Rebuild what a freight invoice should say from the contract: the linehaul rate, the fuel surcharge percentage and the accessorials you ordered, then compare it line by line with what the carrier invoiced. The variance and a list of flags come out, the way a freight auditor reads the bill. For a week or a month of invoices, import the lines as a CSV: duplicates and lines over your tolerance are flagged, and the audit exports.

One invoice, line by line

The contract

A percentage of linehaul, read from the fuel surcharge table in your contract for the week the contract names. Enter 0 if the contract has no fuel surcharge.

Hours from arrival to release, from the proof of delivery or the ELD.

From your contract or rate confirmation. There is no standard value.

Accessorials
The invoice as received

Leave empty to use the sum of the lines above.

Your own rule: no standard exists. Empty or 0 flags every cent.

To audit the invoice, fill in: the contracted rate, the linehaul invoiced.

Several invoices: lines, duplicates and a CSV

Import a week or a month of invoice lines as a CSV, or add them one by one. Each line needs what the carrier billed and, when you have it, what the contract says it should be. Lines over your tolerance, the same line or the same shipment billed twice, and lines that cannot be checked are flagged, and the result exports as a CSV.

Your own rule: no standard exists. Empty means none, so a one-cent variance is flagged. With both set, the larger allowance applies.

Read in your browser, never sent anywhere. The columns are described under “The CSV format” below.

Add a line by hand

Leave empty if you do not know it yet: the line is then not checkable, never compared with 0.

No line yet. Import a CSV, load the example or add a line.

Send one invoice and its rate confirmation.

Our agents read both and send you back what they extracted, each charge that differs from the rate and why it was flagged. A note on the carrier and the charge in doubt is enough to start, with no file.

See freight invoice auditing

Prefer to talk it through? Book a call

Document

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy

How to use it

  1. Take the rate from the contract or rate confirmation for this lane, and the fuel percentage from the contract's fuel surcharge table for the week the contract names.
  2. Enter the accessorials you actually ordered and their contracted prices, and the time the truck spent at the stop from the POD or the ELD.
  3. Copy the invoice line by line: linehaul, fuel, detention, each accessorial, anything else, and the total.
  4. Read the variance and the flags. A flag is a question for the carrier, not a verdict: the answer is in the rate confirmation, the POD and the fuel table.
  5. Short-pay or dispute only what the documents support, and log the result so the same error does not pass next week.
  6. For many invoices, put one invoice line per CSV row with the expected amount from the contract, import it below the single-invoice form, set your tolerance and read the duplicates and variances; then export the audit.

What is rebuilt and how

fuel surcharge = linehaul × fuel %

detention = max(0, hours at stop − free time) × hourly rate

accessorial = contracted charge, when the service was ordered, else 0

expected total = linehaul + fuel + detention + accessorials

variance = invoiced total − expected total

Every expected line comes from a document you hold: the rate confirmation, the fuel table and the order. The invoice is compared to those documents, never to a guess. The flags are the checks an auditor runs on each line, and each one names the document that settles it.

The CSV format

One row per invoice line, with a header row. The separator (comma, semicolon or tab) is detected from the header. Amounts are read in the page's number format (1,250.50 here); an amount that contains the separator must be in quotes. Headers in French or Spanish are accepted, rows starting with # are skipped, and a file holds up to 5,000 rows.

carrier
Required. The carrier's name, spelled the same way on every row.
invoice_number
Required column. The carrier's invoice number; a row needs it or a shipment_ref.
invoice_date
Optional. As written on the invoice; carried to the export, not used in the check.
shipment_ref
Required column. PRO, BOL or load number: the key that finds a shipment billed twice.
charge
Optional. What the row bills: linehaul, fuel, detention, lumper. Name each charge distinctly: two rows with the same shipment and charge read as a possible duplicate.
contract_ref, document_ref
Optional. The rate confirmation or contract line, and the POD, BOL or receipt that supports the charge. A variance with either missing is to verify, not to dispute.
expected_amount
Required column, may be empty. What the contract says the row should be. Empty means unknown: the row is not checkable. 0 means nothing is owed for it.
invoiced_amount
Required. What the carrier billed, 0 or more. Credit notes stay out of this audit.
explanation
Optional. Your note or the carrier's answer, carried to the export.

The overcharges to look for

Wrong rate
An old rate table, a different weight break or a mileage program the contract does not use. Easy to prove with the rate confirmation.
Fuel on the wrong base or week
The fuel percentage applied to the invoice total when the contract says linehaul, or read for the delivery week instead of the week the contract names.
Detention without the clock
Hours invoiced that the POD does not support, or free time ignored. Arrival and release times decide it.
Accessorials not ordered
Liftgate, residential, inside delivery or redelivery charged by default because the address or the consignee type looked like it. The order says what was requested.
Duplicates and unexplained lines
The same shipment invoiced twice under two numbers, or a line labelled 'other' or 'misc'. Each needs a document before it is paid.

A worked example

Invented figures. A lane contracted at 1,200 with 22% fuel, free time 2 hours then 75 per hour, liftgate at 45. The truck waited 3 hours. Expected: 1,200 + 264 + 75 + 45 = 1,584. The invoice says linehaul 1,200, fuel 303.60, detention 75, liftgate 45, residential 60, total 1,700. Flags: the fuel equals 22% of 1,380, so the percentage was applied to the accessorials too (39.60 too much); a residential charge on a commercial address; and a total 16.40 above the sum of its own lines. Variance: 116 on one invoice.

FAQ

  • Checking each carrier invoice against the contract before paying it: the rate for the lane, the fuel surcharge for the week, the accessorials ordered and the times recorded on the delivery documents. Anything the documents do not support is questioned, short-paid or disputed.

  • An amount added to the linehaul rate that follows the price of diesel, read from the fuel surcharge table in the contract, usually indexed to a published diesel price for a given week. What it applies to is set by the same clause: when it names linehaul only, a surcharge on detention or a liftgate is an error.

  • The time the truck spent at the stop, minus the free time the contract grants, times the hourly rate. The arrival and release times on the proof of delivery or the driver's log are the evidence; without them, the charge is only a claim.

  • Charges for services beyond moving the freight: liftgate, residential delivery, inside delivery, redelivery, limited access, detention, layover. Each should be in the contract with a price and should appear on the invoice only when the service was ordered or recorded on the delivery documents.

  • A sample tells you whether errors exist, not what they cost: an error that is small on each invoice but repeated, or a load billed twice on two invoices, only shows when every line is compared. The several-invoices section above does that on a CSV of invoice lines.

The audit is only as good as the three documents behind it.

Mirage deploys AI agents that read the carrier invoice, the rate confirmation and the proof of delivery, rebuild the expected charges and flag the differences before payment, for your team to decide on.

See freight invoice audit automation