ALDOT contract 20251205011 bid tabulation
ROADWAY LIGHTING ON SR-24 FROM THE INTERSECTION OF 9TH STREET SOUTHWEST TO THE JUNCTION OF MCCARTHY DRIVE IN RED BAY. Let by Alabama DOT on December 5, 2025, Franklin, 0202. 4 bids received; low bid $709,161 by Big River Electric, Inc..
- Owner
- Alabama DOT
- Letting
- 05 DEC 2025
- Pay items
- 23
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Big River Electric, Inc. | $709,161 | Low |
| 2 | Temple J Electric, LLC | $765,120 | +8.0% |
| 3 | Shoals Electric Company, Inc. | $796,028 | +12% |
| 4 | Williams Power & Signal, LLC | $1,261,731 | +78% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Big River Electric, Inc. | 2. Temple J Electric, LLC | 3. Shoals Electric Company, Inc. | 4. Williams Power & Signal, LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Aggregate surfacing (crushed aggregate base, type A) (430B042) | TON | 10 | $400.00 | $100.00 | $1,000.00 | $1,118.08 |
| 0020 | Mobilization (600A000) | LS | 1 | $18,000 | $30,000 | $21,000 | $80,178 |
| 0030 | Filter blanket, geotextile (610D003) | SY | 150 | $5.00 | $5.00 | $6.00 | $5.80 |
| 0040 | Seeding (652A100) | ACRE | 1 | $600.00 | $2,500.00 | $650.00 | $791.49 |
| 0050 | Temporary mulching (665B001) | TON | 3 | $700.00 | $1,650.00 | $800.00 | $1,055.32 |
| 0060 | Sand bags (665G000) | EACH | 450 | $5.00 | $10.00 | $5.00 | $4.75 |
| 0070 | Wattle (665Q002) | LF | 780 | $3.00 | $12.00 | $5.25 | $7.12 |
| 0080 | Geometric controls (680A001) | LS | 1 | $8,000.00 | $10,000 | $2,500.00 | $4,748.95 |
| 0090 | Construction fuel (maximum bid limited to $ 24,800.00) (698A000) | LS | 1 | $1.00 | $10,000 | $1.00 | $23,745 |
| 0100 | Construction signs (740B000) | SF | 1,004 | $5.00 | $8.00 | $8.00 | $33.08 |
| 0110 | Channelizing drums (740D000) | EACH | 240 | $75.00 | $75.00 | $75.00 | $81.43 |
| 0120 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 1 | $2,500.00 | $2,400.00 | $2,500.00 | $6,508.43 |
| 0130 | Roadway luminaire assembly with one, LED, 400 watt equivalent luminaire (750B602) | EACH | 32 | $7,500.00 | $6,000.00 | $9,500.00 | $9,307.73 |
| 0140 | Pole foundation,roadway (750C010) | EACH | 32 | $4,000.00 | $3,800.00 | $4,450.00 | $6,341.30 |
| 0150 | Electrical junction box,type 1 (750D200) | EACH | 4 | $500.00 | $650.00 | $500.00 | $974.40 |
| 0160 | Conduit,2 inch,rigid nonmetallic (750E115) | LF | 50 | $15.00 | $21.00 | $10.00 | $15.84 |
| 0170 | Conduit, 2 inch, rigid metallic (750E127) | LF | 150 | $20.00 | $21.00 | $20.00 | $32.55 |
| 0180 | Conductor, #2 AWG (750F026) | LF | 450 | $8.00 | $6.00 | $10.00 | $5.35 |
| 0190 | Combined duct and cable,2 #6 AWG/ 1 #6 AWG GND (750G010) | LF | 10,900 | $10.00 | $11.67 | $10.00 | $21.18 |
| 0200 | Service pole (750H005) | EACH | 3 | $3,000.00 | $4,800.00 | $3,500.00 | $5,158.66 |
| 0210 | Lighting control center (750I015) | EACH | 1 | $26,000 | $35,000 | $30,000 | $43,974 |
| 0220 | Lighting control center, special (750I016) | EACH | 2 | $26,000 | $35,000 | $30,000 | $44,166 |
| 0230 | 4" electrical conduit, 1 line, type 5 installation (756A022) | LF | 1,445 | $50.00 | $65.00 | $40.00 | $123.67 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of December 5, 2025. Compiled by Mirage Metrics.