IDOT contract 62U88 bid tabulation
Section FAP. Let by Illinois DOT on January 17, 2025, Will, District 01. 4 bids received; low bid $9,653,442 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 44
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $9,653,442 | Low |
| 2 | Gallagher Asphalt Corporation | $10,332,568 | +7.0% |
| 3 | Austin Tyler Construction, Inc. | $10,367,460 | +7.0% |
| 4 | D. Construction, Inc. | $15,297,931 | +58% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. Gallagher Asphalt Corporation | 3. Austin Tyler Construction, Inc. | 4. D. Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Serv instl GR MT MTR (X1400150) | EACH | 1 | $4,535.00 | $4,535.00 | $10,000 | $11,000 |
| 2 | CL D patch T3 12 SPL (X4420828) | SY | 1,235 | $85.98 | $170.00 | $99.20 | $137.00 |
| 3 | CL D patch T2 12 SPL (X4421790) | SY | 485 | $153.00 | $210.00 | $98.00 | $138.00 |
| 4 | CL D patch T4 12 SPL (X4421791) | SY | 89,005 | $85.98 | $83.00 | $81.15 | $130.00 |
| 5 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,000.00 | $3,800.00 | $4,000.00 | $5,000.00 |
| 6 | Det loop repl (X8860105) | LF | 78 | $27.38 | $27.39 | $25.00 | $27.50 |
| 7 | Vid veh det sys SN AP (X8891009) | EACH | 1 | $15,320 | $15,319 | $25,000 | $27,500 |
| 8 | Temp info signing (Z0030850) | SF | 104 | $16.71 | $30.00 | $20.00 | $30.00 |
| 9 | Trainees TPG (Z0076604) | HR | 3,000 | $15.00 | $15.00 | $15.00 | $15.00 |
| 10 | Earth excavation (20200100) | CY | 15,426 | $0.01 | $0.01 | $37.00 | $0.01 |
| 11 | Rem & disp uns matl (20201200) | CY | 1,714 | $128.00 | $50.00 | $38.15 | $40.00 |
| 12 | Geotech fab F/GR stab (21001000) | SY | 9,075 | $0.01 | $3.00 | $3.00 | $7.00 |
| 13 | Agg subgrade impr 12 (30300112) | SY | 9,075 | $0.01 | $42.00 | $30.30 | $50.00 |
| 14 | Sub gran mat B 4 (31101200) | SY | 81,650 | $6.57 | $0.01 | $12.00 | $17.00 |
| 15 | Shoulder rum strip 8 (64200108) | LF | 13,675 | $1.30 | $1.20 | $1.10 | $0.85 |
| 16 | Non SPL waste disposl (66900200) | CY | 535 | $84.00 | $80.00 | $68.00 | $70.00 |
| 17 | Soil disposal analy (66900530) | EACH | 2 | $1,500.00 | $1,740.00 | $1,740.00 | $3,630.00 |
| 18 | Reg sub P-const plan (66901001) | LS | 1 | $3,300.00 | $2,700.00 | $2,700.00 | $2,750.00 |
| 19 | Reg sub F con report (66901003) | LS | 1 | $1,300.00 | $2,300.00 | $2,300.00 | $2,750.00 |
| 20 | Reg sub mon (66901006) | CAL DAY | 30 | $680.00 | $998.00 | $1,000.00 | $1,200.00 |
| 21 | Mobilization (67100100) | LS | 1 | $585,000 | $608,399 | $165,000 | $760,000 |
| 22 | Traf cont-prot 701421 (70100310) | LS | 1 | $134,000 | $1,177,565 | $275,000 | $200,000 |
| 23 | TR cont & prot 701501 (70102620) | LS | 1 | $1.00 | $50.00 | $0.01 | $0.01 |
| 24 | TR cont & prot 701601 (70102630) | LS | 1 | $1.00 | $50.00 | $0.01 | $0.01 |
| 25 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $50.00 | $0.01 | $0.01 |
| 26 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $50.00 | $0.01 | $0.01 |
| 27 | Short term pavt mking (70300100) | LF | 83,010 | $0.01 | $0.01 | $2.00 | $1.13 |
| 28 | SHRT TRM pavt MK rem (70300150) | SF | 27,670 | $0.01 | $0.01 | $3.00 | $2.00 |
| 29 | Mod ureth PM LTR-sym (78009000) | SF | 805 | $4.75 | $5.00 | $5.00 | $5.50 |
| 30 | Mod ureth PM line 4 (78009004) | LF | 112,790 | $0.60 | $0.55 | $0.60 | $0.66 |
| 31 | Mod ureth PM line 6 (78009006) | LF | 5,600 | $0.70 | $0.75 | $0.75 | $0.83 |
| 32 | Mod ureth PM line 8 (78009008) | LF | 1,550 | $0.80 | $1.65 | $1.65 | $1.82 |
| 33 | Mod ureth PM line 12 (78009012) | LF | 840 | $1.25 | $3.05 | $3.05 | $3.36 |
| 34 | Mod ureth PM line 24 (78009024) | LF | 490 | $4.75 | $5.00 | $5.00 | $5.50 |
| 35 | Raised refl pavt MKR (78100100) | EACH | 975 | $38.00 | $30.00 | $33.00 | $36.30 |
| 36 | Raised ref PVT MK rem (78300200) | EACH | 975 | $11.00 | $10.00 | $7.00 | $9.00 |
| 37 | Main EX TR sig instal (85000200) | EACH | 1 | $1,800.00 | $1,800.00 | $7,400.00 | $8,102.60 |
| 38 | Elcbl C serv 6 2C (87301805) | LF | 120 | $25.33 | $25.33 | $7.00 | $7.70 |
| 39 | Elcbl C egrdc 6 1C (87301900) | LF | 120 | $8.70 | $8.70 | $3.50 | $3.85 |
| 40 | Conc FDN TY A (87800100) | LF | 4 | $812.50 | $812.50 | $700.00 | $770.00 |
| 41 | Det loop T1 (88600100) | LF | 319 | $27.39 | $27.39 | $25.00 | $27.50 |
| 42 | Rem elcbl FR con (89502300) | LF | 287 | $1.10 | $1.10 | $4.00 | $4.40 |
| 43 | Remov EX TS equip (89502375) | EACH | 1 | $1,120.00 | $1,120.00 | $1,000.00 | $1,100.00 |
| 44 | Remov EX handhole (89502380) | EACH | 1 | $1,560.00 | $1,560.00 | $1,500.00 | $1,650.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.