IDOT contract 62K78 bid tabulation
Section 2020-007-RS&SW. Let by Illinois DOT on September 19, 2025, Kane, District 01. 2 bids received; low bid $4,318,000 by Plote Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 119
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Plote Construction, Inc. | $4,318,000 | Low |
| 2 | Builders Paving, LLC | $4,968,614 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Plote Construction, Inc. | 2. Builders Paving, LLC |
|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $15,000 | $15,000 |
| 2 | Ped signal post 10 FT (X1400367) | EACH | 3 | $1,400.00 | $1,350.00 |
| 3 | Ped signal post 5 FT (X1400378) | EACH | 6 | $1,100.00 | $1,100.00 |
| 4 | Rebld EX HD handhole (X1400450) | EACH | 1 | $2,700.00 | $2,700.00 |
| 5 | Grading & shap SHLDRS (X2020110) | UNIT | 71 | $250.00 | $200.00 |
| 6 | Temporary ramp SPL (X4060995) | SY | 250 | $50.00 | $50.00 |
| 7 | CC&G RMVL repl < = 10 (X4400501) | LF | 560 | $44.00 | $98.00 |
| 8 | CC&G RMVL repl > 10FT (X4400503) | LF | 2,240 | $43.00 | $98.00 |
| 9 | SS cleaned 12 (X5537800) | LF | 525 | $3.00 | $5.00 |
| 10 | FR & lids adjust SPL (X6030310) | EACH | 25 | $1,200.00 | $1,450.00 |
| 11 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,750.00 | $4,000.00 |
| 12 | Rem RE-erect EX sign (X7240600) | EACH | 5 | $150.00 | $3,500.00 |
| 13 | Accessible ped signal (X8760200) | EACH | 16 | $1,600.00 | $1,560.00 |
| 14 | Conc FDN TY A 12D (X8780012) | LF | 36 | $350.00 | $335.00 |
| 15 | Det loop repl (X8860105) | LF | 955 | $35.00 | $31.00 |
| 16 | Construction layout (Z0013798) | LS | 1 | $15,000 | $25,000 |
| 17 | Drainage STR cleaned (Z0018500) | EACH | 35 | $325.00 | $400.00 |
| 18 | Temp info signing (Z0030850) | SF | 104 | $15.00 | $18.00 |
| 19 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 2 | $650.00 | $650.00 |
| 20 | RR prot liability ins (Z0048665) | LS | 1 | $3,500.00 | $9,000.00 |
| 21 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 |
| 22 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 23 | Earth excavation (20200100) | CY | 2,705 | $40.00 | $70.00 |
| 24 | Rem & disp uns matl (20201200) | CY | 275 | $40.00 | $70.00 |
| 25 | Geotech fab F/GR stab (21001000) | SY | 825 | $4.00 | $3.00 |
| 26 | Topsoil F & P 4 (21101615) | SY | 550 | $8.00 | $15.00 |
| 27 | Grading & shap ditch (21400100) | LF | 1,050 | $10.00 | $18.00 |
| 28 | Seeding CL 1 (25000100) | ACRE | 0.25 | $8,000.00 | $50,000 |
| 29 | Erosion contr blanket (25100630) | SY | 13 | $1.35 | $50.00 |
| 30 | Sodding salt tolerant (25200110) | SY | 550 | $16.00 | $45.00 |
| 31 | Supple watering (25200200) | UNIT | 2 | $100.00 | $115.00 |
| 32 | Temp eros contr seed (28000250) | LB | 5 | $10.00 | $100.00 |
| 33 | Perimeter eros bar (28000400) | LF | 90 | $6.00 | $15.00 |
| 34 | Temp eros contr blank (28001100) | SY | 13 | $2.00 | $100.00 |
| 35 | Agg subgrade improve (30300001) | CY | 275 | $55.00 | $100.00 |
| 36 | Agg subgrade impr 12 (30300112) | SY | 4,675 | $30.00 | $45.00 |
| 37 | Sub gran mat B 4 (31101200) | SY | 55 | $10.50 | $10.00 |
| 38 | Bit matls tack CT (40600290) | LB | 45,315 | $0.01 | $0.01 |
| 39 | Long joint sealant (40600370) | LF | 30,800 | $3.50 | $3.75 |
| 40 | Mix CR JTS flangewys (40600400) | TON | 100 | $150.00 | $675.00 |
| 41 | HMA surf rem butt JT (40600982) | SY | 440 | $30.00 | $10.00 |
| 42 | HMA BC IL-9.5 N70 (40602985) | TON | 7,520 | $80.00 | $81.00 |
| 43 | P HMA SC IL-9.5 E N70 (40604172) | TON | 6,580 | $103.00 | $105.00 |
| 44 | Protective coat (42001300) | SY | 1,235 | $1.00 | $0.01 |
| 45 | PCC driveway pavt 8 (42300400) | SY | 500 | $115.00 | $175.00 |
| 46 | PC conc sidewalk 5 (42400200) | SF | 3,235 | $11.00 | $18.00 |
| 47 | Detectable warnings (42400800) | SF | 255 | $40.00 | $30.00 |
| 48 | HMA surf rem 3 3/4 (44000164) | SY | 67,135 | $3.50 | $6.00 |
| 49 | Drive pavement rem (44000200) | SY | 500 | $11.00 | $25.00 |
| 50 | Sidewalk rem (44000600) | SF | 2,915 | $2.00 | $3.00 |
| 51 | CL D patch T3 10 (44201769) | SY | 20 | $175.00 | $37.00 |
| 52 | CL D patch T2 14 (44201815) | SY | 1,100 | $200.00 | $37.00 |
| 53 | CL D patch T3 14 (44201819) | SY | 400 | $199.00 | $37.00 |
| 54 | CL D patch T4 14 (44201821) | SY | 600 | $198.00 | $37.00 |
| 55 | Aggregate SHLDS B (48101200) | TON | 475 | $55.00 | $85.00 |
| 56 | HMA shoulders 8 (48203029) | SY | 4,675 | $75.00 | $50.00 |
| 57 | Structure excavation (50200100) | CY | 138 | $140.00 | $50.00 |
| 58 | Conc struct (50300225) | CY | 27 | $1,400.00 | $3,950.00 |
| 59 | Form liner tex surf (50300285) | SF | 195 | $40.00 | $15.00 |
| 60 | Reinf bars, epoxy CTD (50800205) | LB | 2,780 | $3.50 | $3.00 |
| 61 | Pipe handrail (50901760) | LF | 117 | $150.00 | $410.00 |
| 62 | Granular backfill STR (58600101) | CY | 104 | $100.00 | $50.00 |
| 63 | Geocomposite wall DR (59100100) | SY | 210 | $45.00 | $1.00 |
| 64 | P undr for struct 4 (60146304) | LF | 85 | $50.00 | $10.00 |
| 65 | Man adjust (60255500) | EACH | 3 | $500.00 | $750.00 |
| 66 | VV adjust (60265700) | EACH | 3 | $500.00 | $850.00 |
| 67 | FR & grates adjust (60300105) | EACH | 15 | $475.00 | $750.00 |
| 68 | Frames T23 (60401030) | EACH | 5 | $395.00 | $500.00 |
| 69 | FR & lids T1 OL (60406000) | EACH | 10 | $385.00 | $500.00 |
| 70 | Non SPL waste disposl (66900200) | CY | 2,705 | $80.00 | $125.00 |
| 71 | Soil disposal analy (66900530) | EACH | 6 | $1,200.00 | $900.00 |
| 72 | Reg sub P-const plan (66901001) | LS | 1 | $3,200.00 | $6,500.00 |
| 73 | Reg sub F con report (66901003) | LS | 1 | $2,000.00 | $500.00 |
| 74 | Reg sub mon (66901006) | CAL DAY | 10 | $1,000.00 | $1,500.00 |
| 75 | Mobilization (67100100) | LS | 1 | $245,000 | $310,000 |
| 76 | Traf cont-prot 701201 (70100450) | LS | 1 | $1.00 | $1.00 |
| 77 | Traf cont-prot 701326 (70100500) | LS | 1 | $1.00 | $1.00 |
| 78 | Traf cont-prot 701336 (70100600) | LS | 1 | $1.00 | $1.00 |
| 79 | TR cont & prot 701501 (70102620) | LS | 1 | $241,056 | $320,000 |
| 80 | TR cont & prot 701502 (70102622) | LS | 1 | $1.00 | $1.00 |
| 81 | TR cont & prot 701606 (70102625) | LS | 1 | $1.00 | $1.00 |
| 82 | TR cont & prot 701611 (70102634) | LS | 1 | $1.00 | $1.00 |
| 83 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $1.00 |
| 84 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $25,000 |
| 85 | TR cont surveillance (70103815) | CAL DAY | 30 | $100.00 | $500.00 |
| 86 | Short term pavt mking (70300100) | LF | 57,590 | $0.01 | $0.01 |
| 87 | SHRT TRM pavt MK rem (70300150) | SF | 11,580 | $0.01 | $0.01 |
| 88 | Temp PVT MK LTR & sym paint (70300211) | SF | 3,375 | $0.01 | $0.01 |
| 89 | Temp PVT MK line 4 - paint (70300221) | LF | 88,770 | $0.01 | $0.01 |
| 90 | Temp PVT MK line 6 - paint (70300241) | LF | 17,040 | $0.01 | $0.01 |
| 91 | Temp PVT MK line 8 - paint (70300251) | LF | 2,250 | $0.01 | $0.01 |
| 92 | Temp PVT MK line 12 - paint (70300261) | LF | 5,280 | $0.01 | $0.01 |
| 93 | Temp PVT MK line 24 - paint (70300281) | LF | 1,140 | $0.01 | $0.01 |
| 94 | Temp PVT MK L4 T4 tape (70307120) | LF | 38,165 | $0.01 | $0.01 |
| 95 | THPL PVT MK LTR & sym (78000100) | SF | 1,125 | $4.95 | $6.00 |
| 96 | THPL PVT MK line 4 (78000200) | LF | 29,590 | $0.73 | $0.80 |
| 97 | THPL PVT MK line 6 (78000400) | LF | 5,680 | $0.92 | $1.00 |
| 98 | THPL PVT MK line 8 (78000500) | LF | 750 | $1.30 | $2.00 |
| 99 | THPL PVT MK line 12 (78000600) | LF | 1,760 | $2.45 | $3.50 |
| 100 | THPL PVT MK line 24 (78000650) | LF | 385 | $4.95 | $7.00 |
| 101 | Raised refl pavt MKR (78100100) | EACH | 730 | $32.00 | $45.00 |
| 102 | Raised ref PVT MK rem (78300200) | EACH | 730 | $20.00 | $20.00 |
| 103 | Serv install pole MT (80500020) | EACH | 2 | $3,000.00 | $3,000.00 |
| 104 | Undrgrd C galvs 2 (81028200) | LF | 209 | $60.00 | $60.00 |
| 105 | Undrgrd C galvs 4 (81028240) | LF | 421 | $80.00 | $80.00 |
| 106 | HD handhole (81400200) | EACH | 1 | $6,020.00 | $6,100.00 |
| 107 | Main EX TR sig instal (85000200) | EACH | 3 | $3,080.00 | $3,100.00 |
| 108 | Ground HH FR & cover (87300010) | EACH | 8 | $255.00 | $255.00 |
| 109 | Elcbl C signal 14 2C (87301215) | LF | 1,950 | $3.30 | $3.30 |
| 110 | Elcbl C signal 14 3C (87301225) | LF | 457 | $3.50 | $3.50 |
| 111 | Elcbl C lead 14 1PR (87301305) | LF | 305 | $3.60 | $3.60 |
| 112 | Elcbl C serv 6 2C (87301805) | LF | 204 | $5.75 | $5.70 |
| 113 | Elcbl C egrdc 6 1C (87301900) | LF | 1,365 | $4.25 | $4.50 |
| 114 | Drill EX handhole (87900200) | EACH | 22 | $470.00 | $470.00 |
| 115 | Det loop T1 (88600100) | LF | 919 | $31.00 | $31.00 |
| 116 | Reloc EX ped sig head (89500200) | EACH | 3 | $335.00 | $335.00 |
| 117 | Rem elcbl FR con (89502300) | LF | 393 | $3.00 | $3.00 |
| 118 | Remov EX TS equip (89502375) | EACH | 2 | $200.00 | $190.00 |
| 119 | Rebuild EX handhole (89502376) | EACH | 5 | $2,300.00 | $2,300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.