ARDOT contract 012494 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO REPAIR SCOUR DAMAGE ON SIX BRIDGES ON VARIOUS ROUTES IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF UNCLASSIFIED EXCAVATION, MAINTENANCE OF TRAFFIC, EROSION CONTROL, RIVER TRAFFIC SAFETY, DUMPED RIPRAP AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Various. 3 bids received; low bid $12,116,793 by Kiewit Infrastructure South Co..
- Owner
- Arkansas DOT
- Letting
- 15 JAN 2025
- Pay items
- 20
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kiewit Infrastructure South Co. | $12,116,793 | Low |
| 2 | McMillen, Inc. | $12,299,061 | +2.0% |
| 3 | Mobley Contractors, Inc. | $15,171,827 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kiewit Infrastructure South Co. | 2. McMillen, Inc. | 3. Mobley Contractors, Inc. |
|---|---|---|---|---|---|---|
| 0001 | Bridge site preparation (site no. 1) (201411) | LS | 1 | $613,000 | $168,000 | $378,945 |
| 0002 | Bridge site preparation (site no. 2) (201412) | LS | 1 | $550,000 | $217,000 | $286,817 |
| 0003 | Bridge site preparation (site no. 3) (201413) | LS | 1 | $669,000 | $146,000 | $284,664 |
| 0004 | Bridge site preparation (site no. 4) (201414) | LS | 1 | $512,000 | $228,000 | $108,104 |
| 0005 | Bridge site preparation (site no. 5) (201415) | LS | 1 | $847,000 | $179,000 | $275,783 |
| 0006 | Bridge site preparation (site no. 6) (201416) | LS | 1 | $1,100,877 | $589,000 | $1,785,402 |
| 0007 | Unclassified excavation (210213) | CY | 1,086 | $70.00 | $270.00 | $292.08 |
| 0008 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $575,500 | $584,000 | $716,636 |
| 0009 | Maintenance of traffic (603010) | LS | 1 | $226,000 | $162,000 | $1,483,287 |
| 0010 | Silt fence (621021) | LF | 3,000 | $8.00 | $7.00 | $9.45 |
| 0011 | Sand bag ditch checks (621031) | BAG | 660 | $17.00 | $15.00 | $20.25 |
| 0012 | Rock ditch checks (621151) | CY | 90 | $257.25 | $199.00 | $135.00 |
| 0013 | Geotextile fabric (type 5) (625005) | SY | 6,518 | $18.50 | $65.00 | $73.45 |
| 0014 | Bridge construction control (636001) | LS | 1 | $150,000 | $228,800 | $342,280 |
| 0015 | Cofferdam (801201) | EACH | 2 | $600,000 | $996,400 | $745,310 |
| 0016 | Cellular concrete (802209) | CY | 210 | $2,300.00 | $3,100.00 | $3,089.57 |
| 0017 | Gravel-filled geotextile containers (816009) | CY | 2,636 | $550.00 | $680.00 | $1,094.35 |
| 0019 | Dumped riprap (816112) | CY | 1,829 | $200.00 | $780.00 | $271.94 |
| 0020 | River traffic safety (901006) | LS | 1 | $200,000 | $346,149 | $144,774 |
| 0021 | 2 FT. X 2 FT. concrete armor units (998052) | EACH | 48,664 | $60.00 | $58.00 | $61.52 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.