Research record, not reviewed
I-90 Allston Multimodal Transportation Project
- Location
- Boston, Allston, MA, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Massachusetts Department of Transportation | |
| Category | Highways | |
| Amount | Not collected yet | |
| Threshold evidence | A comparable project-wide cost is still needed |
Contracts and teams
Contracts and teams: Not found in the sources consulted.
About the project
Main I-90 multimodal project in Allston; FHWA's 2019 notice of intent to prepare its environmental impact statement lists a structurally deficient I-90 viaduct among the deficiencies it addresses.
Scope notes
- Main I-90 multimodal project, with viaduct and surface-network alternatives. The bridge preservation works have a separate scope. Massachusetts Department of Transportation
Sources
- I-90 Allston Multimodal Transportation Project, Massachusetts Department of Transportation. Main I-90 multimodal project, with viaduct and surface-network alternatives. The bridge preservation works have a separate scope.. Consulted 9 Nov 2026.
- Notice of Intent To Prepare an Environmental Impact Statement for a Multimodal Project in Allston, Massachusetts (Federal Register vol. 84 no. 202), Federal Highway Administration, 18 Oct 2019. 'a structurally deficient viaduct on the Interstate 90 mainline'. Consulted 19 Nov 2026.