Freight quote automation: how the quote desk works and what to automate first

Freight quote automation means software doing the mechanical part of a quote desk: sorting the mailbox, checking that a request is complete, computing the chargeable weight, finding the valid contract or buy rate, adding the surcharges the rate sheet names, applying your margin and validity rules, and writing the quote to the TMS. A pricer keeps spot buying, dangerous goods, project cargo, tenders and every quote that breaks a rule. Automate intake and completeness first, then lanes you hold contract rates for, then automatic sending for the narrowest class that proves itself. Measure hours from the email to the quote sent, and win rate on quotes the customer answered. It is not worth it when most requests have no rate on file.

Published
Updated
Reading time
15 min
Written by
Jules Toussaint

Scope: quote requests received by email at freight forwarders, NVOCCs and carriers, air, sea and road, up to the quote sent and its outcome. Not legal advice; the Incoterms 2020 rules are ICC's copyright and are paraphrased, not reproduced.

In production, on road quote requests

OFRET Groupe runs two activities on one TMS: OFRET for full truckload, SWILL for groupage. Each defines a standard request its own way, so Mirage set up two Quoting Agent environments, both connected to Logitude World through its API. The agent extracts origin, destination, weight, volume, Incoterms and deadlines and prepares the quote from the entity's carrier network. The case study states that more than 90% of standard RFQs are handled automatically across both entities. A request goes to an operator when data is missing, extraction confidence is low, the price falls outside the entity's usual rate patterns or the shipment matches neither profile. That figure describes OFRET's deployment and its definition of standard; Mirage publishes no air or ocean quoting deployment.

How a quote desk works

Every desk runs the same loop, whether people or software do each step. The drawing marks the four times that turnaround and win rate are computed from.

The quote desk: email received, qualified, checked for completeness with one question back to the customer, priced, checked against rules with a person deciding when a rule fails, sent and written to the TMS, then won, lost or expired, with the clock points T0 to T3Email in the quote mailboxT0receivedQualify: what is this email?otherBooking, rate check, tenderrouted, never pricedquote requestComplete and consistent?noOne question to the customeranswer arrivesT1completePricecontract rate, or buy rate + marginsurcharges for the shipment datespot request if no rate is on fileRules: floor, validity, thresholdfailsA person decidesapprovedpassesQuote sent, written to the TMST2sentWon, lost or expiredT3decidedHours to quote: T2 - T0Waiting for the customer: T1 - T0Win rate: won / (won + lost), counted at T3
The four clock points: T0 received, T1 data complete, T2 quote sent, T3 outcome known. A request complete on arrival has T1 equal to T0.

The loop breaks in the same places at most desks: a booking priced again as a new request, a request priced on a guess because the dimensions were missing, a rate used after its end date, a quote that lives only in a sent email and never reaches the TMS, where nobody can follow it up or check the carrier's invoice against it.

Intake: qualify the email, then check it is complete

A quote mailbox also receives bookings, rate checks ("roughly how much for this lane?"), amendments, tenders, tracking questions and invoices. Only quote requests and amendments get priced. A booking is linked to its quote or contract and passed to operations; a rate check is answered as indicative, never recorded as a firm quote; a tender goes to the pricing team as a project. When the class is uncertain, a person decides: a booking left in the quote queue is a shipment nobody books with the carrier.

A quote request is then complete when it states the ten fields below, or says that one does not apply. This is the table to give whoever, or whatever, reads the mailbox.

The ten fields a freight quote depends on, why, and what differs by mode
FieldWhy the price depends on itWhat differs by mode
Addresses or postcodesPickup and delivery are priced by zoneDoor, or the airport, port, terminal or CFS where the customer hands over
Ready dateRates and surcharges are valid for a periodSea: picks the sailing, or the CFS cut-off for LCL
Pieces or containersMinimum charges, breaks and equipment depend on the countFCL: container type and number; road: pallets or loading metres
Dimensions per pieceVolume decides the chargeable weightAir and LCL always; FCL only out of gauge; road in groupage
Gross weightBilled, or limits the equipmentFCL: per container, against payload
CommoditySome goods are refused, rated apart or regulatedAll modes
Dangerous goodsUN number and class, or a clear "not dangerous"Air: IATA DGR (67th edition, 2026); sea: IMDG Code (Amendment 42-24); road: ADR 2025
TemperatureA range, or "not controlled"Sea FCL: reefer range
Incoterm and named placeWhich legs and charges your customer buysAll modes
ServicesClearance, insurance, delivery conditions: lines or exclusionsRoad: tail-lift, appointment, unloading; sea: free time
The ten fields a freight quote depends on, why, and what differs by mode

Source: dangerous goods rules: IATA DGR, IMDG Code (IMO); LCL weight or measure: Shipco rules tariff, rule 3.B. The rest is recommended practice.

A missing or contradictory field gets one question listing only what is needed and why: "Could you send the length, width and height of each pallet? The air rate depends on volume as well as weight." The request then waits with a status and a reminder date, so it is neither forgotten nor priced twice when the answer arrives in a new thread.

Dangerous goods are never priced on a guess. IATA's Dangerous Goods Regulations are the field manual of the ICAO Technical Instructions (67th edition in 2026, 68th from 1 January 2027), and IATA airlines are somewhat stricter than ICAO; at sea the IMDG Code is mandatory under SOLAS. Lithium batteries can make "spare parts" dangerous goods, so ask. A request that declares dangerous goods leaves the automatic path.

Chargeable weight: the arithmetic every quote rests on

Carriers bill the greater of the gross weight and a weight derived from the volume. For air, IATA's rule (TACT 3.9.4, as reproduced in the ASEAN logistics curriculum) charges on volume above an average of 6,000 cm³ per kilogram (366 in³ per kg, 166 in³ per lb). Four details each change a price:

  • One volume per consignment. Add the cubic volume of every piece, then divide once. Rounding piece by piece gives 415.5 kg where the curriculum's example is 415.0 kg.
  • Rounding. Three decimals, then up to the next half or whole kilogram: 88.358 kg is charged 88.5 kg, 25.665 kg 26.0 kg.
  • The next weight break. Rates fall by break (45, 100, 250, 500, 1,000 kg), so a higher break can cost less: 995 kg at AUD 2.10 is AUD 2,089.50, 1,000 kg at AUD 1.85 is AUD 1,850.00, so 1,000 kg is charged.
  • The minimum charge. When the weight charge is lower than the minimum, the minimum applies (TACT 3.4.1).

Sea LCL is sold per revenue ton: Shipco's rules tariff, for one, applies its rates "per 1,000 kilos (W) or 1 Cubic Meter (M) ... whichever yields the greater revenue" (rule 3.B). Sea FCL sells a container, so weight only matters against its payload. Road conversions belong to each carrier's tariff and country, with no common rule; the rate sheet must carry its own. The freight CBM and chargeable weight calculator applies these conventions to a packing list, and the glossary defines the term.

Incoterms: which legs and charges your customer is buying

The Incoterm and its named place say which party pays each leg, each clearance and the insurance, so they decide which lines go on the quote and which become exclusions. The same shipment quoted to the seller and to the buyer gives two different quotes. The table reads the eleven Incoterms 2020 rules from the desk's side.

The eleven Incoterms 2020 rules read from the quote desk: what the seller's side and the buyer's side pay, the insurance obligation, and what to watch on the quote
RuleModesSeller's side paysBuyer's side paysInsuranceWatch on the quote
EXWAnyNothing: goods made available, not loaded, not clearedLoading, export clearance, main carriage, import clearance, dutiesNoneExport clearance is a separate line for the buyer
FCAAnyExport clearance and delivery to the carrier at the named placeMain carriage from the named place, import clearance, dutiesNoneThe named place splits pre-carriage
CPTAnyExport clearance and carriage to the named destinationImport clearance, duties, anything after the named placeNoneRisk passed at origin
CIPAnyAs CPT, plus cargo insuranceImport clearance, dutiesSeller: Clauses (A), at least 110% of the contract priceInsurance is a line, not an option
DAPAnyExport clearance, carriage to the named place, ready for unloadingUnloading unless in the seller's contract of carriage, import clearance, dutiesNoneExcludes duties and unloading
DPUAnyAs DAP, plus unloading at the named placeImport clearance, dutiesNoneThe only rule where the seller unloads
DDPAnyEverything, import clearance and duties includedUnloading at the named placeNoneCheck the seller can clear imports there
FASSea, inland waterwayExport clearance, goods alongside the buyer's vesselLoading on board, ocean freight, import clearance, dutiesNoneFor containers, ICC points to FCA
FOBSea, inland waterwayExport clearance, goods loaded on boardOcean freight, import clearance, dutiesNoneContainers: use FCA
CFRSea, inland waterwayExport clearance, ocean freight to the destination portImport clearance, dutiesNoneRisk passed on board at the port of shipment
CIFSea, inland waterwayAs CFR, plus insuranceImport clearance, dutiesSeller: Clauses (C), minimum coverThe buyer may need more cover than (C)
The eleven Incoterms 2020 rules read from the quote desk: what the seller's side and the buyer's side pay, the insurance obligation, and what to watch on the quote

Source: EXW, DDP, FCA, FOB, CPT, CIP, DAP, DPU, FAS, CFR, CIF, risk under C and D rules (ICC Academy); insurance clauses, DPU (ICC). Paraphrased; the ICC text governs.

Under the C rules the seller pays carriage to the destination but the risk passed at origin, so insurance is a separate question unless the rule is CIF or CIP, the only two with an insurance obligation. Destination port or terminal charges under the C rules and DAP fall to the seller only when its contract of carriage includes them: the quote says which. A request for door delivery under a rule that ends at a port is the most common contradiction to ask about. The Incoterms 2020 checker gives the split for one rule at a time.

Rate sources, surcharges and validity

Four kinds of price feed a quote. The order of lookup is a commercial decision; write it down, because software can only follow an order that exists.

The rate sources of a freight quote and how each one is used
SourceWhat it isHow it is used
Customer contract rateA sell price agreed with this customer for a lane, a weight break and a periodFirst lookup: if lane, break and date are covered, the sell price comes from here
Buy rateThe carrier's, co-loader's or destination agent's rate sheet, with its version and validityAlways looked up, even under contract: the margin floor needs the cost
Carrier portalAn instant price on a carrier's own booking site, tied to a sailing or a flightA buy rate with a short life; record it with the time it was read
Spot requestA price asked per shipment from carriers or agents, valid hours or daysSoftware can send the requests and line up the answers; a pricer chooses
The rate sources of a freight quote and how each one is used

A portal price such as Maersk Spot's "instant prices and guaranteed loading" (Maersk) is a buy rate with a short life. To compare carriers' answers to a spot request, the freight RFQ comparison template puts base rate, fuel and accessorials on one all-in total.

Surcharges belong to a carrier and a date

Maersk's emergency bunker surcharge is "applicable to all shipments on applicable trades at the time of booking", its peak season surcharge applies "during high volume shipping periods in certain trades" (Maersk surcharge definitions); another carrier's rules differ. In French road freight, the law revises the price for the variation of energy costs between contract and transport dates (Transport Code, articles L3222-1 and L3222-2). A rating step applies the surcharge table attached to the rate it used, for the shipment date, and the quote says which surcharges may be revised.

Validity: one rule, and a US case where the quote is the contract

An expired rate is never used, even if it is the only one for the lane: the request goes to a pricer. A quote is never valid later than the earliest end date among its rates. In the United States, an NVOCC's quote can be the contract itself. Under 46 CFR 532.5, a negotiated rate arrangement is in writing and agreed before the NVOCC receives the cargo, by signature, by an email accepting it or, if the NRA says so, by booking; a rate that is not all-in must say whether surcharges or general rate increases apply, and a pass-through charge with no stated amount is billed at cost. Shipco's rules tariff applies it: its "quotations, e-mails ... shall be considered an NRA" (rule 1.D), with rates fixed as of the cargo tender date, the CFS cut-off for LCL or the in-gate date for FCL (rule 15). The wording of an automated quote is then a legal matter, not a template detail.

Currencies

State which exchange rate a quote uses, its source and its date. The European Central Bank publishes its euro reference rates "for information purposes only" and strongly discourages their use for transactions (ECB): use the rate your finance team sets, the same way on every quote.

Worked example: one air export quote, priced and timed

Illustrative example, invented figures: an air export quote from Lyon to Newark, New Jersey

The request. At 09:12 on 14 October a contract customer near Lyon emails four pallets of machine parts, not dangerous, each 120 x 80 x 150 cm and 180 kg, ready 20 October, DAP its customer's warehouse in Newark. All ten fields are there: T1 equals T0.

Chargeable weight. Gross 4 x 180 = 720 kg. Volume 4 x 120 x 80 x 150 = 5,760,000 cm³, divided by 6,000 = 960.000 kg. Chargeable: 960.0 kg. The next break is checked: the airline's 1,000 kg rate of 2.05 EUR would cost 2,050.00 EUR, more than 960 x 2.10 = 2,016.00 EUR, so the 500 kg rate stands (from 976.5 kg it would not). A break's rate prices the whole chargeable weight, not only the kilograms above 500.

Rates. Airline sheet CDG to JFK, version 3, valid to 31 October: 2.10 EUR/kg above 500 kg, fuel 0.85 and security 0.15 EUR/kg. Road subcontractor 380 EUR to CDG; export handling 95 EUR; Newark agent 140 USD transfer and 420 USD delivery. Customer contract: air 2.45 EUR/kg above 500 kg, export handling 140 EUR, airline surcharges at cost, other legs at cost plus 20%. Internal rate for the week: 1 EUR = 1.12 USD.

Buy and sell lines of the quote, in euros (invented figures)
LineBuy calculationBuy EURSell ruleSell EUR
Pickup Lyon to CDG (road)380.00 flat380.00cost + 20%456.00
Air freight CDG to JFK960 kg x 2.102,016.00contract 2.45/kg2,352.00
Airline fuel surcharge960 kg x 0.85816.00at cost816.00
Airline security surcharge960 kg x 0.15144.00at cost144.00
Export handling and declaration95.00 flat95.00contract flat140.00
Destination transfer and delivery560 USD / 1.12500.00cost + 20%600.00
Total3,951.004,508.00
Buy and sell lines of the quote, in euros (invented figures)

Rules. Margin 4,508.00 - 3,951.00 = 557.00 EUR, which is 12.36% of the sell price (14.10% of cost): above a 10% floor and a 300 EUR floor. The sell price passes a 4,000 EUR approval threshold, so the quote waits for the pricing manager with the calculation above. She approves it unchanged and it goes out at 10:05: 53 minutes from T0 to T2. It excludes import clearance, duties, unloading, insurance and storage, as DAP puts them on the buyer, and states the validity and the exchange rate.

The same request on gross weight. Sold on 720 kg, air freight and surcharges become 1,764.00 + 612.00 + 108.00 and the quote 3,680.00 EUR, while the airline bills 960 kg: 271.00 EUR below cost instead of 557.00 above it.

Margin as a share of the sell price and as a share of cost are different numbers; say which one your floor uses. The markup and margin calculator converts one into the other.

What to automate first, and what a person decides

Automate in the order that takes risk last; each stage produces the data the next needs.

  1. Log and qualify every email. No price is at stake, and it gives you T0, the class and the first count of what the desk receives.
  2. Extract and check the ten fields, draft the question back, compute the chargeable weight. The pricer still prices, from a structured request instead of an email.
  3. Draft quotes on lanes with contract and buy rates, every draft approved by a person. Measure how often the draft goes out unchanged.
  4. Send with no person for the narrowest class that met your criteria, then widen it class by class.
  5. Spot requests: send them and line up the answers; the choice stays with the pricer.

OFRET Groupe's deployment grew the same way: freight document extraction first, then quote requests, then a verification stage that checks a quote against what normal looks like for each entity and sends exceptions to an operator (case study). Whatever the stage, each situation has an owner decided in advance:

Quote request situations, what software does, who decides and the resulting status
SituationWhat software doesWho decidesStatus
Complete, contract lane, valid rates, ordinary cargo, every rule passedPrices it, writes it to the TMS, sends itNobody, once that class is openedSent
Same, above the approval thresholdPrices it and holds it with the calculationPricing managerTo approve
Missing or contradictory dataDrafts one question, prices nothing on a guessDesk, or a rule, sends itWaiting customer
Margin under the floor, rate expired, contract under costBlocks sending, shows the rule and the figuresPricing managerBlocked
Dangerous goods, temperature, oversize, no rate on fileStructures the request, sends spot requests if configuredPricerWith a pricer
Tender: many lanes, volumes, a deadlineRoutes it as a projectPricing teamRouted
Quote request situations, what software does, who decides and the resulting status

An approver should see the email with each value linked to where it was read, the chargeable weight, every charge line with its rate sheet and version, and the rule that triggered the approval. An edit that recurs is a rule or a rate sheet to fix, not a reason to keep approving everything.

Measuring turnaround and win rate

Two numbers tell a desk manager whether automation works: how fast quotes go out and how many are won. Both need the drawing's clock points for every email, not a sample.

What to measure on a quote desk, how, and why
MeasureHowWhy
Hours to quoteT2 - T0 for every quote sent, median and 90th percentileThe median hides the requests that wait a day
Desk hoursHours to quote minus the time spent waiting for the customer's answerThe part of the delay the desk controls
Complete on arrivalQuote requests with all ten fields stated, over all quote requestsTells you whether to fix intake or pricing first
Sent within targetQuotes sent within your own target, over quotes sentThe number a customer feels
Win rate on decided quotesWon / (won + lost)Price and service, on quotes the customer answered
Win rate with expired as lostWon / (won + lost + expired)Counts the silence a slow or high quote gets
Corrected after sendingQuotes revised after they went out, and margin lost at invoicing because the quote was wrongMust stay at zero on the class sent with no person
What to measure on a quote desk, how, and why

Report hours to quote separately for requests complete on arrival and the others, and win rate by pricing path and by mode, with the counts beside each rate: a rate over twelve decided quotes says little. Faster quotes do not guarantee more wins: read the lost reasons alongside.

One row per email: class, mode, the ten fields, the four times, who priced it and the outcome. It computes the measures above, by pricing path and by mode. Nothing is filled in: every figure is yours.

The document automation pilot guide covers running software in shadow alongside the desk and the go-live decision, and the automation ROI calculator turns the desk's hours into a payback on your own figures.

When freight quote automation is not worth it

Automation prices from rates and rules that exist. It pays poorly when:

  • Most requests are spot, project or out-of-gauge cargo with no rate on file: the work is buying capacity, which stays with a pricer.
  • Rate sheets live in personal inboxes and nobody can say which version is current. Organise the rates first; the log above shows how many requests that would serve.
  • The desk receives a handful of requests a day, all different: the setup costs more than the time it saves.
  • The business is tenders: many lanes, volumes over a period and one deadline are a pricing project, not a stream of quotes.
  • Nobody owns the rules. Margin floors, approval thresholds and which classes go out alone must have an owner before software applies them.

If you buy rather than build, ask a vendor where each value was read, how rate versions and expiry are handled, who owns the rules, and which figures come from a named deployment. For a comparison of vendors, see the blog's AI tools for freight forwarders; for where quoting sits among a forwarder's systems, how to choose freight forwarding software. What Mirage deploys for this workflow is on the freight RFQ automation page.

Questions readers ask

  • Yes, for a narrow class you define: complete request, contract lane, valid rates, ordinary cargo, every rule passed, below the approval threshold. Start with every draft approved, measure how often it goes out unchanged, then open automatic sending one class at a time.

  • Automate the request, not the choice. Software can build a complete spot request from the customer's email, send it to the carriers the pricer usually asks, and line up their answers on an all-in total; the pricer picks the carrier and sets the margin.

  • Under IATA's rule (TACT 3.9.4), the volume of all pieces is added up and divided by 6,000 cm³ per kg; the chargeable weight is the greater of that volume weight and the gross weight, rounded up to the next half or whole kilogram. A carrier's own tariff can set another ratio for some products, and a higher weight break can give a lower charge.

  • Those the party you work for has to pay under the rule and the named place. Under DAP, for example, the seller pays carriage to the named place and export clearance, while unloading and import clearance with duties are the buyer's, so a quote to the seller excludes them unless asked.

  • Log when each email arrives, when its data is complete and when the quote is sent. Report the median and 90th percentile of sent minus received, and the desk's share once the wait for the customer is removed. Win rate is won over won plus lost, and again with expired quotes counted as lost.

Sources and scope

Checked on . Incoterms 2020 paraphrased from ICC and ICC Academy; air rules from IATA's TACT as reproduced in the ASEAN curriculum; one carrier's tariff and one carrier's surcharge pages as examples, not as rates. The method, tables and worked example are Mirage's own; the example's figures are invented.

This guide explains quoting practice for educational purposes. Your contracts, the carriers' tariffs and the ICC text prevail over anything here.

Related on this site

Send us a week of quote requests

Send a sample of real requests with the rate sheets and rules your desk used. Each comes back classified, with its fields checked, the chargeable weight, the rates and rules applied, and a drafted quote or the reason it needs a pricer, to compare with what your desk sent.

Prefer to talk it through? Book a call

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy