ARDOT contract SA4283 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 4.94 MILES OF COUNTY ROADS 33 AND 29 IN LOGAN COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TREATMENT, ACHM SURFACE COURSE, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, Logan. 3 bids received; low bid $329,336 by Salt Creek Paving & Const. Co., Inc..

Owner
Arkansas DOT
Letting
26 FEB 2025
Pay items
13
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Salt Creek Paving & Const. Co., Inc.$329,336Low
2Apac-Central, Inc.$330,5320.0%
3Emery Sapp & Sons, Inc.$336,916+2.0%
ARDOT contract SA4283: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Salt Creek Paving & Const. Co., Inc.2. Apac-Central, Inc.3. Emery Sapp & Sons, Inc.
0001Tack coat (401012)GAL900$4.25$3.50$3.74
0002Mineral aggregate in asphalt surface treatment (class 2) (402112)TON876$73.60$62.00$67.43
0003Polymer modified cationic emulsified asphalt (CRS-2P) (solid polymer) (402204)GAL20,442$4.74$5.65$4.76
0004Mineral aggregate in achm surface course (3/8") (407161)TON563$186.69$163.00$149.35
0005Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON37$120.00$120.00$120.00
0006Achm patching of existing roadway (415011)TON80$250.00$225.00$375.00
0007Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$13,972$15,000$16,000
0008Maintenance of traffic (603009)LS1$3,500.00$10,000$22,000
0009Signs (604003)SF295$10.00$10.77$12.11
0010Reflectorized paint pavement marking yellow (4") (718101)LF52,123$0.15$0.16$0.18
0011Standard sign (726002)SF177.50$20.00$21.55$24.23
0012Channel post sign support (type A) (729001)EACH3$85.00$91.58$102.96
0013Channel post sign support (type C) (729003)EACH30$85.00$91.58$102.96
ARDOT contract SA4283: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy