FDOT contract T7571 bid tabulation
SR 93 (I-275) NB/SB SKYWAY REST AREA. Let by Florida DOT on January 29, 2025, Pinellas, District 7. 3 bids received; low bid $714,390 by American Lighting and Signalization, LLC..
- Owner
- Florida DOT
- Letting
- 29 JAN 2025
- Pay items
- 33
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | American Lighting and Signalization, LLC. | $714,390 | Low |
| 2 | Highway Safety Devices, Inc. | $716,488 | 0.0% |
| 3 | New Era Electric Inc | $858,246 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. American Lighting and Signalization, LLC. | 2. Highway Safety Devices, Inc. | 3. New Era Electric Inc |
|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $101,678 | $68,150 | $80,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $81,830 | $25,500 | $110,000 |
| 0015 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $19,867 | $5,750.00 | $87,803 |
| 0020 | Fencing, type B, 0.0-5.0', standard features (0550-10210) | LF | 92 | $166.00 | $250.00 | $54.65 |
| 0025 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $35,000 | $35,000 | $35,000 |
| 0030 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 2 | $29,308 | $17,700 | $18,338 |
| 0035 | Embedded dynamic message furnish & install- with UPS, full color, 12-20 SF (0700-7132) | EACH | 2 | $29,113 | $28,500 | $46,139 |
| 0040 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.28 | $3,863.00 | $6,800.00 | $4,500.00 |
| 0045 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 7 | $1,749.00 | $3,100.00 | $2,263.95 |
| 0050 | Conduit, furnish & install, open trench (0630-2-11) | LF | 917 | $25.00 | $35.00 | $35.00 |
| 0055 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 970 | $31.00 | $57.00 | $45.00 |
| 0060 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 130 | $30.00 | $44.50 | $45.90 |
| 0065 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 2,004 | $4.00 | $7.30 | $4.75 |
| 0070 | Fiber optic connection, install, splice (0633-2-31) | EACH | 12 | $50.00 | $87.50 | $62.65 |
| 0075 | Fiber optic connection, install, termination (0633-2-32) | EACH | 36 | $83.00 | $145.00 | $101.25 |
| 0080 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 3 | $94.00 | $165.00 | $147.20 |
| 0085 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 3 | $1,253.00 | $2,200.00 | $1,830.00 |
| 0090 | Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51) | EACH | 3 | $1,021.00 | $1,800.00 | $1,550.00 |
| 0095 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 11 | $2,225.00 | $2,250.00 | $1,691.95 |
| 0100 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 5 | $3,667.00 | $4,100.00 | $3,110.20 |
| 0105 | Electrical power service, adjust/modify (0639-1500) | AS | 3 | $600.00 | $965.00 | $1,695.60 |
| 0110 | Electrical service wire, & install (0639-2-1) | LF | 1,111 | $7.00 | $22.50 | $13.45 |
| 0115 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 3 | $3,131.00 | $3,300.00 | $3,383.40 |
| 0120 | Electrical power service- transformer, F&I, 5-10 kva, phase, copper windings (0639-6121) | EACH | 3 | $1,559.00 | $3,750.00 | $2,900.00 |
| 0125 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 6 | $2,360.00 | $3,600.00 | $3,311.20 |
| 0130 | Concrete CCTV pole, furnish & install with lowering device, (0641-3163) | EACH | 1 | $54,586 | $74,400 | $55,000 |
| 0135 | ITS cabinet, furnish & install, pole mount with sunshield, 24" W X 46" H X 22" D (0676-2122) | EACH | 3 | $6,411.00 | $12,500 | $9,710.00 |
| 0140 | Small equipment enclosure, furnish and install, less than 10"W X 13"H X 11" D (0676-3-10) | EACH | 4 | $2,238.00 | $3,550.00 | $2,236.95 |
| 0145 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 1 | $8,272.00 | $7,750.00 | $7,707.30 |
| 0150 | ITS CCTV camera, F&I, stationary, IP, high definition (0682-1153) | EACH | 8 | $5,850.00 | $2,700.00 | $6,209.00 |
| 0155 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 3 | $6,617.00 | $6,800.00 | $7,500.00 |
| 0160 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 3 | $4,462.00 | $6,800.00 | $6,074.85 |
| 0165 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 3 | $1,087.00 | $1,450.00 | $1,344.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.