ARDOT contract A30036 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.973 MILES OF HIGHWAY 19 IN NEVADA AND PIKE COUNTIES. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, EARTHWORK, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on November 5, 2025, Nevada, Pike. 3 bids received; low bid $2,314,212 by Redstone Construction Group, Inc..

Owner
Arkansas DOT
Letting
05 NOV 2025
Pay items
34
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Redstone Construction Group, Inc.$2,314,212Low
2Cranford Construction Co.$2,413,192+4.0%
3R. K. Hall, LLC$3,847,896+66%
ARDOT contract A30036: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Redstone Construction Group, Inc.2. Cranford Construction Co.3. R. K. Hall, LLC
0001Removal and disposal of guardrail (202132)LF1,704$12.50$12.50$13.75
0002Compacted embankment (210611)CY200$82.29$119.20$53.11
0003Aggregate base course (class 7) (303117)TON723$60.71$67.06$104.33
0004Tack coat (401011)GAL30,882$0.01$0.01$5.78
0005Mineral aggregate in achm surface course (1/2") (407162)TON14,191$112.25$52.88$167.97
0006Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON874$120.00$1,200.00$200.00
0007Cold milling asphalt pavement (412002)SY89,889$1.69$1.28$4.21
0008Asphalt concrete patching for maintenance of traffic (414011)TON100$150.00$135.55$250.00
0009Achm patching of existing roadway (415011)TON300$150.00$148.96$250.00
0010Approach gutters (504264)CY7.24$7,794.63$4,483.74$4,932.11
0011Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$41,041$28,641$153,916
0012Maintenance of traffic (603009)LS1$35,002$78,643$90,391
0013Signs (604003)SF599$6.00$7.00$8.80
0014Traffic drums (604023)EACH26$30.00$35.00$33.00
0015Construction pavement markings (604041)LF85,114$0.14$0.14$0.17
0016Guardrail (type A) (617005)LF1,350$36.50$36.50$40.15
0017Guardrail terminal (type 2) (617312)EACH12$3,391.14$3,391.14$3,730.25
0018Thrie beam guardrail terminal (617332)EACH8$2,478.16$2,478.16$2,725.98
0019Lime (620001)TON1$125.00$125.00$137.50
0020Seeding (620011)ACRE0.29$3,985.00$3,985.00$4,383.52
0021Mulch cover (620022)ACRE0.58$3,364.53$3,364.53$3,700.98
0022Water (620030)MGAL35.50$10.00$10.00$11.00
0023Temporary seeding (621001)ACRE0.29$2,829.43$2,829.41$3,111.24
0024Silt fence (621021)LF2,400$3.68$3.68$4.05
0025Sediment removal and disposal (621111)CY49$19.77$13.73$66.34
0026Filter sock (18") (621169)LF250$13.85$13.85$15.24
0027Wattle (20") (621173)LF250$13.85$13.85$15.24
0028Rumble strips in asphalt shoulders (642001)LF31,531$0.17$0.29$0.19
0029Centerline rumble stripes in asphalt roadways (642102)LF20,541$0.17$0.29$0.19
0030Portable traffic signal system - actuated (701603)WEEK12$950.00$2,247.05$3,516.76
0031Reflectorized paint pavement marking white (6") (718002)LF42,557$0.17$0.17$0.24
0032Reflectorized paint pavement marking yellow (6") (718102)LF42,557$0.17$0.17$0.24
0033Raised pavement markers (type II) (721002)EACH266$5.00$5.00$7.70
0034Reinforcing steel-roadway (grade 60) (804003)LB492$13.77$3.00$3.30
ARDOT contract A30036: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of November 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy