IDOT contract 62K78 bid tabulation

Section 2020-007-RS&SW. Let by Illinois DOT on September 19, 2025, Kane, District 01. 2 bids received; low bid $4,318,000 by Plote Construction, Inc..

Owner
Illinois DOT
Letting
19 SEP 2025
Pay items
119
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Plote Construction, Inc.$4,318,000Low
2Builders Paving, LLC$4,968,614+15%
IDOT contract 62K78: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Plote Construction, Inc.2. Builders Paving, LLC
1Constructn layout SPL (X0320050)LS1$15,000$15,000
2Ped signal post 10 FT (X1400367)EACH3$1,400.00$1,350.00
3Ped signal post 5 FT (X1400378)EACH6$1,100.00$1,100.00
4Rebld EX HD handhole (X1400450)EACH1$2,700.00$2,700.00
5Grading & shap SHLDRS (X2020110)UNIT71$250.00$200.00
6Temporary ramp SPL (X4060995)SY250$50.00$50.00
7CC&G RMVL repl < = 10 (X4400501)LF560$44.00$98.00
8CC&G RMVL repl > 10FT (X4400503)LF2,240$43.00$98.00
9SS cleaned 12 (X5537800)LF525$3.00$5.00
10FR & lids adjust SPL (X6030310)EACH25$1,200.00$1,450.00
11Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,750.00$4,000.00
12Rem RE-erect EX sign (X7240600)EACH5$150.00$3,500.00
13Accessible ped signal (X8760200)EACH16$1,600.00$1,560.00
14Conc FDN TY A 12D (X8780012)LF36$350.00$335.00
15Det loop repl (X8860105)LF955$35.00$31.00
16Construction layout (Z0013798)LS1$15,000$25,000
17Drainage STR cleaned (Z0018500)EACH35$325.00$400.00
18Temp info signing (Z0030850)SF104$15.00$18.00
19RE-optimize TR sig sys 1 (Z0033044)EACH2$650.00$650.00
20RR prot liability ins (Z0048665)LS1$3,500.00$9,000.00
21Trainees (Z0076600)HR500$0.80$0.80
22Trainees TPG (Z0076604)HR500$15.00$15.00
23Earth excavation (20200100)CY2,705$40.00$70.00
24Rem & disp uns matl (20201200)CY275$40.00$70.00
25Geotech fab F/GR stab (21001000)SY825$4.00$3.00
26Topsoil F & P 4 (21101615)SY550$8.00$15.00
27Grading & shap ditch (21400100)LF1,050$10.00$18.00
28Seeding CL 1 (25000100)ACRE0.25$8,000.00$50,000
29Erosion contr blanket (25100630)SY13$1.35$50.00
30Sodding salt tolerant (25200110)SY550$16.00$45.00
31Supple watering (25200200)UNIT2$100.00$115.00
32Temp eros contr seed (28000250)LB5$10.00$100.00
33Perimeter eros bar (28000400)LF90$6.00$15.00
34Temp eros contr blank (28001100)SY13$2.00$100.00
35Agg subgrade improve (30300001)CY275$55.00$100.00
36Agg subgrade impr 12 (30300112)SY4,675$30.00$45.00
37Sub gran mat B 4 (31101200)SY55$10.50$10.00
38Bit matls tack CT (40600290)LB45,315$0.01$0.01
39Long joint sealant (40600370)LF30,800$3.50$3.75
40Mix CR JTS flangewys (40600400)TON100$150.00$675.00
41HMA surf rem butt JT (40600982)SY440$30.00$10.00
42HMA BC IL-9.5 N70 (40602985)TON7,520$80.00$81.00
43P HMA SC IL-9.5 E N70 (40604172)TON6,580$103.00$105.00
44Protective coat (42001300)SY1,235$1.00$0.01
45PCC driveway pavt 8 (42300400)SY500$115.00$175.00
46PC conc sidewalk 5 (42400200)SF3,235$11.00$18.00
47Detectable warnings (42400800)SF255$40.00$30.00
48HMA surf rem 3 3/4 (44000164)SY67,135$3.50$6.00
49Drive pavement rem (44000200)SY500$11.00$25.00
50Sidewalk rem (44000600)SF2,915$2.00$3.00
51CL D patch T3 10 (44201769)SY20$175.00$37.00
52CL D patch T2 14 (44201815)SY1,100$200.00$37.00
53CL D patch T3 14 (44201819)SY400$199.00$37.00
54CL D patch T4 14 (44201821)SY600$198.00$37.00
55Aggregate SHLDS B (48101200)TON475$55.00$85.00
56HMA shoulders 8 (48203029)SY4,675$75.00$50.00
57Structure excavation (50200100)CY138$140.00$50.00
58Conc struct (50300225)CY27$1,400.00$3,950.00
59Form liner tex surf (50300285)SF195$40.00$15.00
60Reinf bars, epoxy CTD (50800205)LB2,780$3.50$3.00
61Pipe handrail (50901760)LF117$150.00$410.00
62Granular backfill STR (58600101)CY104$100.00$50.00
63Geocomposite wall DR (59100100)SY210$45.00$1.00
64P undr for struct 4 (60146304)LF85$50.00$10.00
65Man adjust (60255500)EACH3$500.00$750.00
66VV adjust (60265700)EACH3$500.00$850.00
67FR & grates adjust (60300105)EACH15$475.00$750.00
68Frames T23 (60401030)EACH5$395.00$500.00
69FR & lids T1 OL (60406000)EACH10$385.00$500.00
70Non SPL waste disposl (66900200)CY2,705$80.00$125.00
71Soil disposal analy (66900530)EACH6$1,200.00$900.00
72Reg sub P-const plan (66901001)LS1$3,200.00$6,500.00
73Reg sub F con report (66901003)LS1$2,000.00$500.00
74Reg sub mon (66901006)CAL DAY10$1,000.00$1,500.00
75Mobilization (67100100)LS1$245,000$310,000
76Traf cont-prot 701201 (70100450)LS1$1.00$1.00
77Traf cont-prot 701326 (70100500)LS1$1.00$1.00
78Traf cont-prot 701336 (70100600)LS1$1.00$1.00
79TR cont & prot 701501 (70102620)LS1$241,056$320,000
80TR cont & prot 701502 (70102622)LS1$1.00$1.00
81TR cont & prot 701606 (70102625)LS1$1.00$1.00
82TR cont & prot 701611 (70102634)LS1$1.00$1.00
83TR cont & prot 701701 (70102635)LS1$1.00$1.00
84TR cont & prot 701801 (70102640)LS1$1.00$25,000
85TR cont surveillance (70103815)CAL DAY30$100.00$500.00
86Short term pavt mking (70300100)LF57,590$0.01$0.01
87SHRT TRM pavt MK rem (70300150)SF11,580$0.01$0.01
88Temp PVT MK LTR & sym paint (70300211)SF3,375$0.01$0.01
89Temp PVT MK line 4 - paint (70300221)LF88,770$0.01$0.01
90Temp PVT MK line 6 - paint (70300241)LF17,040$0.01$0.01
91Temp PVT MK line 8 - paint (70300251)LF2,250$0.01$0.01
92Temp PVT MK line 12 - paint (70300261)LF5,280$0.01$0.01
93Temp PVT MK line 24 - paint (70300281)LF1,140$0.01$0.01
94Temp PVT MK L4 T4 tape (70307120)LF38,165$0.01$0.01
95THPL PVT MK LTR & sym (78000100)SF1,125$4.95$6.00
96THPL PVT MK line 4 (78000200)LF29,590$0.73$0.80
97THPL PVT MK line 6 (78000400)LF5,680$0.92$1.00
98THPL PVT MK line 8 (78000500)LF750$1.30$2.00
99THPL PVT MK line 12 (78000600)LF1,760$2.45$3.50
100THPL PVT MK line 24 (78000650)LF385$4.95$7.00
101Raised refl pavt MKR (78100100)EACH730$32.00$45.00
102Raised ref PVT MK rem (78300200)EACH730$20.00$20.00
103Serv install pole MT (80500020)EACH2$3,000.00$3,000.00
104Undrgrd C galvs 2 (81028200)LF209$60.00$60.00
105Undrgrd C galvs 4 (81028240)LF421$80.00$80.00
106HD handhole (81400200)EACH1$6,020.00$6,100.00
107Main EX TR sig instal (85000200)EACH3$3,080.00$3,100.00
108Ground HH FR & cover (87300010)EACH8$255.00$255.00
109Elcbl C signal 14 2C (87301215)LF1,950$3.30$3.30
110Elcbl C signal 14 3C (87301225)LF457$3.50$3.50
111Elcbl C lead 14 1PR (87301305)LF305$3.60$3.60
112Elcbl C serv 6 2C (87301805)LF204$5.75$5.70
113Elcbl C egrdc 6 1C (87301900)LF1,365$4.25$4.50
114Drill EX handhole (87900200)EACH22$470.00$470.00
115Det loop T1 (88600100)LF919$31.00$31.00
116Reloc EX ped sig head (89500200)EACH3$335.00$335.00
117Rem elcbl FR con (89502300)LF393$3.00$3.00
118Remov EX TS equip (89502375)EACH2$200.00$190.00
119Rebuild EX handhole (89502376)EACH5$2,300.00$2,300.00
IDOT contract 62K78: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy