ARDOT contract A50025 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY ON HIGHWAY 5 AND MILL AND OVERLAY ON HIGHWAYS 25 AND 110 IN CLEBURNE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF PIPE CULVERT, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, SCARIFYING CONCRETE PAVEMENT, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE, PAVEMENT REPAIR OVER CULVERTS, RUMBLE STRIPES, LOOP WIRING, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Cleburne. 3 bids received; low bid $4,109,641 by Rogers Group, Inc..
- Owner
- Arkansas DOT
- Letting
- 15 JAN 2025
- Pay items
- 36
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $4,109,641 | Low |
| 2 | CK Asphalt, LLC | $4,469,016 | +9.0% |
| 3 | Delta Asphalt of Arkansas, Inc. | $5,956,111 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. CK Asphalt, LLC | 3. Delta Asphalt of Arkansas, Inc. |
|---|---|---|---|---|---|---|
| 0001 | Removal and disposal of pipe culverts (202096) | EACH | 3 | $2,100.00 | $5,500.00 | $3,786.77 |
| 0002 | Aggregate base course (class 7) (303117) | TON | 3,491 | $40.00 | $32.60 | $49.01 |
| 0003 | Tack coat (401011) | GAL | 40,591 | $0.01 | $3.00 | $0.01 |
| 0004 | Mineral aggregate in achm binder course (1") (406161) | TON | 566 | $85.00 | $84.10 | $185.24 |
| 0005 | Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402) | TON | 30 | $120.00 | $120.00 | $120.00 |
| 0006 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 28,284 | $31.00 | $23.50 | $71.20 |
| 0007 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 1,678 | $950.00 | $1,300.00 | $900.00 |
| 0009 | Cold milling asphalt pavement (412002) | SY | 55,447 | $1.98 | $2.10 | $5.00 |
| 0010 | Asphalt concrete patching for maintenance of traffic (414011) | TON | 300 | $240.00 | $230.00 | $363.97 |
| 0011 | Achm patching of existing roadway (415011) | TON | 2,592 | $145.00 | $150.00 | $264.40 |
| 0012 | Scarifying concrete pavement (510012) | SY | 37.56 | $110.00 | $13.50 | $413.19 |
| 0013 | Maintenance of traffic (603010) | LS | 1 | $220,000 | $84,300 | $157,000 |
| 0014 | Signs (604003) | SF | 1,584 | $7.75 | $7.50 | $7.50 |
| 0015 | Construction pavement markings (604041) | LF | 437,184 | $0.30 | $0.30 | $0.30 |
| 0016 | 24" reinforced concrete pipe culverts (class IV) (605608) | LF | 86 | $270.00 | $345.00 | $262.22 |
| 0017 | 48" reinforced concrete pipe culverts (class IV) (605628) | LF | 80 | $480.00 | $685.00 | $412.06 |
| 0018 | 24" flared end sections for reinforced concrete pipe culverts (605858) | EACH | 1 | $2,700.00 | $2,500.00 | $6,003.24 |
| 0019 | 48" flared end sections for reinforced concrete pipe culverts (605866) | EACH | 4 | $4,800.00 | $5,800.00 | $5,599.60 |
| 0020 | Selected pipe bedding (606994) | CY | 30 | $54.00 | $22.00 | $158.40 |
| 0021 | Pavement repair over culverts (asphalt) (615022) | TON | 50 | $180.00 | $155.00 | $372.55 |
| 0022 | Water (620030) | MGAL | 0.90 | $10.00 | $10.00 | $10.00 |
| 0023 | Solid sodding (624001) | SY | 70 | $27.00 | $60.00 | $60.00 |
| 0024 | Roadway construction control (635001) | LS | 1 | $20,000 | $9,500.00 | $155,000 |
| 0025 | Rumble stripes in asphalt shoulders (642011) | LF | 78,144 | $0.14 | $0.22 | $0.13 |
| 0026 | Centerline rumble stripes in asphalt roadways (642102) | LF | 7,973 | $0.14 | $0.22 | $0.13 |
| 0027 | Loop wiring class III (1C/16 A.W.G.) (704036) | LF | 1,360 | $13.75 | $13.50 | $12.85 |
| 0028 | Reflectorized paint pavement marking white (10") (718004) | LF | 154 | $4.42 | $5.00 | $5.00 |
| 0029 | Thermoplastic pavement marking white (6") (719002) | LF | 111,228 | $0.70 | $1.00 | $0.85 |
| 0030 | Thermoplastic pavement marking white (8") (719003) | LF | 2,260 | $3.80 | $2.00 | $2.00 |
| 0031 | Thermoplastic pavement marking white (12") (719005) | LF | 502 | $11.00 | $5.00 | $5.00 |
| 0032 | Thermoplastic pavement marking yellow (6") (719102) | LF | 109,228 | $0.70 | $0.85 | $0.85 |
| 0033 | Thermoplastic pavement marking (yield line) (719200) | LF | 47 | $24.00 | $15.00 | $15.00 |
| 0034 | Thermoplastic pavement marking (words) (719201) | EACH | 7 | $350.00 | $350.00 | $350.00 |
| 0035 | Thermoplastic pavement marking (arrows) (719202) | EACH | 7 | $330.00 | $300.00 | $300.00 |
| 0036 | Raised pavement markers (type II) (721002) | EACH | 837 | $4.42 | $7.00 | $7.00 |
| 0037 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $190,000 | $125,000 | $252,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.