ARDOT contract 012539 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 5.29 MILES ON VARIOUS SECTIONS IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, ACHM PATCHING OF EXISTING PAVEMENT, ULTRATHIN BONDED WEARING COURSE, COLD MILLING ASPHALT PAVEMENT, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS & STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on March 4, 2026, Various. 2 bids received; low bid $1,037,253 by Atlas Asphalt, Inc..
- Owner
- Arkansas DOT
- Letting
- 04 MAR 2026
- Pay items
- 16
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Atlas Asphalt, Inc. | $1,037,253 | Low |
| 2 | Rogers Group, Inc. | $1,266,558 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Atlas Asphalt, Inc. | 2. Rogers Group, Inc. |
|---|---|---|---|---|---|
| 0001 | Tack coat (401011) | GAL | 1,077 | $0.01 | $1.00 |
| 0002 | Mineral aggregate in achm surface course (3/8") (407161) | TON | 327 | $115.32 | $130.00 |
| 0003 | Asphalt binder (PG 70-22) in achm surface course (3/8") (minimum bid $120.00) (407441) | TON | 22 | $120.00 | $975.00 |
| 0004 | Ultrathin bonded wearing course (3/4"-type C) (407904) | TON | 6,026 | $133.96 | $150.00 |
| 0005 | Cold milling asphalt pavement (412002) | SY | 10,208 | $2.75 | $6.00 |
| 0006 | Achm patching of existing roadway (415011) | TON | 50 | $115.00 | $285.00 |
| 0007 | Maintenance of traffic (603009) | LS | 1 | $11,426 | $35,000 |
| 0008 | Signs (604003) | SF | 1,113 | $7.00 | $10.15 |
| 0009 | Construction pavement markings (604041) | LF | 96,976 | $0.35 | $0.40 |
| 0010 | Roadway construction control (635011) | LS | 1 | $3,654.12 | $10,000 |
| 0011 | Rumble strips in asphalt shoulders (642001) | LF | 37,845 | $0.19 | $0.32 |
| 0012 | Centerline rumble stripes in asphalt roadways (642102) | LF | 14,837 | $0.19 | $0.32 |
| 0013 | Thermoplastic pavement marking white (6") (719002) | LF | 48,151 | $0.60 | $0.76 |
| 0014 | Thermoplastic pavement marking yellow (6") (719102) | LF | 48,682 | $0.60 | $0.76 |
| 0015 | Raised pavement markers (type II) (721002) | EACH | 739 | $7.00 | $8.91 |
| 0016 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $25,733 | $30,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of March 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.