Stark Pavement Corporation$4,407,390+14%
WisDOT contract 20261110015: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Payne and Dolan, Inc2. Rock Road Companies, Inc.3. Vinton Construction Company4. Zignego Company, Inc.5. Stark Pavement Corporation
1Grubbing (201.0205)STA54$345.00$345.00$345.00$345.00$345.00
2Removing small pipe culverts (203.0100)EACH7$1,560.00$374.91$617.75$600.00$1,560.00
3Removing structure (structure) 01. B-40-155 (203.0220)EACH1$8,232.00$8,232.00$8,232.00$8,232.00$8,232.00
4Debris containment over waterway (structure) 01. B-40-155 (203.0335)EACH1$5,960.00$5,960.00$5,960.00$5,960.00$5,960.00
5Debris containment over waterway (structure) 02. C-40-78 (203.0335)EACH1$3,776.00$3,776.00$3,776.00$3,776.00$3,776.00
6Removing concrete pavement (204.0100)SY1,830$4.60$13.13$5.00$13.43$4.60
7Removing asphaltic surface butt joints (204.0115)SY226$38.00$13.31$38.00$38.00$13.00
8Removing asphaltic surface milling (204.0120)SY57,900$2.65$3.49$2.55$2.55$4.25
9Removing curb & gutter (204.0150)LF443$12.00$12.39$11.10$20.00$12.00
10Removing concrete sidewalk (204.0155)SY74$19.50$13.56$27.00$20.65$19.50
11Removing guardrail (204.0165)LF534$2.50$2.50$5.00$3.00$2.70
12Removing fence (204.0170)LF69$2.00$2.00$5.00$5.00$3.00
13Removing inlets (204.0220)EACH4$839.00$564.89$591.71$500.00$839.00
14Removing storm sewer (size) 01. 10-inch (204.0245)LF8$126.00$24.72$18.67$35.00$126.00
15Removing storm sewer (size) 02. 12-inch (204.0245)LF34$39.50$20.60$18.14$35.00$39.50
16Removing storm sewer (size) 03. 18-inch (204.0245)LF80$46.50$20.60$20.13$35.00$46.50
17Removing storm sewer (size) 04. 30-inch (204.0245)LF8$141.00$24.72$26.46$35.00$141.00
18Removing storm sewer (size) 05. 36-inch (204.0245)LF150$50.50$20.60$24.14$1.00$50.50
19Abandoning sewer (204.0291.S)CY44$214.00$262.07$130.11$300.00$214.00
20Removing (item description) 01. apron end wall (204.9060.S)EACH2$918.00$618.05$521.94$350.00$918.00
21Excavation common (205.0100)CY3,060$21.00$36.26$55.25$44.38$21.00
22Excavation stone piles and stone fences (205.0300)CY180$45.00$41.77$55.25$200.00$45.00
23Excavation for structures bridges (structure) 01. B-40-155 (206.1001)EACH1$4,386.00$4,386.00$4,386.00$4,386.00$4,386.00
24Cofferdams (structure) 01. B-40-155 (206.5001)EACH1$14,328$14,328$15,000$14,328$14,328
25Backfill structure type B (210.2500)TON85$26.80$26.80$26.80$26.80$26.80
26Finishing roadway (project) 01. 2565-03-73 (213.0100)EACH1$7,262.49$5,526.54$10,000$1,000.00$5,600.00
27Base aggregate dense 3/4-inch (305.0110)TON1,410$40.04$21.81$39.15$40.00$33.00
28Base aggregate dense 1 1/4-inch (305.0120)TON3,030$28.29$30.86$30.54$37.00$24.00
29Breaker run (311.0110)TON1,170$20.00$31.19$30.54$37.00$38.00
30Select crushed material (312.0110)TON410$20.00$36.78$35.50$37.00$38.00
31Concrete base 9-inch (320.0155)SY1,070$77.00$98.58$98.17$138.05$70.50
32Removing pavement for base patching (390.0100)CY500$70.00$108.39$0.01$50.00$550.00
33Base patching concrete hes (390.0305)CY500$396.00$306.64$435.00$492.75$385.00
34Concrete pavement 8 1/2-inch (415.0085)SY347$98.00$104.12$105.17$137.01$78.00
35Concrete pavement 9-inch (415.0090)SY32$160.00$134.31$108.17$143.05$90.00
36Drilled tie bars (416.0610)EACH860$15.00$10.73$10.00$15.00$19.00
37Drilled dowel bars (416.0620)EACH1,353$20.00$16.71$19.50$20.00$20.00
38Concrete pavement partial depth repair joint repair (416.0750.S)LF320$175.00$104.67$125.00$370.00$110.00
39Concrete pavement partial depth repair crack repair (416.0752.S)LF320$175.00$104.67$125.00$370.00$110.00
40HMA pavement 3 MT 58-28 S (450.6223)TON7,340$69.60$80.00$68.75$68.75$80.40
41HMA pavement 4 MT 58-28 S (450.6224)TON5,710$75.00$87.00$74.00$74.00$84.80
42Tack coat (455.0605)GAL6,910$2.00$3.25$2.00$2.00$3.00
43Asphaltic surface (465.0105)TON828$99.00$88.00$97.00$97.00$133.60
44Asphaltic surface driveways and field entrances (465.0120)TON51$250.00$216.50$250.00$250.00$155.00
45Asphaltic surface temporary (465.0125)TON8$595.00$330.00$595.00$595.00$260.00
46Asphaltic flumes (465.0315)SY11$60.00$66.00$60.00$60.00$69.00
47Concrete masonry bridges (502.0100)CY20$1,380.00$1,380.00$1,380.00$1,380.00$1,380.00
48Pigmented surface sealer (502.3210)SY20$17.00$17.00$17.00$17.00$17.00
49Adhesive anchors no. 4 bar (502.4204)EACH46$26.50$26.50$26.50$26.50$26.50
50Bar steel reinforcement HS structures (505.0400)LB770$1.18$1.18$1.18$1.18$1.18
51Bar steel reinforcement HS coated structures (505.0600)LB2,450$1.73$1.73$1.73$1.73$1.73
52Concrete surface repair (509.1500)SF325$69.00$69.00$69.00$69.00$69.00
53Full-depth deck repair (509.2000)SY15$1,123.00$1,123.00$1,123.00$1,123.00$1,123.00
54Concrete masonry deck repair (509.2100.S)CY6$1,085.00$1,085.00$1,085.00$1,085.00$1,085.00
55Epoxy crack sealing (509.9020.S)LF40$33.00$33.00$33.00$33.00$33.00
56Rubberized membrane waterproofing (516.0500)SY13$48.00$48.00$48.00$48.00$48.00
57Concrete collars for pipe (520.8000)EACH8$852.00$706.38$815.90$1,000.00$852.00
58Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH2$631.00$454.02$609.71$300.00$631.00
59Apron endwalls for culvert pipe steel 15-inch (521.1015)EACH1$654.00$478.36$579.67$300.00$654.00
60Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH2$685.00$510.82$633.61$300.00$685.00
61Apron endwalls for pipe arch steel 17X13-inch (521.1217)EACH2$754.00$504.33$580.86$300.00$754.00
62Culvert pipe corrugated steel 12- inch (521.3112)LF40$103.00$89.98$103.16$200.00$103.00
63Culvert pipe corrugated steel 15- inch (521.3115)LF16$171.00$152.93$106.72$200.00$171.00
64Culvert pipe corrugated steel 18- inch (521.3118)LF26$131.00$110.83$120.88$200.00$131.00
65Pipe arch corrugated steel 17X13- inch (521.3717)LF26$130.00$109.05$116.07$200.00$130.00
66Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH2$1,540.00$1,325.23$1,328.57$1,100.00$1,540.00
67Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015)EACH1$1,590.00$1,379.23$1,377.49$1,200.00$1,590.00
68Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH1$1,660.00$1,460.02$1,671.15$1,500.00$1,660.00
69Culvert pipe reinforced concrete horizontal elliptical class HE-III 38X60-inch (522.2338)LF68$391.00$355.43$447.08$627.80$391.00
70Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638)EACH2$4,430.00$3,462.14$8,865.80$3,200.00$4,430.00
71Concrete curb & gutter 31-inch (601.0331)LF1,152$53.00$52.83$36.00$48.74$49.25
72Concrete curb & gutter 30-inch type A (601.0409)LF272$71.00$64.75$35.00$49.65$49.25
73Concrete curb pedestrian (601.0600)LF40$31.00$41.94$50.00$100.00$49.25
74Concrete sidewalk 5-inch (602.0410)SF12,050$9.50$10.49$10.60$10.78$10.75
75Curb ramp detectable warning field yellow (602.0505)SF210$48.00$53.95$55.00$60.00$52.00
76Curb ramp detectable warning field radial yellow (602.0605)SF133$74.00$71.93$65.00$100.00$60.00
77Concrete driveway 6-inch (602.0810)SY55$80.00$91.38$90.00$118.15$85.00
78Concrete driveway 8-inch (602.0820)SY25$98.00$120.62$95.00$134.45$95.00
79Concrete surface drains (602.3010)CY2$1,050.00$986.98$1,100.00$2,000.00$900.00
80Riprap medium (606.0200)CY58$167.00$177.48$125.00$275.00$167.00
81Riprap heavy (606.0300)CY188$167.00$139.70$125.00$300.00$167.00
82Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF83$120.00$155.70$161.69$121.73$120.00
83Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF536$88.50$117.34$146.73$185.45$88.50
84Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF72$90.00$219.09$198.38$172.45$90.00
85Storm sewer pipe reinforced concrete class III 36-inch (608.0336)LF150$197.00$285.20$380.53$601.56$197.00
86Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF348$93.00$138.46$127.34$177.69$93.00
87Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF139$96.50$140.78$132.87$185.45$96.50
88Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF75$104.00$142.85$196.52$186.51$104.00
89Inlet covers type B-A (611.0609)EACH8$1,110.00$1,480.59$890.20$1,200.00$1,110.00
90Inlet covers type BW (611.0610)EACH1$1,360.00$1,382.00$796.30$1,200.00$1,360.00
91Inlet covers type H (611.0624)EACH6$994.00$1,360.95$776.96$1,200.00$994.00
92Inlet covers type H-S (611.0639)EACH2$1,080.00$1,360.95$777.84$1,200.00$1,080.00
93Inlet covers type MS-A (611.0645)EACH4$876.00$1,064.68$574.75$900.00$876.00
94Manholes 5-FT diameter (611.2005)EACH1$5,330.00$4,644.30$10,848$11,412$5,330.00
95Inlets 4-FT diameter (611.3004)EACH9$2,300.00$2,729.17$4,992.00$4,777.95$2,300.00
96Inlets 2X2-FT (611.3220)EACH7$1,310.00$2,024.56$2,767.76$2,830.76$1,310.00
97Inlets median 1 grate (611.3901)EACH4$2,300.00$2,468.18$3,588.83$4,061.00$2,300.00
98Adjusting manhole covers (611.8110)EACH1$666.00$686.93$875.00$2,000.00$666.00
99Guardrail mow strip emulsified asphalt (614.0397)SY308$15.61$22.00$15.50$15.50$26.30
100Replacing guardrail rail and hardware (614.0951)LF38$70.00$70.00$20.00$20.00$18.00
101MGS guardrail 3 (614.2300)LF224$33.00$33.00$24.00$24.00$29.00
102MGS guardrail 3 L (614.2340)LF66$35.00$35.00$35.00$35.00$39.00
103MGS guardrail short radius (614.2350)LF85$38.00$38.00$35.00$35.00$39.00
104MGS thrie beam transition (614.2500)LF75$98.50$98.50$100.00$100.00$99.00
105MGS guardrail terminal eat (614.2610)EACH3$3,300.00$3,300.00$4,200.00$4,200.00$4,500.00
106MGS guardrail short radius terminal (614.2630)EACH1$2,400.00$2,400.00$2,500.00$2,500.00$3,000.00
107Mobilization (619.1000)EACH1$416,500$368,941$415,000$207,000$515,518
108Topsoil (625.0100)SY8,596$6.88$0.01$4.53$4.53$4.90
109Silt fence (628.1504)LF4,872$2.10$2.10$1.90$1.90$2.11
110Silt fence maintenance (628.1520)LF4,872$0.05$0.05$0.01$0.01$0.01
111Silt fence heavy duty (628.1530.S)LF833$9.75$9.75$9.00$9.00$11.00
112Silt fence heavy duty maintenance (628.1535.S)LF833$0.10$0.10$0.10$0.10$0.01
113Mobilizations erosion control (628.1905)EACH5$1.00$1.00$100.00$100.00$50.00
114Mobilizations emergency erosion control (628.1910)EACH4$2.00$2.00$50.00$50.00$40.00
115Erosion mat urban class I type B (628.2008)SY8,326$1.70$1.70$1.95$1.95$2.00
116Erosion mat class II type C (628.2027)SY340$3.50$3.50$3.50$3.50$4.00
117Soil stabilizer type A (628.6505)ACRE0.10$40,000$40,000$100.00$100.00$5,000.00
118Inlet protection type A (628.7005)EACH35$5.00$5.00$70.00$70.00$50.00
119Inlet protection type C (628.7015)EACH23$65.00$65.00$70.00$70.00$70.00
120Temporary ditch checks (628.7504)LF188$8.00$8.00$8.00$8.00$8.00
121Culvert pipe checks (628.7555)EACH8$25.00$25.00$20.00$20.00$15.00
122Rock bags (628.7570)EACH154$25.00$25.00$10.00$10.00$13.00
123Fertilizer type B (629.0210)CWT11$60.00$60.00$100.00$100.00$80.00
124Seeding mixture no. 30 (630.0130)LB56$7.50$7.50$8.50$8.50$10.00
125Seeding nurse crop (630.0400)LB3$2.00$2.00$5.00$5.00$3.00
126Seed water (630.0500)MGAL190$1.00$1.00$5.00$5.00$25.00
127Markers culvert end (633.5200)EACH7$65.00$65.00$70.00$70.00$70.00
128Posts wood 4X6-inch X 18-FT (634.0618)EACH43$75.00$75.00$100.00$100.00$144.00
129Signs type II reflective H (637.2210)SF378.96$23.50$23.50$21.00$21.00$23.00
130Removing signs type II (638.2602)EACH49$30.00$30.00$5.00$5.00$10.00
131Removing small sign supports (638.3000)EACH37$30.00$30.00$5.00$5.00$10.00
132Field office type B (642.5001)EACH1$15,863$6,750.00$15,000$20,000$12,500
133Traffic control drums (643.0300)DAY4,320$0.12$0.15$0.12$0.15$0.15
134Traffic control barricades type III (643.0420)DAY4,920$0.51$0.60$0.50$0.60$0.60
135Traffic control warning lights type A (643.0705)DAY9,360$0.06$0.11$0.06$0.11$0.11
136Traffic control warning lights type C (643.0715)DAY1,320$0.08$0.13$0.08$0.13$0.13
137Traffic control signs (643.0900)DAY33,240$0.32$0.20$0.32$0.20$0.20
138Traffic control covering signs type II (643.0920)EACH17$40.40$50.00$40.00$50.00$50.00
139Traffic control signs fixed message (643.1000)SF68$16.16$9.00$16.00$9.00$9.00
140Traffic control signs PCMS (643.1050)DAY14$50.50$45.00$50.00$45.00$45.00
141Traffic control (643.5000)EACH1$18,180$17,000$18,000$17,000$17,000
142Temporary pedestrian barricade (644.1810)LF25$8.08$8.00$8.00$8.00$8.00
143Geotextile type HR (645.0120)SY551$3.50$1.85$4.00$5.00$3.50
144Geogrid type SR (645.0220)SY2,020$4.00$4.85$3.50$2.00$4.00
145Marking line grooved wet ref epoxy 4-inch (646.1040)LF280$1.01$1.00$1.00$1.00$1.01
146Marking line grooved black epoxy 6-inch (646.2025)LF410$1.52$1.50$1.50$1.50$1.52
147Marking line grooved wet ref epoxy 6-inch (646.2040)LF34,477$1.27$1.26$1.26$1.26$1.27
148Marking line grooved wet ref epoxy 10-inch (646.4040)LF1,065$2.93$2.90$2.90$2.90$2.93
149Marking arrow epoxy (646.5020)EACH11$252.50$250.00$250.00$250.00$252.50
150Marking word epoxy (646.5120)EACH1$303.00$300.00$300.00$300.00$303.00
151Marking stop line epoxy 18-inch (646.6120)LF424$13.13$13.00$13.00$13.00$13.13
152Marking yield line epoxy 18-inch (646.6220)EACH17$65.65$65.00$65.00$65.00$65.65
153Marking diagonal epoxy 12-inch (646.7120)LF182$9.60$9.50$9.50$9.50$9.60
154Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,100$10.86$10.75$10.75$10.75$10.86
155Marking crosswalk epoxy block style 24-inch (646.7520)LF120$17.17$17.00$17.00$17.00$17.17
156Marking curb paint (646.8105)LF147$15.15$15.00$15.00$15.00$15.15
157Marking island nose epoxy (646.8220)EACH5$303.00$300.00$300.00$300.00$303.00
158Marking removal line wide (646.9200)LF150$3.03$2.25$3.00$3.00$3.03
159Construction staking storm sewer (650.4000)EACH26$120.00$1.00$120.00$120.00$120.00
160Construction staking subgrade (650.4500)LF5,490$0.01$0.01$0.01$0.01$0.01
161Construction staking base (650.5000)LF8,790$1.50$0.01$1.50$1.50$1.50
162Construction staking curb gutter and curb & gutter (650.5500)LF1,440$2.00$1.00$2.00$2.00$2.00
163Construction staking pipe culverts (650.6000)EACH4$130.00$1.00$130.00$130.00$130.00
164Construction staking resurfacing reference (650.8000)LF10,490$0.17$0.02$0.17$0.17$0.17
165Construction staking electrical installations (project) 01. 2565-03- 73 (650.8501)EACH1$650.00$5,000.00$650.00$650.00$650.00
166Construction staking curb ramps (650.9000)EACH19$200.00$10.00$200.00$200.00$200.00
167Construction staking sidewalk (project) 01. 2565-03-73 (650.9500)EACH3$500.00$0.01$500.00$500.00$500.00
168Construction staking supplemental control (project) 01. 2565-03-73 (650.9911)EACH1$1,500.00$5,500.00$1,500.00$1,500.00$1,500.00
169Construction staking slope stakes (650.9920)LF8,790$0.50$0.02$0.50$0.50$0.50
170Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF68$15.60$15.60$15.60$15.60$15.60
171Adjusting pull boxes (653.0900)EACH2$162.00$162.00$162.00$162.00$162.00
172Concrete bases type 1 (654.0101)EACH3$1,697.00$1,697.00$1,697.00$1,697.00$1,697.00
173Cable traffic signal 5-14 AWG (655.0230)LF401$2.76$2.76$2.76$2.76$2.76
174Pedestal bases (657.0100)EACH3$314.00$314.00$314.00$314.00$314.00
175Traffic signal standards aluminum 10-FT (657.0430)EACH3$635.00$635.00$635.00$635.00$635.00
176Pedestrian signal face 16-inch (658.0416)EACH6$566.00$566.20$566.20$566.20$566.00
177Pedestrian push buttons (658.0500)EACH6$214.00$214.00$214.00$214.00$214.00
178Signal mounting hardware (location) 01. STH 57 & range line road (658.5070)EACH1$1,153.00$1,153.00$1,153.00$1,153.00$1,153.00
179Sawing asphalt (690.0150)LF101$1.20$1.20$2.75$2.05$2.05
180Sawing concrete (690.0250)LF3,840$3.15$3.15$2.75$2.75$2.75
181Nuclear gauge correlation strip - HMA, SMA (706.0110)EACH4$8,476.74$3,500.00$8,000.00$8,000.00$4,250.00
182Incentive density PWL HMA pavement (706.2005)DOL7,970$1.00$1.00$1.00$1.00$1.00
183Incentive compressive strength concrete pavement (707.0020)DOL500$1.00$1.00$1.00$1.00$1.00
184Incentive iri ride (740.0440)DOL7,940$1.00$1.00$1.00$1.00$1.00
185On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00$5.00$5.00$5.00
186On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS3,600$5.00$5.00$5.00$5.00$5.00
187Special 01. backfill slurry (SPV.0035)CY31$167.00$237.36$281.45$300.00$167.00
188Special 02. clear stone bed (SPV.0035)CY29$657.00$137.11$125.00$300.00$657.00
189Special 03. channel bed material (SPV.0035)CY40$538.00$177.48$250.00$300.00$538.00
190Special 01. transpt traffic signal & inter lighting materials (SPV.0060)EACH1$204.00$204.00$204.00$204.00$204.00
191Special 02. marking contrast epoxy special marking word (SPV.0060)EACH2$505.00$500.00$500.00$500.00$505.00
192Special 03. marking contrast epoxy special marking arrow (SPV.0060)EACH6$505.00$500.00$500.00$500.00$505.00
193Special 04. adjusting water valve boxes (SPV.0060)EACH2$1,000.00$426.92$361.00$1,000.00$1,000.00
194Special 01. bank seed mix (SPV.0085)LB2$1,500.00$1,500.00$190.00$190.00$200.00
195Special 01. ditch cleaning (SPV.0090)LF19$150.00$68.01$200.00$50.00$250.00
196Special 02. profile curb cut (SPV.0090)LF139$3.45$3.45$40.00$75.00$25.00
197Special 01. asphaltic repair (SPV.0195)TON1,800$129.50$136.00$125.00$125.00$150.00
WisDOT contract 20261110015: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy