WisDOT contract 20261110015 bid tabulation
Milwaukee - Mequon; 0.1 Mi S of Fairlane to Teutonia (STH 057, Milwaukee County Milwaukee - Mequon). Let by Wisconsin DOT on November 10, 2026, Milwaukee. 5 bids received; low bid $3,862,192 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 197
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $3,862,192 | Low |
| 2 | Rock Road Companies, Inc. | $3,939,006 | +2.0% |
| 3 | Vinton Construction Company | $3,986,535 | +3.0% |
| 4 | Zignego Company, Inc. | $4,259,263 | +10% |
| 5 | Stark Pavement Corporation | $4,407,390 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Rock Road Companies, Inc. | 3. Vinton Construction Company | 4. Zignego Company, Inc. | 5. Stark Pavement Corporation |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 54 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 7 | $1,560.00 | $374.91 | $617.75 | $600.00 | $1,560.00 |
| 3 | Removing structure (structure) 01. B-40-155 (203.0220) | EACH | 1 | $8,232.00 | $8,232.00 | $8,232.00 | $8,232.00 | $8,232.00 |
| 4 | Debris containment over waterway (structure) 01. B-40-155 (203.0335) | EACH | 1 | $5,960.00 | $5,960.00 | $5,960.00 | $5,960.00 | $5,960.00 |
| 5 | Debris containment over waterway (structure) 02. C-40-78 (203.0335) | EACH | 1 | $3,776.00 | $3,776.00 | $3,776.00 | $3,776.00 | $3,776.00 |
| 6 | Removing concrete pavement (204.0100) | SY | 1,830 | $4.60 | $13.13 | $5.00 | $13.43 | $4.60 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 226 | $38.00 | $13.31 | $38.00 | $38.00 | $13.00 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 57,900 | $2.65 | $3.49 | $2.55 | $2.55 | $4.25 |
| 9 | Removing curb & gutter (204.0150) | LF | 443 | $12.00 | $12.39 | $11.10 | $20.00 | $12.00 |
| 10 | Removing concrete sidewalk (204.0155) | SY | 74 | $19.50 | $13.56 | $27.00 | $20.65 | $19.50 |
| 11 | Removing guardrail (204.0165) | LF | 534 | $2.50 | $2.50 | $5.00 | $3.00 | $2.70 |
| 12 | Removing fence (204.0170) | LF | 69 | $2.00 | $2.00 | $5.00 | $5.00 | $3.00 |
| 13 | Removing inlets (204.0220) | EACH | 4 | $839.00 | $564.89 | $591.71 | $500.00 | $839.00 |
| 14 | Removing storm sewer (size) 01. 10-inch (204.0245) | LF | 8 | $126.00 | $24.72 | $18.67 | $35.00 | $126.00 |
| 15 | Removing storm sewer (size) 02. 12-inch (204.0245) | LF | 34 | $39.50 | $20.60 | $18.14 | $35.00 | $39.50 |
| 16 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 80 | $46.50 | $20.60 | $20.13 | $35.00 | $46.50 |
| 17 | Removing storm sewer (size) 04. 30-inch (204.0245) | LF | 8 | $141.00 | $24.72 | $26.46 | $35.00 | $141.00 |
| 18 | Removing storm sewer (size) 05. 36-inch (204.0245) | LF | 150 | $50.50 | $20.60 | $24.14 | $1.00 | $50.50 |
| 19 | Abandoning sewer (204.0291.S) | CY | 44 | $214.00 | $262.07 | $130.11 | $300.00 | $214.00 |
| 20 | Removing (item description) 01. apron end wall (204.9060.S) | EACH | 2 | $918.00 | $618.05 | $521.94 | $350.00 | $918.00 |
| 21 | Excavation common (205.0100) | CY | 3,060 | $21.00 | $36.26 | $55.25 | $44.38 | $21.00 |
| 22 | Excavation stone piles and stone fences (205.0300) | CY | 180 | $45.00 | $41.77 | $55.25 | $200.00 | $45.00 |
| 23 | Excavation for structures bridges (structure) 01. B-40-155 (206.1001) | EACH | 1 | $4,386.00 | $4,386.00 | $4,386.00 | $4,386.00 | $4,386.00 |
| 24 | Cofferdams (structure) 01. B-40-155 (206.5001) | EACH | 1 | $14,328 | $14,328 | $15,000 | $14,328 | $14,328 |
| 25 | Backfill structure type B (210.2500) | TON | 85 | $26.80 | $26.80 | $26.80 | $26.80 | $26.80 |
| 26 | Finishing roadway (project) 01. 2565-03-73 (213.0100) | EACH | 1 | $7,262.49 | $5,526.54 | $10,000 | $1,000.00 | $5,600.00 |
| 27 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,410 | $40.04 | $21.81 | $39.15 | $40.00 | $33.00 |
| 28 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 3,030 | $28.29 | $30.86 | $30.54 | $37.00 | $24.00 |
| 29 | Breaker run (311.0110) | TON | 1,170 | $20.00 | $31.19 | $30.54 | $37.00 | $38.00 |
| 30 | Select crushed material (312.0110) | TON | 410 | $20.00 | $36.78 | $35.50 | $37.00 | $38.00 |
| 31 | Concrete base 9-inch (320.0155) | SY | 1,070 | $77.00 | $98.58 | $98.17 | $138.05 | $70.50 |
| 32 | Removing pavement for base patching (390.0100) | CY | 500 | $70.00 | $108.39 | $0.01 | $50.00 | $550.00 |
| 33 | Base patching concrete hes (390.0305) | CY | 500 | $396.00 | $306.64 | $435.00 | $492.75 | $385.00 |
| 34 | Concrete pavement 8 1/2-inch (415.0085) | SY | 347 | $98.00 | $104.12 | $105.17 | $137.01 | $78.00 |
| 35 | Concrete pavement 9-inch (415.0090) | SY | 32 | $160.00 | $134.31 | $108.17 | $143.05 | $90.00 |
| 36 | Drilled tie bars (416.0610) | EACH | 860 | $15.00 | $10.73 | $10.00 | $15.00 | $19.00 |
| 37 | Drilled dowel bars (416.0620) | EACH | 1,353 | $20.00 | $16.71 | $19.50 | $20.00 | $20.00 |
| 38 | Concrete pavement partial depth repair joint repair (416.0750.S) | LF | 320 | $175.00 | $104.67 | $125.00 | $370.00 | $110.00 |
| 39 | Concrete pavement partial depth repair crack repair (416.0752.S) | LF | 320 | $175.00 | $104.67 | $125.00 | $370.00 | $110.00 |
| 40 | HMA pavement 3 MT 58-28 S (450.6223) | TON | 7,340 | $69.60 | $80.00 | $68.75 | $68.75 | $80.40 |
| 41 | HMA pavement 4 MT 58-28 S (450.6224) | TON | 5,710 | $75.00 | $87.00 | $74.00 | $74.00 | $84.80 |
| 42 | Tack coat (455.0605) | GAL | 6,910 | $2.00 | $3.25 | $2.00 | $2.00 | $3.00 |
| 43 | Asphaltic surface (465.0105) | TON | 828 | $99.00 | $88.00 | $97.00 | $97.00 | $133.60 |
| 44 | Asphaltic surface driveways and field entrances (465.0120) | TON | 51 | $250.00 | $216.50 | $250.00 | $250.00 | $155.00 |
| 45 | Asphaltic surface temporary (465.0125) | TON | 8 | $595.00 | $330.00 | $595.00 | $595.00 | $260.00 |
| 46 | Asphaltic flumes (465.0315) | SY | 11 | $60.00 | $66.00 | $60.00 | $60.00 | $69.00 |
| 47 | Concrete masonry bridges (502.0100) | CY | 20 | $1,380.00 | $1,380.00 | $1,380.00 | $1,380.00 | $1,380.00 |
| 48 | Pigmented surface sealer (502.3210) | SY | 20 | $17.00 | $17.00 | $17.00 | $17.00 | $17.00 |
| 49 | Adhesive anchors no. 4 bar (502.4204) | EACH | 46 | $26.50 | $26.50 | $26.50 | $26.50 | $26.50 |
| 50 | Bar steel reinforcement HS structures (505.0400) | LB | 770 | $1.18 | $1.18 | $1.18 | $1.18 | $1.18 |
| 51 | Bar steel reinforcement HS coated structures (505.0600) | LB | 2,450 | $1.73 | $1.73 | $1.73 | $1.73 | $1.73 |
| 52 | Concrete surface repair (509.1500) | SF | 325 | $69.00 | $69.00 | $69.00 | $69.00 | $69.00 |
| 53 | Full-depth deck repair (509.2000) | SY | 15 | $1,123.00 | $1,123.00 | $1,123.00 | $1,123.00 | $1,123.00 |
| 54 | Concrete masonry deck repair (509.2100.S) | CY | 6 | $1,085.00 | $1,085.00 | $1,085.00 | $1,085.00 | $1,085.00 |
| 55 | Epoxy crack sealing (509.9020.S) | LF | 40 | $33.00 | $33.00 | $33.00 | $33.00 | $33.00 |
| 56 | Rubberized membrane waterproofing (516.0500) | SY | 13 | $48.00 | $48.00 | $48.00 | $48.00 | $48.00 |
| 57 | Concrete collars for pipe (520.8000) | EACH | 8 | $852.00 | $706.38 | $815.90 | $1,000.00 | $852.00 |
| 58 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 2 | $631.00 | $454.02 | $609.71 | $300.00 | $631.00 |
| 59 | Apron endwalls for culvert pipe steel 15-inch (521.1015) | EACH | 1 | $654.00 | $478.36 | $579.67 | $300.00 | $654.00 |
| 60 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 2 | $685.00 | $510.82 | $633.61 | $300.00 | $685.00 |
| 61 | Apron endwalls for pipe arch steel 17X13-inch (521.1217) | EACH | 2 | $754.00 | $504.33 | $580.86 | $300.00 | $754.00 |
| 62 | Culvert pipe corrugated steel 12- inch (521.3112) | LF | 40 | $103.00 | $89.98 | $103.16 | $200.00 | $103.00 |
| 63 | Culvert pipe corrugated steel 15- inch (521.3115) | LF | 16 | $171.00 | $152.93 | $106.72 | $200.00 | $171.00 |
| 64 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 26 | $131.00 | $110.83 | $120.88 | $200.00 | $131.00 |
| 65 | Pipe arch corrugated steel 17X13- inch (521.3717) | LF | 26 | $130.00 | $109.05 | $116.07 | $200.00 | $130.00 |
| 66 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 2 | $1,540.00 | $1,325.23 | $1,328.57 | $1,100.00 | $1,540.00 |
| 67 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 1 | $1,590.00 | $1,379.23 | $1,377.49 | $1,200.00 | $1,590.00 |
| 68 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,660.00 | $1,460.02 | $1,671.15 | $1,500.00 | $1,660.00 |
| 69 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 38X60-inch (522.2338) | LF | 68 | $391.00 | $355.43 | $447.08 | $627.80 | $391.00 |
| 70 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638) | EACH | 2 | $4,430.00 | $3,462.14 | $8,865.80 | $3,200.00 | $4,430.00 |
| 71 | Concrete curb & gutter 31-inch (601.0331) | LF | 1,152 | $53.00 | $52.83 | $36.00 | $48.74 | $49.25 |
| 72 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 272 | $71.00 | $64.75 | $35.00 | $49.65 | $49.25 |
| 73 | Concrete curb pedestrian (601.0600) | LF | 40 | $31.00 | $41.94 | $50.00 | $100.00 | $49.25 |
| 74 | Concrete sidewalk 5-inch (602.0410) | SF | 12,050 | $9.50 | $10.49 | $10.60 | $10.78 | $10.75 |
| 75 | Curb ramp detectable warning field yellow (602.0505) | SF | 210 | $48.00 | $53.95 | $55.00 | $60.00 | $52.00 |
| 76 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 133 | $74.00 | $71.93 | $65.00 | $100.00 | $60.00 |
| 77 | Concrete driveway 6-inch (602.0810) | SY | 55 | $80.00 | $91.38 | $90.00 | $118.15 | $85.00 |
| 78 | Concrete driveway 8-inch (602.0820) | SY | 25 | $98.00 | $120.62 | $95.00 | $134.45 | $95.00 |
| 79 | Concrete surface drains (602.3010) | CY | 2 | $1,050.00 | $986.98 | $1,100.00 | $2,000.00 | $900.00 |
| 80 | Riprap medium (606.0200) | CY | 58 | $167.00 | $177.48 | $125.00 | $275.00 | $167.00 |
| 81 | Riprap heavy (606.0300) | CY | 188 | $167.00 | $139.70 | $125.00 | $300.00 | $167.00 |
| 82 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 83 | $120.00 | $155.70 | $161.69 | $121.73 | $120.00 |
| 83 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 536 | $88.50 | $117.34 | $146.73 | $185.45 | $88.50 |
| 84 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 72 | $90.00 | $219.09 | $198.38 | $172.45 | $90.00 |
| 85 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 150 | $197.00 | $285.20 | $380.53 | $601.56 | $197.00 |
| 86 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 348 | $93.00 | $138.46 | $127.34 | $177.69 | $93.00 |
| 87 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 139 | $96.50 | $140.78 | $132.87 | $185.45 | $96.50 |
| 88 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 75 | $104.00 | $142.85 | $196.52 | $186.51 | $104.00 |
| 89 | Inlet covers type B-A (611.0609) | EACH | 8 | $1,110.00 | $1,480.59 | $890.20 | $1,200.00 | $1,110.00 |
| 90 | Inlet covers type BW (611.0610) | EACH | 1 | $1,360.00 | $1,382.00 | $796.30 | $1,200.00 | $1,360.00 |
| 91 | Inlet covers type H (611.0624) | EACH | 6 | $994.00 | $1,360.95 | $776.96 | $1,200.00 | $994.00 |
| 92 | Inlet covers type H-S (611.0639) | EACH | 2 | $1,080.00 | $1,360.95 | $777.84 | $1,200.00 | $1,080.00 |
| 93 | Inlet covers type MS-A (611.0645) | EACH | 4 | $876.00 | $1,064.68 | $574.75 | $900.00 | $876.00 |
| 94 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $5,330.00 | $4,644.30 | $10,848 | $11,412 | $5,330.00 |
| 95 | Inlets 4-FT diameter (611.3004) | EACH | 9 | $2,300.00 | $2,729.17 | $4,992.00 | $4,777.95 | $2,300.00 |
| 96 | Inlets 2X2-FT (611.3220) | EACH | 7 | $1,310.00 | $2,024.56 | $2,767.76 | $2,830.76 | $1,310.00 |
| 97 | Inlets median 1 grate (611.3901) | EACH | 4 | $2,300.00 | $2,468.18 | $3,588.83 | $4,061.00 | $2,300.00 |
| 98 | Adjusting manhole covers (611.8110) | EACH | 1 | $666.00 | $686.93 | $875.00 | $2,000.00 | $666.00 |
| 99 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 308 | $15.61 | $22.00 | $15.50 | $15.50 | $26.30 |
| 100 | Replacing guardrail rail and hardware (614.0951) | LF | 38 | $70.00 | $70.00 | $20.00 | $20.00 | $18.00 |
| 101 | MGS guardrail 3 (614.2300) | LF | 224 | $33.00 | $33.00 | $24.00 | $24.00 | $29.00 |
| 102 | MGS guardrail 3 L (614.2340) | LF | 66 | $35.00 | $35.00 | $35.00 | $35.00 | $39.00 |
| 103 | MGS guardrail short radius (614.2350) | LF | 85 | $38.00 | $38.00 | $35.00 | $35.00 | $39.00 |
| 104 | MGS thrie beam transition (614.2500) | LF | 75 | $98.50 | $98.50 | $100.00 | $100.00 | $99.00 |
| 105 | MGS guardrail terminal eat (614.2610) | EACH | 3 | $3,300.00 | $3,300.00 | $4,200.00 | $4,200.00 | $4,500.00 |
| 106 | MGS guardrail short radius terminal (614.2630) | EACH | 1 | $2,400.00 | $2,400.00 | $2,500.00 | $2,500.00 | $3,000.00 |
| 107 | Mobilization (619.1000) | EACH | 1 | $416,500 | $368,941 | $415,000 | $207,000 | $515,518 |
| 108 | Topsoil (625.0100) | SY | 8,596 | $6.88 | $0.01 | $4.53 | $4.53 | $4.90 |
| 109 | Silt fence (628.1504) | LF | 4,872 | $2.10 | $2.10 | $1.90 | $1.90 | $2.11 |
| 110 | Silt fence maintenance (628.1520) | LF | 4,872 | $0.05 | $0.05 | $0.01 | $0.01 | $0.01 |
| 111 | Silt fence heavy duty (628.1530.S) | LF | 833 | $9.75 | $9.75 | $9.00 | $9.00 | $11.00 |
| 112 | Silt fence heavy duty maintenance (628.1535.S) | LF | 833 | $0.10 | $0.10 | $0.10 | $0.10 | $0.01 |
| 113 | Mobilizations erosion control (628.1905) | EACH | 5 | $1.00 | $1.00 | $100.00 | $100.00 | $50.00 |
| 114 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $2.00 | $2.00 | $50.00 | $50.00 | $40.00 |
| 115 | Erosion mat urban class I type B (628.2008) | SY | 8,326 | $1.70 | $1.70 | $1.95 | $1.95 | $2.00 |
| 116 | Erosion mat class II type C (628.2027) | SY | 340 | $3.50 | $3.50 | $3.50 | $3.50 | $4.00 |
| 117 | Soil stabilizer type A (628.6505) | ACRE | 0.10 | $40,000 | $40,000 | $100.00 | $100.00 | $5,000.00 |
| 118 | Inlet protection type A (628.7005) | EACH | 35 | $5.00 | $5.00 | $70.00 | $70.00 | $50.00 |
| 119 | Inlet protection type C (628.7015) | EACH | 23 | $65.00 | $65.00 | $70.00 | $70.00 | $70.00 |
| 120 | Temporary ditch checks (628.7504) | LF | 188 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 121 | Culvert pipe checks (628.7555) | EACH | 8 | $25.00 | $25.00 | $20.00 | $20.00 | $15.00 |
| 122 | Rock bags (628.7570) | EACH | 154 | $25.00 | $25.00 | $10.00 | $10.00 | $13.00 |
| 123 | Fertilizer type B (629.0210) | CWT | 11 | $60.00 | $60.00 | $100.00 | $100.00 | $80.00 |
| 124 | Seeding mixture no. 30 (630.0130) | LB | 56 | $7.50 | $7.50 | $8.50 | $8.50 | $10.00 |
| 125 | Seeding nurse crop (630.0400) | LB | 3 | $2.00 | $2.00 | $5.00 | $5.00 | $3.00 |
| 126 | Seed water (630.0500) | MGAL | 190 | $1.00 | $1.00 | $5.00 | $5.00 | $25.00 |
| 127 | Markers culvert end (633.5200) | EACH | 7 | $65.00 | $65.00 | $70.00 | $70.00 | $70.00 |
| 128 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 43 | $75.00 | $75.00 | $100.00 | $100.00 | $144.00 |
| 129 | Signs type II reflective H (637.2210) | SF | 378.96 | $23.50 | $23.50 | $21.00 | $21.00 | $23.00 |
| 130 | Removing signs type II (638.2602) | EACH | 49 | $30.00 | $30.00 | $5.00 | $5.00 | $10.00 |
| 131 | Removing small sign supports (638.3000) | EACH | 37 | $30.00 | $30.00 | $5.00 | $5.00 | $10.00 |
| 132 | Field office type B (642.5001) | EACH | 1 | $15,863 | $6,750.00 | $15,000 | $20,000 | $12,500 |
| 133 | Traffic control drums (643.0300) | DAY | 4,320 | $0.12 | $0.15 | $0.12 | $0.15 | $0.15 |
| 134 | Traffic control barricades type III (643.0420) | DAY | 4,920 | $0.51 | $0.60 | $0.50 | $0.60 | $0.60 |
| 135 | Traffic control warning lights type A (643.0705) | DAY | 9,360 | $0.06 | $0.11 | $0.06 | $0.11 | $0.11 |
| 136 | Traffic control warning lights type C (643.0715) | DAY | 1,320 | $0.08 | $0.13 | $0.08 | $0.13 | $0.13 |
| 137 | Traffic control signs (643.0900) | DAY | 33,240 | $0.32 | $0.20 | $0.32 | $0.20 | $0.20 |
| 138 | Traffic control covering signs type II (643.0920) | EACH | 17 | $40.40 | $50.00 | $40.00 | $50.00 | $50.00 |
| 139 | Traffic control signs fixed message (643.1000) | SF | 68 | $16.16 | $9.00 | $16.00 | $9.00 | $9.00 |
| 140 | Traffic control signs PCMS (643.1050) | DAY | 14 | $50.50 | $45.00 | $50.00 | $45.00 | $45.00 |
| 141 | Traffic control (643.5000) | EACH | 1 | $18,180 | $17,000 | $18,000 | $17,000 | $17,000 |
| 142 | Temporary pedestrian barricade (644.1810) | LF | 25 | $8.08 | $8.00 | $8.00 | $8.00 | $8.00 |
| 143 | Geotextile type HR (645.0120) | SY | 551 | $3.50 | $1.85 | $4.00 | $5.00 | $3.50 |
| 144 | Geogrid type SR (645.0220) | SY | 2,020 | $4.00 | $4.85 | $3.50 | $2.00 | $4.00 |
| 145 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 280 | $1.01 | $1.00 | $1.00 | $1.00 | $1.01 |
| 146 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 410 | $1.52 | $1.50 | $1.50 | $1.50 | $1.52 |
| 147 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 34,477 | $1.27 | $1.26 | $1.26 | $1.26 | $1.27 |
| 148 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,065 | $2.93 | $2.90 | $2.90 | $2.90 | $2.93 |
| 149 | Marking arrow epoxy (646.5020) | EACH | 11 | $252.50 | $250.00 | $250.00 | $250.00 | $252.50 |
| 150 | Marking word epoxy (646.5120) | EACH | 1 | $303.00 | $300.00 | $300.00 | $300.00 | $303.00 |
| 151 | Marking stop line epoxy 18-inch (646.6120) | LF | 424 | $13.13 | $13.00 | $13.00 | $13.00 | $13.13 |
| 152 | Marking yield line epoxy 18-inch (646.6220) | EACH | 17 | $65.65 | $65.00 | $65.00 | $65.00 | $65.65 |
| 153 | Marking diagonal epoxy 12-inch (646.7120) | LF | 182 | $9.60 | $9.50 | $9.50 | $9.50 | $9.60 |
| 154 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,100 | $10.86 | $10.75 | $10.75 | $10.75 | $10.86 |
| 155 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 120 | $17.17 | $17.00 | $17.00 | $17.00 | $17.17 |
| 156 | Marking curb paint (646.8105) | LF | 147 | $15.15 | $15.00 | $15.00 | $15.00 | $15.15 |
| 157 | Marking island nose epoxy (646.8220) | EACH | 5 | $303.00 | $300.00 | $300.00 | $300.00 | $303.00 |
| 158 | Marking removal line wide (646.9200) | LF | 150 | $3.03 | $2.25 | $3.00 | $3.00 | $3.03 |
| 159 | Construction staking storm sewer (650.4000) | EACH | 26 | $120.00 | $1.00 | $120.00 | $120.00 | $120.00 |
| 160 | Construction staking subgrade (650.4500) | LF | 5,490 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 161 | Construction staking base (650.5000) | LF | 8,790 | $1.50 | $0.01 | $1.50 | $1.50 | $1.50 |
| 162 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,440 | $2.00 | $1.00 | $2.00 | $2.00 | $2.00 |
| 163 | Construction staking pipe culverts (650.6000) | EACH | 4 | $130.00 | $1.00 | $130.00 | $130.00 | $130.00 |
| 164 | Construction staking resurfacing reference (650.8000) | LF | 10,490 | $0.17 | $0.02 | $0.17 | $0.17 | $0.17 |
| 165 | Construction staking electrical installations (project) 01. 2565-03- 73 (650.8501) | EACH | 1 | $650.00 | $5,000.00 | $650.00 | $650.00 | $650.00 |
| 166 | Construction staking curb ramps (650.9000) | EACH | 19 | $200.00 | $10.00 | $200.00 | $200.00 | $200.00 |
| 167 | Construction staking sidewalk (project) 01. 2565-03-73 (650.9500) | EACH | 3 | $500.00 | $0.01 | $500.00 | $500.00 | $500.00 |
| 168 | Construction staking supplemental control (project) 01. 2565-03-73 (650.9911) | EACH | 1 | $1,500.00 | $5,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 169 | Construction staking slope stakes (650.9920) | LF | 8,790 | $0.50 | $0.02 | $0.50 | $0.50 | $0.50 |
| 170 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 68 | $15.60 | $15.60 | $15.60 | $15.60 | $15.60 |
| 171 | Adjusting pull boxes (653.0900) | EACH | 2 | $162.00 | $162.00 | $162.00 | $162.00 | $162.00 |
| 172 | Concrete bases type 1 (654.0101) | EACH | 3 | $1,697.00 | $1,697.00 | $1,697.00 | $1,697.00 | $1,697.00 |
| 173 | Cable traffic signal 5-14 AWG (655.0230) | LF | 401 | $2.76 | $2.76 | $2.76 | $2.76 | $2.76 |
| 174 | Pedestal bases (657.0100) | EACH | 3 | $314.00 | $314.00 | $314.00 | $314.00 | $314.00 |
| 175 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 3 | $635.00 | $635.00 | $635.00 | $635.00 | $635.00 |
| 176 | Pedestrian signal face 16-inch (658.0416) | EACH | 6 | $566.00 | $566.20 | $566.20 | $566.20 | $566.00 |
| 177 | Pedestrian push buttons (658.0500) | EACH | 6 | $214.00 | $214.00 | $214.00 | $214.00 | $214.00 |
| 178 | Signal mounting hardware (location) 01. STH 57 & range line road (658.5070) | EACH | 1 | $1,153.00 | $1,153.00 | $1,153.00 | $1,153.00 | $1,153.00 |
| 179 | Sawing asphalt (690.0150) | LF | 101 | $1.20 | $1.20 | $2.75 | $2.05 | $2.05 |
| 180 | Sawing concrete (690.0250) | LF | 3,840 | $3.15 | $3.15 | $2.75 | $2.75 | $2.75 |
| 181 | Nuclear gauge correlation strip - HMA, SMA (706.0110) | EACH | 4 | $8,476.74 | $3,500.00 | $8,000.00 | $8,000.00 | $4,250.00 |
| 182 | Incentive density PWL HMA pavement (706.2005) | DOL | 7,970 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 183 | Incentive compressive strength concrete pavement (707.0020) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 184 | Incentive iri ride (740.0440) | DOL | 7,940 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 185 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 186 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 187 | Special 01. backfill slurry (SPV.0035) | CY | 31 | $167.00 | $237.36 | $281.45 | $300.00 | $167.00 |
| 188 | Special 02. clear stone bed (SPV.0035) | CY | 29 | $657.00 | $137.11 | $125.00 | $300.00 | $657.00 |
| 189 | Special 03. channel bed material (SPV.0035) | CY | 40 | $538.00 | $177.48 | $250.00 | $300.00 | $538.00 |
| 190 | Special 01. transpt traffic signal & inter lighting materials (SPV.0060) | EACH | 1 | $204.00 | $204.00 | $204.00 | $204.00 | $204.00 |
| 191 | Special 02. marking contrast epoxy special marking word (SPV.0060) | EACH | 2 | $505.00 | $500.00 | $500.00 | $500.00 | $505.00 |
| 192 | Special 03. marking contrast epoxy special marking arrow (SPV.0060) | EACH | 6 | $505.00 | $500.00 | $500.00 | $500.00 | $505.00 |
| 193 | Special 04. adjusting water valve boxes (SPV.0060) | EACH | 2 | $1,000.00 | $426.92 | $361.00 | $1,000.00 | $1,000.00 |
| 194 | Special 01. bank seed mix (SPV.0085) | LB | 2 | $1,500.00 | $1,500.00 | $190.00 | $190.00 | $200.00 |
| 195 | Special 01. ditch cleaning (SPV.0090) | LF | 19 | $150.00 | $68.01 | $200.00 | $50.00 | $250.00 |
| 196 | Special 02. profile curb cut (SPV.0090) | LF | 139 | $3.45 | $3.45 | $40.00 | $75.00 | $25.00 |
| 197 | Special 01. asphaltic repair (SPV.0195) | TON | 1,800 | $129.50 | $136.00 | $125.00 | $125.00 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.