IDOT contract 62V88 bid tabulation

Section FAP. Let by Illinois DOT on June 13, 2025, Dupage, District 01. 2 bids received; low bid $1,208,153 by R. W. Dunteman Company.

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
101
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1R. W. Dunteman Company$1,208,153Low
2K-Five Construction Corporation$1,374,611+14%
IDOT contract 62V88: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. R. W. Dunteman Company2. K-Five Construction Corporation
1Weed cont aquatic (K0029614)GAL1$2,300.00$2,459.26
2Weed cont broadlf TRF (K0029629)LB1$15,500$16,573
3Constructn layout SPL (X0320050)LS1$5,000.00$1,603.87
4Ped signal post 10 FT (X1400367)EACH1$1,500.30$2,199.54
5Ped signal post 5 FT (X1400378)EACH2$1,195.40$1,790.61
6Rebld EX HD handhole (X1400450)EACH1$3,418.89$3,446.98
7Tree remov acres SPL (X2010350)ACRE1$7,800.00$8,340.10
8Grading & shap SHLDRS (X2020110)UNIT35$140.00$158.45
9Mowing SPL (X2503110)ACRE2$2,100.00$2,245.41
10Temporary ramp SPL (X4060995)SY185$28.00$11.18
11SS cleaned 12 (X5537800)LF300$3.00$3.21
12FR & lids adjust SPL (X6030310)EACH5$2,000.00$2,138.49
13Vert adj of guardrail (X6330900)LF100$50.00$24.13
14Engrs FLD ofc TY A D1 (X6700407)CAL MO6$3,000.00$3,000.00
15Temp info signing (X7200061)SF104$15.00$16.04
16Fac in exist cab (X8570215)EACH1$10,669$11,436
17Accessible ped signal (X8760200)EACH6$1,911.69$2,364.15
18Conc FDN TY A 12D (X8780012)LF12$394.40$459.11
19Drainage STR cleaned (Z0018500)EACH20$350.00$374.24
20RE-optimize TR sig sys 1 (Z0033044)EACH1$525.00$729.76
21Rem & reset posts (Z0051400)EACH40$200.00$213.85
22Tree remov over 15 (20100210)UNIT75$35.00$37.42
23Earth excavation (20200100)CY1,250$46.41$102.35
24Geotech fab F/GR stab (21001000)SY225$3.71$2.00
25Topsoil F & P 2 (21101605)SY4,840$3.00$3.21
26Topsoil F & P 4 (21101615)SY86$12.00$12.83
27Seeding CL 2A (25000210)ACRE1$5,000.00$5,346.22
28Nitrogen fert nutr (25000400)LB90$3.00$3.21
29Potassium fert nutr (25000600)LB90$3.00$3.21
30Mowing (25000750)ACRE5$500.00$534.62
31Erosion contr blanket (25100630)SY4,840$1.10$1.18
32Sodding salt tolerant (25200110)SY86$20.00$21.38
33Perimeter eros bar (28000400)LF435$3.50$3.74
34Agg subgrade improve (30300001)CY75$69.36$69.00
35Agg subgrade impr 12 (30300112)SY2,235$20.37$31.84
36Bit matls tack CT (40600290)LB10,165$1.04$0.01
37Long joint sealant (40600370)LF4,100$4.05$4.74
38Mix CR JTS flangewys (40600400)TON25$367.40$100.00
39HMA surf rem butt JT (40600982)SY175$21.36$37.07
40HMA BC IL-9.5 N70 (40602985)TON1,425$96.23$94.95
41P HMA SC SMA 9.5 F N80 (40605026)TON1,475$122.41$137.90
42Protective coat (42001300)SY200$1.07$1.00
43PC conc sidewalk 5 (42400200)SF1,295$8.76$15.50
44Detectable warnings (42400800)SF75$38.70$34.75
45HMA surf rem 1 3/4 (44000156)SY2,350$3.00$6.04
46HMA surf rem 3 3/4 (44000164)SY12,705$3.90$6.45
47Comb curb gutter rem (44000500)LF325$13.40$17.64
48Sidewalk rem (44000600)SF1,265$2.86$5.61
49CL D patch T1 14 (44201811)SY20$200.00$85.00
50CL D patch T2 14 (44201815)SY60$160.00$84.00
51CL D patch T3 14 (44201819)SY50$130.00$83.00
52CL D patch T4 14 (44201821)SY30$130.00$80.00
53Aggregate SHLDS B (48101200)TON228$42.13$71.75
54HMA shoulders 8 (48203029)SY2,235$41.93$47.65
55Man adj new T1F CL (60255800)EACH1$1,450.00$1,550.40
56FR & lids T1 OL (60406000)EACH1$650.00$695.01
57Comb CC&G TB6.12 (60603800)LF215$47.48$55.87
58Comb CC&G TY B-6.24 (60605000)LF110$51.90$79.50
59SPBGR TY A 6FT posts (63000001)LF200$29.64$48.88
60TR bar TRM T1 SPL tan (63100167)EACH4$3,368.00$4,101.23
61Guardrail remov (63200310)LF200$9.88$23.36
62Non SPL waste disposl (66900200)CY1,250$58.96$55.00
63Soil disposal analy (66900530)EACH2$1,100.00$1,619.85
64Reg sub P-const plan (66901001)LS1$4,400.00$3,463.14
65Reg sub F con report (66901003)LS1$500.00$1,340.57
66Reg sub mon (66901006)CAL DAY10$700.00$759.65
67Mobilization (67100100)LS1$78,000$82,000
68TR cont & prot 701501 (70102620)LS1$32,830$68,000
69TR cont & prot 701502 (70102622)LS1$1.00$1.00
70TR cont & prot 701701 (70102635)LS1$1.00$1.00
71TR cont & prot 701801 (70102640)LS1$1.00$1.00
72Short term pavt mking (70300100)LF16,350$0.01$0.01
73SHRT TRM pavt MK rem (70300150)SF5,450$0.50$0.01
74Temp PVT MK LTR & sym paint (70300211)SF580$1.25$0.01
75Temp PVT MK line 4 - paint (70300221)LF86,300$0.31$0.01
76Temp PVT MK line 6 - paint (70300241)LF5,840$0.45$0.01
77Temp PVT MK line 12 - paint (70300261)LF4,280$1.00$0.01
78Temp PVT MK line 24 - paint (70300281)LF780$1.60$0.01
79Temp PVT MK L4 T4 tape (70307120)LF3,270$1.40$0.01
80Sign panel T1 (72000100)SF17$34.00$36.35
81Terminal marker - DA (72501000)EACH4$40.00$59.60
82Teles STL sin support (72800100)LF15$16.00$17.11
83THPL PVT MK LTR & sym (78000100)SF145$5.00$6.42
84THPL PVT MK line 4 (78000200)LF21,575$0.89$0.76
85THPL PVT MK line 6 (78000400)LF1,460$1.38$1.02
86THPL PVT MK line 12 (78000600)LF1,070$2.76$3.21
87THPL PVT MK line 24 (78000650)LF195$5.52$6.42
88Raised refl pavt MKR (78100100)EACH255$47.50$42.77
89Grdrail ref type A (78200005)EACH10$12.00$22.30
90Raised ref PVT MK rem (78300200)EACH255$15.56$10.00
91Undrgrd C galvs 2 (81028200)LF66$60.69$34.27
92Main EX TR sig instal (85000200)EACH1$525.00$3,485.74
93Elcbl C signal 14 2C (87301215)LF593$2.62$1.13
94Elcbl C signal 14 3C (87301225)LF563$2.78$1.30
95Elcbl C egrdc 6 1C (87301900)LF71$3.35$3.07
96Drill EX handhole (87900200)EACH3$779.10$844.70
97Ped SH LED 1F BM CDT (88102717)EACH6$1,109.10$740.45
98Det loop T1 (88600100)LF580$29.77$33.90
99Rem elcbl FR con (89502300)LF230$2.23$0.67
100Remov EX TS equip (89502375)EACH1$3,338.99$1,413.41
101Rebuild EX handhole (89502376)EACH3$2,445.99$716.39
IDOT contract 62V88: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy