ARDOT contract SA2456 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO LEVEL AND SEAL APPROXIMATELY 9.70 MILES OF COUNTY ROADS 67 & 446 IN FRANKLIN COUNTY. THIS PROJECT CONSISTS OF FOG SEAL, ASPHALT SURFACE TREATMENT, ACHM SURFACE COURSE, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, Franklin. 2 bids received; low bid $658,674 by Emery Sapp & Sons, Inc..

Owner
Arkansas DOT
Letting
26 FEB 2025
Pay items
11
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Emery Sapp & Sons, Inc.$658,674Low
2Salt Creek Paving & Const. Co., Inc.$676,449+3.0%
ARDOT contract SA2456: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Emery Sapp & Sons, Inc.2. Salt Creek Paving & Const. Co., Inc.
0001Fog seal (type 2) (401005)GAL11,371$5.75$5.45
0002Tack coat (401011)GAL1,500$3.82$4.25
0003Mineral aggregate in asphalt surface treatment (class 2) (402102)TON1,990$57.27$64.33
0004Polymer modified cationic emulsified asphalt (CRS-2P) (solid polymer) (402204)GAL45,485$4.48$4.33
0005Mineral aggregate in achm surface course (3/8") (407161)TON939$146.24$198.91
0006Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON61$120.00$120.00
0007Achm patching of existing roadway (415011)TON170$330.00$250.00
0008Maintenance of traffic (603009)LS1$30,000$7,000.00
0009Signs (604003)SF588$9.68$8.00
0010Reflectorized paint pavement marking yellow (4") (718101)LF102,432$0.16$0.12
0011Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$17,000$22,543
ARDOT contract SA2456: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy